PolyPavement TM. The Natural Soil Pavement NON-TRAFFIC AREA WIND & WATER EROSION PREVENTION

Similar documents
Installation Instructions - Dry Method

Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION. March 22, 2007

Section 409 of the Standard Specifications is hereby deleted and replaced with the following: DESCRIPTION

S-1 (2356) BITUMINOUS SEAL COAT REVISED 9/26/07 SP Mn/DOT 2356 is deleted and replaced by the following:

SPECIAL PROVISIONS - SP2005BOOK Page 237 JUNE 30, 2006 Last Revision 4/16/08

SECTION BITUMINOUS SURFACE TREATMENT

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR SUBGRADE STABILIZATION

The specified emulsion for chip seal shall conform to the following applicable requirements:

TECHNICAL SPECIFICATION

Stanford University Facilities Design Guidelines SECTION STONE FINES PAVING. American Society for Testing and Materials.

INDEX DESCRIPTION MATERIALS CONSTRUCTION MEASUREMENT PAYMENT 6

610 - DOUBLE ASPHALT SURFACE TREATMENT SECTION 610 DOUBLE ASPHALT SURFACE TREATMENT

610 - DOUBLE ASPHALT SURFACE TREATMENT SECTION 610 DOUBLE ASPHALT SURFACE TREATMENT

ITEM 252 IN-PLACE FULL DEPTH COLD FLEXIBLE PAVEMENT RECYCLING

The GREENBOOK 2015 Standard Specifications for Public Works Construction

Stabilizer Solutions, Inc. All Rights Reserved. Page 1 of 5

Asphalt Maintenance PRODUCTS INFORMATION AND INSTALLATION GUIDE

1825 W. Adams, Phoenix, AZ Phone (602) / Fax (602)

Section 506 SLURRY SEAL Description. Prepare the surface and apply a properly proportioned slurry seal mixture.

Construction Specification for Tack Coat

A. Submit product data sheets and literature verifying fire ratings and physical properties of materials.

Construction Specification 62 Grouted Rock Riprap

Section 506. SLURRY SEAL

THE BRITE THING TO DO

Recommended Application Procedures

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

CITY OF SAN ANGELO ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED)

Item P-629 Thermoplastic Coal Tar Emulsion Surface Treatments

MICHIGAN DEPARTMENT OF TRANSPORTATION

SECTION ASPHALT PAVING

Chapter 10. Pipeline Installation

ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED)

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 850 CEMENT TREATED FREE DRAINING BASE APRIL 18, 2008

EVERLAST CONCRETE TECHNOLOGIES PROTECTION PRODUCTS SECTION CONCRETE ADDITIVES AND ADMIXTURES

Master-Seal Surface-Applied Waterproofing System

SECTION ASPHALT PAVING

Polymeric Sand. Guide. for Pavement Joints. Installation. Easy to use Stays within joints HP POLYMERIC SAND RG+ POLYMERIC SAND. techniseal.

SECTION 503 TEMPORARY PAVEMENT RESTORATION

Flexible Pavement Preservation Treatment Construction Patching and Edge Repair AT-TC3PP T1-JA01. Suggested Field Considerations

SPECIFICATIONS FOR ASPHALT-RUBBER SURFACE TREATMENT WITH AGGREGATE COVER

HYDROSTRAW GUAR PLUS HYDRAULIC MULCH

Arizona AGC Pavement Preservation Series. Surface Seal Guide for Application and Construction

ERMCO EUROPEAN READY MIXED CONCRETE ORGANIZATION ASSOCIATION EUROPEENNE DU BETON PRET A L EMPLOI EUROPĂ„ISCHER TRANSPORTBETONVERBAND

Special Specification 3005 Scrub Seal Treatment

HYDROSTRAW ORIGINAL HYDRAULIC MULCH

HP and RG POLYMERIC SANDS for PAVEMENT JOINTS

Item P-629 Thermoplastic Coal Tar Emulsion Surface Treatments

CITY OF FARGO SPECIFICATIONS SEAL COATS

A. Submit product data sheets and literature verifying physical properties of materials.

Section 409. Chip and Fog Seals

Fresh concrete can be lifted from the ground level to the upper floor level by

- Guide 7: Safe Use of Bitumen Hoses

ITEM 231 CEMENT STABILIZED CRUSHED AGGREGATE BASE COURSE

SECTION Stabilizer Apache Warning Track Mix for baseball or softball field surfacing

ESTIMATE OF QUANTITIES

SACRAMENTO COUNTY ASPHALT RUBBER HOT MIX-GAP GRADED (ARHM-GG):

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION 2015

ITEM 231 CEMENT STABILIZED CRUSHED AGGREGATE BASE COURSE

SECTION 28 AGGREGATE BASE COURSE (FAA P-208) [For base course under runway and taxiway surfaces, use Section 29, FAA Item P-209.]

Jason Lampley Intermountain

LAPEER COUNTY ROAD COMMISSION ANNUAL BID SLURRY SEAL SURFACE SPECIFICATIONS

SPECIAL SPECIFICATION. Item Micro-Surfacing (Polymer Modified)

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS

Stanford University Facilities Design Guidelines SECTION ASPHALT UNIT PAVING. A. ASTM C-33 Standard Specification for Concrete Aggregates.

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS

Fugitive Dust Control Plan Sherburne County Generating Plant

HYDROSTRAW BONDED FIBER MATRIX

7.1 INTRODUCTION 7.2 MATERIALS 7.1 ROAD PAVEMENT REPAIRS - GENERAL

Construction Specification 28 Lime Treated Earthfill

Sherman Library Maintenance Handbook for Porous Asphalt

SECTION FLEXIBLE PAVING

Section 505. CHIP SEALS

Section 3 Specification 3.20 Slurry Seal TABLE OF CONTENTS

SPECIFICATIONS FOR FOG SEAL WITH COVER AGGREGATE

Recommended Performance Guideline For Chip Seal

CUT, RE SECTION VI. (Sub-section 290) Cut, Removal, and Replacement of Paved Surfaces. 1. Description Bituminous Pavements thru 290-2

ITEM P-609 SEAL COATS AND BITUMINOUS SURFACE TREATMENTS

Maine s s Experience Utilizing Full Depth Reclamation with Foamed Asphalt. NESMEA 2004 Portsmouth, NH

S Pene- Krete (Spray- Applied)

SECTION CONTROLLED LOW STRENGTH MATERIAL

SECTION BITUMINOUS CONCRETE PAVING

Stanford University Facilities Design Guidelines SECTION SEAL COATS. C. Section : Traffic Striping and Pavement Markings

Road Stabilization And Dust Control

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.

Public Works Manual. Revised September Concrete & Asphalt

Cement Stabilized Aggregate Base

Polymer Modified Cement

2004 Specifications CSJ SPECIAL SPECIFICATION 3250 Emulsified Asphalt Slurry Seal Surface Treatment

FIVE STAR PRODUCTS, INC. (800)

AGGREGATE SEAL COAT TECHNICAL SPECIFICATIONS

SPECIFICATIONS FOR NEW WORK CHIP SEAL

VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LATEX MODIFIED EMULSION TREATMENT (MICRO-SURFACING)

5-02 BITUMINOUS SURFACE TREATMENT

SURFACINGS AND PAVEMENTS SECTION 37: BITUMINOUS SEALS 37-1 SEAL COATS

Overview. Regional District of Nanaimo Team WaterSmart Drip / Micro Workshop. Water Source WATER METER. Backflow Prevention Devices

ITEM 260 LIME TREATMENT FOR MATERIALS USED AS SUBGRADE (ROAD MIXED)

CRUSHED AGGREGATE BLENDED WITH GRANITECRETE ADMIXTURE SURFACING

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING

Transcription:

TM The Natural Soil Pavement NON-TRAFFIC AREA SPRAY-ON APPLICATION INSTRUCTIONS AT 350 SQUARE FEET PER GALLON COVERAGE FOR DATE: _ P. O. BOX 36339, LOS ANGELES, TELEPHONE: (323) 954-2240 CALIFORNIA 90036 www.polypavement.com FAX: (323) 954-2244 1

PRELIMINARY PROJECT DETERMINATIONS READ THE APPLICATION INSTRUCTIONS THOROUGHLY BEFORE THE DAY OF THE JOB. INSTRUCT EACH EQUIPMENT OPERATOR AND LABORER CAREFULLY BEFORE STARTING PROJECT. PLAN AHEAD. CALL POLYPAVEMENT FOR TECHNICAL SUPPORT IF THERE ARE ANY QUESTIONS. I. INSPECT THE TOOLS AND THE EQUIPMENT II. MAKE PRELIMINARY PROJECT NOTATIONS: 1. SIZE OF AREA TO BE TREATED: Square Feet 2. POLYPAVEMENT REQUIRED FOR PROJECT Gallons 3. NUMBER OF SPRAY PASSES REQUIRED 2 4. POLYPAVEMENT REQUIRED FOR 1 st PASS Gallons 5. WATER REQUIRED FOR 1 st PASS Gallons at 20 TO 1 Dilution Ratio 6. POLYPAVEMENT REQUIRED FOR 2 nd PASS N/A Gallons 7. WATER REQUIRED FOR 2 nd PASS Gallons at 15 TO 1 Dilution Ratio 8. POLYPAVEMENT REQUIRED FOR 3 rd PASS N/A Gallons 9. WATER REQUIRED FOR 3 rd PASS Gallons at TO 1 Dilution Ratio 10. CAPACITY OF DILUTION TANK Gallons NOTE: The soil should have already been tested for suitability and for chemical contamination. If not, the test instructions for soil suitability and chemical contamination are below. INSTRUCTIONS FOR SOIL SUITABILITY TESTS TEST 1. Soil Suitability: Squeeze a handful of moistened soil into a tight clump and then open the hand. If the soil clump fails to hold together when hand is opened, the soil might not be suitable for PolyPavement treatment. TEST 2. Soil Contamination: Sprinkle or pour a small amount of water on the dry soil surface and observe. If the water stands on the dry surface or fails to seep into the soil, the soil might not be suitable for PolyPavement treatment. UNSUITABLE SOIL MIGHT HAVE TO BE REMOVED, REPLACED OR PRE-TREATED. CONTACT POLYPAVEMENT TECHNICAL SUPPORT FOR MORE INFORMATION. 2

NON-TRAFFIC AREA SPRAY-ON APPLICATION METHOD FOR: AT 350 SQUARE FEET PER GALLON COVERAGE BASIC EQUIPMENT FOR POLYPAVEMENT SPRAY-ON APPLICATIONS Storage Method, 5 Gallon Buckets, 55-Gallon Drums, or Bulk Storage Tank Metering Tank or Measuring Container Water Pump and Hoses with Fittings and Spray Nozzle Emulsion Spreader Truck, Water Truck with Spray Bar, or other Type Spray Rig that sprays water evenly. [OPTIONAL] Compactor Tape Measure and Calculator The primary piece of equipment for a spray-on application of PolyPavement Soil Solidifier is a sprayer that is capable of spraying water gently and evenly. The sprayer can be either a Computerized or non-computerized Emulsion Spreader Truck; a Water Truck equipped with a Spray Bar; a large or small Tank with pump, hose and Hand Wand; a Back-Pack Sprayer; or a Garden Watering Can depending on the size of the Project at hand. SPRAY-ON APPLICATION PRECAUTIONS 1. TEST THE SELECTED APPLICATION PROCESS on a small-scale area (i.e. one square yard) before attempting a full-scale project. 2. DO NOT APPLY PolyPavement Soil Solidifier during rainfall. 3. DO NOT APPLY PolyPavement Soil Solidifier if rain is forecast in the next 24 hours. If rain is expected before newly applied PolyPavement Soil Solidifier surface has dried, cover the wet PolyPavement Soil Solidifier application with a tarp or plastic sheeting to prevent rain damage. 4. DO NOT ALLOW PolyPavement Soil Solidifier to freeze in the container or before it has dried thoroughly. 5. DO NOT APPLY PolyPavement Soil Solidifier at air or ground temperatures of 42 degrees Fahrenheit or less. 6. ALLOW FOR PROPER DRAINAGE of a PolyPavement Soil Solidifier application. Slope, contour, shape or compact the soil so that the finished soil surface will be free of low spots and depressions where water will pond or puddle. 7. USE TWO OR MORE SUCCESSIVE SPRAY PASSES to avoid run-off and/or to assure even coverage. The first spray pass must not be allowed to dry before the second spray pass is applied. If the first pass dries before the second is applied, the second spray pass' depth of penetration will be hindered. 3

NON-TRAFFIC AREAS COVERAGE: 350 square feet per gallon of PolyPavement (See Note 1) SOIL CONDITION: Existing soil as is, loose or compacted. Do not use the Dilution Ratios below on high clay soil or sand (See Note 4 for Clay Soil and See Note 5 for Sand). APPLICATION INSTRUCTIONS PREPARATION: WET THE SOIL SURFACE evenly with water to prepare the soil surface if the soil is dry, dusty and resistant to water penetration, otherwise go to Step 1. MINIMUM SPREAD RATE: 0.25 g/sy. (See Note 2) DO NOT ALLOW THE SOIL SURFACE TO DRY - Proceed to Step 1. 1. PENETRATION SPRAY-PASS: SOAK THE SOIL evenly with 20 to 1 diluted PolyPavement Soil Solidifier. (See Notes 3, 4 & 5) MININIMUM SPREAD RATE: 0.30 g/sy. (See Note 2) ALLOW THE SOIL SURFACE TO DRY*. 2. TOUGHENING SPRAY-PASS: WET THE SOIL SURFACE EVENLY with 15 to 1 diluted PolyPavement Soil Solidifier. MINIMUM SPREAD RATE: 0.15 g/sy ALLOW THE SOIL TO DRY COMPLETELY. MAINTENANCE: Inclement weather conditions affect the surface in time. The application is not permanent. When maintenance becomes necessary, repeat Step 1 and/or Step 2 whenever needed in specific locations. * NOTE: Drying is an evaporation process. PolyPavement does not set like cement. It dries like glue. Drying occurs more quickly on a hot, sunny, windy day than on a cool, cloudy, windless day. After it dries, PolyPavement begins to cure. The chemical emulsifier (surfactant) in PolyPavement is biodegradable. While the emulsifier is present, PolyPavement has low resistance to water invasion. After the emulsifier is degraded PolyPavement resists water. The curing process is facilitated by sunlight and time. In bright sunlight, the surface cures in a day or so. However, the subsurface requires approximately 30 days or so to fully cure. 4

SPRAY-ON APPLICATION NOTES FOR @ 350 SF/G NON-TRAFFIC AREAS APPLICATION NOTES: NOTE 1: "COVERAGE" is the number of square feet of surface area that can be covered (treated) with one gallon of PolyPavement Soil Solidifier (i.e. 350 square feet per gallon). A Coverage of 350 sf/g means that one gallon of PolyPavement is sufficient to achieve the desired end results over an area of 350 square feet. NOTE 2: "MINIMUM SPREAD RATE" (MSR). Spread Rate is stated in fractions of a gallon or gallons per square yard (i.e. "MSR: 0.25 g/sy"). Apply no less diluted PolyPavement Soil Solidifier than the stated "MINIMUM SPREAD RATE" on every square yard of surface area. NOTE 3: TREATMENT DEPTH is exactly what the term implies. The treatment depth for a sprayon application cannot be specified or controlled. It depends on the porosity of the compact soil. For any given spray-on application, the treatment depth will be no greater than one-quarter inch. NOTE 4: FOR HIGH CLAY SOILS, set the Penetration Spray-Pass dilution ratio at 10 to 1. Apply at a Minimum Spread Rate of 0.15 gallon of diluted PolyPavement per square yard of surface area. Set the Toughening Spray-Pass dilution ratio at 10 to 1. Apply at a Minimum Spread Rate of 0.14 gallon of diluted PolyPavement per square yard of surface area. NOTE 5: FOR CRUSHED ROCK WITH HIGH GRANULAR CONTENT OR SAND, set the Penetration Spray-Pass dilution ratio at 16 to 1. Apply at a Minimum Spread Rate of 0.30 gallon of diluted PolyPavement per square yard of surface area. Set the Toughening Spray-Pass dilution ratio at 12 to 1. Apply at a Minimum Spread Rate of 0.125 gallon of diluted PolyPavement per square yard of surface area. The approximate coverage for Wind & Water Erosion Prevention in granular/sandy soils is reduced from 350 square feet per gallon to approximately 300 square feet per gallon. This is due to the fact that a lower dilution ratio is recommended to address the granular characteristics of the soil. 5