RFQ WEB Advertisement

Similar documents
LEVEL I PREQUALIFICATION DOCUMENTS COMPUTER SCIENCE ENGINEERING (CSE) ADDITION AND RENOVATION

REQUEST FOR QUALIFICATIONS STATEMENT (RFQ) CONSTRUCTION MANAGEMENT AT RISK SERVICES FOR THE GREENWOOD HIGH SCHOOL GYMNASIUM GREENWOOD, SOUTH CAROLINA

REQUEST FOR PROPOSALS. Construction Manager CM Services Pre-Construction and Construction Services

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk

REQUEST FOR QUALIFICATIONS

LEVEL I PREQUALIFICATION DOCUMENTS OUTPATIENT PAVILION UCSD MEDICAL CENTER LA JOLLA

LEVEL I PREQUALIFICATION DOCUMENTS

REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES. For the renovation of existing apartment buildings. August 15, 2016

REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT AT RISK SERVICES SUPPLEMENTAL INFORMATION PACKAGE

Chapter 4 State Requirements for Educational Facilities Section 4.1

REQUEST FOR QUALIFICATIONS AND PROPOSALS

PREQUALIFICATION AND ADVERTISEMENT FOR BIDS

LEVEL I PREQUALIFICATION DOCUMENTS GEISEL RESTROOM RENOVATIONS

Town of Bennington, Vermont Pleasant Street and School Street Sidewalk Installation STP EH08(11)

January 22, Table of Contents

Science Technology Engineering and Mathematics (STEM) Initiative

PUBLIC ANNOUNCEMENT REQUEST FOR DESIGN-BUILD SERVICES STATEMENTS OF QUALIFICATIONS (GREENVILLE CITY SCHOOL DISTRICT)

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District

State Historic Preservation Office. Bidding, Contracting, and Construction Guidelines for the Historic Restoration Fund

TOWN OF WINTER PARK REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER / GENERAL CONTRACTOR

REQUEST FOR QUALIFICATIONS

PROJECT SPECIFIC QUALIFICATION STATEMENT REQUIREMENTS for CONSTRUCTION MANAGEMENT SERVICES

Subject: Statement of Qualifications for Public Safety Building Design

REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT AT RISK SERVICES SUPPLEMENTAL INFORMATION PACKAGE

Denver Water Capital Projects Contractor Prequalification REQUEST FOR QUALIFICATIONS

PROJECT DESCRIPTION. The project is the Spartan Complex Seismic Upgrade, San Jose, California.

NOTICE TO PROSPECTIVE BIDDERS REGARDING PRE-QUALIFICATION FOR CONTRACTS FOR ALISAL UNION SCHOOL DISTRICT. Revised February 11, 2015

REQUEST FOR QUALIFICATIONS

ADVERTISEMENT FOR QUALIFICATION AND PROPOSALS OF DESIGN/BUILD TRADE PARTNERS

The University of Texas at San Antonio Request for Qualifications for University Center Update Common Lounge. RFQ No.

REQUEST FOR QUALIFICATIONS

1. PROJECT INFORMATION

ADVERTISEMENT FOR BIDS (AFTER PREQUALIFICATION)

Instructions for Submission of Contractor's State, ment of Qualifications (SOQ) UF Bid Number ITB17KO-107 Whitney Research Village

Both envelopes must have the following information in the lower left hand corner:

Beaverton School District Capital Program Purchasing SW Merlo Road, Beaverton, OR Phone:

NOTICE INVITING GENERAL CONTRACTOR PREQUALIFICATION

THE NUCLEUS INNOVATION AND RESEARCH PARK PARKING GARAGE

USD 497. Request for Qualifications Commissioning Engineers Building Commissioning Services. August 11, 2017

Request For Proposal Of Printing and Design Services. Marketing Department

Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents

ADDENDUM NO. 1. Date: January 11, for. RFQ for Design-Build Entity, Health Center/ Concession Project at Irvine Valley College. BID No.

ADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION

ADDENDUM #3. GRW Project No.: Date: March 19, 2019 Subject: City of Nicholasville Fire Station #4

VILLAGE OF VERNON HILLS REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER AT RISK SERVICES. Part I: Proposal Information

MASSACHUSETTS STATE COLLEGE BUILDING AUTHORITY REQUEST FOR QUALIFICATIONS TRADE CONTRACTOR SERVICES PART I PROJECT INFORMATION AND DESCRIPTION OF WORK

Department of Public Works Division of Engineering. Nassau County, New York

City of Eagle Point 2017 Paving Instruction to Bidders

Request for Qualifications for Architectural Services

TEXAS TECH UNIVERSITY HEALTH SCIENCES CENTER MEDICAL SCIENCE BUILDING II EARLY GMP SUB SELECTION REQUEST FOR PROPOSAL

CHAPTER AUXILIARY SERVICES. Prequalification of Contractors for Educational Facilities Construction 8.272

West Valley Library Parking Lot Repair with Porous Asphalt

Request for Proposals for: Construction Management Services For The ADDISON PUBLIC LIBRARY INTERIOR RENOVATION

PING YUEN & PING YUEN NORTH REHABILITATION

GWINNETT COUNTY DEPARTMENT OF WATER RESOURCES

REQUEST FOR COMPETITIVE PROPOSALS FOR ARCHITECTURAL SERVICES CITY OF PERRIS

I. CHANGES TO THE SPECIFICATIONS REISSUED WITH THIS ADDENDUM

Request for Letter of Interest (Electronic Submittal Required)

Construction & Engineering 1845 East Russell Road Suite 300 Las Vegas, NV 89119

REQUEST FOR PROPOSALS

Town of Brandon, Vermont Brandon Union St. Sidewalk STP EH 05 (4) Request for Qualifications Construction Inspection and Testing Services

This Addendum is directed to all prime Contract Bidders, and all others to whom Drawings and Specifications have been issued by the Architect.

REQUEST FOR PROPOSALS YORK COUNTY, PENNSYLVANIA TABLE OF CONTENTS

City of Eagle Point South Shasta Pedestrian Bridge Instruction to Bidders

House Doctor Consulting Services Application Package

ADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION

ADVERTISEMENT FOR QUALIFICATION AND PROPOSALS OF DESIGN BUILD SUBCONTRACTORS (DB SUBCONTRACTORS) (BUILDING 590 Deep Foundations)

Contractor Prequalification

MANHATTAN BEACH UNIFIED SCHOOL DISTRICT PREQUALIFICATION INFORMATION FOR PROSPECTIVE LEASE-LEASEBACK DEVELOPERS 2017/2018 I. BACKGROUND AND OVERVIEW

1.1 THE ARCHITECT S SPECIFICATIONS AND DRAWINGS 1.2 THE BIDDING CONTRACTORS

Roosevelt County. INVITATION FOR BID No CRUSHED CALICHE

Proposals will be received at 101 East 11 th Street, Suite G13, Chattanooga, TN until 4:00 P M, EST. End of Day on February 3, 2012 End of Day

DAG Architects, Inc. July South Walton Fire District Fleet Maintenance/Logistics Building & Training Tower

username: U16062 password: 8ojhiog2

SEE BELOW APRIL 3, 2001 FOX CALIFORNIA THEATRE CONSTRUCTION CONTRACT

REQUEST FOR PROPOSAL FOR POLICE OPERATIONS STUDY LOWER SAUCON TOWNSHIP

REQUEST FOR PROPOSALS AND STATEMENT OF QUALIFICATIONS IMPACT FEE STUDY

Pre-Construction Meeting Minutes

2014 ARTICLE III IMPROVEMENTS IN THE CITY OF EL CENTRO ADDENDUM NO. 02

UNIVERSITY OF CALIFORNIA, SAN DIEGO

BERRYESSA UNION SCHOOL DISTRICT PURCHASING DEPARTMENT 1376 PIEDMONT RD SAN JOSE, CA OFC FAX

Ge#ng Started. Application process:

Town of Burlington, MA Request for Qualifications Owner s Project Manager (OPM) Services for the Design and Construction of DPW Facilities

Selection of Contractor Step 5. June 2013

University of Washington. Request for Qualifications ARCHITECTURAL DESIGN SERVICES FOR. UW Fluke Hall Labs and Building Renewal Project Number:


Request for Proposal for GC/CM Consultant Services Ferndale School District. Secondary High School GC/CM Program. October 19, 2018

OAKLAND UNIFIED SCHOOL DISTRICT FOR NON-LOCAL PRIME CONTRACTORS PREQUALIFICATION QUESTIONNAIRE FOR CURRENTLY QUALIFIED FIRMS RENEWAL

MARYLAND STADIUM AUTHORITY

RFQ for Consultant Services- for City of Iowa City Capitol Street Parking Ramp Façade Improvements Project 2016

REQUEST FOR PROPOSAL (RFP) LEGAL SERVICES. Submission Date: November 28, :00 p.m.

August 31, To Whom It May Concern:

Construction Documents Education Program

Document Price List Prices effective June 1, 2016

Request for Proposals Strategic Planning Facilitation

This Addendum consists of:

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES

REQUEST FOR QUALIFICATIONS CITY ENGINEERING SERVICES

Dates/Times: p.m. Pacific Time.

REQUIREMENTS FOR PROCUREMENT BY THE COLORADO DEPARTMENT OF TRANSPORTATION OF DESIGN-BUILD CONTRACTS FOR TRANSPORTATION PROJECTS

Transcription:

165 Capitol Avenue, Hartford, CT 06106 Selection Type: Request for Qualifications (RFQ) Web Advertisement Construction Manager at Risk Adv. No.: Web Advertisement Date: July 18, 2008 General Statement: Services: Contract Number: Contract Title: Project Location(s): User Agency Name Project Delivery Method: Project Description: The,,, requests submittals of qualifications for the Construction of a Community College as specified for the contract below. Provide all of the Construction Manager at Risk services required to build this major facility. Gateway Community College New Haven, CT Church Street, between No. Frontage Rd. and Crown St., New Haven, CT. Gateway Community College Construction Manager at Risk The Gateway Community College project will consolidate many of the programs presently housed on the Long Wharf and North Haven campuses at a new location in downtown New Haven. The $147m project will enable a 367,000 gross square foot facility to be built on two city blocks at a major entrance to the city. The site will also incorporate a 600 car pre-cast concrete parking garage to serve the students of the College. The proposed design is intended to create a meaningful identity for the College while enhancing the urban qualities of the surrounding New Haven neighborhood. Organized along a linear atrium that becomes a three-dimensional interior street, the design gives access to major departments of the school, brings natural light to the center of the building, and creates open gathering spaces for students and faculty. Spanning over the street, the atrium emerges from the building to create a dramatic multi-story glass wall that gives a distinctive public identity to the College. This project will be a LEED Gold facility. The work will include sustainable design strategies including solar shading, ice storage, sustainable and recyclable materials, photovoltaic panels, and solar hot water heating. Project Description: (Continued) The program incorporates general instructional classrooms, science labs, nursing and allied health programs, culinary arts, and an early education child care center. There is a 25,000 sf library, a full service cafeteria and a 300 seat community center. The project is designed as a four storey building above grade. The north site has a full basement with classrooms, building services and shops. Shipping, receiving and trash removal are located in the basement. These will be accessed by the service tunnel owned and maintained by the City of New Haven, This tunnel will remain in service during construction. DPW Website Document Page 1 of 6 117F 072806 PMT

Planned Completion Date: 2011 Project Maximum Construction $147,000,000 Total Cost: Designated Services: Preliminary Schedule - Milestone Dates for CMR Selection Construction Manager at Risk General Selection Criteria The selected Construction Manager at Risk shall have and demonstrate extensive knowledge of, current experience with, and responsibility for the Construction Manager at Risk processes related to comparable facilities of similar size and complexity. The design of the Gateway Community College project is now at the 50% Contract Documents Phase. The final work packages for the trade bids will be established by the CMR. The Construction Manager at Risk preconstruction services will be primarily the bidding phase services. The construction phase services shall be the full range of Construction Manager at Risk services. The CMR will use Prolog (via DPW) as a Project Collaboration and Project Management tool during construction. Date Item QBS 07.18.08 (Fri.) QBS Advertisement in Newspaper for CMR QBS 07.23.08 (Wed.) QBS Advertisement in Newspaper for CMR QBS 07.25.08(Fri.) Post QBS Submission Requirements for CMRs QBS 08.18.08 (Mon.) CMR Qualifications package Submitted to DPW by 3:00 pm RFP 09.03.08 (Wed.) Notice to four (4) Short listed Firms RFP 09.15.08 (Mon.) RFP Package to four (4) Bidders (CMRs) RFP 09.22.08 (Mon.) Pre-proposal Meeting - held at DPW (Rm. 532) RFP 10.15.08 (Wed.) Proposals Due for Best Value Selection Process RFP 10.29.08 (Wed.) Interview RFP 11.14.08 (Fri.) Selection Notification to the selected CMR Cont. TDB Final CMR Negotiation of Scope, Schedule, &Fee completed Cont. TBD CMR Contract In-Place with Notice to Proceed 1. Demonstrated Project Team Experience with Large Higher Education Projects; 2. Demonstrated success with meeting budget and schedule requirements on large Higher Education projects; 3. Successful completion of complex phased projects in congested urban environments 4. Financial Stability and proof of bonding capacity 5. Safety Record and EMR 6. Demonstrated knowledge of local market and subcontractors M/W/DBE awareness and commitment Construction Manager at Risk Items to be Included in RFQ Response 1. The Construction Manager must be have a DAS Prequalification Certificate meeting the following minimum requirements: 1.1. Single project Size of $150,000,000 or more 1.2. Aggregate project limit (AWC) of $300,000,000 or more 2. Letter from Surety Company indicating proof of Bonding Capacity for a single project in excess of $150,000,000 and acknowledgement that capacity exists within your aggregate limits to issue a bond of this magnitude. 3. Documentation demonstrating successful completion of at least three (3) projects exceeding $100,000,000 utilizing a CM at Risk Contract. Provide both Owner and Architect references for each of these projects. 4. Details of the original and final project schedules on the three (3) above referenced DPW Website Document Page 2 of 6 117F 072806 PMT

contracts. Indicate reasons for deviation from the original schedule, if any. 5. Original Estimate and final contract amounts on the three (3) above referenced contracts. Indicate reasons, for deviation from the original contract amount. 6. Complete list of Higher Education project experience in the last five years. 7. Listing of major CM projects completed in a congested downtown city environment in the past 5 years. 8. Proposed project staffing with the following minimum qualifications: 8.1. Project Manager Minimum ten years in the construction industry with at least one project of over $100,000,000 as the Project Manager. 8.2. General Superintendent Minimum ten years in the construction industry with at least one project of over $100,000,000 as the General Superintendent. 8.3. Staff Experience with large Higher Education experience. 9. Provide a preliminary plan as to how the project will be managed. 10. EMR for the past five (5) years and corporate safety plan. QBS Submittal Booklet Requirements: 1. The documents below shall be available on or after July 25, 2008 2. Go to the DPW Website: www.ct.gov/dpw 3. At the top of the DPW Home Page click on the Publications link. 4. Under the Alphabetical Listings title, click on the Construction Manager at Risk Submittal Booklet Requirements link. 5. The Construction Manager at Risk will be selected using the two-step competitive sealed proposal procedure defined under Construction Manager at Risk Selection in the Construction Manager at Risk Submittal Booklet requirements. DPW Website Document Page 3 of 6 117F 072806 PMT

Affidavits Submittals: The Affidavit Requirements for this Contract shall be determined from the Affidavits Button at the top left of the CT DPW home page: www.ct.gov/dpw. All CMR Proposers shall review both the requirements for consultants and for contractors. At the time of the Contract execution, the CMR shall be required to sign the c) Consultant Affidavit if the expected contract fees will exceed $50,000, and the Contractor/Consultant Certification, if the expected contract fees will exceed $500,000. The Contractor/Consultant Certification states that you, your company, and specified other individuals have given no gifts to DPW personnel and other individuals set forth in this Certification. For the purpose of signing the Certification the date DPW began planning the subject project or services is the date noted below. Pursuant to Connecticut General Statute 4-252(d) any bidder, proposer or person who responded to a request for qualifications for a contract with a value over $50,000 who does not make this certification at the time of the contract execution shall be disqualified. The noted $50,000 value is based on Executive order #7C dated July 13, 2006. The most accurate information concerning affidavits and the Contractor / Consultant Certification can be found by going directly to the DPW web page at www.ct.gov/dpw, clicking on the Affidavits link and then carefully reviewing all of the documentation presented (including but not limited to the Introduction link and General Advice for Filling Out Affidavits and Resolutions/Certificates of Authority link. No forms, other than those posted on the DPW web page, shall be used by a consultant or design/builder. With regard to a State contract as defined in P.A. 07-1 having a value in a calendar year of $50,000 or more or a combination or series of such agreements or contracts having a value of $100,000 or more, the authorized signatory to this submission in response to the State s solicitation expressly acknowledges receipt of the State Elections Enforcement Commission s notice advising prospective state contractors of state campaign contribution and solicitation prohibitions, and will inform its principals of the contents of the notice. See (SEEC Form 11). Questions concerning the affidavits can be directed to the DPW Legal Services Division at 860-713-5680. Date DPW Began Planning the Subject Project: Qualifications Based CMR Selection (QBS): July 2004 The Construction Manager at Risk Qualification Based Selection process is based on comparing and evaluating weighted criteria of qualifications, cost, schedule and past performance of Firms in relation to work of similar scope and complexity that is required for this specific contract. The first step involves evaluating all qualified QBS submittals received by the above deadline. A Maximum of four Construction Manager at Risk Firms or teams will be short- listed. For the first step in the selection procedure to determine the three short-listed Construction Manager at Risk teams, the following are the rating point weights for the RFQ screening criteria categories: Notes: 1. Recent experience is considered five years or less. 2. In order to receive a rating of highly responsive for Criteria no.1, the examples cited will include Construction Manager at Risk projects of similar size and scope. 3. For Criteria no. 1 respondents will be considered minimally responsive if none of the examples cited include a Construction Manager at Risk Educational Facility... 4. In order to receive a rating of highly responsive for criteria no. 2, the Construction Manager at Risk team will have one or more Construction Management Association of America certified key personnel. DPW Website Document Page 4 of 6 117F 072806 PMT

Criteria Number Construction Manager at Risk Screening Criteria Categories Rating Points 1 Experience with Work of Similar Size and Scope as Required for this Contract 35 2 Organizational / Team Structure 30 3 Past Performance Data 20 4 Partnering Experience 15 Points per Interview Panel Member Points 100 NOTE: The second selection step will be a best value selection procedure based primarily on the highest qualifications and secondly on the cost proposal. Each short-listed Construction Manager at Risk team will receive a Request for Proposal (RFP). These firms will submit proposals to DPW for evaluation and the Construction Manager at Risk teams will attend an interview to present their proposal and their qualifications. The short-listed Construction Manager at Risk teams will also submit sealed proposals as part of their response to the RFP. The Construction Manager at Risk teams will be evaluated and graded based on their qualitative response to the RFP and their cost proposals. The grades are combined into a Total Best Value Selection Point Value for each Construction Manager at Risk team. The Construction Manager at Risk team with the most appropriate staffing, technical approach, and cost proposal shall be selected. The cost proposal will be 15% +/- of the best value rating score. Qualification Submittal Deadline and Location: Deadline for the receipt of the QBS Submittal Booklets is: 3 p.m., Monday, August 18, 2008. State Office Building Room 261 165 Capitol Avenue Hartford, Connecticut 06106 Note: Failure to the submit properly formatted QBS Submittal Booklets with all of the required contents including the affidavits and Certificate of Authority, by the designated deadline and location will result in the Firm s submittal being deemed deficient for consideration for this Contract. DPW Website Document Page 5 of 6 117F 072806 PMT

RFQ Contacts: For General QBS Requirements: For this QBS Contract: DPW QBS Unit or DPW Project Manager Randy Daigle Room 261 165, Capitol Avenue Hartford, Connecticut 06106 Emilio Pizzoferrato Room 460 165 Capitol Avenue Hartford, Connecticut 06106 Fax: 860 713-7272 Email: randy.daigle@ct.gov Fax: 860-713-7270 Note: Responses to requests for more specific contract information than is contained in this Advertisement shall be limited information that is available to all Firms and that is necessary to complete this QBS process. All requests for more specific contract information must be sent in writing (email acceptable). DPW Website Document Page 6 of 6 117F 072806 PMT