Marina Bay Sands Hotel Arch 631 Kayla Brittany Maria Michelle

Similar documents
S T R U C T U R. magazine

Lessons learned: 3.2.Stability concepts

fifteen design for lateral loads Lateral Load Resistance Load Direction Lateral Load Resistance

fifteen design for lateral loads Lateral Load Resistance Load Direction Lateral Load Resistance

fifteen design for lateral loads Lateral Load Resistance Load Direction Lateral Load Resistance

Lateral System Analysis and Confirmation Design

CCTV Headquarters Case Study. ARCH 631 Haowei Cheng, Peixin Dong, Xiaoying He, Zepeng Jia, Dongqi Zhu

Modjeski and Masters, Inc. Consulting Engineers 04/18/06 St. Croix River Bridge 3D Analysis Report Introduction

BOAST. West Coast. Set to open this spring, the tallest building on the West Coast resists wind and seismic drifts with massive braces.

CCTV HEADQUARTERS. ARCH 631 Spring 2018 Daniel Edith Mckenzie Rafael

Council on Tall Buildings

Construction of the Nhat Tan Bridge (Vietnam-Japan Friendship Bridge)

Alexis Pacella Structural Option Dr. Schneider Lexington II, Washington D.C. Technical Report #3 November 21,

Council on Tall Buildings. and Urban Habitat BACKGROUND SECTION STEEL REINFORCED CONCRETE SHEAR WALL STEEL PLATE COMPOSITE SHEAR WALL

Office Building-G. Thesis Proposal. Carl Hubben. Structural Option. Advisor: Dr. Ali Memari

Dustin Mattiza Crystal Gore Heather Davis Stacey Faniel-Ingram Arch Case Study

CADS A3D MAX. How to model shear walls

Thesis Proposal. La Jolla Commons Phase II Office Tower San Diego, California. December 13, 2013

Danielle Shetler - Structural option Courtyard by Marriott Lancaster, PA

SECTION PLATE CONNECTED WOOD TRUSSES

HIGH RISE CONDO SOHO, NEW YORK, NY

one structural behavior, systems, and design ARCHITECTURAL STRUCTURES: FORM, BEHAVIOR, AND DESIGN DR. ANNE NICHOLS SUMMER 2015 lecture

one structural behavior, systems and design Course Description Course Description Syllabus & Student Understandings statics mechanics of materials

The problems in this guide are from past exams, 2011 to 2016.

Construction Techniques of The 3 rd Bosphorus Bridge in Istanbul, Turkey

Xyston Inn. NY. Proposal. Xiaodong Jiang. Structure Option. Advisor: Dr. Linda Hanagan

Brent Ellmann Structural Option 200 Minuteman Park, Andover, MA Structural Consultant: Dr. Hanagan

TECHNICAL REPORT 1. Structural Concepts / Structural Existing Conditions. Penn State Hershey Medical Center Children s Hospital. Hershey, Pennsylvania

Long Railway Viaducts with Special Spans: Part-1. Arch Construction by Balanced Cantilever with Auxiliary Cables

Structural Engineering, Mechanics, and Materials. Preliminary Exam - Structural Design

Types Of Roofs - Vault

The Design and Construction of a Fast Track 16 Hectare, 18 m Deep Basement in Soft Clay in Singapore

EXPERIMENTAL INVESTIGATION ON THE INTERACTION OF REINFORCED CONCRETE FRAMES WITH PRECAST-PRESTRESSED CONCRETE FLOOR SYSTEMS

Technical Report #1. Matthew R Peyton

Third Avenue New York, NY. Structural Concepts/ Structural Existing Conditions Report September 30, Michelle L.

Interaction between ductile RC perimeter frames and floor slabs containing precast units

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc.

Check the strength of each type of member in the one story steel frame building below.

MCEER Hospital Demonstration Project

7. Draw an equipment set up for the production of a beam by post tensioning. 10. What are the common concrete structures which are produced by

Building in Beijing. Steel provides the support for two new high-profile atriums in China s capital.

THESIS PROPOSAL. christopher m. shipper

Modeling and Design of Bridge Super Structure and Sub Structure

January 14, 2006 Structural Thesis Proposal: Structural and Breadth Redesign Options

Traci Peterson Option: Structural Faculty Consultant: Memari. Executive Summary

Steel Expansion. Located along the Grand River in

SPECIFICATIONS FOR THE CONSTRUCTION OF NEW PASSENGER EQUIPMENT CARS PREFACE

Investigation for the Removal of Steel Tie Rods in a Historic Segmental Arch Floor

The Effect of mixed foundations on the response of some buildings to excavation

Introduction to Structural Analysis TYPES OF STRUCTURES LOADS AND

ST7008 PRESTRESSED CONCRETE

ENTRY FORM. DVASE 2014 Excellence in Structural Engineering Awards Program

HIGH RISE CONDO SOHO, NEW YORK, NY

UNION STATION EXPANSION AND RESTORATION

Xyston Inn. NY. Proposal. Xiaodong Jiang. Structure Option. Advisor: Dr. Linda Hanagan

Contents. Tables. Notation xii Latin upper case letters Latin lower case letters Greek upper case letters Greek lower case letters. Foreword.

Experimental study on the seismic performance of RC moment resisting frames with precast-prestressed floor units.

FINAL REPORT. Structural Redesign of Hershey Medical Center Children s Hospital. Penn State Hershey Medical Center Children s Hospital

Technical Report #3. Matthew R Peyton

Structural Design Challenges for Plaza 66 Tower 2

Hyatt Place North Shore. Pittsburgh, PA T. Technical Assignment #1. Kyle Tennant. Kyle Tenn. Structural (IP) [Type the document subtitle]

VOLUNTARY - EARTHQUAKE HAZARD REDUCTION IN EXISTING HILLSIDE BUILDINGS (Division 94 Added by Ord. No. 171,258, Eff. 8/30/96.)

15.2 Approximate Analysis of a Continuous Beam for Gravity Load

mortarless masonry Design Manual Part 1 (IS 456:2000) Section 1 Page 1 IS 456:2000 PLAIN AND REINFORCED CONCRETE - CODE OF PRACTICE

Pile to Slab Bridge Connections

Brent Ellmann Structural Option 200 Minuteman Park, Andover, MA Structural Consultant: Dr. Hanagan

Basarab Cable Stayed Bridge in Bucharest

Thesis Proposal. Aquablue at the Golden Mile. Hato Rey, Puerto Rico

fourteen Structural Planning 1 APPLIED ACHITECTURAL STRUCTURES: DR. ANNE NICHOLS SPRING 2019 lecture STRUCTURAL ANALYSIS AND SYSTEMS ARCH 631

STRESS-RIBBON BRIDGES STIFFENED BY ARCHES OR CABLES

Case Histories in Geotechnical Engineering

COMPARISON OF MULTISTORY WALL RESULTS BETWEEN ADAPT-EDGE 1 AND ETABS 2 CONCRETE FRAME WITH SHEARWALLS

Structural Option Indiana Regional Medical Center Indiana, PA

The New, Balanced Cantilever, Bridge over Acheloos River in Greece

twenty six concrete construction: foundation design ELEMENTS OF ARCHITECTURAL STRUCTURES: FORM, BEHAVIOR, AND DESIGN DR. ANNE NICHOLS SPRING 2013

twenty four foundations and retaining walls Foundation Structural vs. Foundation Design Structural vs. Foundation Design

Contents. Foreword 1 Introduction 1

Council on Tall Buildings. and Urban Habitat

181 Fremont San Francisco, CA. Tech Report 1 9/12/2014. Caroline Klatman Structural Option Advisor: Dr. Thomas Boothby

CVEN 483. Structural System Overview

Construction Technology B (CON4313)

Howard County General Hospital Patient Tower Addition Columbia, MD. Kelly M. Dooley Penn State Architectural Engineering Structural Option

Case Study: Challenges of a Single-layer Reticulated Dome

Seattle Public Library OMA & REX

Southwest Housing, Arizona State University

ARCH 331. Study Guide for Final Examination

Structural System Design

The Construction of the Langham Place in Mong Kok An Introduction

Simplified Building Schematic for Typical Floor (Levels 9 through 22):

The construction technology of Chongqing Chaotianmen Bridge

S p a c e e l e v a t o r. Structure selection and design Prof Schierle 1

MOUNTAIN STATE BLUE CROSS BLUE SHIELD HEADQUARTERS

Design & Seismic Detailing of Nonstandard Deep Precast Concrete Box Girders For Long Span Railroad Bridges By:

eight plates and grids APPLIED ACHITECTURAL STRUCTURES: DR. ANNE NICHOLS SPRING 2018 lecture STRUCTURAL ANALYSIS AND SYSTEMS ARCH 631

UNDERPINNING A CRANE FOUNDATION

twenty seven concrete construction: foundation design Foundation Structural vs. Foundation Design Structural vs. Foundation Design

(a) Pin-Pin P cr = (b) Fixed-Fixed P cr = (d) Fixed-Pin P cr =

Rutgers University Law School Building Addition and Renovation Camden, NJ

MIDAS Training Series

Transcription:

Marina Bay Sands Hotel Arch 631 Kayla Brittany Maria Michelle

Overall Information Location: Singapore Date of Completion: 2010 Cost: $5.7 billion Architect: Moshe Safdie Executive Architect: Aedas, Pte Ltd. Structural Engineer: Arup Landscape Architects: Peter Walker and Partners Landscape Architects Height: 57 Stories (197 m, 640 ft)

Design Concept General parameters of the design were EXPLORE (new living and lifestyle options) EXCHANGE (new business ideas) ENTERTAIN (rich cultural experiences) 55 Stories of hotel Garden on top of 1 hectare 150 m (492 ft) infinity pool Primary driving element of design was the need for a continuous atrium running along all three towers Tapering of the building was then conceived

Built on reclaimed land http://vimeo.com/18140 564 Layers Deepest layer is stiff-to-hard Old Alluvium (OA) Middle layer (5m- 35m thick) is Kallang Formation made of deep soft clay marine deposits with some firm clay and medium dense sand of fluvial origin mixed in Top layer (12m-15m thick) is sand infill Foundation Design

Old Alluvium (OA) Layer Used a forest of barrettes and 1m-3m diameter bored piles Average excavation depth was 20m 2.8 cubed Mm of fill and marine clay taken from site

Cofferdams Diaphragm walls used for minimum strutting 5 reinforced concrete cofferdams Circular 2-120m diameter 1-103 diameter Peanut shaped (twin-celled) 75m diameter Semi-circular 65m radius Each was a dry enclosure Construction carried out without need for conventional temporary support Construction of diaphragms http://vimeo.com/18140484

Plan of retaining walls and foundations for the 3 hotel structures

Jet Grouting High-pressure jet of fluid (20-40 MPa) used to break up and loosen the soil in a borehole Mixes with a self-hardening grout to form columns, panels and other structures in the ground High pressure is used to produce the kinetic energy required Waste material (a mix of soil, water and binder) is recovered at the surface then is taken away

Top-down construction Minimum temporary props used Continuously reinforced diaphragm wall for DCS box District cooling system housed in a deep reinforced box Shear walls constructed with the box enabled unhindered bulk excavation Top-down excavation Box doubled as a retaining structure for the deepest excavation in the tunnel where soft marine clay is Box has to permanently support the lateral loads from the ground DCS Box Section on plan of adjustable shear pin. Shear Wall

Hotel Towers Reinforced concrete shear walls in the short direction (East-West) Primary vertical and transverse structural system Unlike other high-rise towers Primary lateral stability demands is NOT wind but is gravity loads The curve creates overturning forces Material selection was critical because Lateral load is permanent not transient like wind loads Additional concrete core walls in each of the building legs Retrains the forces in the longitudinal directions Aids in preventing the out-of-plane buckling due to the relatively narrow shear walls Floor system 8 in flat slabs post-tensioned (max span of 10 m) Maximizes the structural efficiency and is a simple floor solution that aids in building time Accommodates the 9 10 floor to floor height Hotel tower flares out at 26 degrees

Section through top portion East Elevation Plan

Hotel Towers Walls and core provide stiffness in short direction Cores and sway action between the walls and slabs resist longitudinally The ground level Base slab of post-tensioned to resist the horizontal thrusts created by the inclined legs Level 23 houses the structural steel trusses Resists the large shear forces where the two legs meet above the atrium In the mechanical level Is large plate-plate steel elements Which are embedded in the concrete walls

Construction Issues/ Design The flare causes the shear walls to flex and drift laterally during construction Lots of structural analysis completed to quantify Locked-in stresses Angular rotation at the top of the tower Maximum displacements of elevation in all three axes Movement between vertical and inclined walls Movement between adjacent bays Movement between all three towers Self-weight was an issue so it was pre-cambered during construction Complication of the material because of Creep and shrinkage Expected to deform laterally over the next 30 years These long-term displacement were accounted for in each aspect of the design

Pre-stressing was introduced into the vertical and inclined shear walls to reduce Movements and stresses accumulated during construction During construction Real time monitor system implemented to compare actual stresses against predicted.

Hotel Atrium Walls Continuous between all three towers. Ground level width decreases from south to north direction. Height decreases from south to north direction. N S

Framing consists of steel trusses connected by horizontal transoms. In sync with glass panels. Rectangular hollow sections (RHS) are the main structural members. Pin connections at base. Temporary system comprised of steel compression struts and tension cable during construction.

Multiframe y y y y z x z x z x z x ) Static Case: Load Case 1 Defl. (in) Static Case: Load Case 1 Mz' (kip-ft) Axial Shear Deflection Moment

SkyPark Design 650 ft. (200m) above grade 1,115 ft. (340m) long 131 ft. (40m) Wide 7,700 tons of steel work 213 ft. (65m) Cantilever Section 3,500 tons 2.5 acre landscaped roof top 250 trees Over 650 plants 81,000 Cubic Feet of soil 495 ft. infinity pool 375,000 gallons of water

Construction Elements The cantilever section of the Skypark was built from a system of post-tensioned segmental steel box girders 33 feet deep and 12 feet wide with 1 3/8 inch wide walls and 2 3/8 inch flanges was used.

Construction Elements The structure of the Skypark that spans between the towers is a system of steel bridge trusses. The bridges that are located atop the towers are supported by raking steel V struts that extend up from the roof of the hotel towers directly over the shear walls.

Construction Elements Because the towers have dramatically different relative displacements, seismic joints were placed in between each tower to keep pounding from occurring by accommodating the movements due to thermal expansion, creep and shrinkage, and wind lateral movements. http://www.youtube.com/watch?v=fjkynch47na 5T Tuned Mass Damper

Dynamic Studies Because the towers have dramatically different relative displacements, seismic joints were placed in between each tower to keep pounding from occurring by accommodating the movements due to thermal expansion, creep and shrinkage, and wind lateral movements.

Construction Sequence 14-main steel segments were prefabricated off site and lifted into place via strand jacks This method took cues from bridge building when lifting the segments into place Stranding jacking with hydraulic jacks were used to lift the box girders and slide them into place. The Cantilever was pre-assembled at grade to assure proper fit and then disassembled and lifted into place and attached to a secondary beam at the top of the hotel tower. 7000 tons of steel work was erected in 13 weeks to build the skypark

References The Arup Journal A496 pdf Deep Basement & Foundations: Diaphragm Wall, Jet Grouting, Barrette & Bored Piles http://www.bachy-soletanche.com/sbf/sitev4_uk.nsf/technique/marina-baysands SkyPark http://newspagedesigner.org/photo/marina-bay-sands-skypark http://www.archdaily.com/70186/marina-bay-sands-safdiearchitects/skypark-hotel-plan/ http://www.ctbuh.org/tallbuildings/featuredtallbuildings/marinabaysan ds/tabid/1766/language/en-us/default.aspx http://www.scribd.com/doc/40220526/marina-bay-sands-sky-park- Cantilever