Best Practices for Using Enphase Current Transformers (CTs) in Australia and New Zealand

Similar documents
APS microinverter commissioning checklist

Training: MED-SOLAR MODULE :4. Constructing and Starting-up Of a Solar Power Plant

Specification for UDC Electrical Testing

Bulletin Grounding and bonding of solar photovoltaic systems Rules , , , and

Solar Power Owner s Manual

Objectives and Task Analysis for the Installer of Grid Connect Photovoltaic System

Australian/New Zealand Standard

ELECTRO-FENCE. Fence Protection System. System Manual. EF_System_V1.1

Accent Floor Heating. Tmat System Installation Manual. Floor heating system

SafeX110 Single Core Flexible Tinned Copper Cable

ELECTRICAL ISOLATION & LIVE WORKING

INFORMATION PROVIDED TO ASSIST THE TENDERER FOR THE SUPPLY OF:

FITTING AND CONNECTION OF CENTRAL UNIT EEN-CIC12

PHOTOVOLTAIC (PV) SUBMITTAL REQUIREMENTS

E.3.5 PHOTOVOLTAIC SYSTEMS TABLE OF CONTENTS UNSW DESIGN & CONSTRUCTION REQUIREMENTS WEB ENTRY PAGE

University of Bath Generic Metering Specification (Rev6)

Solar Electric Systems Safety for Firefighters

7700 TEST KIT OPERATIONS MANUAL

USER S MANUAL release 1.0

FAST POWER FACTOR REGULATOR. Computer-14df - xx - 144a INSTRUCTION MANUAL ( M / 00A ) (c) CIRCUTOR S.A.

XBDM-HW63. 63A Model. User & Installation Manual Xtreme Power Conversion Corporation. All rights reserved.

Introducing Elios4you. The innovative way to monitor & manage PV installations, both single-phase domestic and 3-phase commercial installs

6KW Grid Interactive Photovoltaic System

Content. 5. Appendix Technical Specifications... 13

Candidate Self-Assessment Checklist

Installation Guide Mesh Floor Heating System

Pre-installation Manual CONCEPT 301 D/401 D/501 D

MODBUS-RTU Applied to the XR10CX Control WATER HEATER DIGITAL OPERATING CONTROLLER

SINGLE-PHASE TWO-WIRE, DIRECT TYPE, 5(5A) User Manual for SGE-1Y-10100M

AS/NZS 3000: 2018 Changes to Wiring Rules Standard

Candidate Self-Assessment Checklist

MODELS MB1K-1, MB1K-2 MB2K-1, MB2K-2 MB3K-1, MB3K-2

SUPPLY NETWORK ANALYZER CVM-SP SERIES INSTRUCTION MANUAL ( M / 01A

Grounding of photovoltaic modules

Rooftop Solar PV System Designers and Installers. Training Curriculum. APEC Secretariat

It is acceptable to place all required information in the main element (such as D5010) and delete the sub-elements provided in this template.

Local Government District of Pinawa P.O. Box 100 PH: Pinawa, MB R0E 1L0 FX:

Agilent 86100A Infiniium DCA Time Domain Reflectometry Product Overview

DOWNLOAD PIX4DCAPTURE AND FREEFLIGHT PRO

CITY & COUNTY OF DENVER COMMUNITY PLANNING & DEVELOPMENT BUILDING PERMIT POLICY

Working in roof spaces Guidance note. Government of Western Australia Department of Mines, Industry Regulation and Safety WorkSafe

Keep your head out of the gas. When you are welding, air extractor should be used to prevent inhalation of gas.

Australian/New Zealand Standard

Connecting to the network information pack Version 1

Applied Electronics Essential Questions: Essential Vocabulary

Installation Guide 3CWC Floor Heating Cable System This guide is valid for all our 3CWC floor heating cable systems.

ECP SECONDARY COMMISSIONING REQUIREMENTS

Type 1 Machine Cable. Oxygen free tinned annealed copper wire interwoven with high tensile poly-yarn

Daker DK kva. Parallel installation quick start. Part. LE08927AA-09/15-01 GF

Inspection Guide for PV Systems in One- and Two- Family Dwellings (For Rooftop Photovoltaic Systems meeting the Standard Plan)

Tindo Karra. Installation and Specifications Manual. Introduction

The I-7531 CAN Repeater

ABSORPTION HYBRID FILTER FAR-Q TYPE

humidity probes Temperature and Talk to Grant for all your data logging solutions

Imperial Series. Model IMP-425/525/625/825/1000AP IMD-425/525/625/825/1000AP IMP-1025/1200/1500/2000AP IMD-1025/1200/1500/2000AP

In-Ground LED Light Installation Guide

Mar11 Rev B

AS/NZS :2014 AS/NZS :2014. Demand response capabilities and supporting technologies for electrical products

CABLEMASTER CABLE GUIDE

WARM ALL. Installation Guide Mesh Floor Heating System

WarmAll. 119A Sir Wilfrid Laurier Saint-Basile-le-Grand, (Québec), J3N 1M2

Unit 037 Maintaining electrical equipment/systems 1

Installation and Operation Manual

DOMESTIC ELECTRICAL INSTALLATION PERIODIC INSPECTION REPORT (FOR A SINGLE DWELLING) B ADDRESS AND DETAILS OF THE INSTALLATION Address: SPECIMEN

Toolkit 2 - Apprentice Training and Profiling

VBC Manual MManualManual. Installation and user manual for the VBC

Maintenance Bypass Breaker Cabinet Series Configuration 2. Installation and Operation Manual

Galaxy 300. Operation 05/

OPERATING MAINTENANCE INSTRUCTIONS

3 PHASE ENERGY ELECTRONIC METERS MKB-363-M INSTRUCTION MANUAL ( M / 00 B

Energy Monitoring System P. Ebenezer Paul 1, S. Nagraj 2 Narasu s Sarathy Institute of Technology, Poosarapatty, Salem

EASTERN ARIZONA COLLEGE Photovoltaic Design and Application

ELECTRICAL INSTALLATION DESIGN Three Day Course with option to achieve BTEC Advanced Award

Specification Technical Requirements for Revenue Electricity Meters

XSTi Standby UPS. 400VA, 600VA, 800VA Models. User & Installation Manual

AHP WELDS USER MANUAL

Westbrook House Annual Utility Data. Table 1. Westbrook House Utility Use. 2,713 sf, 3 people

Pre-Installation Guide

Same as Client Address. 40, Havelock Close. India Way. London. Postcode: W12 7NQ

TECHNICAL SPECIFICATION

DOWNLOAD FREEFLIGHT PRO AND PIX4DCAPTURE

FITTING AND OPERATION OF THE VILLA INTERCOM

A CASE STUDY OF A RESIDENTIAL PHOTOVOLTAIC SYSTEM WITH MICROINVERTERS

Ensure no person makes contact with the steel pole streetlight or temporary earth electrode while the testing procedures are being undertaken.

POWER NETWORKS Alternative Control Charges

ROOFTOP PV GUIDELINES FOR SAFE AND LEGAL INSTALLATIONS IN CAPE TOWN

1. Telecommunications mounting elements. 2. Backboards. 3. Telecommunications equipment racks and cabinets. 4. Grounding.

NZQA unit standard version 1 Page 1 of 5

T. SUNDUPALLI BRANCH (04427)

IE Code IE Competency Title Credit OAC Ref.

BX-895 REAL TIME MODULE OPERATION MANUAL

NZQA registered unit standard version 7 Page 1 of 5. Demonstrate and apply knowledge of safeguards for use with portable electrical appliances

ASSESSMENT AND DESIGN OF ROOFTOP SOLAR PV SYSTEM. Click to begin

Same As Client Address SPECIMEN. operational limitations. of the inspection and. agreed with):

TallSlateTM Grandee Installation Manual

Quick tip... DEVELOPMENT WHAT ARE THE ISSUES?

COUNTY OF RIVERSIDE BUILDING AND SAFETY DEPARTMENT PHOTOVOLTAIC PERMITTING GUIDELINES

LIFETIME WARRANTY INSTALLATION MANUAL. Ultra thin cable. Easy to install. Fully compliant to latest regulations CE approved INSTALLATION MANUAL

SL3273 9W Recessed LED Pool Light UNDERWATER LED LIGHTING

Compact Module. Enhanced Category 5 FTP Cabling System

Transcription:

TECHNICAL BRIEF Best Practices for Using Enphase Current Transformers (CTs) in Australia and New Zealand Introduction A Current Transformer (CT) is a current measurement device used in conjunction with the Enphase Envoy-S Metered to measure power flowing through a cable. Enphase provides a proprietary CT solution. Identifying the Correct CT The Enphase Envoy-S Metered is supplied with two CTs: one to measure the solar generation current (production) and one to measure the consumption current. You can order additional CTs for monitoring multiphase systems. Confirm the Envoy model before ordering a compatible CT. There are two CT models. The CTs are not interchangeable between Envoy-S models. Envoy Type Compatible CT Envoy-S Metered SKU: ENV-S-WM1-230-M Note: 200A CT SKU: CT-200-SPLIT Multiphase units have part number 880-00209. Single Phase units have part number 880-00121. Envoy-S Metered + DRM SKU: ENV-S-WM-230-M Units have part number 880-00202. 100A CT SKU: CT-100-SPLIT Note: All units are multiphase 1

Identifying the correct CT terminals on the Envoy-S Metered Envoy-S Metered (SKU ENV-S-WM1-230-M, Part Number: 880-00209) Production CTs Consumption CTs 2

Envoy-S Metered + DRM (SKU ENV-S-230-WM-M) Envoy-S Metered + DRM (SKU ENV-S-230-WM-M) Production CTs Consumption CTs 3

Extending CT Wiring Each CT includes a two meter flying lead for wiring the CT directly into the Envoy-S Metered terminals. An electrician may add up to three Ohms round trip (both wires end to end) resistance to the consumption CT or up to 1.5 ohms per wire. The following list provides the extendable lengths with varied cable sizes. Appropriately rated, 0.75 mm 2 to 1.5 mm 2, (up to 2.5mm 2 for Envoy-S Metered + DRM) twisted pair wire cable is required. Install in accordance with all applicable electrical codes and standards. Some options: Manufacturer Cable Description Max CT Extension Belden Belden 8471NH Unshielded Twisted pair cable (1.33mm 2 ) 75 m Olex, General Cable, Electra Cables Twin Active 1.5mm 2 TPS (AS/NZS 5000.2)* 80 m *Must be twisted gently by hand, 20 twists per metre, V-90, PVC, 90 C. Confirming CTs are Correctly Installed Use Enphase Installer Toolkit to verify that the CTs are correctly installed and measuring accurately. Check that Meters are enabled 1. Connect the Enphase Installer Toolkit app to the Envoy via network or AP mode. 2. Select Meters from the menu. 3. Verify the required meters are enabled (indicated by the green ticks). If not select the meter, and enable them as described in the in-app help of Installer Toolkit. 4

Verify Production & Consumption Meter Readings 1. Select the Production Meter. 2. Verify the number of phases is correct. Single Phase: L1(A) Two Phase: L1(A) and L2(B) Three Phase: L1(A), L2(B), and L3(C) 3. Expand the active power measurements by selecting the drop down arrow on the right. 4. Confirm that the power measurement is positive. In the example, this value is 557 W. If Installer Toolkit displays a negative power level, check that CT polarity is correct. The CT arrow should point from the microinverters to the switchboard. 5. Confirm that the CT is reading current correctly. In the example, 2.64 A is the current flowing from the inverters to the switchboard. Confirm this reading with an AC clamp meter. If this reading is not correct, check that the CT is closed and connected to the correct terminal of the Envoy. 6. Confirm that the Envoy has measured the correct AC voltage with an AC Voltmeter. In the example, the Envoy measured 239.8 V. 7. Confirm the power factor (PF) is correct. In the example, this value is 0.88 PF. Generally, the power factor will be in the range 0.7 to 1 when the production is at least 230W. This example shows a single phase site. 5

8. Select the Consumption Meter. 9. Verify that the number of phases is correct. 10. Verify that the Metered Circuit is correct. If the CT is on the grid supply, select Load with solar production. Use Load only mode if the CT is installed only on the loads. 11. Scroll down to Load with solar production. 12. Expand the active power measurements by selecting the drop down arrow on the right. 13. Confirm power measurement is positive. In the example, this value is 514 W. If Installer Toolkit displays a negative power level, check that the consumption CT polarity is correct. The CT arrow should point from the grid supply on the street to the switchboard. 14. Use an AC current clamp to confirm that the consumption CT is reading current correctly. In the example, this value is 2.327 A. If this reading is not correct, check that the CT is closed and connected to the correct terminal of the Envoy. 15. Confirm that the Envoy has measured the correct AC voltage with an AC Voltmeter. In the example, the Envoy measured 246.1 V. 16. Confirm the power factor (PF) is correct. In the example, the value is 0.88 PF. Generally, the power factor for load will be in the range 0.5 to 0.99 when the load is at least 230 W. A very low power factor is possible when voltage is out of phase to current measurement. Ensure that CT s and Envoy voltage supplies match in multiphase sites. This example shows a single phase site. Tips for Installing CTs Safely and Successfully Install the CTs as directed in the Envoy-S Metered Quick Install Guide, following all safety instructions and warnings. DANGER: Risk of electric shock. Always de-energise circuits before wiring for power and CTs. DANGER: Risk of electrocution! Do not install CTs when current is flowing in the sensed circuit. Always install CT wires in the terminal blocks before energising the sensed circuit. Mark Each End of the CT Wires Colour code each end of the CT wiring so you can quickly identify the correct CT Envoy terminal. This can be especially helpful in a multiphase installation. Colour coded CT Wires 6

Terminate the CT Wiring Before Closing the CT Remember, CTs can produce dangerous voltage and current if left unterminated while closed around an active conductor. CT Noise If the CT is making a buzzing noise, it has not been terminated to the Envoy correctly or there may be a break in the wiring. Open the CT and check the wiring. Close the CT If a CT is not fully closed, measurements will not be accurate. Always ensure that the CT is fully closed once fitted. CT Polarity Using Enphase Installer Toolkit, confirm that the CTs are enabled and measuring correctly. Confirm readings with an AC clamp meter. The arrows on an AC clamp meters indicate the direction of typical energy flow. For example, solar (production) energy should flow from the solar modules to the switchboard. Consumption energy should flow from the electricity supply to the switchboard. A closed CT Enphase Customer Support Enphase Customer Support technicians can make some adjustments to the Envoy-S Metered remotely if an internet connection is in place. Adjustments that may be made remotely on request: Enabling CTs Number of Phases Metered Circuit Call 1800 006 374 to reach Enphase Customer Support. 7