ComEd Customer Requirements for Proper Installation of Metering Equipment Residential and Commercial Customers

Similar documents
Applying For New or Revised Electric Service

Applying For New or Revised Electric Service. ComEd is happy to assist you in initiating new or revised electric service to your location.

OPERATING PROCEDURE NO. 310

METERING INSTALLATION

OVERHEAD SERVICES - RESIDENTIAL & GENERAL SERVICE. See Chapter 3, Section 3.01 for more information about point of entrance (POE).

RESIDENTIAL QUICK REFERENCE

ELECTRIC METERING GENERAL

Basic Service. This Section provides information regarding a. Introduction

8.1.2 Under no circumstances shall a service entrance be left unmetered. Notify the Company if an unmetered service is encountered.

Specifications for Residential Overhead Electric Service Installation

Please check with your local inspection authority for any additional requirements before installation.

UNDERGROUND SERVICES (RESIDENTIAL) SINGLE FAMILY RESIDENTIAL, DUPLEXES, OR TOWNHOUSES

Metering Requirements 750 Volts or Less

8. REVENUE METERING. Operational Excellence Model. 8.1 Introduction

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES

UNITED COOPERATIVE SERVICES. SPECIFICATIONS FOR SELF-CONTAINED METER INSTALLATIONS August 2014

Electric Service Requirements. Residential Overhead. Engineering Specification T002. February

UNDERGROUND SERVICES - GENERAL SERVICE AND MULTI-UNIT RESIDENTIAL

Post Office Box 500 Carson, WA Phone (509) Fax (509) Toll Free (800)

Large Basic Service. This Section applies to members requiring new. Introduction. Service Types

Indianapolis Power & Light Company

A. Provide a complete Distribution Panelboard system as indicated on the drawings, and as specified herein.

OVERHEAD SERVICE. Table of Contents - Section 400

Specifications for Residential Underground Electric Service Installation

Metering Requirements 750 Volts or Less

Primary Contact: Owner Customer Electrician Builder

ELECTRICAL SERVICE UPGRADE RESIDENTIAL AND COMMERCIAL QUICK INFORMATION REFERENCE

SERVICE ENTRANCES. OPPD S Electrical Service Designer (ESD) shall designate the Point Of Entrance.

Indianapolis Power & Light Company

Specifications for Residential Overhead Electric Service Installation

DUPLEX INSTALLATION. Customer provides single service lateral attachment point in trough.

Chapter ELECTRICAL CODE*

Chapter ELECTRICAL CODE

New Construction Handbook

PRIMARY LINE EXTENSION

Inspection Guide for PV Systems in One- and Two- Family Dwellings (For Rooftop Photovoltaic Systems meeting the Standard Plan)

Electrical Service Guidelines

SERVICES - SERVICE EQUIPMENT- PANELBOARDS

Specifications for Electrical Underground Distribution Systems from Overhead Transformation, Apartments & Condominiums

COMMERCIAL CONDUIT RULES AND REGULATIONS

a) Line and load compartments must be separated by a stable barrier.

Electric Service Requirements Service Assembly Guide. Homer Electric Association, Inc Lake St. Homer, AK

Metering Requirements 750 Volts or Less

ELECTRICAL SAFETY Information Bulletin

Residential Electric Policy

An altered service that is moved, upgraded (ex., 200 to 400 amp) or changed to meet today's standards for electric service.

Electric Engineering Division RESIDENTIAL CONDUIT RULES AND REGULATION. S:\COO_ACM_US_Electric_Telecommunications\COO_ET_Engineering\Conduit Policies

Request for Electric and Gas Service Form

Central Lincoln PUD Commercial Service Guidelines & Standards

Electric Service Standards

Tucson Electric Power Company Rules and Regulations

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

Effective June, Eaton-Durham Model # UTRS223ACH. Siemens, Model # SUAS877-PG. (or Landis & Gyr # UAS877-PG) Milbank. Model # U1980-O.

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4.

INDEX. Page SECTION 1.0: SCOPE Toronto Hydro Requirements Ontario Electrical Safety Code 1 SECTION 2.0: PURPOSE 1

BLUEBOOK LITE. for Electrical Service. Edition

TEMPORARY FACILITIES

GENERAL NOTES PEDERNALES ELECTRIC COOPERATIVE, INC. RESIDENTIAL AND COMMERCIAL AMP METER LOOP SPECIFICATIONS

Electric Service Handbook

UNDERGROUND SERVICES SECONDARY

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4.

Commercial Electric Policy

Central Lincoln PUD Single-Family Residential Guidelines & Standards April 21, 2017

ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS

Electric Service Requirement Handbook

METERING INSTALLATIONS (GENERAL REQUIREMENTS)

CITY OF LODI ELECTRIC UTILITY DEPARTMENT RULE AND REGULATION NO. 16 SERVICE CONNECTIONS AND FACILITIES ON CUSTOMER'S PREMISES

OVERHEAD SERVICES - SECONDARY

METERING GUIDE PART 1 METERING GENERAL

Revision History. Corrected issue with spacing at top of overhead temporary drawings Corrected errors in numbered bullets in all drawings

WIRING RULES AND REGULATIONS OF TOMBIGBEE ELECTRIC POWER ASSOCIATION

ComEd Customer Requirements for An Underground Service

COUNTY OF RIVERSIDE BUILDING AND SAFETY DEPARTMENT PHOTOVOLTAIC PERMITTING GUIDELINES

SECTION 8 METERING CONTENTS

ELECTRIC SERVICE REQUIREMENTS

CUSTOMER METERING REQUIREMENTS

CUSTOMER METERING REQUIREMENTS

SECTION GROUNDING AND BONDING

Electric Service Requirements (Service Assembly Guide)

Call the Experts at REA Energy Services for all of Your Electrical and HVAC Needs.

SECTION 200 CLEARANCES

[Type text] Heber Light & Power. Developers & Excavators. Electrical Service Requirements Manual

PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES

PHOTOVOLTAIC (PV) SUBMITTAL REQUIREMENTS

WITH THE TITLE 24. replacement. story. stories, etc. R disconnects. to, PV. unit and any. supporting frame. conditions. greater than the main

(Condensed from National Electric Code)

Temporary Wiring. Low-Voltage Electrical Safety Orders

NORTHEASTERN REMC ELECTRIC STANDARDS MANUAL

1. Contractor shall obtain a valid electrical permit from the Town of Perinton.

For more information contact: Engineering Department (800) Ext RURAL RESIDENTIAL SERVICE INSTALLATION GUIDE.

Duke Energy Carolinas Distribution Construction Standards Reference Guide

Reference Information:

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

If a new residence s electrical service is not located within 200 feet of existing

NORTHEASTERN REMC ELECTRIC STANDARDS MANUAL

FIELD TEST AND OPERATIONAL CHECK SECTION A. Refer to Section 16010, Electrical General Requirements.

The Official Meter Manual of JCREMC. Created by the Engineering Dept.

Revisions for the 2015 Edition of the "Specifications and Requirements for Electric Installations (Bluebook)"

PUBLIC UTILITY DISTRICT NO. 1 OF CLALLAM COUNTY ELECTRIC SERVICE REQUIREMENTS

3. GENERAL INFORMATION AND REQUIREMENTS

Transcription:

1 st Edition ComEd Customer Requirements for Proper Installation of Metering Equipment Residential and Commercial Customers

Dear customer, This booklet contains some of the most common metering equipment installation examples. The illustrations depict Acceptable and Not Acceptable metering configuration installations. Improper installation of metering equipment yields safety hazards to ComEd personnel and may potentially delay the customer s service date. Please devote special attention to the captions next to each picture to get more of an in depth knowledge of what makes a safe and Acceptable metering equipment installation in comparison to a unsafe Not Acceptable metering equipment installation. To ensure your electrical service entrance metering equipment is installed correctly and can be energized in a timely manner, please ensure the following general guidelines are followed. GENERAL METERING EQUIPMENT REQUIREMENTS: Where applicable, a village or county permit must be obtained prior to ComEd notification and/or approval. All fittings must have a CECHA stamp to receive ComEd approval. All meter fittings must be installed at the proper/required vertical height/s and location/s. See EXH s A, B, & C & Fig s 1 & 1A All customer new and revised electric service entrances must be inspected and approved via the governing authority such as the municipality or county. See Fig s 1 & 1A and others for typical approval stickers All meter sockets must be clearly identified using the final tenant, suite or unit number designation and/or address on the metering equipment. See Fig. 2A There must exist a final ground grade with no obstructions around all metering equipment. See Fig s 3 & 3A All load side wires must be landed and terminated between the meter socket and unit panels. All line and load side wires must be landed and terminated at the customer s metering equipment. See Fig s 4 & 4A All meter fittings must be installed with the proper/required frontal, side, and swinging door clearances. See EXH s B & C. See also Fig s 5 & 5A Per local code, all new and existing services must have required grounds. For a situation in which meter-related facilities are located on a balcony, access to such meter-related facilities must be made by stairs, and must not be by ladder. SINGLE PHASE METERING: A fifth jaw is required at the nine o clock position of the socket for WYE (120/208v) single-phase services. See Fig. 6 All single-phase self-contained metering installations (200 amperes maximum), jumping studs/horns are required on the line and load connectors of the meter fitting. Meter fitting(s) must be at proper height. Service attachment (I-plate) must be installed in proper location and must be within minimum and maximum clearances. See Fig. 6 Trees on private property must be trimmed and/or removed as needed by the customer, so as to provide proper metering equipment clearances to allow initial installation and future maintenance. THREE-PHASE SELF CONTAINED METERING: All phases and the neutral must be clearly identified. See Fig s 2 & 4 All three-phase, 120/240V, four wire self-contained meter installations (200 amperes maximum), the high phase must be attached on the right side of the fitting and clearly identified (color coded red) within the meter fitting and at the weather-head. See Fig. 6A An integrated bypass lever is required for all three-phase, self-contained meter fittings. See Fig. 6A THREE-PHASE TRANSFORMER RATED METERING: Please ensure the metering cabinet size, estimated demand load and voltages have been provided to the ComEd field representative. Also, ensure an approved wiring harness is provided in all current-transformer cabinet installations (per ComEd requirements) when the meter fitting is on the CT cabinet door. See Fig s 2 & 4 CT Cabinet must be clearly marked Line and Load side. See Fig. 2 All three-phase, 120/240V, four wire current transformer rated meter installations (400 amperes minimum), the high phase must be in the center terminal lug position of the metering cabinet and clearly Identified (color coded red) within the meter cabinet and at the weather-head. See Fig s 4, 4A Conductor terminal lugs and cables within the CT cabinet must be positioned so as to allow CT mounting and installation. If the line side conduit penetration is located below the upper bus terminals of the CT cabinet, the cable must be trained/installed behind the bus bar detail. See Fig. 4

Approved Meter Connection Devices Exhibit A Typical Meter Connection Devices and Mounting Heights (Mininum & Maximum) 0 e -t------,-- iii z ii SINGLE SOCKET OR SINGLE ROW OF HORIZONTALLY GROUPED SOCKETS 0 0 0 0 8 - - - - --e SINGLE OR DOUBLE POSITION WITH UNDERGROUND SERVICE RACEWAY e--e--~ 00 GRADE ;~0<~ >.. 1/A'//,1/")- ¼_~~~ - 1/A.Y~,~ ALL-IN-ONE METERING PANEL WITH UNDERGROUND SERVICE RACEWAY 8+----~ - ' = VERTICALLY GROUPED AND SWITCHBOARD TYPE SOCKETS o o - --o--e GRADE TRANSFORMER RATED SOCKET HORIZONTALLY GROUPED SOCKETS WITH UNDERGROUND SERVICE RACEWAY

Approved Meter Connection Devices Exhibit B Frontal and Side Clearances a C 24" MIN l Spacer or Bus Extension 38" MIN J (Note 5) 24 MIN b ~ Main Switch or Tap Box (Note4) Conduit (Note4) Frontal Clearance 36" MIN a a Main Switch or Tap Box (Note a) ~ Meter Stack T 24" MIN Drawing Notes I. All dimensions shown are minimum dimensions. 2. 3. 4. Meter connection device approval (CECHA) is not a location or space approval. Location of equipment must comply with dimensions shown on this sketch, and with meter mounting height dimensions shown in Exhibit A. Main switch or tap box (a) may be mounted adjacent to meter stacks when units are of equivalent depth. Separation will be required by spacer, conduit, or bus extension ( c) when main switch or tap box (b) extends beyond adjacent meter stack as follows: a. b. If depth of main switch or tap box is 15" or less, a side clearance of 12" to center line of adjacent meter stack is required. If depth of main switch or tap box is greater than 15", a side clearance of24" is required. 5. These dimensions apply when meter stacks are mounted on adjacent comer walls.

7' \ LOCATION B LOCATION A =E (NOTE 3) C, C') z (NOTE 2) -NOTES- - C Exhibit C ::n 2. ~ 0 m OOOR. > :x:, z 0 36" 1 BARRIER. METER LOCATION C (NOTE 3) 6,. 1 METER (NOTE 3) (1' - / "' f-1 0 1. ALL DIMENSIONS SHOHN ARE MINIKJM DIMENSIONS. 0 METERS ARE NOT TO BE INSTALLED ON WALLS /"' ~ b WHERE THEY HILL BE BEHIND AN OPEN SWINGING,- 3. METERS IN LOCATIONS A, B & CHAY REQJIRE > PROTECTIVE BARRIERS IF TRAFFIC THROOGH OOORHAY COULD CAUSE HETER DAMAGE. A MINIMUM t m CLEARANCE OF 6 11 IS REQUIRED FR04 THE NEAREST u, EDGE OF THE METER -CONNECTION DEVICE TO THE - z

Current Transformer (CT) rated meter socket height s Not Acceptableheight range = 54 to 66 52 Fig. 1 Acceptable - height range = 54 to 66 62 Fig. 1A

Meter cabinet terminal identifications and meter socket premise address designations Not Acceptable line and load side not identified Acceptable line & load side identified Meter Socket Wire Harness Fig 2 Acceptable- preferred unit designations Fig 2A

Current transformer (CT) rated metering equipment accessibility - grading hazard Not To Grade, Safety Hazard Not Acceptable Fig 3 62 Acceptable final grade & height Fig 3A

Current Transformer (CT) metering cabinet line and load side terminal lug mounting Not Acceptable terminal lug placements inhibit CT mounting Meter Socket Wire Harness Fig. 4 Acceptable terminal lug alignment & color coding Not Acceptable un-metered current Allows Spacing For CT Mounting Fig. 4A

Ganged meter tap box configuration missing spacers between tap box and meter fittings Not Acceptablespacers required Acceptable spacing provided by disconnect panel Fig 5 Acceptable - approved spacers Fig 5A

Self contained single phase 3 wire 120/208V meter socket terminal configuration Bypass horns Not Acceptable Missing 5 th terminal & un-metered current t Fig 6 Self contained three phase 4 wire 120/240V meter socket bypass handle and high phase connected to the right terminal requirements Acceptable by-pass lever Acceptable selfcontained meter with high phase connected to right terminal & color coded red Fig 6A

For new or revised electric services, relocations, or temporary services please contact: 1-866-NEW-ELEC (1-866-639-3532) http://www.exeloncorp.com/comed/newbusiness For all other ComEd electrical needs, please contact customer service: 1-800-EDISON-1 (1-800-334-7661) More detailed metering information is available from the literature titled General Terms and Conditions located on the Exelon web site: http://www.exeloncorp.com/ourcompanies/comed/comedbiz/energy_rates/our_rates_and_prices.htm Please be aware that ComEd s system meter department must improve the installation of main electrical panels rated 1200 amps or greater or any switchboard with an un-metered switch. To obtain this approval, four copies of a one-line diagram for the meter-current transformer cabinet and disconnect switch sequence must be submitted to ComEd s system meter department located at 1919 Swift Dr., Oakbrook IL 60521. Please be sure to include the electrical panel s manufacturer and model number. These diagrams may be found in your project s electrical plans or in the manufacturer s specifications for the panel. Communicate with your electrical contractor if you need assistance acquiring these documents, and be sure to allow ComEd ample time to receive and review these items. All plans must be approved before the service can be livened. General ComEd meter application Guidelines In order for ComEd to promptly meet our customer s electric service needs, you must take a few simple actions: 1.) Call a ComEd representative at 1-866-NEW-ELEC (1-866-639-3532) and provide the following: a. Customer name, address, phone number, and Tax ID # or Social Security # b. Type of service i.e. overhead or underground, commercial or residential c. Preferred service start date d. City of Chicago customers must provide a permit number. 2.) Complete the Service and Meter Application. Application must be completed in its entirety. Failure to do so will delay the start of your electric service. 3.) Mail, E-mail, or Fax the Service and Meter Application to your ComEd Field Representative or the website above. If you do not know the name of your ComEd Field Representative, call 1-866-NEW-ELEC and request your representative s name, and contact information. 4.) Follow up by phone with your ComEd Field Representative to ensure your Service and Meter Application was received by the appropriate person. Be aware from the outset that all work must comply with the National Electric Code, your Governing authority s electrical inspection requirements, and with ComEd Service Standards. Customers must verify if the municipal or county requirements are more stringent. Reference the ComEd web site for more information, www.exeloncorp.com/comed/newbusiness