Trialling the re-use of used EEE from Leeds City Council HWRCs

Similar documents
Laying the foundations to double re-use

Assessment form for packaging recyclability

Executive summary. Meeting the UK climate change challenge: The contribution of resource efficiency

Waste management contractors selling the benefits of your Halving Waste to Landfill Commitment to construction clients

Defence sector: recycling waste in construction Defence Estates Regional Prime Contract East, Babcock DynCorp

The efficient use of materials in regeneration projects

Small WEEE collections checklist: Third Sector Organisation

Reducing construction waste saves money Bridge Learning Campus, Bristol Contractor: Skanska

Reducing Food and Packaging Waste in the Egg Supply Chain

The emphasis should be on the contractor to develop the targets for waste reduction and recovery. What is good practice?

Halving Waste to Landfill, SEESA

Packaging trial for tackling mushroom waste in the home

Re-use of WEEE from Household Waste Recycling Centres (HWRCs)

Railways: Waste less and save money

Non-packaging plastics

How to use the Clothing Longevity Protocol

A metric for the construction sector. The Net Waste Method testing a new standard for measuring waste neutrality

Expenditure. Vehicles. Call centre cost. Marketing. Cost of reuse. Disposal

Comparing the cost of alternative waste treatment options

The efficient use of materials in regeneration projects

Post-industrial landscapes bolster energy crops with the help of PAS 100 Compost

Benefits of off site manufacture

Resource efficient remediation

CASE STUDY: NEVIS RANGE MOUNTAIN EXPERIENCE

Engaging with suppliers on waste prevention

Promoting the recycling of small electricals

Innovative washing system helps extend potato product life and reduce water use

Reducing weight, reducing cost: lightweighting can ends

Utilities: Waste less and save money

Construction waste collection good practice: Gloucester Quays

HWRC shops overview 2016

Using quality compost to benefit potato crops

The Demolition Protocol: Aggregates Resource Efficiency in Demolition and Construction. Volume 3. For Contractors

Grays Waste Management

Surface Polymerisation of Retreaded

Study into consumer second-hand shopping behaviour to identify the re-use displacement effect

Reducing and recycling plasterboard waste on a site where space is a constraint

Bulky Waste Collection Options

Zero waste to landfill: Construction waste collection good practice

Redistribution summary

Re-use of WEEE from Household Waste Recycling Centres (HWRCs)

Delivering Sustainability with Prestige: at the BMW PGA Championships

Re-use Partnership Diverts Electricals from Landfill

Triggering a fresh packaging recycling trial

Summary Guide to Identifying Raw Materials Risks

Anaerobic digestion infrastructure in the UK: September 2011

Using quality compost to benefit cereal crops

McGrath works in partnership with Hackney Homes

CASE STUDY: ABERDEENSHIRE COUNCIL

Household food waste collections guide

Innovative waste management approach achieves exemplary recovery rates

Section 3: Brand, design and innovation

Waste Reduction Potential of Light Steel

Halving Waste to Landfill

Benefits of off site manufacture

Minimising construction waste through project design

Sustainable Procurement Case Study Natural History Museum

European Pathway to Zero Waste: embedding sustainable procurement for public sector organisations in south east England

Crack and Seat at Pennygillam to Tavistock Road on the A30. Recycled concrete aggregate (RCA) Concrete and Cement Bound Bases

RNLI makes waves with lifejacket recycling scheme

Raploch: urban regeneration

Best Practice Construction Waste Procurement: Office Fit-Out of 15 Canada Square, Canary Wharf

Comparing the costs of waste treatment options

Quality Protocol Biomethane from waste

Consumer attitudes to sustainable electrical products

Guidance for Mobile Asset Management (MAM) in the Facilities Management Sector

A blueprint for reducing waste and cutting costs

EfW Outputs. Guidance on the management of energy outputs and residues including air pollution control residues and incinerator bottom ash

Environmental. Environmental Permits (EP) are required to operate an energy from waste facility within England and Wales. Guide page 32.

Contractor follows nine-step plan to achieve best practice in construction waste management

Post-consumer film recycling Protomax trial

Cost Assessment of Wales Environment Bill Measures on Business Waste Producers in the Construction & Demolition Sector

Chapter 6 Monitoring quantities diverted

Biffa. ces Ltd. separation at. Report. Research

Using Quality Compost in potato production to increase yields

Tool for measuring the recovery rates in CDEW MRFs

Statistical comparison of the laboratory stability test with the Commercial SOLVITA rapid test for stability and maturity

In this update: P7. Energy Live Expo

The Recycling Industry. Help for your recycling business

Social Value Training Materials March 2015

7. Managing commercial waste

Resources and Waste Management Exhibition recycles 83% of waste

Resource efficiency pursued through design coordination and waste management

EXECUTIVE SUMMARY RESOURCES MERSEYSIDE A place where nothing is wasted. The Joint Recycling and Waste Management Strategy for Merseyside

Use of recycled asphalt and recycled aggregate in the A34 Chieveley/M4 Junction 13 improvement

Multi-bottle beer pack

Door to door canvassing

Reducing Waste in Sainsbury s Supermarket Refits through off site fabrication

Collection of carpet tiles for closed loop recycling through manufacturer take-back scheme

STRAWBERRY PRODUCTION SYSTEMS. Comparing the business case for table top and ground production systems

EU Green Capital Competition 2015

Reducing stretch film waste in the food. and drink sector: Good practice for buyers and users

European Green Capital Award 2015 Bristol UK Technical Bid

SME plastic carrier bag pilot survey

Framework for Effective Redistribution Partnerships

HERITAGE AND INFORMATION GOVERNANCE Records Retention Schedule for Equipment & Consumables Management

Comparing the costs of waste treatment options

Development of standard laboratory based test to measure compost stability Annex A

Universities and Colleges Climate Commitment for Scotland Edinburgh Napier University May 2011 Report

Elior review dishes up savings

Transcription:

Trialling the re-use of used EEE from Leeds City Council HWRCs Background Leeds City Council (LCC) has been working in close partnership with its WEEE producer compliance scheme (PCS), WeeeLink, to establish better systems for managing used EEE. A formal segregation system for used EEE was originally established in April 2012. The process applies across all nine of LCC s HWRC sites. The items targeted include: Large domestic appliances and white goods; fridges; Dyson vacuums and display equipment. These are collected, tested and re-sold via a partnership with five charities. LCC engaged in a WRAP funded trial to further enhance this system by: Capturing detailed monitoring data to understand the quantities, types, and working condition of used EEE deposited at HWRCs; Establishing whether its segregation systems could be improved to increase the quantities of working items sent to the charities; Extending the collection systems to include IT equipment and small mixed EEE items. Key findings Based on monitoring and PAT testing of all items entering a single HWRC over a 7 day week, up to 42% of used EEE was deemed to have re-sale potential. An estimated 17,000 items that could potentially be re-used are instead being recycled at just one of LCC s HWRCs in Leeds each year. LCC was able to capture nearly 200 items at two sites over two months. 60 of these to a 6value of were resold at a value of 1,500. Accessing the full range of potentially re-usable items requires investment in resourcing meet-and-greet. The trial has helped us to quantify the EEE re-use potential at our sites and understand how to adapt our systems to exploit this opportunity. Janice Frost, Waste Strategy Office, Leeds City Council

Trial Description The trial involved three key stages: 1. Independent monitoring of used EEE entering a selected site over one week. This involved one week of intercepting all householders depositing used EEE at LCC s Pudsey site in order to determine the types of appliances being deposited and their re-use potential. This provided LCC with detailed baseline data to facilitate informed decision making for future approaches to managing used EEE arisings at its HWRCs. 2. PAT testing of all equipment identified as having re-use potential over the one week trial period. PAT testing was carried out at Pudsey HWRC to determine what items had the greatest re-use potential. This enabled LCC to determine if there were additional products, particularly from the small mixed EEE category that could be targeted through the existing re-use programme. 3. Based on the outcome of tasks 1 and 2, the systems at 2 HWRCs were reviewed, adapted and monitored. Changes to the existing systems were based on the outcomes of stages 1 and 2. This involved targeting additional IT equipment, display equipment and small mixed used EEE items (such as garden, DIY, consumer electronics, and small kitchen items etc.) in order to generate additional income and volume. Two sites were engaged, Pudsey and Meanwood Road. The existing system of segregation was reviewed and adapted, with site staff and the re-use collection charities engaged to try and raise awareness of the opportunity with site users. The additional service offering was then monitored over a 2 month period.

Trial Scope The independent monitoring of used EEE entering LCC s Pudsey site was carried out over a 7 day week in mid-may 2013. Pudsey was chosen for being representative of an average HWRC within Leeds and having sufficient space and staff to accommodate monitoring. A clear process was established including intercepting site users, capturing data on incoming EEE, visually assessing items, PAT testing, logging, labelling, and storing for collection. Based on the findings from the week s monitoring, the systems at 2 HWRCs were reviewed, adapted and monitored. The two sites chosen were Pudsey and Meanwood Road. The two sites are both busy, with each hosting a container for the re-use of bric-a-brac and furniture. Emmaus Leeds services the Meanwood Road site and Safe Haven services the Pudsey site re-use container. A revised process was established at both, with the new elements shown in yellow in the flow diagram below. The approach was designed to minimise any additional burden on site staff and resources. The revised process included the presence of a member of staff from each of the re-use charities at each site at weekends.

Trial Tonnages In total 779 items were brought on site during the 7 day monitoring at Pudsey and the fate of these items is illustrated below: In total, the maximum potential for EEE re-use at the Pudsey site, based on the monitoring and testing, was 42%. However, this was based on having a team of three people intercepting every site user. The system was rolled out to two sites over a period of 2 months, but without the additional personnel in place to intercept site users at the same rate. Instead, existing site staff incorporated this into their roles and the re-use charities posted a member of staff on each site to help out at weekends. The results over the two month period are summarised below: Of the 453 items identified as still working by site users, 77 were immediately rejected upon visual inspection because they were clearly not re-saleable. There were 49 items that could not be PAT tested as they formed accessories to electronic equipment. These were set aside as they were still in good working order. PAT testing was then carried out on 326 items. Of these, 46 items failed and 280 passed. The 280 items passing the test, along with the 49 accessories (329 items in total) were then stored securely in the shipping container. The charities split the items between them to take away for further function testing and re-sale. The rate of reusability for items taken off site for testing varied across the range of products collected, with LDAs and Dysons the highest.

Challenges and considerations Strong relationships - An important factor to consider is the contracted PCS for WEEE. In this case, the working partnership balances commercial compliance with innovative re-use activities. Demand - Leeds has a well-established cluster of third sector re-use organisations operating in the area delivering re-use services and the re-sale of used EEE. There is therefore a ready-made source of demand which is not the case for all Local Authorities. Existing systems - LCC and the charities had already established a system for segregating and collecting furniture and bric-a-brac. This made it much easier to capture additional items such as used EEE. Terminology - Communication with site users is a major factor in promoting any newly established drop-off point for used EEE re-use. The terminology used is highly significant. The words repair and charity communicated the principle of re-use more effectively than the word re-use itself, which was often taken to mean recycling. Monitoring - The extended monitoring of the trials proved that without the additional on-site resource to meet-and-greet, capture rates were significantly reduced. Councils might consider a short-term investment in meet-and-greet over a 2 to 3 month period in order to introduce and establish such re-use systems. Conclusions and Recommendations LCC will review the re-use system for LDAs, Dysons and display equipment. Given the existing systems in place, it would not be a significant undertaking in terms of cost or resource for LCC to continue to roll-out the broader collection of used EEE for re-use, by first of all targeting its highest-performing sites. The additional income generated is sufficient to cover the additional activity, if the system is kept simple and the additional items continue to benefit the charities that LCC is working with in the area. If this is successful, the system could be extended to the other medium-performing sites. LCC must now consider how to continue to communicate and promote this activity in partnership with the charities it is working with.

While steps have been taken to ensure its accuracy, WRAP cannot accept responsibility or be held liable to any person for any loss or damage arising out of or in connection with this information being inaccurate, incomplete or misleading. This material is copyrighted. It may be reproduced free of charge subject to the material being accurate and not used in a misleading context. The source of the material must be identified and the copyright status acknowledged. This material must not be used to endorse or used to suggest WRAP s endorsement of a commercial product or service. For more detail, please refer to our Terms & Conditions on our website - www.wrap.org.uk Waste & Resources Action Programme The Old Academy 21 Horse Fair Banbury, Oxon OX16 OAH Tel: 01295 819 900 Fax: 01295 819 911 E-mail info@wrap.org.uk Helpline freephone 0808 100 2040 www.wrap.org.uk