Grid Code Compliance. For India S.Balasubramoniam, Senior Consultant. 08 September September 2017 SAFER, SMARTER, GREENER

Similar documents
GRID CODE COMPLIANCE TESTING OF RENEWABLES NEW REQUIREMENTS AND TESTING EXPERIENCES

DNVGL-SE-0124 Edition March 2016

From KEMA to DNV GL Energy

Reliable Grid Integration of Wind Power Plants

Type Certification vs. Project Certification

Wind Turbine Life Extension

CENTRE FOR WIND ENERGY TECHNOLOGY CHENNAI INDIAN WIND GRID CODE

A REVIEW ON POWER CONTROL SYSTEM INVERTERS WITH VARIATION POWER SYSTEM

A Review on Low Voltage Ride Through Capability in Wind Turbines of India and Challenges in Implementation

Integrated Resource Planning: CAPEX & Wind Generation Modeling

Closed Bus Tie Systems Why to operate a DP vessel in closed bus tie configuration? Global Maritime 2013

Renewable Integration in India

Grid codes as enablers of the energy transition

Review of Procedures for Verification of Grid Code Compliance of Renewable Generation

Renewable energy connection requirements in Spain April 2012

Grid interconnection solutions for optimized renewable energy feed-in. Sneha Manohara Project Engineer Grid Interconnections

Dynamic Reactive Power issue in Wind Integrated Power Systems and LVRT Compliance of WPPs

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION COMMENTS OF NATIONAL HYDROPOWER ASSOCIATION

What can Wind Technology nowadays do for ASEAN s Smart Energy Future?

India-Sri Lanka Wind Energy Knowledge Exchange Program Nov 03 06, Type Certification of Wind Turbines In India

California Independent System Operator Renewable Integration Study

Type and component certification of wind turbines

RenewableUK Small Wind Turbine Standard

EAMS for Future Grids

Generation Application Part B: Technical Form

Renewable Energy in Power Systems

DISTRIBUTED GENERATION AND POWER QUALITY

Emerging ancillary service products in large-scale renewable energy integrated system

Wind Power Grid Integration - Grid Code Requirements & Compliance Schemes The German Case Lessons and Experiences

Inverter-Based Resources During a Cascading Failure: Present State and Future State

Norvento A renewable energy pioneer with 30 years proven track record

The Odyssey of Ulysses: Mobile Laboratory For Testing Wind Turbines

Certification of advanced Electrical Characteristics based on Validation of WEC Models and Simulation of Wind Farms

New Recommended Practises for Low Temperature and Icing Climate Conditions

ORISSA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAWAN UNIT-VIII, BHUBANESWAR ***** NOTIFICATION Dated the 30 th September, 2010

SYNOPSIS OF THE THESIS. Enhanced Power Quality Management of Grid Connected Wind Farm

We are a global classification, certification, technical assurance and advisory company Ungraded

Recent US Wind Interconnection Experience

Inverter Based Generation Power System Performance Needs workshop

Improving Industrial Energy Efficiency by Changing the Energy Culture

BUSINESS ASSURANCE GUIDANCE FOR THE TRANSITIONING FROM ISO 9001:2008 TO ISO 9001:2015 SAFER, SMARTER, GREENER

Grid Connection and Power Quality Optimization of Wind Power Plants

French riviera impact of climate change and REN on grid resiliance

Wind Turbine Certification

Proposal for categorization of Significant Users

PROJECT MICYT 2008 at the UPC

Digital Transformation of Energy Systems

Rate of Change of Frequency Distribution Code Modifications. Response to the Consultation

SMALL GENERATION SYSTEM APPLICATION (10 kw OR LESS)

SANY Heavy Energy Machinery Co., Ltd.

Grid Interconnection Standards for Distributed Resources and Microgrids

Adaptive Control Strategy for Low Voltage Ride through Capability Enhancement of Grid-Connected photovoltaic Power Plants

Turbine Commissioning & Data Processing

Digital Transformation of Energy Systems

Wind Farm Performance on the Grid: Perception and Reality

EAPP interconnection readiness workshop

Lessons Learnt From Qualification Testing In The US

Seminar on African Electrical Interconnection. Module 8 - Interconnected Systems Operating Conditions

Grid Interconnection Issues for Wind Generation

WIND ENERGY GENERATION

NERC Lessons Learned and Industry Recommendation

CLARIFICATION OF GENERATOR TECHNICAL PERFORMANCE REQUIREMENTS (S5.2.5)

ENERGY TRANSITION OUTLOOK 2017 A global and regional forecast of the energy transition to 2050

What makes a Wind Plant Grid Friendly?

Targeted Deployment of Solar Generation using Advanced Inverters. J. VALENZUELA J. WOODARD J. SALSMAN National Grid USA

A New Market Design for the German Electricity Market Local and European Context

Opportunity of a Lifetime. An integrated approach to asset life extension. Graeme McCann 10 DECEMBER 2014 ENERGY

Session 13: German MV and LV Grid Code and PV/Wind Operating Experience

Grid Connected Photovoltaic System with Voltage Control Strategy for Fault Ride through Enhancement

TRANSFORMING AUSTRALIA S ELECTRICITY SYSTEM

CALIFORNIA INDEPENDENT SYSTEM OPERATOR ANCILLARY SERVICES REQUIREMENTS PROTOCOL

Primary control - description of main technical and design characteristics

ENERCON. Wind Farms with Power Plant Capabilities. Tokyo, October 27 th Werner Bohlen / Eckard Quitmann

Connection of generation plant to distribution networks. Guidance on completing the application form

Future Energy Markets

DNVGL-CP-0432 Edition April 2016

LEVEL 1 Application for Interconnection and Net Metering

DIGITAL SOLUTIONS TRAINING CATALOGUE. RAM analysis. Maros and Taro SAFER, SMARTER, GREENER

Hydrogen and other routes to decarbonization of the gas network

ROOFTOP PV GUIDELINES FOR SAFE AND LEGAL INSTALLATIONS IN CAPE TOWN

Cascaded Two-Level Inverter-Based Multilevel STATCOM for High-Power Applications with Comparisions of DFIG and SCIG

Jammu and Kashmir State Electricity Regulatory Commission

Enabling the Internet of Energy through Network Optimized Distributed Energy Resources. ARPA-E NODES Program. TREIA Webinar June 28 th, 2016

AORC Technical meeting 2014

Experimental Microgrid in Venice. European Utility Week November 4, 2015 Angelo Bovo Veritas SpA

Hydro-Quebec s experience with HYPERSIM Real-time Power System Simulator

CASE STUDY : ASSESSMENT OF POWER QUALITY IN PRACTICE

Siemens Hybrid Power Solutions. Cost and emission reduction by integrating renewables into diesel plants

Dynamic Behaviour of Large Scale Wind Farm

Grid Code Reinforcements for Deeper Renewable Generation in Insular Energy Systems

Overview, Status and Outline of the New Standards Series - IEC

DIGITAL SOLUTIONS TRAINING CATALOGUE. QHSE and risk management. Synergi Life SAFER, SMARTER, GREENER

Technology development for greener shipping

Impacts of the Decentralized Wind Energy Resources on the Grid

ADVANCES in NATURAL and APPLIED SCIENCES

ANTICIPATING AND ADDRESSING SECURITY CHALLENGES IN AN EVOLVING POWER SYSTEM

safe reliable affordable GENERATOR COMPLIANCE MONITORING PROGRAM REQUIREMENTS 1 21 September 2015 TITLE: PREPARED BY: SYSTEM ANALYSIS & SOLUTIONS

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Workshop #8: Certification of Lidar-Assisted Control Applications

End-to-end electrical solutions for the biggest challenges involved with connecting wind energy to the grid. Solutions for Wind Energy Integration

Transcription:

Grid Code Compliance For India S.Balasubramoniam, Senior Consultant 08 September 2017 1 DNV GL 2015 08 September 2017 SAFER, SMARTER, GREENER

Organized to maximise customer value MARITIME OIL & GAS ENERGY BUSINESS ASSURANCE SOFTWARE CYBERNETICS RESEARCH & INNOVATION 2

DNV GL 3

Overview Why grid codes? Who requires to comply with grid codes in India? How to proof LVRT? Full or part proof that grid codes are fulfilled Summary 4

Two examples why grid codes must exist: frequency response (FRC) and fault current injection (FRT) 1. Frequency response (FRC) Power consumption and generation need to be balanced continuously Settings in India [MW/Hz]: consumption Generation Balancing power Balancing Power Europe & Ireland 2. Fault ride through (FRT) Behaviour during faults (means during voltage dips) 3 6 9 12 15 18 21 24 27 30 Minutes Example from India 5

UVRT field dipping (Under-Voltage Ride-Through) in India: LVRT (Low-Voltage Ride-Through) 1. Short circuit starts 2. Protection system switches off successfully 2 V T 1. Short circuit starts Voltage 1 V T time Fault 2. Protection system switches off successfully No. 6

Two Grid Code requirements as examples here: India 1. FRC, Frequency Response: for wind turbines or for PV inverters in India: no consumpt ion Generat ion Balancing power Grid Codes for India: CEA Local codes, e.g. APERC Grid Code 2. FRT OVRT required in India: no LVRT required in India: yes active current injection: yes in proportion to retained voltage Reactive current injection: yes for 300 ms or till voltage recovers whatever is first Specific characteristic: yes Requirements: 1. FRC: no 2. OVRT: no 3. LVRT: yes 4. Active fault current: yes 5. Reactive fault current: yes 6...x.. other. 7

What exactly is required? Currently: CEA requires a lot, e. g. LVRT (Under-Voltage Ride-Through) Harmonics Reactive power compensation AVR (automatic voltage regulation) PSS (power system stabilizers) Synchronous condenser mode Etc. Coming soon: LVRT also for PV inverters HVRT Frequency response Ramp rate limitations AVR also for PV and wind Compliance monitoring MNRE via RLMM only requires: LVRT 8

Overview Why grid codes? Who requires to comply with grid codes in India? Historically first: wind turbines can do LVRT PV will be following probably with LVRT, (HVRT?) and the rest How to proof LVRT? Full proof that grid codes are fulfilled Summary 9

RLMM (Revised List of Models and Manufacturers of Wind Turbines) Historically first to pass a governmental listing in India: Wind turbines Main concern: first structural integrity, now LVRT additionally Solution in India: RLMM with Type Certificates (structural integrity) plus Statement of Compliance (LVRT). Confusion with wording: see next slide Competent Authority: Ministry of New and Renewable Energy (MNRE), formerly: NIWE 10

Type Certificates with different scopes. Here: Grid Code only Note: the evaluation criteria within the type certificate gives clarification. Type Certificate Scope: Structural Integrity Type Certificate Scope: Grid Code Compliance Covered by RLMM using: IEC 61400 GL 2010 Avoid black-outs by: following rules from CEA Certify CEA compliance by qualified and independent certification bodies 11

Rules from CEA: The Grid Code for India Currently valid: http://www.cea.nic.in/reports/regulation/grid_connectivity_12112013.pdf Coming soon :http://www.cea.nic.in/reports/regulation/draft_technical_std_grid_regulations.pdf 12

Overview Why grid codes? Who requires to comply with grid codes in India? How to proof LVRT? In principal In India Full proof that grid codes are fulfilled Summary 13

Principle of Testing Low-Voltage Ride-Through (LVRT) Line-to-line voltage Medium Voltage Substation Time fault occurred 14

Comparing LVRT test of IEC 61400-21 with CEA LVRT requirement IEC 61400-21 defines LVRT test CEA requirement for LVRT is represented logarithmically Logarithmic time line Linear time line 15

IEC testing cannot proof CEA requirements (IEC 61400-21) VT/VN [%] 120 100 80 60 40 20 VD3 from IEC No IEC-tests in this area VD2 from IEC CEA curve, Grid Code India 0-1000 0 1000 2000 3000 4000 5000 time [ms] 16

Solution for India to proof LVRT-requirements for types of generating units per CEA to MNRE within RLMM approval process Test LVRT with specific test plan ensures to cover CEA requirement on LVRT principle of test plan per DNV GL s Service Specification 0125 Assessment of test results by Certification Body accredited for CEA Statement of Compliance for LVRT Is based on assessment of test results To be issued by a non-governmental Certification Body accredited for CEA Is a proof of evidence for LVRT in India 17

Overview Why grid codes? Who requires to comply with grid codes in India? How to proof LVRT? Full proof that grid codes are fulfilled For types of power generating units For each power plant station at a given site Summary 18

Unit level (here: individual wind turbine) 19

plant level (here: wind power station) Utility / control-centre Wind Plant 20

Solution for full proof of all CEA-Requirements Unit level (power generating unit models available on the market): Type Certificate for Grid Code Compliance (not limited to LVRT as currently) Component certificate for plant control device Specific simulation model validated against test results possible Plant level (power station with collected wind or photovoltaic power) Project Certificate for each single plant / power station at a given site based on the existing certificates from unit level e.g.: Type Certificate for Grid Code Compliance (CEA-requirements) Type Certificate for structural integrity (IEC 61400-22) Compliance monitoring Regularly checking settings, new regulatory requirements, harmonics 21

Overview Why grid codes? Who requires to comply with grid codes in India? How to proof LVRT? Full proof that grid codes are fulfilled Summary 22

Summary Grid Codes help preventing blackouts The grid code for India is from CEA MNRE requires for wind turbines Type Certificate for structural integrity plus Statement of Compliance for LVRT only. Approval takes place via RLMM process. LVRT will soon also be required for PV inverters IEC scope of LVRT-testing is not sufficient to proof compliance for India LVRT is not the full scope required by CEA Full scope of CEA-Requirements as far as applicable to unit level can be covered by Type Certificate for Grid Code Compliance To proof full compliance with CEA, each site with a PV or wind power station needs a site specific project certificate, based on existing Type Certificates Plant control equipment can become certified simulation models can be validated against LVRT-test results and certified for such DNV GL also provides tailor made solutions to proof your specific scope 23

We offer helping you regarding Grid Code Compliance in India Call us or write us an e-mail Tobias Gehlhaar Tobias.Gehlhaar@dnvgl.com +49 (0) 40 36149 7577 www.dnvgl.com SAFER, SMARTER, GREENER 24