NOVA Chemicals Corporation

Similar documents
ENMAX Power Corporation

Decision MEG Energy Corp. Amend Christina Lake Industrial System Designation. December 15, 2011

Pembina NGL Corporation

Suncor Energy Inc. Errata to Decision Firebag Substations and Power Plant Expansion and Industrial System Designation Amendment

NaturEner Wild Rose 1 Energy Inc.

Harvest Operations Corp.

Decision Cenovus FCCL Ltd.

Alberta Electric System Operator Needs Identification Document Application

Decision GTE Solar Inc. Brooks Solar Power Plant. January 31, 2013

Alberta Electric System Operator Yeo 2015S Substation Needs Identification Document

EPCOR Distribution & Transmission Inc.

Canadian Natural Resources Limited

Nexen Inc. OPTI Canada Inc.

Pengrowth Energy Corporation

Seven Generations Energy Ltd.

Grande Prairie Generation, Inc.

Decision B. St. Pierre kW Photovoltaic Micro-Generation System. May 15, 2013

Nexen Inc. and CNOOC Canada Inc.

Connacher Oil and Gas Limited

Aquatera Utilities Inc.

C&B Alberta Solar Development ULC

The City of Red Deer

C&B Alberta Solar Development ULC

Pteragen Canada Inc.

SunEEarth Alberta Solar Development Inc.

Signalta Resources Limited

Burdett Solar GP Corp.

Grizzly Oil Sands ULC

Decision D ATCO Electric Ltd. Swan Hills F.P.L. 744S Substation Decommission and Salvage. November 8, 2018

TransAlta Corporation

Alberta Power (2000) Ltd.

Decision D The City of Calgary. Bonnybrook Cogeneration Expansion Project. May 17, 2018

Greengate Power Corporation

AltaGas Utilities Inc.

Oldman 2 Wind Farm Limited

C&B Alberta Solar Development ULC

Solar Krafte Utilities Inc.

AltaGas Utilities Inc.

EDF EN Canada Development Inc.

Oldman 2 Wind Farm Limited

Renewable Energy Services Ltd.

Notice of Technical Meeting

HYDRO AND ELECTRIC ENERGY REGULATION

Decision Syncrude Canada Ltd. Mildred Lake Power Plant. July 17, 2014

Ellerslie Substation Expansion

Decision FortisAlberta Inc. Micro-Generation Determination. December 16, 2008

SUNDANCE 7 January 2014

Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments

C&B Alberta Solar Development ULC

Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments

ATCO Electric Ltd. ATCO Gas (a division of ATCO Gas and Pipelines Ltd.) ENMAX Power Corp. EPCOR Distribution and Transmission Inc. FortisAlberta Inc.

Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments

Capital Power Generation Services Inc.

AltaLink Management Ltd. and ATCO Electric Ltd.

Alberta Electric System Operator

Alberta Electric System Operator AltaLink Management Ltd. Alberta-Pacific Forest Industries Inc.

Decision D Alberta Ltd. (BluEarth) Bull Creek Wind Power Project Noise Complaints

Janine Sullivan Vice President, Finance and Chief Financial Officer

COMMUNITY FUND AND INVOLVEMENT

Alberta Electric System Operator

Directive 026: Setback Requirements for Oil Effluent Pipelines

EDP Renewables SH Project GP Ltd.

ATCO Gas and Pipelines Ltd.

Alberta Electric System Operator

OPEN HOUSE PROJECT OVERVIEW OPEN HOUSE NOVEMBER 16, :00-8:00 PM FALL 2017

Decision ATCO Electric Ltd. St. Paul Transmission Project. December 20, 2013

ALBERTA ENVIRONMENT ENVIRONMENTAL PROTECTION AND ENHANCEMENT ACT APPLICATIONS NO AND ENVIRONMENTAL IMPACT ASSESSMENT

Wind Power Regulatory Process Review

Alberta Energy - Capacity Market Framework Engagement December 2017

Welcome to our Open House!

Decision (Errata) Alberta Ltd. Errata to Decision Bull Creek Wind Project. March 10, 2014

DOW CHEMICAL CANADA INC. POLYETHYLENE PLANT EXPANSION Decision 97-7 FORT SASKATCHEWAN Application No

October 30, 2012 Our File:

SUNCOR ENERGY CEDAR POINT WIND POWER PROJECT DESIGN AND OPERATIONS REPORT. Attachment D. Property Line Setback Assessment

Project Location. The CEC is a 320 MW combined-cycle power generation

AMHERST ISLAND WIND ENERGY PROJECT CONSULTATION REPORT. Appendix C. Project Notices

Alberta Electric System Operator

Amherst Island Wind Energy Project - Renewable Energy Approval Amendment Modification Report #4

Understanding Bill 50

Alberta Energy Capacity Market Framework Engagement December 2017

Foothills Pipe Lines Ltd.

TransAlta MidAmerican Partnership

Your guide to the. SOUTHERN ALBERTA Transmission Reinforcement

Alberta Regulation 258/95. Alberta Heritage Scholarship Act ALBERTA HERITAGE SCHOLARSHIP AMENDMENT REGULATION

E.L. SMITH SOLAR FARM PROJECT UPDATE

EOG Resources Canada Inc.

Canadian Natural Resources Limited

Proposed Enhance CO 2

RATE SCHEDULE IT-S INTERRUPTIBLE - ACCESS TO STORAGE

Welcome to our Public Information Centre

NATIONAL ENERGY BOARD

Proposed Heartland Cavern Lateral Pipeline and Meter Station. Public Information Document

ATCO Gas and Pipelines Ltd. (South)

October Published by. Energy Resources Conservation Board Avenue SW Calgary, Alberta T2P 3G4

10 Network Utilities Introduction Kaipara District Council Engineering Standards Resource Management Act 1991 Requirements

Grand Valley Wind Farms Phase 3 Wind Project Wind Turbine Specification Report

Alberta Reliability Committee (ARC) Terms of Reference

Wednesday, February 15, :00 9:00 p.m. Sedalia Hall 1st Avenue, Sedalia, Special Area 3, Alberta

Improving Customer Service

MICRO-GENERATION NOTICE SUBMISSION GUIDELINE

Transcription:

Decision 2013-426 NOVA Chemicals Corporation Industrial System Designation Amendment November 29, 2013

The Alberta Utilities Commission Decision 2013-426: NOVA Chemicals Corporation Industrial System Designation Amendment Application No. 1609920 Proceeding ID No. 2835 November 29, 2013 Published by The Alberta Utilities Commission Fifth Avenue Place, Fourth Floor, 425 First Street S.W. Calgary, Alberta T2P 3L8 Telephone: 403-592-8845 Fax: 403-592-4406 Website: www.auc.ab.ca

The Alberta Utilities Commission Calgary, Alberta Decision 2013-426 NOVA Chemicals Corporation Application No. 1609920 Industrial System Designation Amendment Proceeding ID No. 2835 1 Introduction 1. In accordance with sections 4, 14, 15 and 18 of the Hydro and Electric Energy Act, NOVA Chemicals Corporation (NOVA) filed an application with the Alberta Utilities Commission (AUC or the Commission) on September 13, 2013, requesting approval to construct and operate the NOVA R3 Main substation 196S (the NOVA Main substation), to connect two T-tap transmission lines 330L1 and 330L2 to the Alberta Interconnected Electric System, and to amend an existing industrial system designation to include the proposed substation and transmission lines. 2 Background 2. NOVA, by Order No. U2013-282, 1 has approval to operate an industrial system within its Joffre petrochemical complex. 3. TransAlta Utilities Corporation (now AltaLink Management Ltd.) by Orders No. Misc. HE 9928 2 and No. Misc. HE 9929 3 has approval to connect its Joffre 535S substation to NOVA s 138-kilovolt (kv) transmission lines 330L1 and 330L2. 5. The proposed NOVA Main substation is required to provide electric power to a new polyethylene unit that NOVA is installing at its Joffre petrochemical complex. NOVA plans to increase polyethylene production at the Joffre site by approximately 40 per cent, resulting in approximately a $900 million investment. The NOVA Main substation would include two 138/13.8-kV transformers and two 138-kV circuit breakers. The NOVA Main substation would be connected by two 40-metre, 138-kV T-tap connection lines designated as 330L3 and 330L4. 6. The NOVA Main substation would be located within the Joffre industrial system located within sections 29, 31 and 32 of Township 38, Range 25, west of the Fourth Meridian, two kilometres from the hamlet of Joffre in Lacombe County. NOVA also indicated that there would be no changes to the on-site generation or to the existing facilities as approved in the original industrial system designation application. 7. The requirements to designate an electric system as an industrial system are prescribed in Section 4 of the Hydro and Electric Energy Act. Section 4(2) of the Hydro and Electric Energy Act sets out principles that the Commission must have regard to when considering an industrial 1 2 3 Industrial System Designation Order No. U2013-282, Application No. 1609606, Proceeding ID No. 2617, June 11, 2013. Order No. Misc. HE 9928, Application No. 980632, July 9, 1999. Order No. Misc. HE 9929, Application No. 980632, July 9, 1999. AUC Decision 2013-426 (November 29, 2013) 1

Industrial System Designation Amendment NOVA Chemicals Corporation. system designation application. Section 4(3) sets out the criteria for evaluating an industrial system designation application. 8. NOVA indicated that the Joffre petrochemical complex is an integrated set of industrial processes which share utilities, process streams and common infrastructure. With the addition of the NOVA Main substation, the degree of utility, process and operations integration of the Joffre site would be increased. 9. NOVA indicated that there would be no significant environmental impacts resulting from construction of the NOVA Main substation or the proposed 138-kV T-tap connection lines. 10. NOVA indicated that the proposed substation and industrial system designation amendment do not facilitate the development of an independent electric system or the duplication of electric system facilities. Further, the NOVA Main substation, to be included in the amended industrial system designation, would be located within the contiguous land area of the Joffre petrochemical complex. 11. NOVA submitted a noise impact assessment regarding the proposed NOVA Main substation. The most impacted dwelling is located 1.65 kilometres from the substation facility boundary. Thirty-four residences were identified within approximately 1.5 kilometres of the Joffre petrochemical site and were included in the noise impact assessment for completeness and continuity with the previous noise impact assessment submissions. The noise impact assessment concluded that the proposed substation is expected to cause negligible or no increase in the cumulative sound level at the most impacted dwelling or at any residential receptors located in the study area. 12. NOVA conducted a participant involvement program, including public, government agencies and industry. Stakeholders were provided with details on the polyethylene expansion project including the proposed substation. No concerns specific to the substation were raised in the course of NOVA s consultation. 13. A notice of application was issued by the Commission on October 22, 2013. No objections were received. 3 Findings 14. The Commission is satisfied with NOVA s participant involvement program and that there are no outstanding objections. The Commission issued a notice of application and no objections were received. 15. The Commission is satisfied that the substation is not likely to cause any adverse environmental effects and finds that the noise impact assessment demonstrates compliance with the requirements of AUC Rule 012: Noise Control. 16. In making its decision on NOVA s amendment of its existing industrial system designation, the Commission has considered the principles, criteria and legislative framework contained in the Hydro and Electric Energy Act and the Electric Utilities Act. Based upon the 2 AUC Decision 2013-426 (November 29, 2013)

Industrial System Designation Amendment NOVA Chemicals Corporation evidence contained in the application, the Commission finds that each of the criteria contained in Section 4(3) has been met. 17. The Commission finds the industrial system designation amendment application and the associated substation meet the requirements as specified in AUC Rule 007: Applications for Power Plants, Substations, Transmission Lines, and Industrial System Designations. 18. Having considered the social, economic, and environmental impacts of the proposed project, the Commission considers the project to be in the public interest in accordance with Section 17 of the Alberta Utilities Commission Act. 4 Decision 19. Pursuant to sections 4, 14, 15, 18 and 19 of the Hydro and Electric Energy Act, and sections 2(1)(d) and 117 of the Electric Utilities Act, the Commission approves the application and grants to NOVA the following approvals: Appendix 1 Permit and Licence No. U2013-617 November 29, 2013 to construct and operate the NOVA R3 Main Substation 196S. Appendix 2 Industrial System Designation Order No. U2013-618 November 29, 2013, to amend its industrial system at its Joffre petrochemical industrial complex. Appendix 3 - Connection Order No. U2013-619 November 29, 2013, to connect transmission line 330L1 to AltaLink Management Ltd. s 535S substation. Appendix 4 - Connection Order No. U2013-620 November 29, 2013, to connect transmission line 330L2 to AltaLink Management Ltd. s 535S substation. 20. The appendices will be distributed separately. Dated on November 29, 2013. The Alberta Utilities Commission (original signed by) Neil Jamieson Commission Member AUC Decision 2013-426 (November 29, 2013) 3