Procedia - Social and Behavioral Sciences 150 ( 2014 ) Azar Izmailov a

Similar documents
The Five Focusing Steps

Drum-Buffer-Rope in PlanetTogether Galaxy

Optimizing Inplant Supply Chain in Steel Plants by Integrating Lean Manufacturing and Theory of Constrains through Dynamic Simulation

USING THE THEORY OF CONSTRAINTS TO PRODUCTION PROCESSES IMPROVEMENT

The Core Structure of TOC Thinking Processes and their Applications to Improve Systems. Oded Cohen

A Roadmap Approach For Implementing Theory of Constraints In Manufacturing Organisations

By: Adrian Chu, Department of Industrial & Systems Engineering, University of Washington, Seattle, Washington November 12, 2009.

Available online at ScienceDirect. Procedia Engineering 138 (2016 )

Make-to-Stock under Drum-Buffer-Rope and Buffer Management Methodology

Sabbatical Marine, Inc.: Utilizing Constrained Resources Additional Information Boating Industry Background The boat building industry s North America

CHAPTER 4.0 SYNCHRONOUS MANUFACTURING SYSTEM

Procedia - Social and Behavioral Sciences 197 ( 2015 )

APPLYING THEORY OF CONSTRAINTS FOR IMPROVING BUSINESS RESULTS IN A NPD PROCESS

THE GOAL. Dr. Eliyahu Goldratt. Theory of Constraints

Theory of Constraints (TOC)

Proven Project Risk Management Techniques for Increased Project and Organizational Success

Operational Success = Audits, Metrics And Right Technology

ThermoFab and DBR: Manufacturing At Warp Speed. A White Paper Report

SS ynchronous olutions

How Real-time Dynamic Scheduling Can Change the Game:

Infor CloudSuite Industrial Whatever It Takes - Advanced Planning & Scheduling for Today s Manufacturer

Managing Complex Organizations: A Simplified Approach

Throughput Accounting (Relevant to PBE Paper II Management Accounting and Finance)

A New Ap p roach for The Mi l l e n n i u m : Holistic Ma n u f a c t u r i n g

Eli Schragenheim

MBH1123 Project Scope, Time and Cost Management Prepared by Dr Khairul Anuar. Lecture 8 Project Time Management - IV

Drum Buffer-Rope. Skorkovský. Based on : R. Holt, Ph.D., PE

Available online at ScienceDirect. Procedia CIRP 57 (2016 )

THE POSSIBLE WAYS TO ELEVATING AND FIXING THE CONSTRAINTS IN IRONFOUNDRY PRODUCTION. Nicole KYNCL

USE OF DYNAMIC SIMULATION TO ANALYZE STORAGE AND RETRIEVAL STRATEGIES

Extending Lean Initiatives Across the Organization:

Synchronous Flow Helping the Countertop Fabricator to synchronize the business system March 2017 Ed Hill

Highlights of CCPM - Critical Chain Project Management The TOC way of managing projects By Oded Cohen International Director Goldratt Schools

Project Management. Minsoo Ryu. Hanyang University.

LEAN INNOVATION - R&D.

APPLYING THE THEORY OF CONSTRAINTS TO INCREASE ECONOMIC VALUE ADDED: PART 2 IMPLEMENTATION. M. Smith and P. Pretorius

Planning, Scheduling & Execution

// How Traditional Risk Reporting Has Let Us Down

Procedia - Social and Behavioral Sciences 221 ( 2016 ) SIM 2015 / 13th International Symposium in Management

Risk Management As A Quality Enabler

COPYRIGHTED MATERIAL OVERVIEW OF THE THEORY OF CONSTRAINTS DEFINITIONS FOR THE OPERATIONAL ASPECTS OF THE THEORY OF CONSTRAINTS

WHEN SCHEDULING IS OUT OF CONTROL

Process design Push-pull boundary 35C03000 Process Analysis and Management Max Finne, Assistant Professor of Information and Service management

Justifying Advanced Finite Capacity Planning and Scheduling

LEAN PROCUREMENT.

Available online at ScienceDirect. Procedia CIRP 28 (2015 ) rd CIRP Global Web Conference

Differential Analysis: Relevant Costs the Key to Decision Making

Managing Systems - Part 1: Structuring system analysis and solution development through the U-shape. Oded Cohen

Resource Critical Path Approach to Project Schedule Management

Cascading change throughout an organisation

Strategic or Bust: Why Project Execution Needs to Change

Back to Basics TOC: Throughput Accounting

Available online at ScienceDirect. Procedia CIRP 40 (2016 )

From Not-So-Good, To Good, To Great, and Beyond: An Empirical Analysis of an Illustrative Field Example

Integrating Cost, Capacity, and Simulation Analysis

Drum Buffer-Rope. Based on : R. Holt, Ph.D., PE

User Involvement in Project Success

The Goal is Lean. MTA English

Critical Chain and Critical Path What s the Difference? By Gerald I. Kendall (

A Publication of RefineM TOP 5 STAKEHOLDER CONCERNS A GUIDE TO MUTUAL SUCCESS

Project Management. Week 2. Core Issues in Rapid Development. Lecture Overview. Does One Size Fit All?

ORDER PROMISING IN A COMPETITIVE WORLD

Scheduling for Success with Critical Chain. Abstract

By Eli Schragenheim Supporting TOC implementations worldwide

Competency Based Interview Guide

Consulting. The importance of optimizing maintenance management for efficient operations

By Eli Schragenheim Supporting TOC implementations worldwide

Operational Efficiency

Cost of Poor Quality

In this Part 6 we will cover:

Administrator s Institute Handbook

PULL PRODUCTION CYCLE-TIME UNDER VARYING PRODUCT MIXES

Software Safety Testing Based on STPA

Testing: The critical success factor in the transition to ICD-10

Available online at ScienceDirect. Procedia CIRP 17 (2014 )

Avoiding the 'Tipping Point to Failure'

Operational Effectiveness Unlocks Profits and Incremental Revenue

GPE engineering project management. Project Management in an Engineering Context

TOCICO CONFERENCE The PECo Journey : The Fusion of Theory of Constraints, Lean and Six Sigma- Velocity

Doomed from the Start?

Avoiding the 'Tipping Point to Failure'

Clinical Trials Roadmap: A Go-To-Market Guide for Probiotics

INTERIM MANAGEMENT AND FINANCIAL ADVISORY. Turning challenges into positive outcomes

World Class Purchasing

How are prices determined? By Dr. Eliyahu Goldratt

What Is the Theory of Constraints? A Basic Workshop

IT 470a Six Sigma Chapter X

Overall Equipment Effectiveness: A Strategic and Practical Improvement Tool

Available online at ScienceDirect. Procedia Computer Science 104 (2017 ) ICTE 2016, December 2016, Riga, Latvia

Communication & Alignment Why No Major Initiative Should Be

Schedule Compression

An Introduction to Strategic Planning for Service Organizations

Profit Center Planning & Analysis

Business Outcomes Management: The Undervalued Business Priority

Delivering Real Value Through Strategic Sourcing

The Economic Benefits of Puppet Enterprise

TOCICO Critical Chain Project Management Certification Webinar

Cost of Quality. Appendix 2B. Copyright 2006, The McGraw-Hill Companies, Inc.

PRODUCTION AND INVENTORY. Capabili. TOC and critical chain methodologies aren t just for manufacturing anymore. 46 March 2005 APICS magazine

LANDMARKS OF IMPLEMENTING LEAN MANAGEMENT IN PUBLIC SERVICES

Transcription:

Available online at www.sciencedirect.com ScienceDirect Procedia - Social and Behavioral Sciences 150 ( 2014 ) 925 929 10 th International Strategic Management Conference If your company is considering the Theory Of Constraints Azar Izmailov a a,b Kazan (Privolzhsky) Federal University, Kazan, 420008, Russian Federation Abstract TOC's basic vocabulary emphasizes its philosophy and its three performance measures. Throughput equals sales revenue minus direct materials cost--it measures the speed at which the company makes money. Inventory is the raw materials value tied up in work in process and finished goods. Large amounts of inventory are undesirable because it means that the company has spent money for production that hasn't generated revenue yet. Operating expenses are all of the costs of operations other than direct materials costs. Under the Theory of Constraints, operating expenses are fixed and therefore irrelevant to any TOC decision. Of the three terms, throughput is the most important. It tells the company that it is achieving its goal of making money. Moreover, increases in throughput mean that the rate at which the company is making money is increasing. So far, we've discussed increasing speed and output and improving quality, but we haven't mentioned any of the conventional management accounting performance measures (i.e., productivity, cost per unit, etc.). TOC won't suggest using any of them, either. Moreover, according to TOC, not only are conventional management accounting performance measures unnecessary, but focusing on them can make things worse. 2014 The Authors. Published by Elsevier Ltd. This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/3.0/). Peer-review under responsibility of the International Strategic Management Conference. Keywords: Theory of constraints, project management, management accunting Corresponding author. Tel. + 7-917-9118373 Email address: azar@moymol.com 1877-0428 2014 The Authors. Published by Elsevier Ltd. This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/3.0/). Peer-review under responsibility of the International Strategic Management Conference. doi:10.1016/j.sbspro.2014.09.103

926 Azar Izmailov / Procedia - Social and Behavioral Sciences 150 ( 2014 ) 925 929 1. Introduction Whether your organization manages stand-alone or multiple projects, whether those projects are small or large, whether your customers are internal or external, or whether the nature of the work performed is product development, construction, design, IT, or service; most projects are difficult to manage because of two things: 1) They involve uncertainty, and 2) They involve three different and opposing commitments: Due date, budget, and content In organizations that attempt to manage multiple concurrent projects with common, shared resources, the job is even more challenging. Managers can quickly find themselves on project overload with continual resource shortages and great difficulty in determining which tasks are truly the most important. If this is beginning to sound familiar, then you are probably experiencing some of these problems in your organization: There are difficulties completing projects on time, within budget and with full content. There is too much rework activity. Promised lead times are longer than desired. Existing project work is not complete before new projects require a shifting in priorities. Project Managers and Resource Managers have frequent conflicts about priorities and resource commitments. Existing project work is not complete before new projects require a shifting in priorities. Problems in one project cascade into problems in other projects. Some projects are abandoned or completed without the organization gaining the promised benefit. The organization is too slow responding to important opportunities. This paper provides a brief introduction into the basics of TOC Project Management, showing how the solution addresses the underlying root causes of the problems listed above. It is organized in the context of answering three very important questions: 1. What To Change? 2. To What To Change? 3. How To Cause The Change? 2. Literature Review And Hypotheses In today's competitive global economic marketplace, manufacturers are struggling to squeeze out 5% to 7% operational cost reductions. The reality is startling. If a plant is not consistently improving performance, it is in danger of closing. However, if a company is able to find a way to increase throughput with the same or less resources, it may mean the difference between continuing operations in North America or moving them to lower cost regions around the world. Twenty years after Eliyahu Goldratt first introduced the Theory of Constraints in his book The Goal, the manufacturing world is again experiencing another paradigm shift in thinking. Through the synthesis of the Theory of Constraints and lean manufacturing techniques, continuous improvement efforts and ultimately, performance improvement areno longer measured over periods of years, but weeks.

Azar Izmailov / Procedia - Social and Behavioral Sciences 150 ( 2014 ) 925 929 927 When one looks at the Theory of Constraints, the underlying principle emphasizes the importance of identifying and eliminating bottlenecks (constraints) in the manufacturing process-not only to increase productivity, but as a tool for measuring and controlling the flow of materials. The only problem is how to actually identify these constraints. However, the fundamental approach to lean manufacturing is to maximize the amount of net good parts per shift by striving for true one-piece flow. Targeting balanced flow, buffers of excess inventory between each point in the process are removed, making it immediately apparent which process is underperforming. With this knowledge, a manager candispatch resources to address the situation, knownas "go and see." While both ideas are productive, the key to unlocking true value and performance improvement is in merging the two approaches. Maximize your "go and see" efforts by focusing resources on the true constraint; the result is a seamless flow of production that generates the highest possible return. This simple idea in theory wasa nearly impossible task in reality, until now. By taking a constraint-based approach to maximizingthe flow of product through the plant, you end up with less data, but more critical, decision-enabling information directly from the plant floor. This is accomplished by limiting and prioritizing data collection and identifying the key chronic constraints that must be corrected tomeet a specified throughput target. This allows plant personnel to focus their efforts on corrections that will lead to the greatest improvements in plant performance. The results are astounding. "Manufacturers need to be able to improve plant performance by eliminating bottlenecks one constraint at a time. By focusing directly on true constraints, manufacturing operations can significantly improve efficiency on the plant floor." -- Greg Gorbach, VP of Collaborative Manufacturing, ARC Advisory Group Recently, the idea of synthesizing lean and the Theory of Constraints was utilized by a major Tier Oneautomotive supplier with two goals: to provide better clarity and focus by identifying true constraints, and to spend less time collecting data and more time solving problems. In this project, weekly kaizen events were driven by the application. By measuring the identified constraints before and after focused kaizen events, the true value of the system would soon be revealed. Almost immediately, constraints that had not been identified after 18 months of lean initiatives on one line were now completely visible. The system proved that resources were being misdirected towarddowntime issues that had no impact on throughput. As a result, improvement efforts were directed to areas where true constraints existed, resulting in performance improvement and project acceleration. In just seven weeks, throughput increased by 6.6%. Themanufacturer estimated an annual savings in overtime costs of $840,000. 3. Methodology 3.1. Indentifying What to Change? In order to make significant and lasting improvements in the way projects are managed, an organization must effectively address the underlying root causes that lead to the above problems. The dominant root cause in organizations performing multiple projects with shared resources is the unavoidable conflict about when to begin new project work. In almost every organization, there are continual internal and external pressures to address important new opportunities. At the same time, managers recognize that beginning new work too soon may divert needed resources from ongoing project work, compromising their ability to meet existing commitments. Unfortunately, with imperfect knowledge of the true status of current project work, ongoing pressures to increase the organization s output, and a belief that delaying a project s start will only serve to delay it s finish, managers all too frequently make decisions that overload the organization. The root cause that dominates the execution of individual projects is a planning and scheduling process thatis based on several erroneous assumptions. One such assumption is the widespread belief that placing protection time in every task will lead to optimized project performance that good individual task performance will inherently lead to good overall project performance. Couple this with the fact that today s most widely used scheduling algorithms don t provide proper protection for the effects of integrating pathways (many parallel paths of work, all of which must be completed before a common successor task may begin), don t correctly address resource dependencies, and don t properly account for task and iteration variability, and the stage is set for almost certain disaster (See Figure 1). These

928 Azar Izmailov / Procedia - Social and Behavioral Sciences 150 ( 2014 ) 925 929 algorithms calculate overly optimistic schedules that will almost certainly throw the project into expensive firefighting once it is recognized that the commitment is inserious jeopardy. Rushed up-front planning aggravates this situation by missing out important task and resource dependencies. Figure 1. Today s widely used scheduling algorithms don t provide proper protection for the way in which projects are mapped. Ultimately, firefighting becomes rampant, most people become severely multi-tasked, and management institutes coping mechanisms for more and more tracking of individual task and budget performance - ultimately resulting in more overhead and adding even more protection time to task estimates in an attempt to guarantee that people s work will meet management s expectations. Under such circumstances, people begin to place a higher priority on self-preservation. Being measured on individual task performance, people realize that it is not in their best interest to report early finishes. They may feel it will compromise their future negotiations or they may worry about being blamed for problems in their work because they did not take all the time they were given. More than likely, the task completion criteria are also very vague and people even feel encouraged to work well beyond what is truly good enough. At the same time, since most people carrysuch heavy loads, just the knowledge that the protection time is there makes them believe it is possible to use some of that time to finish other, more time-critical work. The net result is that work that could have been turned in early is not and the project has little chance to take advantage of any positive variation. The effect of late tasks accumulates day-by-day while any potential for early task completion is almost completely masked. Unless these two major root causes are addressed effectively, there is little chance for any organization to make significant and lasting improvements in project management performance. Unless these two major root causes are addressed effectively, there is little chance for any organization to make significant and lasting improvements in project management performance. 3.2. Indentifying To What to Change To? The TOC Project Management provides a comprehensive solution to address these root causes and coping mechanisms. The solution includes 1) a robust planning process, 2) a more effective scheduling process, 3) a methodology for introducing work that actually leads to increased capacity, 4) execution processes that provide excellent project control, visibility and decision support, and 5) work behaviors that are more conducive to good project performance. 3.3. Indentifying How to cause the change? For many organizations, projects are what we do for a living. Projects are their business. In such environments, changing how people manage projects is tantamount to changing the basic fabric of the business. Clearly, one must approach such change with great care. The right people must be brought into the picture at the right time, in just the right way. The process must move slowly enough to permit identification of essential changes, yet fast enough that it does not lose the momentum that is necessary to sustain continued progress. Goldratt has developed a very robust

Azar Izmailov / Procedia - Social and Behavioral Sciences 150 ( 2014 ) 925 929 929 implementation process consisting of six distinct phases. Each phase builds upon the next and each is specifically designed around a logical progression of obtaining the true support and collaboration of the participants. In the first phase, senior management learns what changes are required and what their roles need to be in facilitating that change. In order for change to succeed, they need to be in consensus that they will continue to champion the change for the long term. Once they are aligned, management needs to inform the organization about what will change, why the change is necessary, how the organization and each of its people will benefit, and when and how theywill be brought on board. Following the informational briefing, the hard work begins. There is a third phase, where previously trained experts begin to use the generic solution to identify areas where customization will be required to address the unique needs of the organization. In order to minimize disruption to the organization, only a few necessary people are brought into the activities of Phase three. During the fourth phase, the rest of the organization is brought into the picture. People are trained and begin to participate in their designated roles. This is also the phase where the readiness of all support systems is verified. The fifth phase is more of an event than a phase of significant time duration. It is analogous to throwing the switch to take the system live. This is the point at which TOC Project Management truly becomes the way we do our work. If everythinghas been done properly up to that point, much of the chaos has now been driven out of the organization, setting up the final stage. The sixth phase begins the process of ongoing improvement. A this stage, the organization has so much visibility to every aspect of its project management system that people can begin to systematically pinpoint and implement changes that will bring the most improvement to the bottom line. 4. Conclusion TOC brings a new dimension to management philosophy and provides an interesting challenge to the traditional ways of looking at an organization s profitability. Adopted within a wide variety of organizations and settings, it appears that organizations using TOC have determined that it can help them achieve a number of management objectives, including continuous improvement. Using TOC, like any other form of information, should be guided by the purpose or requirements it is necessary to meet. In the end, the goal of every organization is the same; optimize profitability by meeting customer requirements better than the competition. It is this purpose the information system needs to serve. References Cox, Jeff; Goldratt, Eliyahu M. (1986). The goal: a process of ongoing improvement. North River Press. ISBN 0 88427-061-0. Eliyahu M. Goldratt; Fox, Robert (1986). The Race. North River Press. p. 179. ISBN 978 0-88427-062-1. Eric Noreen; Debra Smith, James T. Mackey (1995). The Theory of Constraints and its implications for Management Accounting. North River Press. ISBN 0-88427-116-1. Goldratt, Eliyahu M. (1997). Critical Chain. Great Barrington, MA: North River Press. ISBN 0-88427-153-6. Paul H. Selden (1997). Sales Process Engineering: A Personal Workshop. Milwaukee, WI: ASQ Quality Press. pp. 33 35, 264 268. ISBN 0-87389-418-9. Corbett, Thomas (1998). Throughput Accounting. North River Press. p. 160. ISBN 978-0-88427-158-1. Eli Schragenheim and H. William Dettmer (2000). Simplified Drum-Buffer-Rope: A Whole System Approach to High Velocity Manufacturing. Retrieved 2007-12-08. Eliyahu M. Goldratt (2004). Essays on the Theory of Constraints. North River Press. ISBN 0-88427-159-5. Eliyahu M. Goldratt (2004). _The Goal: A Process of Ongoing Improvement, ISBN 978-0-88427-178-9. Theory of Constraints Handbook (2005), ISBN 978-0-07-166554-4, p. 8 D. Trietsch (2005), From Management by Constraints (MBC) to Management By Criticalities (MBC II), Human Systems Management (24) 105 115 See the annex of: Vidal, C. 2008.The Future of Scientific Simulations: from Artificial Life to Artificial Cosmogenesis. Qui, Mabel; Fredendall, Lawrence; Zhu, Zhiwei (2002). "TOC or LP? (production control)". Manufacturing Engineer 81 (4): 190 195 Linhares, Alexandre (2009). "Theory of constraints and the combinatorial complexity of the product-mix decision". International Journal of Production Economics 121 (1): 121 129. Steyn, Herman (2009). "An Investigation Into the Fundamentals of Critical Chain Project Scheduling.". International Journal of Project Management (19): 363 369. Eliyahu Goldratt (2009). Standing on the Shoulders of Giants.