Stadthaus, 24 Murray Grove, London Eight storeys of apartments featuring cross-laminated timber panels

Similar documents
Cross Laminated Timber (CLT)

Tall Timber Buildings: Application of Solid Timber Constructions in Multi-Storey Buildings

Timber Building in the City of Tomorrow

Cross-laminated timber construction - an introduction

CLT solid wood panels*

Multi-storey timber construction in the UK IRCC workshop, Vienna 7 June 2013 Dr Julie Bregulla Dipl-Ing, PhD, CEng, FICE

Design of an 8 storey Residential Tower from KLH Cross Laminated Solid Timber Panels

Value Benefits of Modular Construction in Building Extensions

Renovation of Buildings using Steel Technologies (ROBUST)

ACHIEVING FIRE & ACOUSTIC COMPLIANCE IN MULTIRESIDENTIAL CONSTRUCTION. USGBoral.com

The Thin-Joint Construction Cost Advantage The 12.4% cost saving building method *

CHAPTER 3: Modern Methods of Construction (MMC)

Carbon Neutral Construction SAFE EFFICIENT AFFORDABLE SUSTAINABLE

Reinforced concrete double walls

GypLyner IWL Independent wall lining system

Building Systems by Stora Enso. 3 8 Storey Modular Element Buildings

Mjøstårnet Construction of an 81 m tall timber building. Rune Abrahamsen, CEO, Moelven Limtre AS

Carpenter Level 2 Rev. September 2017

Construction Catalogue Timber construction goes into a lot of detail. Just like this catalogue.

Metal Web Floor System

Passive House Project documentation

T I M B E R E N G I N E E R E D S O L U T I O N S

DriLyner 5.2. DriLyner. Drywall masonry lining systems. Key facts. Sector Guide

Reinforced concrete double walls

Overall Existing Conditions Summary

CHAPTER 3: Modern Methods of Construction (MMC)

DRY CONSTRUCTION SYSTEMS

Site check The timber frame pocket guide

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage

GREENHOUSE, MIXED USE DEVELOPMENT LEEDS WEST AND MACHELL ARCHITECTS

Interior FRT Wood. References of Previous Model Building Codes

Sustainability and Process Benefits of Modular Construction

OUR OBJECTIVE: TO PROVIDE EDUCATION ON AN ALTERNATIVE TO TRADITIONAL CONCRETE FORMWORK FOR WALLS

Reliance House Investors Report. IR11 September 2018

Cross Laminated Timber (CLT) Manufacturing in the Southeast U.S. Steve Lieberman, PE

Structural Inspection

Garage Conversions. Technical Issues

17-21 Wenlock Road Building a 10 Storey Hybrid Structure in London

Fire Safety and Performance of Wood in Multi-Residential and Commercial Buildings. Boris Iskra Forest & Wood Products Australia

GypLyner UNIVERSAL Metal framed wall lining system

Overview. Introduction to Housing Solutions 2-3. Why Modular Housing 4-5. Standarised Designs Apartments Warranties.

CARPENTRY WORKPLACE TASKS - CHECK LIST (Note: for employer reference only)

LUXURY LOG CABINS. Built under caravan regulations act 1960, 1968 Amendment 2006 BS VAT Zero rated 701/20

Introduction to Canadian Residential Construction CANADIAN HOUSING IS ADAPTABLE, FLEXIBLE AND ACCOMMODATES DIVERSE CLIMATES.

AUTOMATED FAST-TRACK BUILDING SYSTEM

Construction Studies Theory - Higher Level

Shaft Wall Solutions for Wood-Frame Structures. Ricky McLain, PE, SE WoodWorks Wood Products Council Boston & Waltham Workshops, December 6 & 7, 2017

LCT ONE: CASE STUDY OF AN EIGHT STORY WOOD OFFICE BUILDING

Hollowcore. Roof & Floor Systems. Roof & Floor Systems. Commercial Applications

Modular Wood Framing Goes Vertical

COST COMPARISON DINCEL vs AAC WALLS

Copyright Materials. Learning Objectives

Construction Studies Theory - Higher Level

BROCK COMMONS PHASE 1

Project Description. Projected build start date 01 Mar 2010 Projected date of occupation 31 May Aberdare, Rhondda Cynon Taff, Wales

Building the Future for Care Homes

Environmentally Friendly and Sustainable Development

CLT in the U.S. Manufacturing and Applications

STEEL STRUCTURAL SYSTEMS

Definition of Wall. A continuous, vertical structure Thin relatively to its length and height

GypLyner (walls) Metal framed wall lining system. GypLyner.

THE MODULAR HOUSE - PLOT 15 - SCOTLAND S HOUSING EXPO

Application of Modular Construction in High-Rise Buildings

RESIDENTIAL NEW CONSTRUCTION PLAN REVIEW CHECKLIST

UBC BROCK COMMONS PROJECT

SOUND INSULATION DESIGN OF MODULAR CONSTRUCTION HOUSING

Acoustic Design Criteria

Project Description. Projected build start date 01 Mar 2010 Projected date of occupation 01 Aug Energy target.

ArcelorMittal Europe - Long Products Sections and Merchant Bars. Office Building ArcelorMittal in Esch Alzette

2003 International Residential Building Code

SECTION WOOD FRAMING. A. Includes But Not Limited To 1. Furnish and install wood framing and blocking as described in Contract Documents.

MIB FACADES LIMITED. MetSIP Structure. Affordable High Performance Building Technology

Demonstration building

AUGUST 2018 ZED Pods Ltd. All rights reserved. Housing for key workers & young professionals

THE CITY OF WALTHAM MASSACHUSETTS PURCHASING DEPARTMENT PHASE III RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING CONDOMINIUMS AND CONDOMINIUMS

T1 6 C1 Influence of Manufacturing Parameters on CLT Plate to Resist Out of Plane Loading

Connections between CLT elements and future challenges for CLT in practice

Detailing For Wood Shrinkage

CONSTRUCTION BRIEFINGS. Code for Sustainable Homes (CSH) A Summary of How the Scheme Works

Note on the assessment:

COPYRIGHTED MATERIAL. Contents. 1 Making Buildings 3. 3 Wood Foundations and. Preface to the Sixth Edition xi. Sitework 31

6D-BUILDTECH Building Systems. Products and services. Introduction

AISC Steel & Timber Research for High-Rise Residential Buildings

PROFESSIONAL FORMWORK SOLUTIONS

Panelised construction system benefits for mid and high-rise residential developments. Adam Strong

Project name SOLAR HOUSE 80/50 Project summary

NOISE IN HIGH RISE BUILDINGS

GypWall TM ROBUST 4.4. GypWall ROBUST. Durable impact resistant partition system. Key facts. Sector Guide

GypLyner UNIVERSAL Metal framed wall lining system

Construction Technology Revision Guide

Construction of Treet - How and Why

Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc.

Jabfloor 70, 100, 150, 200, 250

September Saddle Flooring Systems

Mass Timber & Tall Wood Buildings

Administrative Changes

For more information on any of our products and services please visit

BUILDING RENOVATION USING LIGHT STEEL FRAMING

Multiboard Australia is committed to leading the way in setting new standards with cutting edge technology within construction, building and design.

Jabfloor High Performance (HP) 70 and 100

Transcription:

Project information Completion date: 2009 Building type: Location: Client Architect: Structural Engineer Main Contractor: Timber supplier and erector: Timber elements: Timber species: Multi-storey apartment block Hackney, London Telford Homes PLC and Metropolitan Housing Trust Waugh Thistleton Architects Techniker Telford Homes KLH UK Solid wood panels for floors, roof, internal and external walls, lift and stair cores Spruce Awards Wood Awards 2008 Timber in Construction Awards 2008 Timber Journal Awards 2008 Introduction There is nothing in the building regulations that prohibits high-rise timber buildings, although the practical limit (and current code limitation) for stud wall timber frame is seven storeys. The Stadthaus (German for townhouse) is with eight floors of timber structure the tallest habitable timber building in the world. And architects and structural engineers are already working on timber buildings that will be considerably taller. The building is insulated and airtight beyond UK requirements. Mechanical ventilation of all rooms includes a heat recovery system that retains 70% of the heat that would normally be lost when return air is expelled. Photovoltaic (PV) panels on the roof generate a modest supply of renewable energy. With sustainability high on the agenda, the design meets the Lifetime Homes standard and includes a green-wall wrapping on the southern elevation of the building to encourage local biodiversity. A variety of new shrubs and trees will create an ecologically sustainable pocket park. The development includes a landscaped playground for children on the south side, which parents can overlook from half the apartments. The unusual feature is the cross-laminated timber (CLT) panels used as load-bearing walls and floor slabs. There are no beams or columns anywhere and the structure is amenable to openings being created in walls with relative ease. The architects and engineers had prior experience of CLT, gained through a variety of low rise housing, commercial, educational and industrial projects. Their interest in using CLT arose from an environmental position and a desire to make timber more readily accepted in the UK, especially for tall structures that have hitherto been feasible only with inorganic building materials such as concrete, masonry and steel. 1

PROVOST STREET Stadthaus, 24 Murray Grove, London Site Plan MURRAY GROVE Building description The Stadthaus, comprising 29 apartments (in 1, 2, 3 and 4-bedroom designs), is effectively divided into two sections that are independently owned, accessed and serviced. The floor plans show how this is achieved. The local residents association has an office at ground level and the Metropolitan Housing Trust has apartments on levels 1, 2 and 3. Levels 4-8 are privately owned. Level 4 marks a change in floor layouts and external elevations. The building was assembled using a unique structural system pioneered by KLH in Austria, using timber strips glued together (using formaldehyde-free adhesive) in perpendicular layers to form the panels. The bonus with CLT is its tremendous contribution to making construction sustainable. It lowers the energy used in construction, reduces heat loss during occupation by improving insulation and airtightness, and it is also very easy to demolish and recycle at end of life. There were minimal wet trades in bathrooms and kitchens, and therefore little need to dry out the building. Windows and doors were fitted early to weatherproof the building. Even the façade, inspired by the work of artists Gerhard Richter and Marcus Harvey, employs wood. Eternit manufactured the 5,000 panels (each 1200mm x 230mm ) made up of 70% waste timber. The architects designed the façade by firstly recording the changing light and shadows formed on the vacant site by the surrounding buildings and trees. Then they modelled the pattern through a sun-path animation and, finally, wrapped the pixilated and blurred image around the building. The balconies and windows punctuate the rhythm of the abstract image. Being a residential construction, the building satisfies building insurers and comes with an NHBC certificate of insurance of the construction itself. Cross-laminated timber panels Although commonly used in Continental Europe, cross-laminated timber is a relatively new product in the UK. CLT is the main form of solid wood panels (not all solid wood panels are cross-laminated). Cross-laminated timber is produced from industrially dried spruce boards which are stacked at right angles and glued together over their layer surfaces in 3, 5, 7 or more board layers. The panels are used as large wall, floor and roof elements, and are manufactured with precision cut-outs for doors, windows and building services. KLH manufactures three grades: non-visual quality, industrial visual quality and domestic quality for living spaces. In the UK, KLH offers panels up to 14m long and 2.95m wide (limited by transport restrictions). The solid wood panels make a substantial contribution towards lowering the building s carbon footprint. The designers calculated that had the building been of conventional reinforced concrete construction, it would have incurred an additional 124 tonnes of carbon generated during construction. Adding this to the 188 tonnes of carbon sequestered (locked away) in the 900m³ of timber in the structure results in a total offset of some 310 tonnes of carbon. This gain, combined with the building being better insulated and more airtight than the Building Regulations demand, convinced the local planning authority to [Continued page 3] 2

Cross-laminated timber panels (cont.) Third floor plan (apartments for tenants of Metropolitan Housing Trust) grant a dispensation from the Merton rule that normally requires at least 10% of the energy used during occupation to be generated onsite. Thus, the designers avoided having an in-house combined heat and power plant or ground source heat pump (which would have occupied part of the basement) and left most of the roof space as an amenity. However, the development does include modest PV generation to power lights in common areas and the water booster pump, saving expenses that would otherwise be met by charges on occupants. The CLT structure comfortably achieved the required fire resistance. The structural engineer allowed for charring to achieve 60-minutes fire resistance and achieved 90-minutes fire resistance by adding plasterboard. The 128mm wall met the thermal resistance of U = 0.13 W/m²/K with just 100mm of insulation. Lift and stairs for levels 1-3 terminate at 4th floor Fifth floor plan (apartments for private owners) Lift and stairs for levels 4-8 run full height but don t have access to levels 1-3 3

Structure Isometric View The tower is a cellular structure with apartments in a honeycomb pattern around a central core. The load-bearing elements (lift shafts, stairwells, all external and some internal walls) provide exceptional resistance to progressive collapse and good acoustic separation between apartments and lift shaft. Although timber would be feasible for the ground floor walls, the structural engineers opted for reinforced concrete. They felt it would better accommodate the dramatic difference in layout between ground and first floor, and that it would be easier to ensure good damp proofing with a concrete sub-structure. Concrete provides a level threshold for the timber, at either ground or first floor level. Each of the panels was prefabricated, including cut-outs for windows and doors. As the panels arrived on site, they were immediately craned into position, dramatically reducing time on site. The eight-storey timber structure was assembled in eight weeks. The entire nine-storey structure was up in nine weeks. The contractor used a platform construction configuration, which means they set each floor on the walls below, and then another storey of walls was raised and so on up the building. Screws and angle plates secured the joints. Stresses are generally very low throughout the structure although, at points where cross-grain pressures are high, screws were added to reinforce the timber locally. Progressive collapse is avoided by providing sufficient redundancy so that any single elements can be removed. The untreated timber relies on the building envelope for protection from damp and rot. While installation in wet weather was inconvenient, it had no effect on the panels because the system releases moisture readily as it dries. Maintaining a high acoustic performance for the Stadthaus was an important design consideration. Acoustically, timber buildings have traditionally been classified as poor when compared with reinforced concrete and masonry. But CLT panels have a significantly higher density than timber frame buildings. They provide a solid structural core on which different, independent and separating layers can be added. The layer principle overcomes any sound transfer issues. With a consistent and economic layering strategy of walls with joints in front of the party walls, floating floor build-ups and suspended ceilings, the designers achieved sound reduction and thermal performance that exceed UK requirements. Detail B Detail A Detail C [Continued page 5] 4

Structure (cont.) Although more expensive than an equivalent reinforced concrete frame, CLT brought significant overall savings by making a radical cut in the building programme. For example, an equivalent concrete building was estimated to take 72 weeks, whereas the CLT solution required only 49 weeks. The erectors brought a large mobile crane, which eliminated the need for a tower crane that would normally be needed for a concrete structure. Scaffolding was needed to fix the cladding, but not to erect the wood structure. The CLT structure represented three days production at KLH s factory. And the rapid installation played an important role here. The four-man Austrian crew was on site three days a week and accomplished the entire superstructure erection in 27 working days, over nine weeks. The contractor was delighted with the +/- 5mm tolerance achieved with the timber construction, compared with the 10mm normally expected in concrete structures. The consequence of tight tolerances is the ease of fitting the structure together, its good airtightness and the ease of fixing cladding. Floor-to floor movement due to moisture and creep is estimated to be 3mm, which gaps in finishes can tolerate. Also, by avoiding concrete cores, there is not the differential movement to resolve between concrete and timber that occurs with conventional timber frame. Early indications are that the solid timber is making a significant contribution to thermal mass, as indicated by modest fluctuations in temperature. Installation of building services has proven easier than expected and future projects might expect better prices as this experience is taken into account. Cables and pipes were generally surface mounted with simple screwfixed straps. The plasterboard was installed on metal tophat sections. In contrast, Austrian practice takes advantage of the factory s ability to cut chases for service runs. Hence, they would normally fix the plasterboard directly to the CLT panels. Another encouraging conclusion is that CLT is evidently well suited to infill construction. This is because, when compared to other materials, the CLT site is less disruptive to neighbours on account of the rapid construction and quieter building activities using lightweight power tools. These tools pose a lower hazard to operatives health than the heavier equipment needed to drill into concrete, masonry and steel structures. Wall panel anchored to floor panel. Floor panel installation. Typical internal wall arrangement. Floor panel installation. Self-drill woodscrews installed using lightweight power drivers. Easy fixing of services to ceiling. 5

Detail A: Section at external wall Detail B: Section at lift shaft Key 1. 15mm timber 2. 55mm screed 3. 100mm insulation 4. 25mm insulation 5. 40mm insulation 6. 50mm insulation 7. 117mm KLH 8. 128mm KLH 9. 146mm KLH 10. 75mm Void 11. 1 layer of plasterboard 12. 2 layers of plasterboard 13. Eternit cladding 7 5 8 6 12 1 2 4 9 8 3 13 10 6 11 Drawings not to scale 5000 Eternit panels, comprising 70% wood waste clad the building. Detail C Section of Window Opening. 6

TRADA Technology Stocking Lane Hughenden Valley High Wycombe Buckinghamshire HP14 4ND (UK) t: +44 (0)1494 569600 f: +44 (0)1494 565487 e: information@trada.co.uk w: www.trada.co.uk Credits: Construction drawings and photos - Waugh Thistleton Architects Page 1, Page 5 (Easy fixing of services to ceiling), Page 6 (5000 Eternit panels) - Will Pryce Page 4 (isometric) and Page 6 (Detail C) Techniker Consulting Structural Engineers TRADA Technology Ltd 2009 7