ISO Types 1-6: Construction Code Descriptions

Similar documents
EMERGENCY MANAGEMENT PREPAREDNESS AND ASSISTANCE TRUST FUND ARC 4496 Evaluation Questionnaire

Module number 3 provides an on-line, self-paced training seminar on chapter 4, foundations and chapter 5, floors from the residential code of ohio.

SUBJECT: NEW 2000 INTERNATIONAL RESIDENTIAL CODE (IRC) DATE:

Stone and Masonry Veneer

Fundamentals of Building Construction: Materials and Methods

Carroll County Bureau of Permits and Inspection Residential Code Compliance Guidelines Detached Garage

ACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings

STEEL STRUCTURAL SYSTEMS

A PROGRAM OF IBHS COMMERCIAL

THE FLORIDA BUILDING CODE

Minimum Requirements For One & Two Family Structures FBC 6 th Edition (2017)

The better way to build TM. Installation Manual NAILBASE PANELS

APPENDIX DETAIL (1) INSULATION HAS 3-INCH TOP INSPECTION GAP AND EXTENDS 24 INCHES BELOW GRADE

BVSC BVSC. Midwest Technical Inspections Survey Worksheet. Account / Account Code: Insured: Policy #: Building Data - Section 1

R-Matte Plus-3: Insulation for the Building Envelope

assembly an open space between the roof and ceiling of a building attic balloon frame a joist constructed of steel with bars in the verticle web space

POST AND FRAME STRUCTURES (Pole Barns)

POST AND FRAME STRUCTURES (Pole Barns)

Administrative Changes

The Structural Redesign of Boyds Bear Country and its Related Systems. Boyds Bear Country, Pigeon Forge, Tennessee

A PROGRAM OF IBHS COMMERCIAL

Thermal Characteristics of Exterior Building Wall (Above Heritage Building

WOOD USE IN NONCOMBUSTIBLE BUILDINGS

COPYRIGHTED MATERIAL. Contents. 1 Making Buildings 3. 3 Wood Foundations and. Preface to the Sixth Edition xi. Sitework 31

Uniform Mitigation Verification Inspection Form Maintain a copy of this form with the insurance policy

Framing Methods Structural Components

Introduction. This Part One will address; Type 1 Fire Resistive and Type 2 Noncombustible buildings.

North Shore at Canton Baltimore, MD Beau Menard Technical Report 1

U.S. EDITION RESIDENTIAL CONSTRUCTION DETAILS SAMPLE. A visual guide to construction detailing. Emma Walshaw

Interior FRT Wood. References of Previous Model Building Codes

GARAGE MAIN FLOOR PLAN

TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS

GARAGE MAIN FLOOR PLAN

0103 Plan Reading 4% Read plans to verify the project conforms with the code, approved plans, and construction documents.

SPECIAL INSPECTION AGREEMENT

CALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE 01. GENERAL ADMINISTRATION 6% Project Administration 1%

City of Republic Community Development Department. Residential Roofs REVISION DATE: JANUARY 2017

Pro-Con Structural Study of Alternate Floor Systems

Masonry Veneer - Chapter 6. Masonry Veneer Anchored Veneer

Uniform Mitigation Verification Inspection Form Maintain a copy of this form and any documentation provided with the insurance policy

Uniform Mitigation Verification Inspection Form Maintain a copy of this form and any documentation provided with the insurance policy

2007 SHELTER RETROFIT PROJECT SUBMITTAL Ref: Section (3), Florida Statutes

Uniform Mitigation Verification Inspection Form Maintain a copy of this form with the insurance policy

Covering Design Regions

ZARA & ASSOCIATES, INC. Peter L. Zara 8435 Sunrise Lake Blvd -# Sunrise, Florida Phone

Christopher North Builders, INC.

Roof & Deck Insulation / PLA BuyLine Insulation Systems for. Roofing Applications

Christopher North Builders INC

FirstEnergy Program Overview

GARAGE MAIN FLOOR PLAN

1. Asphalt / Fiberglass Shingle / / 2. Concrete / Clay Tile 05_/_01 /_ Metal / / 4. Built Up / / 5. Membrane / / 6.

CHAPTER 6 TYPES OF CONSTRUCTION

NC 2009 Residential Code changes (Highlights on changes between the 2006 and 2009 NC Residential Code)

HOOVER TREATED WOOD PRODUCTS, INC. TECHNICAL NOTE FOR ADDITIONAL INFORMATION: TEC-WOOD ( )

Go Green Thermal Imaging, LLC P.O. Box 1523 Hobe Sound, FL Phone: GGTI (4484)

The better way to build TM. Installation Manual FOUNDATION SIPs & FROST WALLS SIPs

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

GARAGE MAIN FLOOR PLAN

AN INSURANCE APPRAISAL FOR

2018 IBC Chapter 6 Types of Construction

2018 British Columbia Building Code Public Review of Proposed Changes

Building Division Informational Handout

Uniform Mitigation Verification Inspection Form Maintain a copy of this form and any documentation provided with the insurance policy

Building Guide. olorado Chapter of the International Conference of Building Officials. Lancaster County Building Department

Custom 22' x 40' - 16' Tall Garage Plan #g227 By SDS-CAD Specialized Design Systems

TGIK.R Roofing Systems, Uplift Resistance. Roofing Systems, Uplift Resistance

Owner Information. Inspection Date:

Roof Replacement. Notes: T-1 (Title Sheet) Roof Key Plan Russell House Student Union 1400 Greene Street Columbia, South Carolina 29208

DATE:6/18/2013 INSPECTOR: ELEVATION

THE SPENCER RESIDENCE J&S ARCHITECT

Uniform Mitigation Verification Inspection Form Maintain a copy of this form and any documentation provided with the insurance policy

Common Applications: FRT plywood Type X Gypsum wall board

Uniform Mitigation Verification Inspection Form Maintain a copy of this form and any documentation provided with the insurance policy

Custom 30 x 48-14' Tall Garage Plan #g226 By SDS-CAD Specialized Design Systems

Property & Liability Application for Proposal

UL Design System HW-D-1012 continued

Gold Bond BRAND Gypsum Sheathing

TGIK.R Roofing Systems, Uplift Resistance. Roofing Systems, Uplift Resistance

ML200 Panel Technical Data Guide

COMMERCIAL WINDSTORM MITIGATION INSPECTION REPORT Prepared for: Boca Vista Condominium Association, Inc th Avenue Madeira Beach, FL 33708

WASHINGTON STATE ENERGY CODE, APPENDIX CHAPTERS

Knowledge Objectives (3 of 3)

GENERAL & WIND BEARING

SECTION TEMPORARY ROOFING MEMBRANE INSTALLATION. A. Areas of the roof deck for asbestos abatement.

.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division 1.

RESIDENTIAL PATIO COVER Submittal/Permitting Guidelines

TABLE OF CONTENTS FLORIDA BUILDING, BUILDING

Colorado Chapter of the International Conference of Building Officials. Building Guide. The Colorado Chapter of the International

Chapters 4 through 10 address the prescriptive methods. Building Construction PART. Chapters 4 through 10

Special Inspections. Topics for Today. What are Special Inspections. Presented by -Chris Kehl, PE Braun Intertec Corporation

Minimum required percentage of length of braced wall band on each storey 4

PROPERTY OVERVIEW PROPERTY HIGHLIGHTS. 2,340 SF Convenience Store. 3,508 SF Three Unit Strip Center. U-Haul Business. Sunoco Branded Gas Station

Plan /Submission Requirements

#G445 Plans, 48'x28' x 10' detached garage with bonus room By SDS-CAD Specialized Design Systems

Butte County Fire Department Fire Prevention Bureau 176 Nelson Avenue Oroville, CA Office (530)

Uniform Mitigation Verification Inspection Form Maintain a copy of this form with insurance policy

Supplemental Plan Correction Sheet for LA Residential Code Prescriptive Design (2014 LARC)

Acknowledgments. Abstract

GARAGE MAIN FLOOR PLAN

Airport Vicinity Acoustic Insulation

Transcription:

ISO 1 Frame (combustible walls and/or roof) Typically RMS Class 1 Wood frame walls, floors, and roof deck Brick Veneer, wood/hardiplank siding, stucco cladding Wood frame roof with wood decking and typical roof covers below: *Shingles *Clay/concrete tiles *BUR (built up roof with gravel or modified bitumen) *Single-ply membrane *Less Likely metal sheathing covering *May be gable, hip, flat or combination of geometries Roof anchorage *Toe nailed *Clips *Single Wraps *Double Wraps Examples: Primarily Habitational, max 3-4 stories ISO 2 Joisted Masonry (JM) (noncombustible masonry walls with wood frame roof) Typically RMS Class 2 Concrete block, masonry, or reinforced masonry load bearing exterior walls *if reported as CB walls only, verify if wood frame (ISO 2) or steel/noncombustible frame roof (ISO 4) *verify if wood frame walls (Frame ISO 1) or wood framing in roof only (JM ISO 2) Stucco, brick veneer, painted CB, or EIFS exterior cladding Floors in multi-story buildings are wood framed/wood deck or can be concrete on wood or steel deck. Wood frame roof with wood decking and typical roof covers below: *Shingles *Clay/concrete tiles *BUR (built up roof with gravel or modified bitumen) *Single-ply membrane *Less Likely metal sheathing covering *May be gable, hip, flat or combination of geometries Roof anchorage *Toe nailed *Clips *Single Wraps *Double Wraps Examples: Primarily Habitational, small office/retail, max 3-4 stories If tunnel form construction meaning there is a concrete deck above the top floor ceiling with wood frame roof over the top concrete deck, this will react to wind forces much the same way as typical JM construction. It is slightly better from a fire rating standpoint and from a wind standpoint in terms of potential damage if the wood frame is damaged. Please provide comments in the construction details of SOV for this type of construction. A subset of JM Construction is Heavy Timber Joisted Masonry JM Class II, also known at ISO 7. This is Joisted Masonry constructed buildings where the following additional conditions exist: Where the entire roof has a minimum thickness of 2 inches with Roof Supported by timber and having a minimum dimension of 6 inches, or where the entire roof assembly is documented to have a UL wind uplift classification of 90 or equivalent. ISO 3 - Non Combustible (NC) Class NC-I, Typically RMS Class Class 4A, 4B, or 4C Minimal combustible materials in the building construction Typical steel frame walls with masonry in-fill, brick veneer, metal sheathing, EIFS. Steel framing is load bearing portion of the building frame. AMBS (all metal building system) pre-engineered construction is common. Light steel frame ISO 3 smaller geometry with no interior building support columns. Heavier ISO 3 larger geometries with internal support columns and heavier roof framing. If multi-story, floors are commonly concrete on steel frame on steel deck. Roof deck and roof cover systems: *Steel deck 1

-Single-ply membrane -Usually flat/low sloped *Metal -Lap seam metal panel (exposed fasteners) -Standing seam metal panel (concealed fasteners) -May or may not be coated/sealed -May be gable, hip, flat or combination of geometries Roof anchorage: *Light steel frame ISO 3 may still incorporate clips, single wraps, or double wraps *Because of heavier construction with no wood framing in roof, roof to wall anchorage is typically an engineered bolted and/or structural roof connection. Toe nailing, Clips, single wraps, double wraps do not apply. Examples: warehouses, manufacturing facilities A subset of NC Construction is Superior Non-Combustible Construction NC-II, also known as ISO 8. This shall apply to Non-combustible constructed buildings where the following additional conditions exist: Where the entire roof is constructed of 2 inches of masonry on steel supports; or, where the entire roof is constructed of 22 gauge metal (or heavier) on steel supports; or, where the entire roof assembly is documented to have a wind uplift classification of 90 or equivalent. This is heavy noncombustible construction. ISO 4 - Masonry Non Combustible (MNC) Class MNC-I, Typically RMS Class 2, 2C1, or 3C Concrete block, reinforced masonry, tilt-up concrete load bearing walls may be combined with some heavy steel framing. Floors commonly concrete on steel deck for multi-story buildings. Roof construction is typically heavy steel frames. Roof deck and roof cover systems: *Steel deck with insulation boards (commonly called insulated steel deck roofing system) -Flat/low sloped *Lightweight insulating concrete or gypsum board on steel deck -Flat/slow slope -Sometimes possibly heavier concrete on steel deck or precast concrete panels for roof frame may still be considered ISO 4 if exposed steel is not fire proofed to obtain fire ratings needed to be ISO 5. *Steel frame with metal sheathing roof cover -Lap seam metal panel (exposed fasteners) -Standing seam metal panel (concealed fasteners) -May or may not be coated/sealed -May be gable, hip, flat or combination of geometries Roof anchorage *Because of heavier construction with no wood framing in roof, roof to wall anchorage is typically an engineered bolted and/or structural roof connection. Toe nailing, Clips, single wraps, double wraps do not apply. Walls have minimum 1 hour fire rating Examples: shopping centers, strip centers, office buildings, warehouses, schools A subset of MNC Construction is Superior Masonry Non-Combustible Construction MNC-II, also known as ISO 9. This shall apply to Masonry Non-combustible constructed buildings where the following 2

additional conditions exist: Where the entire roof is constructed of 2 inches of masonry on steel supports; or, where the entire roof is constructed of 22 gauge metal (or heavier) on steel supports; or, where the entire roof assembly is documented to have wind uplift classification of 90 or equivalent. ISO 5 - Modified or Semi Fire Resistive (MFR or SFR) Typically RMS Class 4A or 4C Protected steel and/or concrete or heavy masonry walls and floors. Semi wind resistive Roof deck and roof cover systems *Heavy steel frame with concrete poured on steel deck -Flat/low sloped -Exposed steel must be fireproofed to achieve required fire rating *Precast concrete (PC) panels -Flat/low sloped *Steel deck with insulation boards, gypsum, lightweight insulating concrete -Flat/low sloped -Exposed steel must be fire proofed to achieve required fire rating. Roof anchorage *Because of heavier construction with no wood framing in roof, roof to wall anchorage is typically an engineered bolted and/or structural roof connection. Toe nailing, Clips, single wraps, double wraps do not apply. Overall construction of fire resistive materials with fire rating less than 2 hours but greater than 1 hour. Exterior walls, floors and roof deck typically of masonry materials not less than 4 in thick but less thick than required for the 2 hour minimum rating for fire resistive construction. Examples: high and mid-rise office buildings and condos ISO 6 - Fire Resistive (FR) Typically RMS Codes 3A, 3B, or 3C Reinforced Concrete Construction building frame and floors and/or very well protected steel and concrete Floors are minimum 4" cast in place concrete, precast concrete or concrete on protected steel Wind resistive Precast construction - brought in from elsewhere / Cast in Place is poured on site Roof deck and roof cover systems *Cast in place reinforced concrete or precast concrete is not considered a roof cover replacement -Flat/low sloped -In some cases, structural concrete poured on steel deck, but exposed steel must be fireproofed to achieve required minimum 2 hour fire rating -If exposed concrete, such as on parking deck, leave roof cover as Unknown on SOV. This is typically an exposed or sealed concrete roof deck and the ISO 5 or 6 construction and occupancy will account for the roof deck/cover type. Can provide construction comment on SOV. Roof anchorage 3

*Because of heavier construction with no wood framing in roof, roof to wall anchorage is typically an engineered bolted and/or structural roof connection. Toe nailing, Clips, single wraps, double wraps do not apply. Fire rating not less than 2 hours for walls, floors, and roofs. This typically requires walls of masonry materials minimum of 4 in thick, hollow masonry minimum 8 in thick, floors and roofs minimum of 4 in thick reinforced concrete, and any structural steel load bearing components with minimum of 2 hour fire rating, Examples: high-rise office buildings and condos, parking garages 4

ISO 1 Frame (combustible walls or roof) Source: www.isopropertyresources.com 5

ISO 2 Joisted Masonry (JM) (noncombustible) 6

ISO 3 - Non Combustible (NC) 7

ISO 4 - Masonry Non Combustible (MNC) 8

ISO 5 - Modified or Semi Fire Resistive (MFR or SFR) 9

ISO 6 - Fire Resistive (FR) 10