PUBLIC HEARING April 24, 2017

Similar documents
19. Hazardous Materials

Northern Branch Corridor CLC Meeting. June 30, 2008

Northern Branch Corridor DEIS December 2011

14. Water Quality Chapter Overview Introduction

Chapter 4: Analysis Framework 4.1 INTRODUCTION

Meeting attendees are now required to go through security screenings upon entering the building. Please allow for extra time.

Environmental Impact Statement (EIS)/ Section 106 Public Meeting Proposed Alternatives. December 14, 2017

Project Purpose. Federal Railroad Administration

Notice of Preparation For Link Union Station (Link US) Project. Joint Environmental Impact Statement and Environmental Impact Report

HUDSON TUNNEL PROJECT

FINAL ENVIRONMENTAL IMPACT STATEMENT/RECORD OF DECISION AND SECTION 4(F) EVALUATION

RESCHEDULED MEETING NOTICE

Chapter 5B: Transportation Services 5B.1 INTRODUCTION

22.1 INTRODUCTION 22.2 ANALYSIS METHODOLOGY REGULATORY CONTEXT

Chapter PURPOSE AND NEED

Executive Summary S.1 INTRODUCTION

Riverview Corridor Pre-Project Development Study

Preparation of an Environmental Impact Statement for High Capacity Transit

Welcome! Overview Agenda: 6:00 pm 6:30 pm: Welcome & Sign-In. 6:30 pm 7:00 pm: Link US Presentation. 7:00 pm 8:00 pm: Open House

Rail & Transit Alternatives Analysis. NH Capitol Corridor. Public Scoping Meeting. March 5, 2014

Sounder Extension to DuPont

Jim Alexander Director of Design and Engineering, Southwest Light Rail Transit Project

BENNING ROAD & BRIDGES

Raritan River Bridge Replacement. Public Information Session September 2016

Intent to Prepare an Environmental Impact Statement for the South Bay Metro

Public Meeting. Draft Environmental Impact Statement (EIS) and Section 106 Consultation. Preferred Alternative Selection November 29, 2018

Table of Contents. Green Line Extension Project. Draft Environmental Impact Report/Environmental Assessment and Draft Section 4(f) Evaluation

VRE Gainesville-Haymarket Extension (GHX) Study. December 16, 2016

Evaluation of Alternatives

FINAL. Sound Transit Long-Range Plan Update Issue Paper S.6: Potential Tacoma Link Extension - East. Prepared for: Sound Transit

Long Bridge Project. Environmental Impact Statement (EIS) Revised Purpose and Need

EVALUATION OF ALTERNATIVES CARRIED FORWARD

King of Prussia Rail Project Frequently Asked Questions - Archive Version: Summer 2018

FEDERAL HIGHWAY ADMINISTRATION RECORD OF DECISION FOR THE LYNNWOOD LINK EXTENSION

Environmental Impact Statement for the Green Line to the Airport Project. ACTION: Notice of Intent to Prepare an Environmental Impact Statement (EIS).

OPTIONAL STATIONAVIATION/MANCHESTER

NEW JERSEY STATE RAIL PLAN NJ TRANSIT New Jersey Department of Transportation

Port Jervis Line Service Strategy Report

Green Line Extension EOT. Project Location. Project Purpose. Environmental Impact Report Public Scoping Session

THIS PAGE INTENTIONALLY LEFT BLANK.

S-16: Sounder Rail Extension from Puyallup to Orting

Port Jervis Line Service Strategy Report. Appendix C: Port Jervis Line Capacity Improvements Analysis

SOUTHWEST LRT (METRO GREEN LINE EXTENSION)

Media Briefing. February 7, 2011

West Santa Ana Branch Transit Corridor. Draft EIS/EIR Scoping Interagency Meeting June 19, 2017

Cotton Belt Corridor. Area Focus Group (AFG) DFW Airport/Coppell/Cypress Water May 4, John Hoppie, Capital Planning

Community Advisory Committee

Redlands Passenger Rail Project

Long Bridge Project. Environmental Impact Statement (EIS) Revised Purpose and Need

12 Evaluation of Alternatives

Business Advisory Committee. July 12, 2016

WELCOME TO THE LONG BRIDGE PROJECT

Environmental Impact Statement; Lone Star Regional Rail Project Williamson, Travis, Bastrop, Hays, Caldwell, Comal, Guadalupe, and Bexar Counties, TX

Metro Blue Line Improvements & Project Update

Southeastern Minnesota Freight Rail Capacity Study

THE GATEWAY PROGRAM. James Richter, P.E Dana Shaeffer, P.E. Number of words: 4006

Green Line extension Project Fall 2009

Restoration of Historic Streetcar Service in Downtown Los Angeles

Federal Transit Administration s New Starts Process. Red Line Extension Alternatives Analysis Study

Final Environmental Impact Statement and Section 4(f) Evaluation

West Lake Corridor Final Environmental Impact Statement/ Record of Decision and Section 4(f) Evaluation. Executive Summary

Cumulative and Secondary Impacts

Gold Line Environmental Impact Statement (EIS)

Chicago Transit Authority Orange Line Alternatives Analysis Study

Willmar Wye Public Open House #4 and Public Hearing

New Jersey Transit Rail Stoppage Forum February 18, 2016 Summary of Key Points

Federal Way Transit Center to Tacoma Dome Light Rail

Lake Oswego to Portland Transit Project Health Impact Assessment

Central Corridor. Light Rail Transit. Navigating NEPA Between St. Paul and Minneapolis

Environmental Analysis, Chapter 4 Consequences, and Mitigation

Northern Intermodal Transit Facility WHAT IS AN INTERMODAL TRANSIT FACILITY?

Welcome! Route 1 Viaduct Rehabilitation Project Chelsea Project File No

3 Documentation of Alternatives

Executive Summary October 2017

South Sounder Capital Improvements Program

SUPPLEMENTAL NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT. ACEforward Notice of Additional Project Element Niles Junction Connections

Airport Metro Connector. Scoping Meeting February 23, 2015

1.1 Environmental Assessment/Environmental Impact Evaluation for the New Haven, Hartford and Springfield High-Speed Intercity Rail Project

Walk Bridge Replacement Project

I-20 East Transit Initiative

Project Overview. A Collaborative Effort

S-09: Auburn Station Access Improvements

6.1 INTRODUCTION 6.2 REGULATORY FRAMEWORK NATIONAL AMBIENT AIR QUALITY STANDARDS COMPLIANCE STATUS TRANSPORTATION CONFORMITY

West Santa Ana Branch Transit Corridor. Draft EIS/EIR Scoping Meeting June 2017

Appendix C Presentation Slides with Script

Draft Environmental Impact Statement and Section 4(f) Evaluation. Executive Summary

DRAFT Scoping Booklet

Long Bridge Project. Environmental Impact Statement (EIS) Alternatives Development Report. June 19, 2018

Rail Corridor Feasibility Study

Regional/Local CMAQ Initiatives Program

2030 Transportation Policy Plan SUMMARY PRESENTATION. Land Use Advisory Committee November 15, 2012

Delaware State Rail Plan. October 12,2011 DVRPC Freight Committee

South Sounder Capital Improvements Program

Summary. Preliminary Alternative Development and Screening. DEIS July 23, 2018

Transit Investment Direction and Plan Introduction. Transportation Advisory Board TPP Workshop August 16, 2017

DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR HOUSTON DALLAS HIGH SPEED RAIL (TEXAS CENTRAL)

Atlanta BeltLine Corridor Environmental Study. Technical Advisory Committee/Agency Coordination. Kick-Off Meeting

TEXAS-OKLAHOMA PASSENGER RAIL STUDY. TPP Planning Conference 2014

LONG ISLAND RAIL ROAD EXPANSION PROJECT FROM FLORAL PARK TO HICKSVILLE FINAL ENVIRONMENTAL IMPACT STATEMENT

Fairfax County Countywide Transit Network Study

Transcription:

PUBLIC HEARING April 24, 2017 1

Agenda SDEIS Public Review Environmental Process Overview Project Highlights Comments to Stenographer 2

3 SDEIS Public Review

Public Hearing Schedule Monday, April 24, 2017 Crowne Plaza Englewood Hotel 401 S. Van Brunt Street, Englewood, NJ 3:00 to 5:00 PM (presentation at 3:30 PM) & 7:00 to 9:00 PM (presentation at 7:30 PM) 4

Public Hearing Format Open House for Informal Review of Displays Discussions Are Not Part of the Official SDEIS Record Project Overview Presentation Verbal Comments to Stenographer 2 3 Minutes Written Comments May Be Submitted 5

Hearing Accommodations Spanish and Korean Translators Available Accommodations for Hearing & Mobility Impaired Other Special Accommodations Upon Request 6

Important Dates Northern Branch Corridor SDEIS Released on March 17, 2017 Notice of Availability (NOA) in Federal Register on March 24, 2017 Comments on the SDEIS Must be Received by May 23, 2017 7

SDEIS Available for Review Project Area Libraries North Bergen, Fairview, Ridgefield, Palisades Park, Leonia, Englewood, Tenafly, Cresskill, Demarest, Closter, Norwood Municipal Clerks Offices North Bergen, Fairview, Ridgefield, Palisades Park, Leonia, Englewood, Tenafly, Cresskill, Demarest, Closter, Norwood, Northvale http://northernbranchcorridor.com 8

To Provide Comments on the SDEIS Written Comments May Be Either: 1) Submitted Today in the Comment Box Located at the Front of the Room 2) Sent to NJ TRANSIT by May 23, 2017: Linda A. Mosch, P.E. Project Director NJ TRANSIT One Penn Plaza East Newark, NJ 07105 info@northernbranchcorridor.com Verbal Comments Can Be Given to the Stenographer Either: 1) Privately at Any Time During the Hearing 2) Publicly After the Presentation 9

10 Environmental Process Overview

Northern Branch Corridor SDEIS Prepared by FTA & NJ TRANSIT National Environmental Policy Act of 1969 (NEPA) Requires Evaluation & Public Disclosure of Potential Impacts for All Federal Actions SDEIS Complies with Guidelines of NEPA Section 106 Section 4(f) Other Federal & State Requirements 11

EIS Process Draft EIS DEIS Released Dec. 13, 2011 1,200+ Comments Received Supplemental Draft EIS Preferred Alternative Revised Based on Comments & Meetings with Municipalities Impacts Evaluated Public Review & Comment Final EIS Address Comments on DEIS & SDEIS Agency/Public Review of FEIS ROD Completes NEPA Process 12

Section 106 Process Requires Evaluation & Public Disclosure of Potential Impacts for on Historic & Archaeological Resources Evaluation in SDEIS 13

Section 4(f) Process Section 4(f) US Department of Transportation Act of 1966 Federally funded Projects May Not Use Land From Public Park, Recreation Area, Wildlife Refuge, or Historic Site Unless No Alternative & Project Will Minimize Harm Requires Coordination with Public & Agencies Section 4(f) Evaluation Chapter of the SDEIS 14

DEIS Comments DEIS Examined 2 Alternatives Light Rail to Tenafly (Preferred Alternative) Light Rail to Englewood Route 4 Many Comments Expressed Support Residents & Community Leaders in Tenafly Strongly Opposed to Extension into Tenafly City of Englewood & Englewood Hospital Strongly Supportive Recommended Terminating at Englewood Hospital 15

SDEIS Purpose SDEIS Prepared to Document Project Changes in Response to DEIS Comments Environmental Impacts as a Result of Changes Analyzed in SDEIS Circulated for Public Comment New Preferred Alternative Terminating at Englewood Hospital 16

SDEIS Changes West Side Avenue Freight Railroads Requested Light Rail Moved from CSX North Bergen Rail Yard Alignment Changed Viaduct over Rail Yard Along West Side of West Side Ave. Viaduct over NYS&W & CSX Tracks Onto Northern Branch Running Track North Bergen VBF Eliminated 17

SDEIS Changes Leonia Station Relocation of Station & Parking Deck South of Fort Lee Road Within Overpeck County Park Site of an Abandoned Basketball Court & Comfort Building 18

SDEIS Changes Englewood Route 4 Station & VBF Co Locate Station Parking Deck & VBF Parking Deck 2 nd, 3 rd & 4 th Stories Above VBF 19

SDEIS Changes Englewood Town Center Station 2 Tracks through Town Center Area Reconfigured Surface Parking Area Between Rail ROW & North Dean Street Station Platform Relocated Between Palisade & Demarest Avenue 20

SDEIS Changes Englewood Hospital & Medical Center Station Use of Existing Parking Garage at Hospital Pedestrian Overpass Connecting Station with Parking Garage over Dean Street 21

SDEIS Changes Ridership & Operations SDEIS Service Hours Extended: 5:00 a.m. to 1:00 a.m. DEIS Service Hours: 5:30 a.m. to 10:30 p.m. Ridership Model Revised New Service Hours Updated US Census Data 22

23 Project Highlights

SDEIS Alternatives No Build Alternative SDEIS Preferred Alternative 10 Mile Extension of Hudson Bergen Light Rail Tonnelle Avenue in North Bergen to Englewood Hospital 24

Vehicles & Operations Light Rail Vehicles Flexible, Small, Light Weight 2 3 Car Trains Powered by Electricity Direct Service to Hudson River Waterfront Transfers to Manhattan via Ferry or PATH Operation from 5:00 a.m. to 1:00 a.m. Frequency 10 Minutes to Hoboken Terminal/Ferry (Peak) 20 Minutes to Jersey City (Peak) 30 Minutes to Hoboken & Jersey City (Off Peak) 25

Infrastructure Requirements Rehabilitation of 2 Track Rail ROW 7 Stations Power Infrastructure Overhead Catenary Electrical Substations 2 Viaducts over Freight Tracks Closure of Undergrade Xing at 83rd St. New Crossing at 85th St. to West Side Ave. Vehicle Base Facility at Englewood Route 4 26

Freight Light Rail Service Would Change Freight Operations Between North Bergen & Northvale FRA Does Not Permit LRT to Operate Mixed with Freight Rail Freight Would Operate During Overnight Hours 1:30 a.m. to 4:30 a.m. 27

Stations & Parking Station Parking 91 st Street 123 Ridgefield 269 Palisades Park 219 Leonia 583 Englewood Rt. 4 945 Englewood Town Center 0 Englewood Hospital 600 TOTAL 2,739 28

Travel Time Destination From Englewood Hospital To Weehawken Ferry 21 Minutes To Hoboken Terminal 33 Minutes 29

Ridership Forecast Ridership Daily Ridership Total Daily Passengers 12,370 Total Daily Trips 24,740 30

SDEIS Contents Project Background & Purpose and Need Revised Preferred Alternative Changes to the Social, Economic, and Environmental Impacts & Mitigation Public Outreach 31

Please Submit Your Written Comments or Give Verbal Comments to the Stenographer Visit Our Website to Review the SDEIS: http://northernbranchcorridor.com 32