Thank you for purchasing our product. *Please read these instructions and follow them step by step.

Similar documents
FW66 FORESTRY WINCH FW66. Owner s Manual 19/02/2016

Operator s Manual for Morse Mobile-Karrier for 55-Gallon Plastic or Steel Drum

Model 195 Loader Attachment

TRUSS DOCK INSTRUCTIONS

You will probably need to perform this procedure in the loading dock area of the building. A fork lift or chain hoist may be needed.

MODEL 185R Kontrol-Karrier Operator s Manual for Morse Kontrol-Karrier

Conergy SolarFamulus II

11, 000- L b. E x t r e m e - D u t y P a l l e t Tr u c k OWNER S MANUAL

MECHANICAL LEVELERS. P.O. Box 338 Spring Hill, Tennessee /486/ /251/3382 Fax 931/486/0316

Tube-Line Bale Feeder BF-5600SL. Operator's Manual

MODEL 285A-HD Heavy-Duty Forklift-Karrier Operator s Manual for Morse Heavy-Duty Forklift-Karrier Model 285A-HD

Instruction Manual HK285. Note: The Owner/Operator must read carefully and understand all the information presented here before operation.

3.2 SuperTie 50K Installation Guide

Multi-Piece EasyStep Product Installation Instructions

YCW 250 I-Beam Curtain Wall System Installation Manual

Multi-Piece EasyStep Product Installation Instructions

DOUBLE SLIDE RAIL INSTALLATION METHOD. Double Slide Rail August

Pallet Jack 4,400 Lbs Capacity Model #31001

Single Mount Installation Instructions

H07 H09. BENCH FUME HOOD with Combination Sash. Fume Hoods. Installation Instructions. 48"- 60"- 72"- 96" long

OPERATING INSTRUCTIONS

Model 185A Kontrol-Karrier

Repackaging the Router

Tourmaster 3-Step Riser

Niklas portable freestand

MODEL 185A Kontrol-Karrier

6032 SH 3P Residential Shower Installation Instructions Gelcoat & Solid Surface Bathware

METALWorkS. RH200 Custom Hook-on Panels. General Installation Instructions. Ceiling 1.0 GENERAL Site Conditions Product Description

ZS880 Linear Shower Drain Installation Instructions

MODEL GEK E3 Guard Enclosure Kit. Operator s Manual for Morse Guard Enclosure Kit Model GEK E3 for Can Tumbler Model E3

MODEL GEK E1 Guard Enclosure Kit. Operator s Manual for Morse Guard Enclosure Kit Model GEK E1 for Can Tumbler Model E1

PHP8 & PHP30 Series Hydraulic Pushers

Quick-release pins swing the rack open from left to right to simplify installing and maintaining your equipment.

Aegis Heavy Capacity 20K Floor Scale. MODEL: 6200 Series. Installation Manual

SECURE. UNIVERSAL. MOUNTING. Tilt Kit Installation Manual

Rolling Towers. Layher Rolling Towers Uni Wide. Safety Structure Instructions for Assembly and Use. Mobile working platforms to DIN EN 1004:

ALUMINUM SCAFFOLDING

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

SECTION TIMBER FLOATS

HEAVY DUTY WELDING CART

BENNINGTON VS. AVALON/TAHOE

C.R. LAURENCE CO., INC. Intelli-Track SPS. Phase One - Installation Instructions

Custers. Camino CHIMNEY SCAFFOLDING ASSEMBLY AND USER S INSTRUCTIONS. Nov. 2003

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

MiniMax USER GUIDE. Mobile Aluminium Trade Quality Access Tower System. 3T - Through The Trapdoor Method

C Series Mechanical Pit Levelers. P.O. Box 338 Spring Hill, Tennessee fax:

Table of Contents Big expertise. Real convenience. Concrete commitment.

Method Statement. Panel Lifting Clamp. General Operation. John Trainor Products Manager. Date: Last Reviewed:

Aluminum Headache Rack

TO THE OWNER WARNING WARNING

PREMIER V Bucko Cast In Place

INDUSTRIAL CURTAINS INSTALLATION INSTRUCTIONS CHAIN SUPPORT MOUNTING

Radiant PV-RoofTopRac System Planning and Installation With Australia AS/NZS1170.2:2011 AMDT

DURA-BLOK is made from 100% recycled rubber and qualifies for LEED credits. Reflective strips on both sides allow for easy product visibility.

FIXED CEILING COLUMN. Installation Manual FIXED CEILING COLUMN

USER S Manual. HAKI Bridge System (HBS)

CORNER SLIDE RAIL OPEN PIT INSTALLATION INSTRUCTIONS

Operator s Manual for Morse Kontrol-Karrier with Spark Resistant Parts and Air Power Tilt

Manufactured by: FLOE INTERNATIONAL, INC State Hwy. 65 McGregor, MN

IMPORTANT. Use of safety surfacing (wood mulch) in compliance with ASTM specification F1292 is required. WARNING

Light Duty Ramps. Loadingdocksupply.com PHONE:

USER S OPERATING AND INSTRUCTION MANUAL

WINSAFE Corp. OPERATING INSTRUCTIONS MODULAR BEAMS and ACCESSORIES

Table of contents. 1.0 Assembly procedure for pallet live storage Supplemental information for "VARIOFIX" roller conveyor system - 2 -

Vision Platform System

user s guide for ( Hand-Built )

KINETICS Pipe & Duct Seismic Application Manual

KEEP FOR FUTURE REFERENCE MRT FORKLIFT ADAPTER READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT

TETRIX PRIME Expansion Crane Bot Assembly

Bravo Platform Unpacking Guide

HIGH MAST CAMERA POLE ASSEMBLY GENERAL

Sectional Scaffold. Scaffold Access Unit Installation Instructions

H 12 Heavy Duty Modern Tripod 8 Seat Swing Heavy Duty Hangers

PanelGrip Dry Glaze Glass Railing System

ODYSSEY FLOOR MODEL. Owner s Manual. O-6400-F shown rev 118

WALL CANTILEVER WORK STATION JIB CRANE

OWNER S MANUAL SERIES MDS-96-BK, SM, DR

OPERATING INSTRUCTIONS

Installation Manual. ArchCast Bridge. 3-Sided Precast Concrete Bridge Structure

LANAP300 Installation Instructions

Instruction Guide. FreeSpan SR. English

General Guidelines. Tools Required. Instructions for Part # SC500-AF. Safety

FodderPro 3.0 Commercial Feed Systems

Installation. Natrix

Magnetic Treadmill OWNER S MANUAL. Item #1000

DESCRIPTION SAFETY: WARNINGS ORDERING INFORMATION T01-B INSTALLATION INSTRUCTIONS DROP-IN AND FREESTANDING BATH K-11343T / K-11344T

BESTMOVE STANDING TRANSFER AID

SCAFFOLDING RUNWAY SYSTEM

DETAIL INSTRUCTION No. 1

DURA-BLOK Rooftop Supports

SCAFFOLDING RUNWAY SYSTEM

USER S GUIDE for HAKITEC 750. TEMPORARY ROOF with HAKI Trak Sheeting ( Hand-Built )

H50. DYNAMIC BARRIER Bench Fume Hood. Fume Hoods. Installation Instructions. 48"- 60"- 72"- 96" long

In-Wall Slide-out OEM INSTALLATION MANUAL

OVERSHOT GATE TECHNICAL DATA SHEET

Leveling Foot RB210. Leg Extender RLT66

Table of Contents. I. Introduction II. How To Use This Catalog Drives Idle End Conveyor Beams...

Edge-of-Dock Leveler 'BA' - 'BX' Series. Owner s Manual and Installation Instructions

OWNER'S MANUAL. Drum Handling Solutions DRUM CARRIER / ROTATOR SERIES DCR-205

Magnetic Treadmill OWNER S MANUAL

Transcription:

PAGE 1 OF 5 PORTA-DOCK, INC. AD01- DS 4'x 16'SW-AA - AP01- DS 4'x 16'SW-APD AW01- DS 4'X 16'SW-CPD ALUMINUM PORTA-DOCK *For Beige Decking Add the Letter B to the Model* Thank you for purchasing our product. *Please read these instructions and follow them step by step. Step 1. Block dock up about 16" (about 2' behind winch pockets) then bolt on winch (REF. # 11) to the plate with the winch handle shaft to the outside using 3/8"x 1" bolts and nuts (REF. # 18 & 2). Step 2. Apply the four nylon wear strips (REF. # 30) to the inside narrow ends of the pockets. Pockets should be clean and dry and above 50 degrees. Slide a VLM cover plate (REF. #38) onto each vertical lift member. Attach dock pulleys (REF. # 14) with 1/2"x 2 1/2" bolts and nuts (REF. # 15 & 3) to top of vertical lift members (REF. # 7). Insert vertical lift members into pockets on each side of dock. Screw the set screws (REF. # 6) into the face of the pockets. Leave both set screws loose at this time.

PAGE 2 OF 5 Step 3. Attach the chains (REF. # 16) to the two farthest inside holes of the axle (REF. # 10) with 3/8" X 3" bolt and nut (REF. # 19 & 2). Next, slide on the vertical lift member brackets (REF. # 13) onto axle, then wheels (REF. # 4) with the hub to the inside, then 3 washers (REF. # 8). Place a 1/4 X 2 1/2 pin (REF. # 1) in the holes in the ends of the axle. Roll the axle under dock, keeping axle centered with dock. Bolt lift member brackets (REF. # 13) to vertical lift members (REF. # 7) with 3/8" X 3" bolts, washers, and nuts (REF. # 19, 20, & 2) so there is a bracket on each side of the lifting member. Bring end of chain up to the opposite side of dock through the keyhole located on the right side of pocket and lock in position by sliding the chain link down the keyhole slot. Step 4. Attach winch handles (REF. # 28) with winch nut (REF. # 29). Attach lower dock pulleys (REF. # 14) to the winch side of the dock pockets with 1/2" x 2 3/4 pin (REF. # 21) between pocket and ear tab. Starting winch cable (REF. # 12) from the outside of the winch, pass cable through the hole on the side of the drum with the gears. Run cable through the lower pulley (REF. # 14), then up to pulleys (REF. # 14) on vertical lift members, and down to the top 13/32 hole in the pocket and back through the bottom 13/32 hole. Fasten with cable clamp (REF. # 5). Work winches until cables are raising dock. You must alternate winches as the dock moves up or down and you must have slack in the chain when rising. Place VLM pulley cover (REF. # 23) on cover (REF. # 23) on vertical lift member.

PAGE 3 OF 5 Before moving your dock into the water, make sure that the chains are not wrapped around the axle, and then pull the slack out of the chains by hooking them into the keyhole bracket. Roll your dock into position, and loosen the set screws on the VLM pocket. Adjust the dock to the desired height making sure that there is enough slack in the chains to accommodate the height you will be adjusting to. Once the desired height is reached, pull both the chains tight and then lower one side of the dock so the next link can be hooked into the keyhole slot and raise the dock back up to complete the tightening of the chain. Repeat on the other side. When finished with this, there should be no visible slack left in the chains, and they should be tight enough that you can t move them. Tighten the set screws in the VLM pocket. The cross chains are to help control the side-to-side stability of the end of the dock and need to be tight. Once set they only need to be adjusted if the height of the dock is changed. WARNING: before raising the dock it is necessary to loosen both of the chains and the set screws, or serious damage to the dock may occur. When tightening the set screws, they should be tightened until they are snug against inside leg, and then tightened 1 1/2 to 2 turns more. Check the set screws after a couple of uses and retighten if necessary. When moving dock into and from lake, lower dock to lowest level possible. AD01- DS SW-AA / AP01- DS SW-APD AW01- DS SW-CPD ALUMINUM PORTA-DOCK REF. # PART NO. DESCRIPTION APD CPD AA 1 5270 1/4"X 2 1/2" PIN SS 2 2 2 2 5056 3/8" NUT 12 12 12 3 5058 1/2" NUT 4 4 4 4 4002 TIRE PLASTIC MOLDED 2 2 2 5 5003 3/16" CABLE CLAMP 2 2 2 6 5170 1/2" X 3/4" SET SCREW 2 2 2 7 30084 VERTICAL LIFT MEMBER 2 2 2 8 5077 WASHER 3 2 2 2 10 30080 AXLE SW 1 1 1 11 3005 WINCH DL1100 2 2 2 12 3050 CABLE 3/16" X 15' 2 2 2 13 30088 LIFT MEMBER BRACKET 4 4 4 14 3300 PULLEY SHEAVE 1 1/2" 6 6 6 15 5120 1/2" X 2 1/2" BOLT 4 4 4 16 3071 CHAIN 3/16" X 7 2 2 2 17 5025 1/8" X 1" COTTER PIN 2 2 2 18 5081 3/8" X 1" BOLT 6 6 6 19 5084 3/8" X 3" BOLT 6 6 6 20 5070 3/8 WASHER 8 8 8 21 5008 1/2" X 2 3/4" PIN 2 2 2 23 3804 VLM PULLEY COVER 2 2 2 28 3008 DL WINCH HANDLE 2 2 2 29 5066 DL WINCH NUT 2 2 2 30 4112 8 1/2" VLM WEAR PAD 4 4 4 38 3850 VLM COVER PLATE APD WHITE 2 - - 3851 VLM COVER PLATE APD BEIGE 2 - - 3852 VLM COVER PLATE CPD BROWN - 2 -

PAGE 4 OF 5 FRAMES PART# DESCRIPTION APD CPD AA M60 FRAME APD/CPD 4'X 16 WHEEL END 1 1 - M20 FRAME AA 4'X 16 WHEEL END - - 1 PANELS PART# DESCRIPTION APD CPD AA B87 (B) ALUM PANEL 4'X 4' SW CUTOUT 2 - - BB60 CEDAR PANEL 4'X 4 SW CUTOUT - 2 - B86 (B) ALUM PANEL 4'X 4 STRAIGHT 2 - - B53 CEDAR PANEL 4'X 4' STRAIGHT - 2 -

PAGE 5 OF 5 Wheel dock height adjustment instructions Before moving your dock into the water, make sure that the chains are not wrapped around the axle, and then pull the slack out of the chains by hooking them into the keyhole bracket. Roll your dock into position, and loosen the set screws on the VLM pocket. Adjust the dock to the desired height making sure that there is enough slack in the chains to accommodate the height you will be adjusting to. Once the desired height is reached, pull both the chains tight and then lower one side of the dock so the next link can be hooked into the keyhole slot and raise the dock back up to complete the tightening of the chain. Repeat on the other side. When finished with this, there should be no visible slack left in the chains, and they should be tight enough that you can t move them. Tighten the set screws in the VLM pocket. The cross chains are to help control the side-to-side stability of the end of the dock and need to be tight. Once set they only need to be adjusted if the height of the dock is changed. WARNING: before raising the dock it is necessary to loosen both of the chains and the set screws, or serious damage to the dock may occur. When tightening the set screws, they should be tightened until they are snug against inside leg, and then tightened 1 1/2 to 2 turns more. Check the set screws after a couple of uses and retighten if necessary. When moving dock into and from lake, lower dock to lowest level possible.

Porta-Dock, Inc.