Stand construction regulations Horecava 2018:

Similar documents
All electrical equipment must be tagged and tested by a professional and must not create any hazards to others when installed.

2020 DISPLAY REGULATIONS

VIENNA JUNE 2017

Stand construction regulations

Exhibition / Event:... Hall / Standnr. :...

Exhibitors & Contractors

RIGGING THE GRBCC

GENERAL STAND BUILDING REGULATIONS AND INFORMATION

RIGGING SSGRB

Allocation of floor space ESA Partners have priority choice and booking of space until 31 October 2017.

Linear, Corner & Perimeter Guidelines-Cubic Content May 15-17, 2019 Mandalay Bay Convention Center, Las Vegas, NV

IV. REGULATIONS GOVERNING BOOTH DECORATION WITHIN THE TAIPEI WORLD TRADE CENTER EXHIBITION HALL

IWF Safety Guidelines

STAND REGULATION VISUALS

Relevant issues of booth construction

BOOTH CONSTRUCTION REGULATIONS & DIAGRAMS

SPACE ONLY STAND FORM (To be filled by the Exhibitor)

Remote-controlled flying objects are not permitted in the exhibition booths.

PISCINE GLOBAL EUROPE Architectural regulations

BOOTH DESIGN REGULATIONS & HALL DESCRIPTIONS

Cobo Center SUBCONTRACTOR BUILDING MANUAL

Tivoli Hotel & Congress Center EXHIBITORS HANDBOOK

Subcontractor Building Manual

HANGAR AND PAVILION STAND REGULATION VISUALS

MARCH 16-18, 2016 ORANGE COUNTY CONVENTION CENTER ORLANDO, FLORIDA. Display Rules

EXHIBIT DESIGN REGULATIONS

RECon LEASING MALL EXHIBIT DESIGN CRITERIA

ALL HANGING SIGNS MUST BE APPROVED BY PARAMOUNT

13 16 May vinexpobordeaux.com STAND LAYOUT AND INSTALLATION

SPACE ONLY STAND FORM (To be filled by the Exhibitor)

2018 Booth Standards & Regulations

SPACE ONLY STAND FORM (To be filled by the Exhibitor)

Linear Booth. Corner Booth

General conditions The general terms and conditions as shown on the contract form apply to Europort.

SPACE ONLY STAND FORM (To be filled by the Exhibitor)

Liability insurance Booth food and beverage service Material handling Shipping Computer rentals. Sign design and hanging Customized booth design

2018 Hospitality Expo and Tradeshow HEAT General Show Schedule & Information

Stand Construction Guidelines For Raw Space

FREEMAN installation & dismantle labor

Art Basel Miami Beach Dec Booth Design Regulations

Cardok Sàrl CP37 CH-1295 Tannay Switzerland Phone:

EXHIBITION RULES AND REGULATIONS

Guidelines for Display Rules & Regulations

SPACE ONLY SAFETY FILE SIMPLE

American Wind Energy Association (AWEA) Exhibit Booth Display Rules and Exhibitor Guidelines

2016 ISPA CONFERENCE & EXPO BOOTH GUIDELINES

SUBCONTRACTOR BUILDING MANUAL

STAND LAYOUT AND INSTALLATION

Cardok Carlift Data Sheet

Rigging Services. The MCCA provides rigging and overhead lighting services through our service contractor, JCALPRO.

GUIDELINES AND SPECIFICATIONS SERVICES

FREEMAN hanging sign labour

Cardok Carlift with Rigid Chains Data Sheet

ROCKFON SYSTEM ULTRALINE E

The MCCA provides rigging and overhead lighting services through our service contractor, JCALPRO.

Exhibition Manual for Gallagher Convention Centre ( GCC )

EXHIBIT DESIGN REGULATIONS

Guidelines for Display Rules & Regulations

Rigging Services. The MCCA provides rigging and overhead lighting services through our service contractor, JCALPRO.

JA2018 TOKYO Booth Regulation

DISPLAY RULES & REGULATIONS PAGE 1 OF

ESC Guidelines for Congresses

1. VINEXPO RULES 2. EXHIBITION CENTRE TECHNICAL SPECIFICATIONS 3. VINEXPO STAND DESIGN REGULATIONS APPENDICES

30mm Height Linear Drain Shower Trays

SPONSORSHIP OPPORTUNITIES

c r e a t i n g a b r i e f

10-12 February 2019, India Exposition Mart, Greater Noida, Delhi (NCR), India

Spring / Summer 2019 Show July 17th to 19th 2018 Centre de Foires de Sherbrooke

DECORATION REGULATION

Stand Design Regulation

IMPORTANT INFORMATION - PLEASE READ PRIOR TO ORDERING

LET US DO THE HEAVY LIFTING

Tulsa Women s Living Expo EXHIBITOR KIT

Exhibitor Manual. FTTH Conference 2019 Amsterdam, the Netherlands March 2019 (Workshops on 12 March)

DISPLAY RULES & REGULATIONS FOR ALL EXHIBITORS

Exhibitor Guidelines for Booth Display Rules and Regulations

Exhibitor Manual. FTTH Conference 2019 Amsterdam, the Netherlands March 2019 (Workshops on 12 March)

I want to build an extension or conservatory

METHOD OF PAYMENT FORM

EXHIBITOR KIT. Exhibitor Kit Forms are Online

INTERNATIONAL EXHIBITION & CONVENTION CENTER WORLD TRADE CENTER

MACH 2018 STAND REGULATIONS IMPORTANT INFORMATION

CCIB EXHIBITION AREA GENERAL REGULATION EXHIBITORS

The HKIE Structural Examination Written Examination

GENERAL SHOW INFORMATION

PTAK WARSAW EXPO TERMS AND CONDITIONS CONSOLIDATED TEXT

Reinforced concrete double walls

Permitted Development for Householders: Guidance from Communities and Local Government. March 2010 Department for Communities and Local Government

Asian Attractions Expo 2018 HKCEC, Halls 3B-3G 6 8 June 2018

Installation guide. ROCKFON System Z mm. 600 mm

ELECTRICAL ORDER FORM

ELECTRICAL ORDER FORM

ThermMAT. Please read these instructions in conjunction with the Guarantee Card enclosed with your ThermFloor heating system.

Hanging Sign Approval and Labor. Hanging Sign / Truss Labor Types

8th, 9th and 10th December 2017 RAI Amsterdam

FOR YOUR CONVENIENCE PLACE YOUR ORDER ONLINE AT

Exhibitor information Optikmässan 2017

COMPLETE THE STEPS BELOW IN PLACING YOUR UTILITY ORDERS

Stack Parking Surface Mounted Stackers

CITY OF FORTUNA, CALIFORNIA

Transcription:

Stand construction regulations Horecava 2018: The stand construction regulations are an addition to the Specific Terms and Conditions Horecava 2018. The Stand Design department of RAI Amsterdam does assist the Horecava 2018 organization by checking all stand designs. The aim is to avoid problems during build up and to create the best possible image of the event as a whole. 1. Submitting the stand design Mail your stand design to RAI Stand Design of RAI Amsterdam before November 1st 2017. Your mail should contain: 1) Name of the show, Stand number and Company name 2) The stand drawings / visualization / photos, including all relevant (height) dimensions Companies that use ready-to-exhibit stands from the organizers don t need to submit a stand design. Companies that don t submit a stand design can be asked to do last minute changes during buildup. Exceptions are only possible when approved by Stand Design department before the buildup starts. If you have any questions regarding the stand construction regulations, please contact RAI Stand Design. E: standdesign@rai.nl T: +31 (0)20 549 23 84 Note Below: Any requests that are not covered by these stand construction regulations will be decided upon by the organizers. Fire and safety regulations take precedence over these stand construction regulations in all circumstances. 2. Building compliant to type of stand The layout of the allocated stand space has to be compliant to the type of stand which is reserved Island stands Front stands have 4 open sides along the aisles; have 3 open sides along the aisles; one stand separation wall must be placed; Corner stands have 2 open sides along the aisles; two stand separation walls must be placed; Inline stands have 1 open side along the aisle; three stand separation walls must be placed. The regulations for an open side and for a stand separation wall can be found at point 4 and 5. 3. Standard building height Standard construction height is 250 cm (including platforms). This is also the height of the shell scheme stands. Building up to 300 cm is also allowed. The back side of the stand separation needs to be finished properly when exceeding 250 cm. Building height above 300 cm is only allowed after approval of the RAI Stand Design, see page 2 for regulations. 1

4. Walls along the Open stand sides Point 4 does concern all exhibitors who want to partially close one or more open sides with walls Walls : Open : Walls and all other parts that (partially) block the view will be checked as walls. All materials as transparent as clear glass can be checked as Open. RAI Stand Design can judge the material you want to use based on a photo. 4a 4b Walls within 200 cm from an aisle: - lower than 130 cm are allowed to cover the complete width of the stand. - with a height of 130 up to 300 cm are allowed if their width is maximum 1/2 of the booth side - higher than 300 cm are not allowed. Columns within 200 cm of an aisle: can be up to 600 cm high A column can be maximum 50 cm wide x 50 cm deep. Columns should be placed at least 200 cm from each other. 5. Stand separation Walls Point 5 does concern all exhibitors who share one island with other exhibitors. Each exhibitor needs to place a wall at the stand separation. This wall needs to meet the following regulations: 5a 5b The height of the stand separation walls: - is standard 250 cm - can be 250 up to 300 cm. The back side must be finished properly equal white or black above 250 cm. - above 300 cm up to 500 cm is only possible for the full width of the stand after consultation with RAI Stand Design. RAI Stand Design will check if the high walls don t block the view to other exhibitors too much. A wall(partition) higher than 300 cm at the stand separation: - can be maximum 1/3 of the stand sides width. - must be placed at least 200 cm from the aisles - is only possible after consultation with RAI Stand Design. RAI Stand Design can ask to tune the finish of the stand separation with your neighbors for an optimal result. 5c Finish of the stand separation walls: - The stand separation must be finished properly equal white or black above 250 cm. - A wall at the stand separation cannot contain advertisement facing a neighboring booth. - Cables and other parts must be covered proper. - The organization can decide during build up that a wall should be finished more proper. For example with flannel. This to guaranty the image of the event as a whole. 2

6. High walls in the center of the stand Point 6 does concern all exhibitors who want to use high walls / standing eye catchers. 6a 6b Walls higher than 300 cm - must be placed at least 200 cm from the aisles. - can be maximum 600 cm high. - can only contain advertisement facing an neighboring booth when placed at least 200 cm away from this booth. Stands along the walls of the RAI building: - can have a full width back wall of maximum 600 cm high. - can build parts up to 600 cm high when placed at least 200 cm away from the front aisle. Under no circumstances should air inlets and safety facilities be blocked. 7. Suspending above the stand, rigging Point 7 does concern all exhibitors who want to use trusses or banners above their stand. Horizontal ceilings and other things will be judged as banners. 7a 7b 7c 7d 7e Banners with a maximum height of 100 cm: - are not limited in width if the bottom is placed at least 400 cm above the RAI floor. - cannot contain advertisement at the sides facing a neighboring stand, within 200 cm of this stand. Banners higher than 100 cm: - should have a maximum width of 1/3 of the booth side - should be placed at least 200 cm away from the aisles. - cannot contain advertisement at the sides facing a neighboring stand, within 200 cm of this stand. Trusses above the stand: - should hang at maximum 700 cm high - should be placed within the perimeter Nothing should protrude above the trusses except the required rigging and electrics. Suspension wires: - The company Mansveld Expotech Rigging is exclusively authorized to carry out these activities. If you want to use suspension wires please contact the department Exhibitor Services by mail (exhibitorservices@rai.nl) or phone (+31(0)20 549 19 28) Rigging: Any technical questions about rigging can be answered by Mansveld Expotech. RAI Stand Design can forward your questions. 3

8. Aisles 8a Building within the perimeter: - all stand construction items must be placed within the perimeter, nothing can be placed within the aisles. Also moving parts must be placed completely within the perimeter. - Aisles cannot be covered with stand construction or banners. 8b Aisles in between two stands of one exhibitor: After consultation with the organizers it can be decided to approve a different finish of the floor cover in between two stands. If you prefer this please include this wish specifically in your mail when submitting the stand design. 8c Big parts Bringing in big parts, like a car, can only be done when the aisles are still free. If you need to bring big parts to the stand you should specifically mention this in your mail when submitting the stand design. 9. Floors 9a Floor loads : The maximum load on the floors differs at different locations. It can be between 500 up to 3000 kg/m2. RAI Stand Design must be specifically informed if you have any loads bigger than 500 kg/m2. Point loads are not allowed; forces should always be spread. 9b Floors: The floors of the halls might not be completely flat. If you have any doubt, please consult RAI Stand Design. If any problems occur during build up, please consult the Event Manager on duty. 9c Wooden platforms: The use of wooden platforms is recommended for stands with water pipes, and/or large amounts of electric wiring; the stand builder can be approached for advice. When using platforms, the following must be taken into account: - maximum height is 10 cm, measured from floor level to the top of the platform; - the platform sides should be closed off and neatly finished; - platforms should be placed within the stand s perimeter; - exhibitors who fit their stand with raised floors are asked to make sure that their presentation is accessible to the disabled, for instance, by employing sloping stand edges or by adding ramps (of sufficient width and without sharpangled sides). This should preferably be recognizable to the visitors. 10. Multi-storey stands / podia permits Exhibitors using stands with multiple stories, or a podia for people higher than 60 cm should request a temporary building permit for multi storey stands or podia. The request should be done at the latest 8 weeks before the beginning of construction. Where building an extra story, the exhibitor will be charged 50% of the hire of stand space per square meter. More information can be found in the web shop, as well as the application form for a temporary building permit for multi storey stands or podia. For questions regarding the multi-storey stand permit please contact the department Vergunningendesk by mail (vergunningen@rai.nl) or by Phone (+31 (0)20-549 18 70) 4

11. Stand Decoration 11a Stand decoration: - All items should be placed within the perimeter. RAI Stand Design can ask to move items if this improves the view through the hall. - Visually blot beauty parts on stands are not allowed. - Parts which can cause danger, like sharp and/or overhanging parts, have to be fenced off efficiently. - We advise to place your booth number on your stand. This helps the visitors to orientate at the exhibition. 11b 11c 11d Floor cover: - The Floor of the stand has to be finished in good order by applying carpet or carpet tiles - For the use of special floor covering (e.g. concrete tiles, sand, pebbles) written permission from RAI Stand Design is obligatory. The permission can be requested when submitting the stand design. Before placing such materials, a plastic cover has to be applied to the floor. - Painting the floor is not allowed. - The exhibitor will be invoiced for removing any remains of e.g. adhesive tape on the floor. Smoke and gas outlets / fire brigade license - Do you use heating equipment at your stand for baking, frying, roasting, grilling or any other method of food cooking? Then please order the obliged permit at least six (6) weeks in advance of the first construction day of the show and your extractor system. More information is available in the webshop. Grease trap - Participants who cook on their stand, should be required to install a grease trap to prevent pollution of the RAI pipes. This grease trap can be ordered in the Web shop from Exhibitor Services. Damage / blockages which are detected after the Horecava, which are caused by the absence of the grease trap will be recovered at the expense of the participant. 12. Safety Rules & Logistic Services RAI Amsterdam 12a Safety rules - RAI Amsterdam has set a goal to create a safe and hospitable working environment for everybody working in the RAI. We comply with Dutch laws and regulations and also clients demand increased safety at work. Go to www.rai.nl/safetyatwork for more information. 12b Exclusive use DB Schenker - As safety of our guests is one of our main goals, only personnel of DB Schenker is allowed to enter the halls and working areas with motorized and/or electrical means of transport. - Time slots to load and/or unload can be reserved in advance in the web shop. - NB: Other parties are allowed to use manually driven material. 5