APPLICATION NUMBER:, TAX MAP KEY: STREET ADDRESS:, PRPOJECT: APPLICANT:, PHONE NO: MAILING ADDRESS:, FAX NO:

Similar documents
Project Address Applicant: (Please Print) Plan review Engineer: Phone: Date

EGRESS AZMIR SULTANA NICOLAS MIMU SAKUMA EDWIN VEGA CHAMORRO

2015 IBC Exit Systems

General Building Information

City of Des Moines. Permit and Development Center 602 Robert D Ray Drive Des Moines, IA Phone: Fax:

SPARTANBURG COUNTY BUILDING CODES DEPARTMENT

Common Plan Review Rejection Reasons

Common Plan Review Rejection Reasons

CITY OF OCEANSIDE. Single Family Dwelling Stairways/Guards. Informational Bulletin

Worksheet for Commercial Building Planning

2012 IBC Exit Systems

RESIDENTIAL STAIRWAYS, HANDRAILS,

Applying the Building Code During Design

FRAMING INSPECTION GENERAL

This worksheet must be signed by the architect or engineer of record for the entire project for commercial or mixed-use buildings.

CALIFORNIA BUILDING PLANS EXAMINER CONTENT OUTLINE 01. GENERAL ADMINISTRATION 3 % Project Administration 3%

RESIDENTIAL BUILDING REQUIREMENTS

Document G808. Project Data CONSTRUCTION DOCUMENTS DATE IDENTIFICATION DESIGN DEVELOPMENT DATE IDENTIFICATION INITIAL INFORMATION DATE IDENTIFICATION

2015 International Fire Code

SIDEWALK & RAILING REPLACEMENT BOARD OF ED BUILDING

COMMERCIAL TENANT IMPROVEMENT PERMIT APPLICATION

COMMUNITY & DEVELOPMENT SERVICES 840 Northgate Drive, Richland, WA Phone: Fax:

CITY OF CALABASAS RESIDENTIAL PLAN REQUIREMENTS 1 OF 5 8/2017 PLAN INFORMATION

RESIDENTIAL REMODELING AND BASEMENT FINISH

4. Number of drawings required: ( ) Locations of nearest streets

City of Santa Monica Building and Safety Division

311.7 Stairways Width Headroom. Exception: Walkline Stair treads and risers Tread depth.

2009 IBC Section 1024 Approved Luminous Egress Path Markings

(Statute, Rule, FBC, Industry) FBC 406.3, see also FBC No provisions in FBC or FS

Village of Lombard Community Development Department/Building Division 255 E. Wilson Avenue Lombard, IL Tel: Fax:

HOUSING CONVERSION Guidelines for the conversion of a house to commercial use.

CODE COMPLIANCE PLAN REVIEW PROCEDURES

EXIT ACCESS RAMP. An interior ramp that is not a required interior exit ramp.

PRESCRIPTIVE COMPLIANCE METHOD

Permit Application Commercial / Industrial / Mutli-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE (Form #2)

1. Complete Building Permit Application forms on page 2. Include septic system design approval from the Washington County Health Department.

Work Group Item Stairways serving an occupant load of less than 50 shall have a width of not less than 36 inches (914 mm).

1301: Means of egress.

Permit Application Commercial / Industrial / Multi-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE

Municipal Code of Chicago CHAPTER EXIT REQUIREMENTS

Report of project list/proposed changes for Dec. 5 and 6, 2017 BCAC face-to-face committee meeting and

Name of Project: Address: Zip Code Owner/Authorized Agent: Phone # ( ) - Owned By: Select one Code Enforcement Jurisdiction: Select one

Name of Project: Address: Zip Code Owner/Authorized Agent: Phone # ( ) - Owned By: Select one Code Enforcement Jurisdiction: Select one

BUILDING CODES & DESIGN CRITERIA

E2-09/ (IFC [B] )

2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES)

City of Pekin- Zoning and Inspections Department 111 S. Capitol Street, Pekin, Illinois (309)

CALIFORNIA BUILDING CODE MATRIX ADOPTION TABLE CHAPTER 10 MEANS OF EGRESS

Permit Application Commercial / Industrial / Multi-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE

ICC CODE CORNER 2012 IFC Code & Commentary

City of Omaha Plans and Permits Commercial Alterations and Conversions Building Permit Submittal Checklist

* RESIDENTIAL PLAN REVIEW *

CARBON MONOXIDE ALARMS

FIRE-RESISTANCE-RATED CONSTRUCTION

PENNSAFE BUILDING INSPECTION SERVICES LLC Deck and Roof Cross Section Submittal

(1) [BE] Definitions. The following terms are defined in rule 1301: of the Administrative Code.

PLAN SUBMITTAL REQUIREMENTS - ARCHITECTURAL

STAIRWAYS, HANDRAILS, AND GUARDRAILS (RESIDENTIAL)

2018 IRC Sections R303 through R310 Building Planning II

INTERNATIONAL CODE INTERPRETATIONS

PENNSAFE BUILDING INSPECTION SERVICES LLC PERMIT APPLICATION

City of Walnut Creek Development Review Services 1666 N. Main Street, Walnut Creek, CA (925) phone (925) fax

INTERIOR ENVIRONMENT

LEAD DESIGN PROFESSIONAL:

2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES)

LINCOLN COUNTY REQUIRED INSPECTIONS (Last updated August 23, 2017)

RESIDENTIAL BUILDING PLAN REQUIREMENTS

Minimum Requirements for Residential Occupancy Codes and FAQs

DECK CONSTRUCTION REQUIREMENTS

CITY OF LONG BEACH Department of Development Services BUILDING AND SAFETY BUREAU TENANT IMPROVEMENT GROUP B FIRE PLAN REVIEW CHECKLIST

2009 IBC/IFC Photoluminescent Signs & Pathway Marking Systems Frequently Asked Questions

Company Overview. Significant Code Changes Massachusetts State Building Code 9 th Edition (2015 International Code)

DEVELOPMENT SERVICES BUILDING INSPECTIONS

Comparison of the life safety elements of the 1997 UBC and the IBC 2000.

COMMERCIAL PLAN CHECK CORRECTION LIST PERMIT NO.: K20110

The Building Codes A.R.E. Building Design and Construction Exam Prep

DECK INFORMATION SHEET

Centennial Hills Skilled Nursing Facility Fire Protection Report July 13, 2016 Revised September 15, 2016 JBA Project No

MEANS OF EGRESS CHAPTER 10

General Residential Code Requirements

Plan Submittal Checklist 2015 I-Codes

Updated references to SEI/ASCE 7 to the 2016 edition once it is available.

UCC Permit Application Procedures

E?? , , , , , , , , , , , , Table ,

Commercial Remodel Permit

STATE UNIVERSITY CONSTRUCTION FUND

County of Yolo Development Services Building Inspection Division

City of Walnut Creek Development Review Services 1666 N. Main Street, Walnut Creek, CA (925) phone (925) fax

CITY OF DANA POINT. COMMUNITY DEVELOPMENT, BUILDING AND SAFETY Golden Lantern, Suite 209 Dana Point, CA

MVRTA Newburyport Intermodal Parking Facility Newburyport, Massachusetts

EGRESS CHAPTER ,500 3 Over 2,500 4 OCCUPANT LOAD REQUIRED MEANS OF EGRESS

INTERNATIONAL BUILDING CODE - ADOPTION AND AMENDMENTS Effective July 1, 2004

International Code INTERPRETATIONS

Plan Routing Information:

Village of Glencoe 675 Village Court, Glencoe, Illinois

BUILDING DIVISION 120 Malabar Road, S.E., Palm Bay, FL Phone: (321) Fax: (321)

2020 DISPLAY REGULATIONS

BENZIE COUNTY BUILDING SAFETY and CODE ENFORCEMENT DEPARTMENT 448 Court Place, Beulah, Michigan Ph Fax.

2003 International Residential Building Code

EFFECTIVE USE OF THE IBC/CBC

Transcription:

COUNTY OF KAUAI BUILDING DIVISION, DEPARTMENT OF PUBLIC WORKS 4444 RICE STREET, SUITE 175, LIHUE, HAWAII 96766 Telephone: (808) 241-6655 Fax Number: (808) 241-6806 BUILDING CODE COMMERCIAL CHECKLIST APPLICATION NUMBER:, TAX MAP KEY: STREET ADDRESS:, PRPOJECT: APPLICANT:, PHONE NO: MAILING ADDRESS:, FAX NO:, E-MAIL: PLAN MAKER/ ARCHITECT:, PHONE NO: MAILING ADDRESS:, FAX NO:, E-MAIL: BUILDING CODE SEARCH 1997 UBC Occupancy Type of Group: (Chapter 3):, Construction: (Chapter 6): ALLOWABLE FLOOR AREA: (Sections 504, 505) 1. Basic Floor Area (Table 5-b): S. F. 2. Increase for Multi-Story (Section 505): S. F. a. Twice area allowed for 1-story: S. F. b. Sub Total: S. F. 3. Increase where yard more than 20 feet wide is provided (Section 505). Circle one below if applicable. a. Separation 2 sides: 1¼ per cent each foot over 20 feet (50% maximum) b. Separation 3 sides: 2½ per cent each foot over 20 feet (100% maximum) c. Separation all sides: 5% (per cent) each foot over 20 feet (100% maximum): S. F. 4. Increase for Fire Sprinkler System (Section 505). Circle one below if applicable. a. Tripled for 1-story b. Double for multi-story buildings: S. F. 5. Total Allowable Floor Area: S. F. 6. Total Actual Floor Area of Building (s): S. F. 7. Will Unlimited Area Provisions be used? Yes: No: 1

8. Any future floor area expansion? Yes: No: ALLOWABLE HEIGHT AND NUMBER OF STORIES: 1. Height limited by Type of Construction (Table No. 5-B): FT. 2. Maximum height in stories (Table No. 5-B) ST. 3. Increase one story if fire sprinklers are used and not required by code (Section 506). ST. 4. Total Number of Stories: ST. LOCATION ON PROPERTY: Check appropriate answer for compliance. 1. To determine wall and opening protection requirements, property line shall be established (Section 503). 2. Projections beyond the exterior walls shall not extend beyond: a. One-Third the distance to the property line (Section 503, See also Section 705). b. More than 12 inches into area where openings are prohibited (Section 503). 3. Eaves overhangs and similar architectural projection should comply with Section 705. 4. Exterior exit balconies should not project into yards where openings are not permitted or protection of openings are required. 5. Exterior stairs should not project into yard where openings are not permitted or protection of openings is required. REQUIRED SEPARATION: 1. Area Separation Wall (Section 504.6). HR. 2. Separation Walls/Common Walls (Section 601.5) HR. 3. Mixed Occupancy Separation (Table No. 3-B) HR. 4. Attic Separation (Section 708.3.1.2 & 1505) a. Unsprinklered every 3,000 s.f. b. Sprinkerlered every 9,000 s.f. Actual maximum attic area: S.F. 5. Fire blocks and draft stops (Section 708). Circle location of required stops if applicable. a. Walls b. Ceilings c. Floors d. Floor/Ceiling Systems e. Roofs f. Roof/Ceiling Systems g. Others 6. Other special separations if required: 2

Others (con t.): FIRE RESISTIVE CONSTRUCTION REQUIREMENTS: (Table No. 5-A, Table No. 6-A) Provide Fire-Resistive Rating Repost(s)/Design Number (Chapter 6 & 7) Exterior Bearing Walls: Exterior Non-Bearing Walls: (Section: 503.2, 709) (Section: 503.2 & 709) Vertical Openings: Floors: (Section: 711) (Section: 302, 709) Roof: Interior Bearing Walls: (Section: 710, Chapter 15) (Section: 709) Exterior Door/Window: Structural Frame: (Section: 713) (Section: 703) Permanent Partitions: Inner Court Walls: (Section: 709) (Section: 503.3, 1203.4) Shafts: (Section: 711) EXTERIOR OPENINGS PROTECTION: Required: Not Required: 1. For Types I and II Construction (Section 503, 602.3, 603.3, Table No. 5-A & 6-A). 2. For Types III and IV Construction (Section 503, 604.3, 605.3, Table No. 5A & 6-A)). 3. For Type V Construction (Section 503, 606.3, Table No. 5-A & 6-A). 4. The sum of the area of protection openings shall not exceed 50% of wall in each story (Section 503.2). OCCUPANT LOADS: Determine the occupant loads and all portions of a building shall be presumed to be occupied at the same time (Section 1003, Table No. 10-A). Room Area Square Feet Number of Number of (Occupancy) (S.F.) Per Person Person Exit Required TOTAL OCCUPANT LOAD: EXIT REQUIREMENTS 1. Number of exits required (Section 1003). Required Exit(s) 2. Total width of exits shall not be less than the total occupant load determined and multiplying the factor set forth in Table 10-B. (Section 1003.2.3). Required Width 3. Arrangement of exits. If 2 exits are required, they shall have a minimum separation of one-half the maximum overall diagonal dimension of the building or area served measured in a straight line between exits (Section 1004.2.4). Diagonal Dimension 3

4. Travel distance to exits (Section 1004.2.5). a. Unsprinklered building: Maximum 200 feet to exit. b. Sprinklered building: Maximum 250 feet to exit. c. Maximum of 250 feet, when last 100 feet is within corridor. 5. Access to exits (Section 1004.2.6), dead end corridors shall not exceed 20 feet in length. 6. Exits through adjoining rooms (Section 1004.2.2). Check answer for compliance: No: a. Room shall not exit through more than one adjoining room. b. Room shall not have more than one of its required exits through an adjoining or intervening room. c. Exits from room shall not pass through kitchens, store rooms, restrooms, closet or space used for similar purposes. 7. Corridors minimum widths (Section 1004.3.4) a. 44 inches minimum width serving occupant load of 50 or more. Yes: b. 36 inches minimum width serving occupant load of 49 or less. EXCEPTION: 1. Handrails and doors shall not project more than 7 inches into the required corridor width when fully opened or more than one-half the required width when fully open (Section 1004.3.4). 2. Nonstructural projections and decorative features may project 1½ inches into required width on each side (Section 1004.3.4). 8. Exit Doors (Section 1003.3.1). a. Shall swing in the direction of exit travel serving any hazardous area or an occupant load of 50 or more. b. Double-acting doors shall not be used as exits serving and occupant load of more than 100, door is part of a fire assembly, door is part of a smoke-and-draft control assembly or panic hardware is required. c. Double-acting doors shall have a view panel of not less 200 square inches. d. Exit doors shall be openable from the inside without the use of a key, any special knowledge or effort. e. Required minimum of an exit doors shall be of a 3-feet by 6-feet 8 inches door with a minimum clear width of 32 inches is provided. f. Exit door leaf width should not exceed 4 feet. 9. Exit Illumination shall comply with Section 1003.2.9. a. Exit illumination required. b. Illumination of exit sign required. c. Stairway enclosure illumination. 10. Exit signs shall be provided in conformance with Section 1003.2.8. 4

a. Exit signs required. b. Illumination of exit signs required. c. Separate source of power required. MEZZANINE FLOOR: (Section 214, 504.4, 507) GUARDRAILS: Maximum allowable area is ⅓ the area of the room in which is it located. Guardrails for stair, balconies, landings and openings should conform to Section 509. STAIRWAYS: (Section 1003.3.3) Height: 3-0 3-6 Spacing: 4 o. c. 6½ 12 o. c. 1. Minimum width of 44 inches for occupant load of 50 or more:. Minimum width of 36 inches for occupant load of 49 or less:. 2. Handrail should not project more than 3½ inches into each side of the required width. Specify actual projection: inches. 3. Risers not less than 4 inches nor more than 7 inches or 8 inches and runs should not be less than 11 inches or 9 inches. Maximum 7 inches risers, minimum 11 inches runners:. Maximum 8 inches risers, minimum 9 inches runners:. 4. Stairway landing should not be less than the required width of the stairway, but not exceed 44 inches when the stair has a straight run. Actual landing dimension: inches. 5. Handrails required on both sides of a stairway if the width of the stairs is more than 44 inches. Actual width of stairway: inches. 6. Top of handrails shall be placed not less than 34 inches or more than 38 inches above the nosing of treads. Actual height of handrailing: inches. 7. Handrailing projecting from a wall shall have a space not less than 1½ inches between the wall and handrail. Actual dimensional clearance: inches. 8. Handgrip portion of handrail shall have a cross-sectional dimension or shape of not less than 1¼ inches nor more than 2 inches. Handgrip shall have a smooth surface with no sharp corners. Actual cross-sectional dimensional: inches. 9. At least one handrail shall extend at least 6 inches beyond the top and bottom risers and returned or terminated in newel post of safety terminal. 10. Headroom clearance for stairway shall be not less than 6 feet 8 inches. Headroom dimension should be specified on plans. Specified on plans: 5

* * * * * * * * * * * * GENERAL CHECK LIST OF OTHER REQUIREMENTS * * * * * * * * * * * * BUILDING CODE: 1. Architectural or structural stamp and certification (Section 106.3.2). Required: Not Required: 2. Energy Conservation compliance certifications (Article 6 of Chapter 12, Building Code, KCC 1987 as amended). Building: Electrical: Plumbing: ELECTRICAL CODE: 1. Requirements for electrical plans. The following should be provided on electrical plans. PLUMBING CODE: OTHER DATA: a. Overhead Service: Underground Service: b. Symbols and abbreviations as applicable: c. One-line distribution diagram: d. Floor plan with circuit numbering: e. Branch circuit panel location: f. Panel schedule with total calculated load: g. Service equipment elevation and location: h. Electrical engineer stamp and certification required for total load exceeds 35 K.V. A. i. Lighting efficiency standard for energy conservation certification: 1. Requirements for mechanical plans. The following information should be provided on mechanical plans. a. Plumbing floor plan drawings. b. Sanitary piping isometric diagram. c. Water piping isometric diagram. d. Available water pressure at meter. e. HAVE system and equipment energy conservation certification: 1. Other data or additional information may be required by the Building Official to complete the review and processing of the permit application. Submitted By: Telephone: Fax Number Mailing Address: Date: E-Mail Address: 6