ASSEMBLY AND OPERATING MANUAL LTW SHORING BOXES VB 100

Similar documents
ASSEMBLY AND OPERATING MANUAL LTW SLIDE RAIL SYSTEM - Type FP

ASSEMBLY AND OPERATING MANUAL LTW EG CORNER - MANHOLE

ASSEMBLY AND OPERATING MANUAL LTW SLIDE RAIL SYSTEM - Type PV

manufacturer: 6%+7LHIEDXWHFKQLN*PE+ Ferdinand-Porsche-Str. 8 D HEINSBERG

DOUBLE SLIDE RAIL INSTALLATION METHOD. Double Slide Rail August

CORNER SLIDE RAIL OPEN PIT INSTALLATION INSTRUCTIONS

Edge Support Trench Lining System

KS - Assembly and operating manual Trench box

SHORING SYSTEMS FROM SHORING PROFESSIONALS

Summary. Mini KKP - Assembly and operating manuel Pile guide box. Montage. Implementation. Accessories. Technical data

Trench Box. Important Notes. Introduction. User Guide

Rolling Towers. Layher Rolling Towers Uni Wide. Safety Structure Instructions for Assembly and Use. Mobile working platforms to DIN EN 1004:

MAXIMO MXH Heated Formwork The cost-effective solution for concreting operations at low temperatures. Product brochure

h Installation Manual

Installation Manual. Orion. TL-3 Steel Barrier. VHD (v2)

Autolock Tipping Skip

New Zealand s Excavation Safety Specialists.

is generally suitable for trench depths of up to 7.16m, widths of up to 3.92m, pipe lengths of up to 3.0m and a pipe OD of up to 2.6m.

CIRCULAR COLUMN SK 100

Z5054 Ci60/Ci90 Flying adapter Mounting instructions

MGF TECHNICAL FILE TRENCH BOXES. Description. Product Notes.

Tabulated Data Hydraulic Vertical Shores

PERI PD 8 The cost-effective shoring for slab tables and high loads

TRITEC light Steel Panel Formwork

Edge-of-Dock Leveler 'BA' - 'BX' Series. Owner s Manual and Installation Instructions

INSTALLATION GUIDE Sika SolarMount 1 Exposition East West

Conergy SolarFamulus II

LADDERSPAN AGR. BoSS Camlock Advance Guardrail Mobile Aluminium Tower 1450/850 Frames USER GUIDE

RAPID Column Formwork For the highest requirements on concrete surfaces and edge formation. Product Brochure Issue 10/2017

Shore Steel Trench Boxes & Manhole

Contents. Before you begin. Introduction: Installing trench support 1. Element 1: Planning and preparing 3

Span 500. Elite Instruction Manual. DESIGNATION SPAN 500 Double Width EN /12 XXXD SPAN 500 Single Width EN /8 XXXD

Siting. Supporting the Chassis. Craning. Siting. Procedure

SAFETY SYSTEM. G-Deck Consideration. Manual Handling

KEEP FOR FUTURE REFERENCE MRT FORKLIFT ADAPTER READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT

Formwork Direct International. Tel: Heavy Duty Panel System

Span 400 Series Instruction Manual

Modular Scaffolding MEKA 48

BoSS Climalite Camera and lighting tower

Span 400 Instruction Manual

PACIFIC SHORING, LLC ALUMINUM SHORING PRODUCTS ALUMINUM S-PANEL SHIELDS. TABULATED DATA Effective April 01, 2014

USER S GUIDE for HAKITEC 750. TEMPORARY ROOF with HAKI Trak Sheeting ( Hand-Built )

GRIDFLEX The flexible slab formwork with safe accessible grid elements

Mobile Towers - 3T Method

INSTALLING A POUR-IN-PLACE DOCK LEVELER (EH & RR)

Acrow V-Shore Formwork System

Instruction Manual. DESIGNATION SPAN 500 Double Width EN /12 XXXD SPAN 500 Single Width EN /8 XXXD

EASY-SET SCAFFOLD TOWER OPERATIONAL SAFETY AND ASSEMBLY INSTRUCTIONS MODEL: AL-Q0107. Customer Service

EASY-SET SCAFFOLD TOWER OPERATIONAL SAFETY AND ASSEMBLY INSTRUCTIONS MODEL: AL-Q0106. Customer Service

Ring System Scaffolding φ60.2mm Instruction Manual

CLIMA 3T. Mobile Aluminium Tower with Climbing Frame 1450/850 3T - Through the Trapdoor Method USER GUIDE

Heavy-Duty Braces Triplex Assembly and Operating Instructions

ifix INSTALLATION MANUAL PV flat roof installation system Version

Modular Scaffold MEKA 48

TEMPORARY EDGE PROTECTION SYSTEM DESCRIPTION CTS. Combisafe International AB

SP Prop Steel prop. // Versatile, strong, safe

S-60-MI2 : 500kg mini tower system v.2

CLIMA 3T. Mobile Aluminium Tower with Climbing Frame 1450/850 3T - Through the Trapdoor Method USER GUIDE

SPECIFICATION FOR REINFORCED SOIL WALL

Span 300 Instruction Manual

CLIMA AGR. Mobile Aluminium Tower with Climbing Frames 1450/850 Camlock Advanced Guardrail USER GUIDE

Reinforced Earth wall Construction Manual

USER S MANUAL. HAKI Loading Tower

Z5010 (Version 2) TV spigot with fixing plate Mounting instructions

Althon slot channels Althon

MANUAL. portrait set-up. landscape set-up. ClickFit Evo mounting system for sloping roofs with roof tiles for solar panels

MECHANICAL LEVELERS. P.O. Box 338 Spring Hill, Tennessee /486/ /251/3382 Fax 931/486/0316

Uniscaff User Guide. Uniscaff. George Roberts Total Reliability of Supply. George Roberts Total Reliability of Supply

Z5043 MAX Horizontal bracket Mounting instructions

" RISKS ASSOCIATED WITH THE INSTALLATION OF THE SYSTEM

S-60-TO : 1 ton tower system

Instruction Guide. FreeSpan SR. English

DT 23 DT 24 DT 32 DT 33 DT 34 DT 44

Installation Manual. ArchCast Bridge. 3-Sided Precast Concrete Bridge Structure

The frame elements, accessories and additional elements are maintenance-free!

Z5028 E3/Ci80 Horizontal bracket Mounting instructions

INSTALLATION INSTRUCTIONS TRI-STAND East-West. energy for a better world. Mounting system for PV systems with east-west orientation on flat roofs

KEEP FOR FUTURE REFERENCE FORKLIFT ADAPTER FOR MRTA6 AND MRTA8 LIFTERS READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT

Guy cable tower for WTGS. Installation guide for tower & foundation

MANUAL. landscape orientation. portrait orientation. metal roof mounting system for solar panels METAL ROOF MOUNTING SYSTEM. Rev

HEKAPLAST. PE-HD twin wall cable ducts and cable protection pipes for underground installation. Corrugated and Twin Wall Pipes of Plastics

Span 300 Manual. DESIGNATION EN1004 CEN 1298 IM - en. CEN designation of this instruction manual EN 1298 IM en

Precast Concrete Trench Drain Systems INSTALLATION INSTRUCTIONS

Mounting systems for solar technology

MGF TECHNICAL FILE MGF 305 UC BRACE. Description. Product Notes Issue 4

Goods Cage. Introduction. Important Notes. Key Benefits. User Guide

Z5394 Rigging manual 1.2 en

Date Prepared: Location: Time: Approximate Temperature (degrees F): Weather Conditions: Project Name:

EASY-SET SCAFFOLD TOWER OPERATIONAL SAFETY AND ASSEMBLY INSTRUCTIONS MODEL: AL-Q0108. Customer Service

ASSEMBLY.

12'W x 20'L x 10'H Run-in-Shed Assembly Instructions

STRAIL level crossing systems & STRAILastic track damping systems

Z5385 V Flying adapter Rigging manual (1.3 EN)

RESCUE SUPPORT SYSTEMS

MOUNTING SYSTEM FOR PITCHED ROOF WITH TILES. mounting system for pitched roof with tiles for solar panels in landscape setup. Rev

Constructing Fixed Span Bridges From Floating Equipment

VIA BOWLING. File No.: M COPYRIGHT 2005, VIA BOWLING PRODUCTS

Z5384/Z5551 Mounting instructions 1.4 en

CITY OF WILSON. Public Services Engineering. Backfilling, Compaction, & Patching Policy on Existing Pavements

Safety First Mobile Towers - 3T Method INTRODUCTION

Transcription:

Dealer: MV Trench Support Ltd Letham Road Houston Industrial Estate Livingston EH54 5BY Phone: +44 (0) 1506 / 445800 Fax: +44 (0) 1506 / 443080 Mobile: +44 (0) 7917 / 208767 MV Trench Support Ltd * Letham Road Houston Industrial Estate * Livingston EH54 5BY 14.01.2014 page 1

General Instructions The trench Boxes type VB 100 & VB 120 can be used up to a depth of ~5,00m in the lowering and cut method with a maximum of 2 nos. top Boxes. The following regulations and rules have to be followed in their valid version: - Regulations of the BG-Fachausschuss Tiefbau (technical committee civil and underground engineering) - DIN 4124 Baugruben und Gräben (excavation pits and trenches) - DIN EN 13331 Teil 1 & 2 Grabenverbaugeräte (part 1 and 2 construction equipment) - Regeln für Sicherheit und Gesundheit bei der Arbeit (rules for safety and health during work) - Unfallverhütungsvorschriften / Arbeitsschutzvorschriften (regulations for the prevention of accidents and safety at work rules) Our shoring components have the GS-Sign Certified Safety. Please follow the instructions making use of our Boxes. Lifting & Transportation The shoring may only be attached at the corresponding eyes and openings and/or lifting accessories. Lifting chains must be chosen to suit the weight being handled. To prevent the accidental detachment of the load use only load hooks with safety catches. The allowed tensile forces have to be kept in any cases. Transportation has to be carried out next to soil and unneeded oscillations have to be avoided. It is prohibited to stand within the pivoting range of the excavator or crane and beneath suspended loads. When handling and removing the shoring, watch out for overhead contact lines (power cables). A load operator must stand to the front of the excavator and be in eye contact with the machine operator. Measures to reduce hazards The safety of persons on site must be enhanced with the aid of signs, cones, warning tapes and/or safety staff specially deployed on site for this purpose. Neighbouring traffic flow has to be made possible by means of safety staff if needed. Personnel must wear protective clothing (helmet/safety shoes/gloves). The risk of instability as a consequence of wind loads when setting up or using the shoring must be considered. The shoring must be lowered onto level and firm ground. Where the ground is sloping or uneven, the shoring should be set up, if possible, at right angles to the slope. Maintenance & Repair Before use, all shoring components must be checked for their correct function. Faulty or deformed parts must be replaced in any case. Minor repairs can be carried out by the user, after consultation with LTW. There is no warranty on incorrectly performed repairs and the use of non-original parts. According to intenseness of years. use, the components should be painted with anticorrosion paint every two MV Trench Support Ltd * Letham Road Houston Industrial Estate * Livingston EH54 5BY 14.01.2014 page 2

System view B T H Base Box Top Box Height b b C t Pl Shoring Width Inner Working Width Thickness h C L L C Pipe Culvert Height Length Pipe Culvert Length MV Trench Support Ltd * Letham Road Houston Industrial Estate * Livingston EH54 5BY 14.01.2014 page 3

Technical Characteristics Base Boxes Pipe culvert Pipe culvert height Limit state design load weight Box weight length height thickness length L H t Pl L C h C e d G PL G E [ m ] [ m ] [ mm ] [ m ] [ m ] [ kn / m² ] [ kg ] [ kg ] 3,50 2,56 100 3,11 1,52 55,7 930 2150 Top Boxes Pipe culvert Pipe culvert height Limit state design load weight Box weight length height thickness length L H t Pl L C h C e d G PL G E [ m ] [ m ] [ mm ] [ m ] [ m ] [ kn / m² ] [ kg ] [ kg ] 3,50 1,33 100 3,11 55,7 535 1210 Tensile Forces lifting eyes at the plate head R d = 229 kn bottom eyes R d = 47 kn Standard Strut A strut unit consists of two spring mushrooms, the strut and, if required a brace extension. Brace Extension Working Width b C Shoring Width b for VB 100 Shoring Width b for VB 120 Weight [ m ] [ m ] [ m ] [ m ] [ kg ] without 0,99-1,29 1,20-1,50 1,24-1,54 71,0 0,30 1,29-1,59 1,50-1,80 1,54-1,84 15,5 0,50 1,49-1,79 1,70-2,00 1,74-2,04 20,0 0,80 1,79-2,09 2,00-2,30 2,04-2,34 26,7 1,00 1,99-2,29 2,20-2,50 2,24-2,54 31,1 1,50 2,49-2,79 2,70-3,00 2,74-3,04 42,3 2,00 2,99-3,29 3,20-3,50 3,24-3,54 53,4 2,50 3,49-3,79 3,70-4,00 3,74-4,04 64,5 G MV Trench Support Ltd * Letham Road Houston Industrial Estate * Livingston EH54 5BY 14.01.2014 page 4

Assembly Instruction Place the Base on the attachment points facing upwards. Place 4 spring spindle holders (mushrooms) in their allocated places and secure with bolts 40*226mm and locking clips. Release the nuts to expand the spring holder. Put the struts and extension pipes, respectively staggered, into the spring spindle holders (shoring width up to 2,0m at one plate - greater width at two plates) and secure with bolt 20*148mm and locking clips. Per strut unit brace extensions up to a maximum lengths of 3,0m can be used. After mounting all struts, one plate is connected to the corresponding lifting/transportation points at the top and the cutting edge. Lift the second plate above the first plate. Position carefully so that the spring spindle holder align with the struts assemblies. Carefully and slowly lower into place. Secure it with bolts 20*148mm and locking clips. 1 Spring Holder 2 Strut 3 Bolt 20*148 4 Bolt 40*226 5 Locking Clip Adjust the struts to the desired trench width (fine adjustment). Take care, to ensure that the two lower struts are adjusted 4-5cm wider than the top two. You must achieve an A Position. This will ensure correct alignment of the assembly as it is dug into the trench. The assembly of the top boxes is effected as described for the base box, whereas only one strut will be adopted centred each end. MV Trench Support Ltd * Letham Road Houston Industrial Estate * Livingston EH54 5BY 14.01.2014 page 5

Installation Instruction The shoring must be without gap and close to the ground. The limiting values for the max. loads have to be kept strictly. Single shoring boxes may only be used if the front and rear faces are properly secured. Place in position method The shoring box is placed into the totally pre-excavated trench. The place in position method is only allowed if the following conditions are given: - temporary steady soil - outside of the sphere of influence of buildings and structures - outside of the sphere of influence of circulation spaces and endangered lines - Settlements can be accepted The ground is considered as temporary firm, if no mayor collapses is noted in the period from the start of the excavation until the insertion of the shoring. If the trench depths is greater than the Base height, Base and Top modules must be assembled outside the trench and then inserted as a single unit into the trench. Base and Top Boxes are connected with the aid of Box Connectors and bolts and must be secured by locking pins. Connect the lifting hooks into all four lifting eyes on the top edges of the plates. Place the completely assembled Base and Top Box as a whole into the entirely preexcavated trench by means of lifting tools and appropriate lifting accessories. Observe the details regarding Box weights as per our technical data sheet.. The lengths of the excavated and unsecured section should not be more than the lengths of the Box. The gap between the trench walls and the inserted shoring unit must be backfilled and compacted. MV Trench Support Ltd * Letham Road Houston Industrial Estate * Livingston EH54 5BY 14.01.2014 page 6

The lowering and cut method ( dig and push ) If the soil is unsteady, the shoring box has to be pressed vertically into the ground, by alternately pushing and lowering. In order to protect the shoring plates we recommend using plate protectors.. Installation of Base Boxes Pre-Excavation max. 1,25m and not more than the lengths of one Box. In principle the pre-excavation complies with the type of soil and the safety regulations. Connect the lifting hooks into all four lifting eyes of the plates and place the adjusted base box in the pre-excavated trench, align and push it. Observe the details regarding Box weights as per our technical data sheet. Fill the gap between the trench walls and the inserted shoring unit and compact it. The shoring plates are to be pressed and not to be hammered. For safety reasons it is not allowed to push or press on the struts and brace extensions. No personnel should enter the trench until the shoring system is fully installed to depth required. Excavate about further 0,5m and alternately press in the plates. As smaller the steps are carried out as better for the shoring!. Do not press more than 0,5m on one side. The spindle assemblies have a maximum of +/-8 vertical movement available. Continue this process until the trench has reached the desired depth. MV Trench Support Ltd * Letham Road Houston Industrial Estate * Livingston EH54 5BY 14.01.2014 page 7

Installation of Top Boxes Depending of trench depth, Top Boxes are required. Connect the lifting hooks into all four lifting eyes on the top edges of the completely assembled Top Box. Align the Top Box over the Base Box and connect by means of Box Connectors, bolts 40*226mm and locking clips. The further installation is effected as above by alternately excavating and pressing in of the shoring plates. The top edge of the shoring must overlap the surrounding site by at least 5cm! Installation of the next shoring unit Once the foregoing shoring section has been installed to full depth, it can be started with the next shoring unit. Assemble and install the second assembly as the first. While the shoring is place utilise the safely protected work space to lay pipe or undertake other works. 4 Bolt 40*226 5 Locking Clip 7 Box Connector Re-Installation After completion of the Pipe laying the re-installation of the shoring can be effected. According to compacting possibilities bring in 0,5m filling material. Using 4 point lifting chain and lift the box by the filed height. As smaller the lifting steps as better for the shoring! Do not lift more than 0,5m to one side and not exceed the +/-8 limitation on horizontal movement of the spindle assemblies. Repeat the procedure as described until the shoring can be lifted out of the trench according to the safety regulations. Only use the corresponding lifting eyes for lifting! It is not allowed to lift at the struts or brace extensions! It is prohibited to stand within the pivoting range of the excavator or crane and beneath suspended loads. In order to avoid an overstraining of the shoring plates, do not lift one-sided. Attach the lifting accessories at least at 2 lifting eyes of the particular plate. MV Trench Support Ltd * Letham Road Houston Industrial Estate * Livingston EH54 5BY 14.01.2014 page 8