Draft for an Appendix O Cost Structures

Similar documents
LCOE reduction potential of parabolic trough and solar tower CSP technology until 2025

Case Study: Masen NOOR Ouarzazate Solar Complex

CSP TECHNOLOGY IN THE MARKET

CSP Solar Tower Report 2014: Cost, Performance and Thermal Storage

Solar Thermal Power Plant Technology. Workshop for Investors. New and Renewable Energy Authoriy (NREA)

Techno-economic Optimization of CSP Plants

HPS2 High Performance Solar 2. Évora Molten Salts Platform. Dipl.-Ing. Klaus Hennecke Dr. Michael Wittmann

Operation Experience of a 50 MW Solar Thermal Parabolic Trough Plant in Spain

Future Concepts in Solar Thermal Electricity Technology. Marc Röger. World Renewable Energy Congress XIV Bucharest, Romania, June 08-12, 2015

Siemens Solar Energy. Buenos Aires, November 2011 By Rolf Schumacher R2 Siemens AG All rights reserved

VI International Forum ATOMEXPO 2014

CSP Parabolic Trough Technology for Brazil A comprehensive documentation on the current state of the art of parabolic trough collector technology

Concentrating Solar Power: Current Cost and Future Directions

Eagle Mountain Pumped Storage Project Draft License Application Exhibit D Project Costs and Financing

The Status and Prospects of CSP Technologies

Overview CSP Technologies, Markets, Challenges

Welcome! Webinar #7: MODELLING SOLAR THERMAL SYSTEMS 27 JULY 2017

CSP Market Status. Solar Thermal Energy Research Group. Alberto Cuellar. Senior Renewable Energy Engineer Mott MacDonald

FICHTNER SOLAR GmbH a company of the Fichtner group

Design and Construction of Molten Salt Parabolic Trough HPS Project in Évora, Portugal

Concentrating Solar Power (CSP) Cornerstone of Future Energy Generation? ENERDAY 2009, April 3rd 2009

June, 2017 RENEWABLE PROJECTS. Enhancing The Local Supply Chain

Building the Renewable Energy Sector in Saudi Arabia

Status and Perspectives of CSP Technology. Robert Pitz-Paal

Concentrating Solar Thermal Technology and Solar Process Heat Projects: A focus on the MENA Region German Aerospace Center (DLR)

Overview on systems for process heat applications

Application of an Integrally Geared Compander to an sco 2 Recompression Brayton Cycle

Beyond LCOE: The Value of CSP with Thermal Energy Storage

Installed Capacity Market

Available online at ScienceDirect. Energy Procedia 49 (2014 ) SolarPACES 2013

Andasol 1 - Experience and Tests Miroslav Dolejsi, Georg Brakmann SolEngCo GmbH

Solar Power Program Solutions

NREL CSP WORKSHOP. Bright Source Energy Inc. Oakland, CA

Novatec Solar s direct molten salt technology, dispatchable power to perfectly match energy demand in Northern Chile 27 th May 2014 T.

The First Solar Thermal Power Plant. In Egypt. Engineer. R & D Sector Director New & Renewable Energy Authority NREA, Egypt

Potential For Local Manufacturing of Solar Thermal Systems in Egypt

Innovative Technology Solutions for Sustainability ABENGOA. CSP: A Time for Solid Players. Analyst & Investor Day. Santiago Seage

Renewable Energies Unlimited resources. Turning Ideas into Reality.

Day one - 23 March 2009 CSP for Decision Makers

WIND & SOLAR TECHNICAL EXPERT

Solar Energy ;; A pillar of The Sustainable Energy Kingdom

ScienceDirect. Efficiency improvement and potential LCOE reduction with an LFR-XX SMS plant with storage

Master Level Thesis. Techno-economic Appraisal of Concentrating Solar Power Systems. European Solar Engineering School No.

How to stimulate the South African rooftop PV market without putting municipalities financial stability at risk A Net Feed-in Tariff proposal

CSP Research on CSP cost reduction. Bernhard Hoffschmidt, DLR Institute of Solar Research

Advanced Concentrating Thermal Technologies for Power and Process Heat Generation. Robert Pitz-Paal

Overview on use of a Molten Salt HTF in a Trough Solar Field

Modular Trough Power Plants

Prof Wikus van Niekerk Director of CRSES Prof Frank Dinter Eskom Chair in CSP Stellenbosch University

The Future of CSP: Dispatchable Solar Power

California Independent System Operator. Variable Operations and Maintenance Costs January 8, 2019

Professor George Stavrakakis ( Dr Apostolos Apostolou(

Bokpoort CSP and the Future of Solar in South Africa. Nandu Bhula Deputy Managing Director (Southern Africa) CEO Redstone CSP (designate)

Project Update Crescent Dunes Solar Energy Project

ABENGOA SOLAR Solar Power for a Sustainable World

CSP PLANT OPERATIONS & MAINTENANCE

Engineering Evaluation of a Molten Salt HTF in a Parabolic Trough Solar Field

CRESCENT DUNES PROJECT OVERVIEW

CRESCENT DUNES PROJECT OVERVIEW

Feasibility Study on Solar Process Heat in Lebanon: The FreeGreenius Software. German Aerospace Center (DLR) Institute of Solar Research Dirk Krüger

COMBINING CONCENTRATING SOLAR POWER WITH MULTIPLE EFFECT DISTILLATION AT INLAND LOCATIONS

Solar Tower Receivers. The Power to Change the World

CONCENTRATING SOLAR POWER, THE PANACEA TO NIGERIA S POWER SUPPLY

ABENGOA SOLAR Solar Power for a Sustainable World

+ Head of STERG. Stellenbosch University

Technology Mix for the Diego de Almagro Solar Technology District in Chile

VGB Kongress Will African Electricity Contribute to Sufficient High Security of Supply in the European Power System?

Renewable Energy & Energy Efficiency in Egypt

CSP Development Status and Trends. Dipl.-Ing. Klaus Hennecke DLR Institute of Solar Research

Solar Boiler Concept for Concentrating Solar Power Plants. Ulrich Hueck, Dr.-Ing. Co-Founder

Conference Paper Upscaling of an Innovative Cogeneration CSP System

Funded by. EU GCC CLEAN ENERGY NETWORK II Join us: Contact us:

Collinsville Solar Thermal Power Station. Joe Hallenstein ASTRI 2015 Symposium 11 Feb 2014

Operational Aspects and Environmental Profile of Solar Thermal Technologies

CSP Technologies, Markets, Challenges

Techno-economic analysis of concentrated solar power plants in terms of levelized cost of electricity

Services to Technology Providers

CMR Journal of Engineering and Technology Vol.2 Issue.2 April, 2018

Prospects of Solar CSP Integration in the Oil & Gas Industry of the Middle East for Process Heating

Solar Industrial Process Heat Potential A California Highlight

Renewable Energy in Egypt Ehab Ismail Amin New and Renewable Energy Authority

Introduction to Solar Energy Technology. Introduction to Solar Energy Technology. Introduction to Solar Energy Technology

Jes Donneborg Executive Vice President

PS10 Solar Power Tower. Xi Jing, Fang

The Bokpoort: CSP Continuous Operator Success Story. Nandu D Bhula Chief Executive Officer Acwa Power Solafrica Bokpoort CSP South Africa

Advanced Thermal Energy Storing with the most efficient use of the ressources. Peter Badstue Jensen Vice President - Partner

Green Building and Smart City Solutions Wind and Solar Power Plant Projects in GCC. Abu Dhabi

Solar Energy: The Sustainable Energy Mix Cornerstone for Saudi Arabia

Available online at ScienceDirect. Energy Procedia 69 (2015 )

High-tech for Solar Thermal Power Generation Made in Germany NUMOV: Solar Industry in the Republic of Cyprus

ABENGOA SOLAR Solar Power for a Sustainable World

Renewables: The True Costs. Michael Taylor Senior Analyst

Forecasting DNI Requirements for STE commercial plants

Superconducting technology for Wind-powered Thermal Energy System to realize economic base load power

Comparative Analysis of Different CSP Plant Configurations in Saudi Arabia

Grid Integration of Concentrating Solar Power Plant and Cost Analysis

CALIFORNIA ENERGY COMMISSION STAFF GENERAL METHOD FOR DETERMINING THERMAL POWER PLANT GENERATING CAPACITY

The Value of Thermal Storage in STE Plants The Issue of Integrating Intermittent Renewable Generation into Power System Operation

RES - Status Quo, Potential and Prospects Vasileios Tsolakidis, CRES

SYLLABUS OF THE ONLINE COURSE ABOUT SOLAR THERMAL POWER PLANTS. TOWER, FRESNEL & DISH

Transcription:

CSPBankability Project Report Draft for an Appendix O Cost Structures to the SolarPACES Guideline for Bankable STE Yield Assessment Document prepared by the project CSPBankability funded by the German Federal Ministry Economic Affairs and Energy under contract No. 0325293.

Document properties Title Editor Author Contributing authors CSPBankability Project Report Draft for an Appendix O Cost Structures to the SolarPACES Guideline Bankable STE Yield Assessment Tobias Hirsch (DLR) Enver Yildiz (DLR) Fred Hustig-Diethelm (Suntrace) Stephan Heide (DNV-GL) Johannes Kretschmann (Fichtner) Date January 9, 2017 Page: 2

Index of contents Document properties... 2 O. Cost structures... 4 O.1. General structure of costs... 4 O.1.1. Capital expenditures (CAPEX)... 4 O.1.1.1. EPC costs... 4 O.1.1.2. Owner s costs... 6 O.1.1.3. Financing costs... 7 O.1.2. Operation and maintenance expenditures (OPEX)... 8 O.2. Exemplary cost estimate for Reference System PT-Oil... 9 O.2.1. Capital expenditures (CAPEX)... 9 O.2.2. Operation and maintenance expenditures (OPEX)... 12 List of tables... 15 Page: 3

O. Cost structures O.1. General structure of costs Depending on the time when project costs are estimated, the project structure and the type of CSP technology, respective cost structures, their level of detail and the accuracy of estimate will differ. The cost structures provided in this guideline refer to a project financed CSP project (see Appendix N) with an EPC turnkey contract. The level of breakdown and accuracy range presented herein corresponds to a project in the planning (feasibility study) phase. General information on cost estimation and typical accuracy ranges which shall be expected for the different estimate classes (project phases) is provided in Section 2.2 of the Guideline. On a very top level, project expenses are divided into capital expenditures (CAPEX) and operational expenditures (OPEX), as further outlined in the following sections for each of the reference plants. Chapter O.1 provides general aspects on the cost categories valid for all CSP technologies. In chapter O.2 the methodology is applied to the reference system parabolic trough with oil as heat transfer fluid. Corresponding default values for cost items are provided for this technology. In later versions of this document similar chapters will be added for other CSP technologies like molten salt towers. O.1.1. Capital expenditures (CAPEX) Capital expenditures consist of the following three main categories: EPC costs; Owner s costs; and Financing costs The sum of the EPC costs and the Owner s costs is often referred to as overnight cost, a term used in the power generation industry in order to compare different power plant options on a levelized cost basis. Overnight costs describe the cost of building a power plant overnight, i.e. the overnight cost does not take into account financing costs or escalation. Financing costs mainly refer to interest during construction and financing fees, as further outlined in Appendix N. O.1.1.1. EPC costs In case of an EPC turnkey project, an experienced EPC contractor will carry out the engineering for the project, procure all the equipment and materials necessary, and construct the plant, thus, providing the Owner with a facility which is ready to use. The EPC contractor has to execute and deliver the project within an agreed time and budget, commonly known as a Lump Sum Turn Key (LSTK) contract and provides the Owner with the respective guarantees. Page: 4

EPC costs consist of the costs for plant equipment, on-site facilities, and all infrastructure supporting the plant installation (e.g. workshops, offices, or roads), as well as costs for the direct and indirect labor required for the construction of the plant. Further, there are the costs of services provided by the EPC contractor, including the basic and detail engineering, contractor permitting, project and construction management, site related studies, commissioning and start-up services. Last, the EPC costs include the profit margin of the contractor and considered contingencies. The following general cost breakdown into main categories / subsystem 1 is proposed for the EPC costs: Site preparation incl. all site relevant works Solar field / heliostat field Heat transfer fluid system (incl. central receiver, if applicable) Thermal energy storage Solar tower (if applicable) Power block and Balance of Plant (BoP) Auxiliary heaters (if applicable) Engineering, project management and other EPC services Profit margin and contingencies The split into these main categories allows a techno-economic optimization, varying the size of the subsystems (e.g. solar field reference aperture area or thermal energy storage capacity) knowing the respective specific cost (e.g. $/m 2 or $/kwh t ) and a scaling factor. Scaling factors are considered in particular important for concept studies, in which different plant configurations are compared against another in order to derive the most economic plant configuration. The economy of scale relationship is based on the following formula: CC 2 = CC 1 SS 2 SS1 ssss (O.1) With CC 2 Equipment / subsystem cost at target size/capacity SS 2 CC 1 Equipment / subsystem cost at reference size/capacity SS 1 ssss Scaling factor for equipment/subsystem 1 Further information on the different cost categories are provided in the respective Reference System chapters in this document. Page: 5

Recommendations for the scaling factors are provided below for each Reference System, see e.g. Table O-6 for parabolic trough oil system. An overview of the corresponding reference and specific reference unit for the EPC cost items is provided in Table O-1. Please note, that for solar field costs, the reference aperture area is used. Since the exact definition of this area is specific for each manufacturer the corresponding costs need to be calculated on a consistent basis. Thus, a cost value for solar field can only be interpreted together with the definition of the reference aperture area and the performance data related to this specific aperture area. Table O-1: Reference and specific reference units of EPC cost items EPC cost item Reference Unit Direct Cost Site preparation total land area $/m² land Solar field / heliostat field solar field reference aperture area $/m² Heat transfer fluid system (incl. central receiver, if applicable) solar field reference aperture area or thermal capacity $/m² or $/kwh t Thermal energy storage (TES) thermal capacity of storage system $/kwh t Solar tower (if applicable) tower height $/m Power block and Balance of Plant nominal capacity of power block (BoP) $/kw e Auxiliary heater (if applicable)* thermal capacity of auxiliary $/kw t heater Engineering, management and other EPC direct costs % EPC services Profit margin and contingencies EPC direct costs % * HTF heater or supplementary firing for steam generation O.1.1.2. Owner s costs The Owner s costs prior to the Commercial Operation Date (COD) include all expenses for the Owner, which are not included in the EPC turnkey package and which are not related to the financing of the project. The Owner s costs can be grouped into the following: Project development (incl. preparatory studies and surveys, permits and licensing, taxes, development fee, incl. premium, etc.) Land costs (purchase or land lease during construction) Utility connections (incl. grid, water and other necessary connections) Page: 6

Additional Owner s costs (Owner's management, Owner's advisors (Owner s engineer, Financial advisor, Tax advisor, Insurance advisor, Legal advisor, etc.) Lender's advisors (Lender s technical advisor, Lender s legal advisor, Lender s insurance advisor; Lender s tax advisor, Financial model auditor, etc.), O&M mobilization, pre-operating costs, contingencies, etc.) The corresponding references for the Owner s cost items to be used as first approximation are summarized in Table O-2. Both the project development costs and the additional Owner s costs can be determined indicatively as percentage of total EPC cost. Land cost might only be applicable in some cases, i.e. might be included as land lease payments in the fixed OPEX. The cost for utility connections is very project specific (e.g. length of grid connection) and can vary significantly amongst projects. It needs to be further noted, that utility connections are sometimes also within the scope of the EPC contractor or provided by the respective power off-taker (utility). Table O-2: Reference and specific reference units of Owner s cost items Owner s cost item Reference Unit Total Project development EPC cost % Land cost (if applicable)* total land area $/m² land Utility connections** project specific $ Additional Owner s costs EPC cost % * if not fully reflected through land lease payments in OPEX ** to be determined on a project specific basis, depending on project constraints O.1.1.3. Financing costs The financing costs prior to COD, further described in Appendix N Financing, shall consider the following items: Interest During Construction (IDC); Up-front fees; Commitment fees; Agency fees (if applicable); Debt Service Reserve Account (DSRA) (if applicable); and Initial Maintenance Reserve Account. Page: 7

O.1.2. Operation and maintenance expenditures (OPEX) Annual operation and maintenance expenditures are divided into fixed and variable O&M costs. Fixed O&M costs need to be paid regardless of how much electricity is generated, i.e. regardless of the number of operating hours. In comparison, variable O&M costs are a function of the operation of the plant, i.e. the more operating hours the higher the variable O&M costs. O&M services are often provided by an experienced O&M contractor, based on a multiyear O&M contract, signed with the project company and including most of the required operation and maintenance activities. Table O-3 provides an overview of OPEX cost items, together with the respective references and proposed indicative calculation for each of the cost items. In addition, there might be maintenance reserve account payments required, generally at the beginning of the O&M period. Table O-3: Cost structure - O&M costs Item Fixed O&M costs Solar field & HTF system (material and maintenance) TES system (material and maintenance) Power block, BoP and aux. heater (material and maintenance) O&M personnel Administration & management Land lease (if applicable) Insurance Variable O&M costs Fuel Raw water Electricity Others (e.g. HTF, nitrogen, other consumables etc.) Total OPEX Reference / calculation Fixed percentage of solar field & HTF system direct costs Fixed percentage of TES system direct costs Fixed percentage of PB, BoP and aux. heater direct costs Number of staff times average manpower costs Fixed percentage of direct costs Land area times specific land lease costs Fixed percentage of total direct costs Fuel price times fuel consumption Raw water price times raw water consumption Electricity price times downtime electricity consumption Fixed specific value times annual power generation ($/MWh e ) Page: 8

The required inputs in order to calculate the O&M costs are summarized in Table O-4. Table O-4: Input data required for O&M cost estimation Item Input / Source Unit Power generation simulation result GWh/a Downtime electricity consumption simulation result GWh/a Electricity price location-specific value $/MWh Direct costs for main subsystems EPC cost estimate (as above) (solar field, power block etc.) $ Number of operating staff project-specific value (assumption based on knowledge of amount of # staff required for the O&M) Average manpower costs location-specific value (assumption based on knowledge of required personnel qualification and applicable $/a annual rates) Land area simulation result (solar field size etc.) m² Land lease location-specific value $/m² Fuel price location-specific value $/MWh Fuel consumption simulation result MWh/a Raw water price location-specific value; often water $/m³ concession - fixed water costs/a Annual raw water consumption simulation result m³/a O.2. O.2.1. Exemplary cost estimate for Reference System PT-Oil Capital expenditures (CAPEX) Based on key parameters for the determined Reference System PT Oil, indicative capital expenditures are provided in Table O-5 along with the specific cost figures and calculation. The considered key parameters are as follows: Nominal gross electric power: 100 MW e Solar field reference aperture area: 987,920 m² (296 standard collector loops) Total land area: 3,870,000 m² (approx. land factor of 4, i.e. 4 times SF reference aperture area) Thermal storage capacity: 2,052 MWh t Page: 9

Aux. heater nominal thermal power: 40 MW t Given the degree of definition for the Reference System, as outlined in the cost estimate chapter of the guideline, the cost estimate has been carried out on a class 3 level. Based on the technical definition of the parabolic trough oil Reference System as given in Appendix B and typical site conditions for a parabolic trough power plant in Spain, an overall accuracy range of -20 to +25% has been determined.. This relates to an accuracy range typically for a cost estimate conducted during the feasibility stage of a project (as outlined in Guideline Section 2.7.3). Table O-5: CAPEX breakdown for the Reference System PT-Oil Item Reference / Calculation M $ EPC Cost 511 Site preparation 4 $/m² total land area 15.5 Solar field 180 $/m² SF ref. aperture area 174.2 HTF system 56 $/m² SF ref. aperture area 54.2 Thermal energy storage (TES) 42 $/kwh t storage capacity 86.2 Power block and Balance of Plant 1050 $/kw e power block 105 (BoP) capacity Auxiliary heater 50 $/kw t auxiliary heater 2 capacity EPC direct costs Sum of above items 437.1 Engineering, management and 5% of EPC direct costs 21.9 other EPC services Profit margin and contingencies 17% of EPC direct costs 74.3 Owner s cost 36.7 Project development 3% of total EPC cost 16 Land cost N/A (land lease) - Utility connections N/A (fixed estimate for 220 kv) 6 Additional Owner s costs 3% of total EPC cost 16 Total Overnight Cost (-20% / +25% accuracy) 571.3 Above cost breakdown items include the following main subsystems, equipment and services: Site preparation: site clearing and grubbing, site leveling, drainage system, fencing (incl. wind protection), internal roads and parking areas, temporary laydown and storage area, etc. Solar field: collector foundations, collector support structure, mirrors, receivers, flexible connections (ball joints, flex hoses) and collector piping (cross over piping) incl. insulation, Page: 10

drives, instrumentation and control, assembly building, collector assembly and installation, initial spare parts, etc. HTF system: civil works (foundations and structures), ullage and reclamation system, HTF expansion and storage, nitrogen system, HTF pumps and accessories, heat transfer fluid, HTF piping and accessories, insulation, firefighting, instrumentation and control, electrical system, installation, initial spare parts, etc. Thermal energy storage: civil works (foundations and structures), storage tanks, molten salt pumps, molten salt / HTF heat exchangers, molten salt, immersion heaters, piping and accessories, insulation, firefighting, instrumentation and control, electrical system, installation, initial spare parts, etc. Power block and Balance of Plant (BoP): civil works (foundations and structures), solar steam generators, steam turbine generator, step-up and auxiliary transformers, main condenser, cooling tower, condensate, feedwater and steam system, general PB piping and accessories, insulation, technical buildings incl. control and electrical building, non-technical building (warehouse etc.), firefighting, water treatment plant, effluent treatment plant, aux. cooling system, aux. steam system, compressed air system, fuel storage and handling, instrumentation and control (incl. DCS and meteorological stations), electrical system (incl. UPS and emergency diesel generators), installation, initial spare parts, etc. Auxiliary heaters: civil works (foundations and structures), HTF heaters or supplementary firing for steam generation, fans and fuel forwarding pumps, piping and accessories, insulation, firefighting, instrumentation and control, electrical system, installation, initial spare parts, etc. Engineering, management and other EPC services: overall EPC management, basic and detailed engineering, procurement management, construction management, studies and surveys, EPC permitting, EPC insurance, commissioning and start-up services, training, etc. Project development (Owner s cost up to financial close): permits and licensing (building license, environmental permit, etc.), preparatory studies and surveys, local taxes and concessions, tendering, third party services (technical, legal due diligence, etc.), return for project developer (development fee or multiple), etc. Utility connections: HV grid connection, back-up power supply (MV) grid connection, water connection, fuel connection, access road, etc. Page: 11

Additional Owner s costs: Owner s management and administration, Owner's advisors (Owner s engineer, Financial advisor, Tax advisor, Insurance advisor, Legal advisor, etc.) Lender's advisors (Lender s technical advisor, Lender s legal advisor, Lender s insurance advisor; Lender s tax advisor, Financial model auditor, etc.), permitting during construction, supply of consumables during construction (water, power, etc.) As indicted above, scaling factors might be used in case of techno-economic optimizations, varying the size of the subsystems (e.g. solar field reference aperture area or thermal energy storage capacity) knowing the respective specific cost (e.g. $/m 2 or $/kwh t ) and scaling factor. Table O-6 provides indicative scaling factors for the respective cost items, in case of a parabolic trough power plant. Additionally, incremental design changes (e.g. chance of single storage tank pair to multiple storage tank pairs) need to be considered. Table O-6: Recommended scaling factors reference system PT-Oil Item Scaling Factor / Range Site preparation 0.8-0.9 Solar field 0.9-0.95 HTF system 0.8-0.9 Thermal energy storage (TES) 0.85-0.9 Power block and Balance of Plant (BoP) 0.7-0.8 Auxiliary firing 0.7-0.8 Engineering, management and other EPC services 0.3-0.5 Profit margin and contingencies 1 Project development 0.3-0.5 Land costs 0.9-1 Utility connections N.A. Additional Owner s costs 0.3-0.5 O.2.2. Operation and maintenance expenditures (OPEX) Based on the key parameters and simulation results for the Reference System PT Oil, the indicative direct cost figures presented above as well as Spanish specific operational and price assumptions, the indicative O&M costs for the Reference System PT Oil have been calculated and are presented in Table O-7. Given the degree of project definition, presented in this guideline, also for the OPEX estimate an overall accuracy range of -20 to +25% can be considered. Page: 12

The input data used to calculate the indicative O&M cost is summarized below, whereas the cost figures are presented in the subsequent table. Table O-7: Input data O&M cost estimate - Reference System PT-Oil Item Unit Value Net power generation GWh/a 363 Downtime electricity consumption GWh/a 8 Electricity price $/MWh 80 Direct cost M $ 422 Direct cost - solar field + HTF 228 M $ system Direct cost - thermal energy 86 M $ storage Direct cost - power block + BoP + 107 M $ aux. heater Number of operating staff # 48 Average manpower costs $/a 40,000 Land area m² 387 Land lease $/m²/a 0.17 Fuel price (e.g. NG) $/MWh 28 Fuel consumption (e.g. NG) MWh/a 180 Raw water price $/m³ 0.5 Annual raw water consumption m³/a 1,270,500 Page: 13

Table O-8: OPEX breakdown for the Reference System PT-Oil Item Reference / calculation Value [M$/a] Fixed O&M costs 7.14 Solar field & HTF system 0.5%of solar field & HTF 1.14 (material and maintenance) system direct costs TES system 0.3% of TES system direct 0.26 (material and maintenance) costs Power block, BoP and aux. heater 1% of PB, BoP and aux. 1.1 (material and maintenance) heater direct costs O&M personnel Number of staff times 2.1 average manpower costs Administration & management 0.15% of direct costs 0.63 Land lease (if applicable) Land area times land lease 0.66 costs Insurance 0.3% of direct costs 1.26 Variable O&M costs 1.64 Fuel Fuel price times fuel 0.01 consumption Raw water Raw water price times raw 0.64 water consumption (3.5 m³/mwh e ) Electricity Electricity price times 0.64 downtime electricity consumption Others (e.g. HTF, nitrogen, other consumables etc.) 1 $/MWh e times annual power generation 0.36 Total OPEX (-20% / +25% accuracy) 8.78 Page: 14

List of tables Table O-1: Reference and specific reference units of EPC cost items... 6 Table O-2: Reference and specific reference units of Owner s cost items... 7 Table O-3: Cost structure - O&M costs... 8 Table O-4: Input data required for O&M cost estimation... 9 Table O-5: CAPEX breakdown for the Reference System PT-Oil... 10 Table O-6: Recommended scaling factors reference system PT-Oil... 12 Table O-7: Input data O&M cost estimate - Reference System PT-Oil... 13 Table O-8: OPEX breakdown for the Reference System PT-Oil... 14 Page: 15