Fjardaal Smelter Project

Similar documents
Fjardaal Smelter Project

SELWYN PRIMARY SCHOOL, LONDON ENVIRONMENTAL NOISE SURVEY

ASTM E 90-09: Laboratory Measurement of Airborne Sound Transmission of Building Partitions and Elements

100 Avenue Road, Swiss Cottage, London

Determination of the sound reduction and sound absorption of a railroad noise barrier

ASTM E 90-09: Laboratory Measurement of Airborne Sound Transmission of Building Partitions and Elements

For inspection purposes only. Main Street, Newbridge, Co. Kildare. Site Survey Completed by: Mr. Stephen Stapleton Environmental Scientist

The specimen B W was identified by the client as a Skyfold Classic operable partition, with panels, seals, and clearances in configuration 4E.

Dun Laoghaire/Rathdown County Council. Longitude Festival 15 th to 17 th July Marlay Park, Dublin

10 Noise and Vibration

HAINE ROAD, RAMSGATE NOISE ASSESSMENT

Monthly Noise Monitoring Assessment

KINETICS NOISE CONTROL TEST REPORT #AT001021B

Decibell Consulting pty Ltd

8. Appendix F Acoustic Assessment

KINETICS NOISE CONTROL TEST REPORT #AT001049

Hudson Series 200 Acoustic Louvre

TECHNICAL DOCUMENT - SOUND INSULATION R9 SYSTEM. Dated: 30 August 2013

Environmental Noise Compliance Assessment Bass Point Quarry

PROPOSED PLAN CHANGE: ALEXANDER ROAD UPPER HUTT. Noise Assessment. Rp W. 27 July 2012

ASSESSMENT OF INWARD TRAFFIC NOISE IMPACT AT RESIDENTIAL DEVELOPMENT, WONDERFUL BARN, LEIXLIP, CO. KILDARE

KINETICS NOISE CONTROL TEST REPORT #AT001110

Measurement of Sound Absorption Coefficient for Perfopan slotted Wall Panels Code No. SLT 7x7-PR 12%, DS 270, on 45 mm mineral wool

Salem, Massachusetts

Impact Sound Testing of Floor Covering on a Heavyweight Standard Floor

Signatures are required on this document for an official laboratory test report. Copies of this document without signatures are for reference only.

WAIKATO POWER PLANT SH31, KAWHIA ROAD OTOROHANGA ASSESSMENT OF NOISE EFFECTS

Hudson Series 300 Acoustic Louvre

1 Introduction. Mine EPL. report. Dear Leonard, J13083L2_24 assessment. operation of. the crusher, RASP Mine. 2015); and

Community and Environmental Noise Measurement

Wind Turbine Generator System Acoustic Noise Test Report. Bergey Excel Wind Turbine

Roma to Brisbane Pipeline Dalby Compressor Station Upgrade Environmental Management Plan. Appendix 8. Noise Assessment

Planning. Local. 46 Planning

CRANBOURNE LANDFILL. Environmental Noise Assessment. Rp ML. 10 May 2013

KINETICS NOISE CONTROL TEST REPORT #AT001032

ICF/Building System FSTC Test Report

This report assesses the outward noise and vibration impact of the proposed development on its surrounding environment.

BS4142:2014 Assessment for Planning Application

KINETICS NOISE CONTROL TEST REPORT # AT001084

Woodlawn Mechanical Biological Treatment Facility. Project Approval (06_0239) Condition 28 - Noise Audit Report. Report Number 610.

Signatures are required on this document for an official laboratory test report. Copies of this document without signatures are for reference only.

Environmental Noise Assessment

Traffic Noise Analysis for The Westerly City of Simi Valley, California

RIVERBANK ACOUSTICAL LABORATORIES

BARON WINDS SOUND MONITORING AND COMPLIANCE PROTOCOL

Rainfall and impact noise measurements on metal roof tiles

ASTM C 423 SOUND ABSORPTION TEST REPORT. Rendered to: FABRI TRAK SYSTEMS, INC. SERIES/MODEL: FabriSpan. TYPE: Ceiling System. Summary of Test Results

Additional information relevant to Section 7 is presented in Appendix D in Volume 2 of 3 of the EIS.

KINETICS NOISE CONTROL TEST REPORT #AT001052

Technical Report - Noise Monitoring OOHW: 5 to 7 March Sydney Metro City and Southwest North Corridor Works. Nathan Lynch; Paul Douglass

KINETICS NOISE CONTROL TEST REPORT #AT001067

Appendix P. Construction Noise Assessment. (Prepared by Marshall Day Acoustics, November 2013)

South Branch Wind Farm Acoustic Audit - Emission Summary for Public Distribution

Strategic noise mapping of Adelaide CBD

Qualitative Noise Impact Evaluation for the Continuous Disposal of Ash at the Camden Power Station

ASTM C 423 SOUND ABSORPTION TEST REPORT. Rendered to: FABRI TRAK SYSTEMS, INC. SERIES/MODEL: 1-1/4" Fabri Trak

Future Generation Wind, LLC

The Effect of Atmospheric Absorption on Environmental Noise Propagation in an Urban Area

Sound Insulation Test Easterton of Duntelchaig, Farr, Inverness, IV2 6AW

9. NOISE AND VIBRATION

PROPOSED CO-OPERATIVE SUPERMARKET, KNIGHTON

BASELINE NOISE MEASUREMENTS Different Techniques Different Results

For inspection purposes only.

Rainfall and impact noise measurements on metal roof tiles

KINETICS NOISE CONTROL TEST REPORT #AT001035

s:fl~a~~'illilirt~/l

Status: Rev: Comments Date: Author: Reviewer:

GUIDANCE NOTE FOR NOISE MEASUREMENT OF EQUIPMENT TO ENSURE CONFORMANCE WITH MHSC MILESTONES

SERIES & NO. SMI SUBJECT: GUIDELINES FOR CONDUCTING ENVIRONMENTAL NOISE MEASUREMENT SURVEYS

B Page 1 of 21-

Important Notice. QuietRock by PABCO Gypsum Cherry Street Newark, CA

Noise Impact Assessment

A L I O N Technical Center. Test Report

INTRODUCTION SPECIMEN DESCRIPTION

RIVERBANK ACOUSTICAL LABORATORIES

END-OF-LINE ACOUSTIC ENGINE TESTING. DISCOM Noise Analysis for Engine Test

ASTM C 423 SOUND ABSORPTION TEST REPORT. Rendered to: FABRI TRAK SYSTEMS, INC. SERIES/MODEL: Fabri Trak System. TYPE: Upholstered Panel

EDF EN Canada Development Inc.

Important Notice. QuietRock by PABCO Gypsum Cherry Street Newark, CA

RIVERBANK ACOUSTICAL LABORATORIES

F6. Operational Noise

Technical Report - Noise Monitoring OOHW: 24 and 25 February Sydney Metro City and Southwest North Corridor Works. Nathan Lynch; Paul Douglass

RIVERBANK ACOUSTICAL LABORATORIES

Laboratory Measurement of Impact Sound Insulation of Floor Coverings on a Heavyweight Concrete Slab Floor

MANAGING THE NOISE IMPACT FROM SHALE GAS DRILLING

Noise annoyance caused by large wind turbines a dose-response relationship

BAY MEADOWS PHASE II SPAR 2 SAN MATEO, CALIFORNIA

G R0 ACOUSTICAL PERFORMANCE TEST REPORT ASTM E90. Rendered to: MI WINDOWS AND DOORS, LLC. SERIES/MODEL: 1650 Vinyl

A L I O N Technical Center. Test Report

Environmental Noise Monitoring. Hanson Quarry Wagga Wagga, NSW. October 2012

NO. 19 WILBERFORCE ROAD COXHEATH, MAIDSTONE, KENT ME17 4HD SOUND INSULATION TESTING. On behalf of: Oscar Acoustics

G R0 ACOUSTICAL PERFORMANCE TEST REPORT ASTM C423. Rendered to FABRITRAK SYSTEMS, INC. SERIES/MODEL: Fabri Flex Fabric with 6#

ASTM C 423 SOUND ABSORPTION TEST REPORT. Rendered to: FABRI TRAK SYSTEMS, INC. SERIES/MODEL: 1" FABRI TACK

Status: Rev: Comments Date: Author: Reviewer:

FIELD IMPACT INSULATION TESTS 133 SCARBOROUGH STREET, SOUTHPORT TEST REPORT

LABORATORY MEASUREMENT OF AIRBORNE SOUND INSULATION OF STEEL CLAD PIR WALL PANELS (According to ISO )

Rosalba Silvaggio (ISPRA - Italian National Institute for Environmental Protection and Research) Francesco Borchi (Department of Industrial

ACOUSTIC STUDY OF THE SUNY CANTON WIND TURBINE CANTON, NEW YORK. June 2013

Section 12: Noise & Vibration

CJ Buma. To: Steelform Building Products Inc. Wednesday, 2007 May Avenue Edmonton, AB, T6B 2V2. Attn: Mr.

Transcription:

Fjardaal sf Fjardaal Smelter Project Noise Survey 6 September 6

Fjardaal sf Fjardaal Smelter Project Noise Survey 6 September 6 Report no P-24-A-1 Issue no Date of issue 27 September 6 Prepared Checked Approved Rasmus Krogh Lars Find Larsen Søren Rasmussen

1 Table of Contents 1 Preface 2 2 Measurement positions 3 21 Specific description 4 3 Conditions during the measurement 6 31 Meteorological conditions 6 32 Background noise 7 33 Day and time of measurement 7 34 Work in progress during the survey 7 4 Measurements and analyses 8 41 Equipment and software 8 42 Procedure of the measurements and analyses 8 5 Results 9 51 Equivalent noise and fractiles 9 52 Noise events 9 53 Uncertainty 6 Remarks 11 Table of Appendices Appendix 1 - Measurement positions Appendix 2-1/3 octave spectrum

2 1 Preface A baseline noise survey was carried out in June 4 prior to the construction phase and the later operation of the Fjardaal Smelter The first noise survey during the construction phase was carried out in September 5 This year, the second noise survey during the construction phase has been executed in order to show the noise levels near the construction site boundary The survey was performed during a 3 day period; Monday August 7 th to Wednesday August 9 th 6 by COWI employees, Rikke J Lemberg and Rasmus Krogh

3 2 Measurement positions The noise measurements were carried out in 4 positions near the site boundary (same positions as last year's survey) Each position is shown on the map below with a red dot and described in the table underneath it A map in larger scale can be seen in appendix 1 Measurement position Coordinates(*) LON / westing LAT / northing Description 5 411 389 Western site boundary 6 433 22254 Northern site boundary 7 529 21418 Northern site boundary 8 51 19953 Eastern site boundary (*) Local Fjardaal datum

4 21 Specific description 211 Measurement position 5 Measurement position no 5 (MP 5) is located near the western gate to the site Significant noise sources during the measurement period near MP 5 are: trucks and cars on internal road no 1 maintenance area (east of MP 5) assembling of structural steel on the Casthouse 212 Measurement position 6 Measurement position no 6 (MP 6) is located near the western diversion channel Significant noise sources during the measurement period near MP 6 are: trucks and cars on internal road no 1 assembling of structural steel on the Casthouse workshop 213 Measurement position 7 Measurement position no 7 (MP 7) is located near the internal road no 8 Significant noise sources during the measurement period near MP 7 are: trucks and cars on internal road no 8 cladding of the Potline concrete cutting inside the Potline grinding inside the Potline

5 214 Measurement position 8 Measurement position no 8 (MP 8) is located near the eastern end of the Potline, close to internal road no 12 Significant noise sources during the measurement period near MP 8 are: cars and trucks on internal road no 12 cladding of the Potline

6 3 Conditions during the measurement The noise measurement periods were selected to ensure the appropriate measurement conditions in compliance with the requirements in the Icelandic (and Nordic) standard 1 31 Meteorological conditions The meteorological conditions during each of the measurements are listed below The cloudiness is defined as a fraction where /8 means clear sky and 8/8 means fully overcast The wind direction is given by direction of the compass Meas pos Period Cloudiness Temperature Wind speed Wind direct 5 Day 4/8 ºC 3 m/s W Evening 8/8 9 ºC < 1 m/s Shifting Night 3/8 5 ºC < 1 m/s Shifting 6 Day 6/8 ºC 3 m/s W Evening 8/8 9 ºC < 1 m/s Shifting Night 8/8 8 ºC < 1 m/s Shifting 7 Day 8/8 15 ºC 1 m/s E Evening 6/8 11 ºC 1 m/s E Night 8/8 8 ºC < 1 m/s Shifting 8 Day 4/8 ºC 4 m/s E Evening 7/8 ºC 3 m/s E Night 4/8 6 ºC < 1 m/s Shifting The wind direction does not completely comply with the meteorological guidelines, according to the standard, in all of the measurements The meteorological window states that measurements should be done downwind Because of the relative short measurement distance to the sources and the very low wind speeds, it will not have any significant influence on the results 1 Nordtest Method NT ACOU - Industrial Plants: Noise Emission

7 32 Background noise The only background noise was noise from traffic on the road no 92 from Reyðarfjörður to Eskifjörður The background noise levels were not significant and the measurements need not to be adjusted 33 Day and time of measurement The noise measurements were carried out from Monday August 7 th to Wednesday August 9 th covering the three time periods; day (7h-18h), evening (18h- 23h) and night (23h-7h) All activities at the site during the measurements have been considered representative for a "normal" day, despite the measurements only shows a "snapshot" of the noise levels during our stay at the site 34 Work in progress during the survey Major works in progress during the survey period: Cladding of the Potlines Work on the alumina silo Erection of the Casthouse structural steel Assembling of the Gas Treatment facilities Erection of the Rectifier buildings

8 4 Measurements and analyses The noise measurements were carried out according to the procedures as described in the Nordic standard NT ACOU : "Industrial plants: Noise emission" 41 Equipment and software Instrument Type Serial number Microphone GRAS AE 34349 Preamplifier 1dB-Stell Pre 12Hn 142 Data Acquisition card 1dB Symphonie 19 Laptop PC HP/Compac nc62 CNU9FTGZ Sound Level Calibrator Brüel & Kjær - 42 148 Anemometer Skywatch Eole - Acquisition software 1dB - dbtrig ver 4 Analysis software 1dB - dbtrait ver 41 42 Procedure of the measurements and analyses The measurements were carried out as attended measurements The measurements were taken in a number of selected, representative one hour periods in all three time periods (day, evening and night) All measurements were recorded using a PC-based acquisition system and later analysed in our laboratory The analyses give; L Aeq, L, L, L and L Amax L, L and L show the noise level that is exceeded in %, % and % of the measurement time L may be considered as the average minimum noise level (often considered as the true background level)

9 5 Results 51 Equivalent noise and fractiles The overall results of the analyses are shown in the table below Measurement position no Day period L Aeq [] L [] L [] L [] L Amax [] Day 58 58 53 5 Evening 54 53 45 43 Night 47 48 43 72 Day 57 59 48 41 81 6 Evening 58 55 53 81 Night 53 55 36 81 Day 61 65 53 43 7 Evening 41 34 78 Night 46 48 36 33 73 Day 64 65 53 47 89 8 Evening 51 46 38 35 85 Night 48 41 35 33 78 1/3 octave spectrums of each measurement can be seen in appendix 2 52 Noise events Significant noise events during measurements MP 5 - Traffic on internal road no 1, noise from maintenance area (east of MP 5) and assembling of structural steel on the Casthouse (pneumatic driven impact wrench) MP 6 - Traffic on internal road no 1, noise from workshop (building no T-3) and assembling of structural steel on the Casthouse (pneumatic driven impact wrench)

MP 7 - Traffic on internal road no 6, cladding of the Potline, concrete cutting and grinding inside the Potline MP 8 - Traffic on internal road no 12 and cladding of the Potline 53 Uncertainty The uncertainty of the analysed noise levels presented in section 51, depends on both the accuracy of the measuring chain (± 2dB) and the fluctuations of the noise during the three time periods (day, evening and night) The overall uncertainty of the results is estimated to be better than ± 4dB

11 6 Remarks This year's noise survey shows a generally lower noise level than last year's survey It's because most of the earth work is finished where heavy machinery and stone crushers were used Most of the work on site this year is done manually with hand tools, or with lighter, less noisy machinery than those used last year

12 Appendix 1 - Measurement positions

13 Appendix 2-1/3 octave spectrum Measurement position 5 Position 5 - day L L 1 2 Freq [Hz] Position 5 - evening L L 1 2 Freq [Hz] Position 5 - night 1 2 L L Freq [Hz]

14 Measurement position 6 Position 6 - day L L 1 2 Freq [Hz] Position 6 - evening L L 1 2 Freq [Hz] Position 6 - night 1 2 L L Freq [Hz]

15 Measurement position 7 Position 7 - day L L 1 2 Freq [Hz] Position 7 - evening L L 1 2 Freq [Hz] Position 7 - night 1 2 L L Freq [Hz]

16 Measurement position 8 Position 8 - day L L 1 2 Freq [Hz] Position 8 - evening L L 1 2 Freq [Hz] Position 8 - night 1 2 L L Freq [Hz]

Odensevej 95 DK-52 Odense S Phone +45 11 4 Fax +45 11 4949 wwwcowidk