Aircraft Lockout/Tagout (LOTO)

Similar documents
Sample Written Program. for. Control of Hazardous Energy (Lockout/Tagout) OSHCON

CALIFORNIA STATE UNIVERSITY, LOS ANGELES LOCKOUT / TAGOUT PROGRAM

Lockout / Tagout Policy

James E. Thompson, Inc. dba JTS Construction

Control of Hazardous Energy Program (Lockout/Tagout) Berryessa Union School District 1376 Piedmont Road, San Jose CA

No. GA Page 1 of 5 Effective Date: 03/04/16

CONTROL OF HAZARDOUS ENERGY LOCKOUT/TAGOUT PROCEDURES (Revised 8/05)

Lockout/Tagout. Company Policy

Title: Lockout/Tagout Policy. University Division/Department: Environmental Health & Safety Effective Date : May, 1996 Revised: July, 2017

CITY AND COUNTY OF DENVER CR&CF RISK UNIT Lockout/Tagout/Verify Standard

Lockout/Tagout Procedures

FCX Department of Occupational Health and Safety Policy

OPERATING POLICY MANUAL

2200 LOCK-OUT TAG-OUT PROGRAM. Document History. Version Date Comments

Effective Date Revision Date Page October 1, 2014 June 2015 Page 1 of 13

Lockout Tagout Program

ESSENTIAL SAFETY RESOURCES

NATIONAL HIGH MAGNETIC FIELD LABORATORY NHMFL FLORIDA STATE UNIVERSITY NHMFL LOCKOUT/TAGOUT SAFETY PROCEDURE SP-1

Delaware State University

An Example Of An Effective Lockout-Tagout Procedure

LOCKOUT TAGOUT OTCO WATER WORKSHOP MARCH 5, 2014 COLUMBUS, OH

An annual review of all local Lock Out Tag Out procedures must be accomplished.

Lockout Tagout Program

LOCKOUT / TAGOUT PROGRAM

LOCKOUT TAGOUT SAFETY PROGRAM

COMMONWEALTH SCAFFOLD Quality Scaffolding Across New England

CRAVEN COMMUNITY COLLEGE. Control of Hazardous Energy. (Lockout/Tagout) Completed by: Eddie Foster. Completed Date: January 2, 2018

Lockout/Tagout Program

TABLE OF CONTENTS 1.0 SUMMARY SCOPE REGULATIONS AND POLICIES DEFINITIONS RESPONSIBILITIES... 2

-Sample- Hazardous Energy Control Program

LOCKOUT/TAGOUT POLICY

MISSOURI UNIVERSITY OF SCIENCE & TECHNOLOGY

ENERGY CONTROL PROGRAM (LOCKOUT/TAGOUT)

The Control of Hazardous Energy (Lockout/Tagout) California State University Chico

Lockout/Tagout Program

Title: Lockout / Tagout Effective Date: 11/28/2014 Control Number: THG_0008 Revision Number: 1 Date: 10/8/2015 Annual Review Completed: 5/13/2015

Lock Out Tag Out (LOTO) Safety Procedure

Millersville University Finance and Administration Division Management Directive

Dutchess Community College. Control of Hazardous Energy. Lockout Tagout Program

Richland County School District One. Lockout & Tagout Program (29 CFR PART )

Lockout Tagout.

Brief Outline Code of Federal Regulation (29) The Control of Hazardous Energy (Lockout/Tagout)

Procedure. Procedure

New Mexico Institute of Mining & Technology. Lockout/Tagout Policy

Lockout/Tagout Program (Control of Hazardous Energy)

Training Calendar. Monthly Poster Theme Make copies and post them wherever you will get the most impact. In This Issue: April 2018 SAFETY THEME

THE UNIVERSITY OF SOUTHERN MAINE. Lockout/Tagout Policy

Model Safety Program

The Control of Hazardous Energy (Lockout/Tagout)

Sample Lockout Procedure Use with Lockout/Tagout (Control of Hazardous Energy)

Hazardous Energy Control / Lock out Tag out (LOTO)

The City of Redlands Lockout/ Tagout (LOTO) Program Rev. March 2017

Control of Hazardous Energy Program (Lockout/Tagout Program) June 13, 2017

UNCG Lockout/Tagout Program

Lockout Tagout Program

Control of Hazardous Energy (Lockout/Tagout) Program. The Department of Environmental Health and Safety

This approach involves the following suggested steps: Assemble the participants, hand out copies of the theme page, and pass around the signin

Energy Control and Lockout Tagout

D. Bleed: To release or dissipate residual energy in a machine, equipment, pipe, line, or duct so that all energy is reduced to a zero energy state.

White Paper. May Ensuring Safety with a Lockout/Tagout Program Seven Steps to Compliance

CSEA Energy Control (Lockout/Tagout) Program Evaluation Form

COMPLETE AND EFFECTIVE LOCKOUT / TAGOUT PROGRAMS

Control of Hazardous Energy. How to comply with new shipyard safety regulations

RISK CONTROL SOLUTIONS

Control of Hazardous Energy Lockout/Tagout A GUIDE TO EVALUATION OF EXPOSURES AND PROGRAM DEVELOPMENT

Grace & Co. Conn Page 1 of 25

LOCK OUT/ TAG OUT PROGRAM

FACT SHEET Standard: Lockout - Tagout

LOCKOUT/TAGOUT PROGRAM29 CFR

Control of Hazardous Energy (Lockout/Tagout Requirements and Procedures): OSHA Standard

LOCKOUT / TAGOUT PURPOSE SCOPE DEFINITIONS. Applicable OSHA Standards: 29 CFR

LOCK OUT - TAG OUT LO-TO

LOCKOUT TAGOUT STILL CRAZY AFTER ALL THESE YEARS?

HAZARDOUS ENERGY CONTROL PROGRAM

Lockout Myths & Misconceptions. Chad Ignatowski. Office: (616) Cell: (616)

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Control of Hazardous Energy Sources

UNCONTROLLED. Title: Energy Control and Lockout Compliance Work Instruction

UNCONTROLLED. Title: Energy Control and Lockout Compliance Work Instruction

Machine Guarding and Maintenance

FACILITIES MANAGEMENT OFFICE OF ENVIRONMENTAL HEALTH AND SAFETY AERIAL WORK PLATFORM POLICY 09/06/17 Last Revision

LOCKOUT/TAGOUT PROGRAM

Guideline for In-Service Assessment of Ammonia Refrigeration Plants

Stud Welding Procedures Training. Presented By Dan Beigel in cooperation with Texas Stud Weld and UFS QC.

Operations: HSE. Ground Disturbance Safe Work Practice (SWP)

READ ONLY. Adopting Agency BSC SFM. Adopt Entire Chapter Adopt Entire Chapter as amended (amended sections listed below)

Technical Safety Office. Hazardous Energy Control (Lockout/Tagout) Program An Environmental Health & Safety Document

SECTION E1 SUMP SYSTEM

BEFORE THE STATE OF CALIFORNIA OCCUPATIONAL SAFETY AND HEALTH APPEALS BOARD. Docket No. 00-R2D3-3623

1 IMHOFF CUSTOM SERVICES INC. AERIAL LIFT POLICY

CLEVELAND INTEGRITY CIS SAFETY NEWLSETTER December 2017

Tom Carpenter Crane Maintenance Technician

Internal Operating Procedure ISO 9001:2008 SOC NEVADA LLC

L OCKOUT T AGOUT. For Authorized Employees

PURPOSE OF THE PROCEDURE To minimize the incidence of employee injuries from machines and equipment as per OSHA

Newport News Shipbuilding Contractor Environmental, Health and Safety Resource Manual Hazardous Energy Control

NLCTA Electromagnet Equipment Lockout Procedure

Standards Summary Sheet

Critical Elements from the Arrium Codes of Practice (Including Arrium Mining Codes of Practice)

The Safety Professional s Expanded Guide to LOCKOUT TAGOUT

Transcription:

Aircraft Lockout/Tagout Program (LOTO) for All EMPLOYEES Rules codified in 29 CFR 1910.147 and 1910.146. There are many areas on an aircraft that require positive control of Hazardous Energy: E & E Bays, -Wing Integral Tanks Wheel Wells, -Center Integral Tanks Flap Wells. Hazardous energy must be dissipated!

Definitions Lock:A device used to positively control or isolate the operation of an energy device. Tag:A device used to identify that the component is under maintenance, giving specific instructions not to activate under any circumstances. JSA: Job Safety Analysis, a process where a competent, qualified person conducts a thorough inspection and evaluation of the work area and identifies each safety and/or health hazard; with positive corrective actions to minimize or eliminate those safety and/or health hazards. 1910.147(c)(4)(I) Definitions Continued Aircraft Unique Non-Permitted Confined Space- Those spaces identified by the customer or air carrier as non-permit required confined spaces. These spaces are typically areas of the aircraft where access is limited and might be impacted by moving flight controls, electrical energy etc. Aircraft Permitted Required Confined Space- A Confined Space that contains or has the potential to contain a hazardous atmosphere, Contains a material having the potential for engulfing an entrant, Has an internal configuration in which an entrant could be trapped or asphyxiated by inwardly converging walls or by a floor which slopes downward and tapers to a smaller cross section or any other recognized serious safety of health hazard.

Definitions Continued Warning Tag (Red) Tag to be installed on the aircraft, aircraft circuit barkers or any part of the aircraft systems indicating that a system has been disabled and will remain disabled until such time as the task is completed and the tag is removed. Tag Out The disabling of a system by use of a Warning Tag 1910.147( c)(3)(i) General Types of Lockout Devices: Locks Gear Safety Pins Tags Circuit Breaker Lockout Collars Chains Hydraulic Line Caps

General Lockout/Tagout Steps: Know the equipment and types of energy associated with it as well as the maintenance you will be doing. Use the normal shutdown procedures to prepare the equipment for Locking and Tagging. All controls should be in the OFF or Neutral position. Turn off main power switches. Shut all fluid isolation valves. Lock & Tag the Energy Sources. Put a Lock and Tag on all energy isolation devices when it is possible. With aircraft components, it is not always possible to apply an actual lock to the system being worked on. General Lockout/Tagout Steps (cont): Release all Stored Energy. Cap, vent and drain all fluid lines. Discharge all capacitors. Block all pieces that would be a hazard if they moved. Disconnect pneumatic lines and apply pneumatic or hydraulic line caps. Test to ensure LOTO is effective. Check voltage on all circuits. Check pressure gauges on fluid lines. Attempt to start the equipment in the normal manner. Then return all control devices to the OFF or NEUTRAL position.

Procedures: Identify the type of work to be performed and what equipment will be worked on. The mechanic, mechanic s supervisor or Manager identifies the system by referencing Job Cards, JSA s or Maintenance Manuals. The mechanic, mechanics' supervisor or Manager surveys aircraft to determine if affected systems have been locked out. Signs are placed around aircraft if required by Customer, Operator or Maintenance Manual. Energy is dissipated (if required). If the task is NOT completed at the end of your shift and the system is still required to be locked-out for the operation, the tag MUST remain installed until such time as the task or tasks requiring the tagout is completed. NOTE: Additional technicians working on same system, Performing different task are required to install Danger Tags as well

Procedures: After work is completed, employee or his supervisor removes the tag and files it with the tag control log. The mechanic, mechanics supervisor or Manager must verify that all systems affected by the LOTO are restored to operational status.. Procedures: Identify the type of work to be performed and what equipment will be worked on. The Lead Mechanic, Supervisor or Manager identifies the system by referencing Job Cards, JSA s or Maintenance Manuals. Lead Mechanic, Supervisor or Manager surveys aircraft to determine if affected systems have been locked out.

WARNING TAG SAMPLE NORTH AMERICAN AIRCRAFT SERVICES INC. 11502 Jones Maltsberger Repair Station San Antonio, Texas NS8R594J WARNING QC-104 WARNING WARNING WARNING TAG NO. 11 TAG NO. 1 AIRCRAFT REG. NO. 2 A/C REG 12 WORK ORDER NO. 3 CARD NO. 4 W/O NO. 13 LOCATION 5 CARD NO. 14 REASON 6 LOCATION 15 INSTALLED BY 7 DATE 8 INST DATE 16 REMOVED BY 9 DATE 10 INST BY 17 WARNING WARNING WARNING REM DATE 18 THIS TAG MAY ONLY BE REMOVED BY THE INDIVIDUAL WHO INSTALLED IT OR BY THEIR SUPERVISOR OF MANAGER REM BY 19 WARNING WARNING TAG INSTRUCTION Block 1. Enter the control number from the warning tag control log Block 2. Enter the Aircraft Reg. Number Block 3. Enter the Work order number form the warning tag control log block 1 Block 4. Enter the routine or non-routine card number the warning tag is to be installed against Block 5. Location. Enter the location the tag is to be installed Block 6. Enter the reason the tag is installed Block 7. The name of the individual installing the tag. Block 8. The date the tag is installed. Block 9. The name of the individual removing the tag. NOTE: the warning tag must be removed by the individual who installed it or his/her supervisor or manager. Block 10. The date the tag was removed Block 11. Enter the control number from the warning tag control log Block 12. Enter the Aircraft Reg. Number Block 13. Enter the Work order number form the warning tag control log block 1 Block 14. Enter the routine or non-routine card number the warning tag is to be installed against Block 15. Location. Enter the location on the aircraft the tag is to be installed. Block 16. Enter the date the tag is installed. Block 17. Enter the name of the individual installing the tag. Block 18. Enter the Date the tag is removed. NOTE: the warning tag must be removed by the individual who installed it or his/her supervisor or manager. Block 19. Enter the name of the individual removing the tag When removed, the warning tag must be attached to the routine or non-routine work card that generated the installation of the tag.

WARNING TAG SAMPLE NORTH AMERICAN AIRCRAFT SERVICES INC. 11502 Jones Maltsberger Repair Station San Antonio, Texas NS8R594J WARNING QC-104 WARNING WARNING WARNING TAG NO. 001 TAG NO. 001 AIRCRAFT REG. NO. N123MM A/C REG. N123MM WORK ORDER NO. B26543 CARD NO. 0123 W/O NO. 26543 LOCATION #1 Boost Pump C/B CARD NO. 0123 REASON #1 Pump Removed LOCATION #1 Boost Pump C/B INSTALLED BY J. Jones DATE 01-15-2006 INST DATE 01-15-2006 REMOVED BY DATE INST BY J Jones WARNING WARNING WARNING REM DATE THIS TAG MAY ONLY BE REMOVED BY THE INDIVIDUAL WHO INSTALLED IT OR BY THEIR SUPERVISOR OF MANAGER REM BY WARNING When filling out the tag, all blocks on both portions of the tag must be completed and the individual installing the tag must sign and date the tag. The Warning Tag Control number shall be assigned from the warning tag control Log WARNING TAG SAMPLE AND INSTRUCTION NORTH AMERICAN AIRCRAFT SERVICES INC. 11502 Jones Maltsberger Repair Station San Antonio, Texas NS8R594J WARNING WARNING WARNING TAG NO. 001 AIRCRAFT REG. NO. N123MM WORK ORDER NO. B26543 CARD NO. 0123 LOCATION #1 Boost Pump C/B REASON #1 Pump Removed INSTALLED BY J. Jones DATE 01-15-2006 REMOVED BY DATE WARNING WARNING WARNING THIS TAG MAY ONLY BE REMOVED BY THE INDIVIDUAL WHO INSTALLED IT OR BY THEIR SUPERVISOR OF MANAGER REMOVE THE RIGHT SIDE OF THE TAG AND FILE IT WITH THE WARNING TAG CONTROL LOG. PUT THE LEFT (LARGE) PORTION OF THE TAG AT THE LOCATION TAGED OUT

WARNING TAG SAMPLE AND INSTRUCTION NORTH AMERICAN AIRCRAFT SERVICES INC. 11502 Jones Maltsberger Repair Station San Antonio, Texas NS8R594J WARNING WARNING WARNING TAG NO. 001 AIRCRAFT REG. NO. N123MM When removing the tag, The mechanic, his supervisor or manager must sign and date the Removed By blocks of the tag WORK ORDER NO. B26543 CARD NO. 0123 LOCATION #1 Boost Pump C/B REASON #1 Pump Removed INSTALLED BY J. Jones DATE 01-15-2006 REMOVED BY J Jones DATE 01-22-2006 WARNING WARNING WARNING THIS TAG MAY ONLY BE REMOVED BY THE INDIVIDUAL WHO INSTALLED IT OR BY THEIR SUPERVISOR OF MANAGER The tag may only be removed by the individual who installed it, his supervisor or manager The tag must be retained with the Warning Tag Control Log. WARNING CONTROL LOG SAMPLE North American Aircraft Services, Inc 11502 Jones Maltsberger San Antonio Texas Repair Station NS8R594J Form -QC-102 WARNING TAG CONTROL LOG WORK ORDER NO. A/C REG. NO. DATE 001 002 003 004 005 006 007 008 009 010 011 012 013 014 015 016 017 018 019 020 021 022 023 024 025 026 027 028 029 030 031 032 033 034 035 036 037 038 039 040 041 042 043 044 045 046 047 048 049 050 051 052 053 054 055 056 057 058 059 060 061 062 063 064 065 066 067 068 069 070 071 072 073 074 075 076 077 078 079 080 081 082 083 084 085 086 087 088 089 090 QUALITY CONTROL AUDIT DATE: QUALITY CONTROL AUDITOR:

WARNING CONTROL LOG SAMPLE AND INSTRUCTIONS North American Aircraft Services, Inc Repair Station NS8R594J 11502 Jones Maltsberger San Antonio Texas Form -QC-102 WARNING TAG CONTROL LOG WORK ORDER NO. A/C REG. NO. DATE 001 002 003 004 005 006 007 008 009 010 011 012 013 014 015 016 017 018 019 020 021 022 023 024 025 026 027 028 029 030 031 032 033 034 035 036 037 038 039 040 041 042 043 044 045 046 047 048 049 050 051 052 053 054 055 056 057 058 059 060 061 062 063 064 065 066 067 068 069 070 071 072 073 074 075 076 077 078 079 080 081 082 083 084 085 086 087 088 089 090 Enter the work order number, Aircraft registration number and the date the first tag was issued. When issuing a Warning Tag Control number, place a diagonal Line (/) through the number issued (See Example) This indicates the number has Been issued and will not be Duplicated. Enter the Control Number in Block 1 and block 11 of the Warning Tag. QUALITY CONTROL AUDIT DATE: QUALITY CONTROL AUDITOR: WARNING CONTROL LOG SAMPLE AND INSTRUCTIONS North American Aircraft Services, Inc 11502 Jones Maltsberger San Antonio Texas Repair Station NS8R594J Form -QC-102 WARNING TAG CONTROL LOG WORK ORDER NO. A/C REG. NO. DATE 001 002 003 004 005 006 007 008 009 010 011 012 013 014 015 016 017 018 019 020 021 022 023 024 025 026 027 028 029 030 031 032 033 034 035 036 037 038 039 040 041 042 043 044 045 046 047 048 049 050 051 052 053 054 055 056 057 058 059 060 061 062 063 064 065 066 067 068 069 070 071 072 073 074 075 076 077 078 079 080 081 082 083 084 085 086 087 088 089 090 When the task is completed and the Warning tag is removed. Place another diagonal line through the number block. This will form an (X) and indicate the tag has been removed and the control number has been closed. Retain the large portion of the Warning with the control log and discard the small right hand portion. QUALITY CONTROL AUDIT DATE: QUALITY CONTROL AUDITOR:

WARNING CONTROL LOG SAMPLE AND INSTRUCTIONS North American Aircraft Services, Inc Repair Station NS8R594J 11502 Jones Maltsberger San Antonio Texas Form -QC-102 WARNING TAG CONTROL LOG WORK ORDER NO. B1123RE A/C REG. NO. N123MM DATE 01-01-2006 001 002 003 004 005 006 007 008 009 010 011 012 013 014 015 016 017 018 019 020 021 022 023 024 025 026 027 028 029 030 031 032 033 034 035 036 037 038 039 040 041 042 043 044 045 046 047 048 049 050 051 052 053 054 055 056 057 058 059 060 061 062 063 064 065 066 067 068 069 070 071 072 073 074 075 076 077 078 079 080 081 082 083 084 085 086 087 088 089 090 When all the tasks are completed and all the Warning tags have been removed. The Inspector, supervisor or manager must insure all the large portions of the tags are accounted for. The inspector, supervisor or manager will sign and date the bottom of the Warning Tag control log. The large portion of the tag Must be retained with the control log when all task are completed QUALITY CONTROL AUDIT DATE: 01-22-2006 QUALITY CONTROL AUDITOR: John Jones