CANNING WAREHOUSE CANNERY DISTRICT BOZEMAN, MT DESIGN DEVELOPMENT CQ + MA 100% DD Set 04-28-2015 Canning Warehouse CQ + MA 04-28-2015 Canning Warehouse
EXISTING CONDITIONS CQ + MA 04-28-2015 Canning Warehouse 2
DIAGRAMS / CONCEPTS Secondary Circulation: East/West (below beams) Primary Circulation: North/South (floor to ceiling) 11-0 MAX 10-0 MIN 22-2 MAX 20-9 MIN 9-2 MAX 7-3 MIN N-S Circulation (Primary) & E-W Circulation (Secondary) 2,000 sf Core Primary Access Points Natural Light Core Access Tenant Space Connection To Perimeter Core Connection To Natural Light Borrowed Light CQ + MA 04-28-2015 Canning Warehouse 3
FLOOR PLANS / LEASE AREAS Mechanical Room: Sprinkler Riser & Water Meter Sewer Clean-Out Janitor Sink NOTES: For Interior Glass Elevations, See Pages 14 & 15 For Exterior Storefront and Doors, See Page 23 For Unit Window Elevations, See Page 24 MAIN FLOOR 1/16 =1 CQ + MA 04-28-2015 Canning Warehouse 4
FLOOR PLANS / LEASE AREAS NOTES: For Interior Glass Elevations, See Pages 14 & 15 For Exterior Storefront and Doors, See Page 23 For Unit Window Elevations, See Page 24 SECOND FLOOR 1/16 =1 CQ + MA 04-28-2015 Canning Warehouse 5
ROOF PLAN Velux 1 - Typ. of 10-8 -0 x 8-0 Custom Skylight -CM Dome Fixed Skylight -Clear Thermoformed Polycarbonate Dome topped with Clear Polycarbonate Snow Load Lens. -To attach to 6 Site Built Curb -Mill Aluminum Finish with Thermal Break and Weep Holes. Velux 2 - Typ. of 4-4 -1 x 4-1 Standard Skylight -CM Dome Fixed Skylight -Clear Thermoformed Polycarbonate Dome topped with Clear Polycarbonate Snow Load Lens. -To attach to 6 Site Built Curb -Mill Aluminum Finish with Thermal Break and Weep Holes. ROOF PLAN 1/16 =1 CQ + MA 04-28-2015 Canning Warehouse 6
ELEVATIONS (x11) Remove Existing Windows EXISTING NORTH ELEVATION 1/16 =1 Remove & Replace Remove & Demolish Wall To New Opening Size Remove & Replace (x11) New Windows @ Existing Openings NEW NORTH ELEVATION 1/16 =1 New Glass Garage Door Existing Opening New Storefront @ Existing Openings New Glass Garage Door Existing Opening CQ + MA 04-28-2015 Canning Warehouse 7
ELEVATIONS (x11) Create New Openings, Demo Brick Create New Opening, Demolish Brick & Infill Window Remove Roll-Up Door Remove Garage Door Create New Opening, Demolish Brick & Infill Window EXISTING SOUTH ELEVATION 1/16 =1 (x11) New: 3-4 x 3-0 NEW SOUTH ELEVATION 1/16 =1 New Tenant Exits, w/ Metal Gate New Glazing New Storefront @ Existing Openings Feature Wood @ Jambs & Soffits New Tenant Exits, w/ Metal Gate CQ + MA 04-28-2015 Canning Warehouse 8
ELEVATIONS (x5) Remove & Replace Windows EXISTING EAST ELEVATION 1/16 =1 Remove Remove Door 1 (Exist) Remove Garage Door Remove Door EXISTING WEST ELEVATION 1/16 =1 2 (Exist) (x15) Remove & Replace Windows (x5) New Windows @ Existing Openings NEW EAST ELEVATION 1/16 =1 Existing 1 (New) New Storefront @ Existing Openings, Feature Wood @ Wall & Soffit Infill w/glass Existing Opening NEW WEST ELEVATION 1/16 =1 2 (New) (x15) New Windows @ Existing Openings CQ + MA 04-28-2015 Canning Warehouse 9
SECTION 1/8 =1-0 CQ + MA 04-28-2015 Canning Warehouse 10
LEVEL 1 MAIN CORRIDOR 1 2 4 3 1. SITE BUILT STEEL WINDOW FRAMES 2. CORRIDORS, FULL OF LIGHT & CHARACTER 3. SIMPLE WOOD WALLS W/ BASE REVEAL 4. BIG STEEL OPENINGS W/ LAMINATED GLASS SOUTH ENTRY CANNING WAREHOUSE CQ + MA 04-28-2015 Canning Warehouse 11
CORRIDOR SECTION ELEVATIONS NOTES: For Interior Glass Elevations, See Pages 14 & 15 A.14 B.14 C.14 G.14 SOUTH ENTRY WEST WALL 1/8 =1 1 G.14 F.14 E.14 D.14 SOUTH ENTRY EAST WALL 1/8 =1 2 CQ + MA 04-28-2015 Canning Warehouse 12
CORRIDOR SECTION ELEVATIONS NOTES: For Interior Glass Elevations, See Pages 14 & 15 J.15 H.15 I.15 K.15 NORTH ENTRY EAST WALL 1/8 =1 1 K.15 NORTH ENTRY WEST WALL 1/8 =1 2 CQ + MA 04-28-2015 Canning Warehouse 13
CORRIDOR WINDOW & DOOR ELEVATIONS 1/4 =1-0 2.16 1.16 Reference Details on Page 16 for Material and Dimensional References CQ + MA 04-28-2015 Canning Warehouse 14
CORRIDOR WINDOW & DOOR ELEVATIONS 1/4 =1-0 2.16 1.16 Reference Details on Page 16 for Material and Dimensional References CQ + MA 04-28-2015 Canning Warehouse 15
CORRIDOR DETAILS INTERIOR STEEL WINDOW PLAN DETAIL 1 1/2 =1 1 INTERIOR STEEL WINDOW SECTION DETAIL 1 1/2 =1 2 CQ + MA 04-28-2015 Canning Warehouse 16
INTERIOR DETAILS TYP. CORNER @ CORRIDORS 1 1/2 =1 1 TYP. PRIMARY CORRIDOR WALL SECTION 1 1/2 =1 2 TYP. DEMISING WALL DETAIL 1 1/2 =1 3 TYP. FURRING @ COLUMNS 1 1/2 =1 4 CQ + MA 04-28-2015 Canning Warehouse 17
TENANT STAIR TENANT STAIR PLAN 1/4 =1 1 1.19 2.19 TENANT STAIR ELEVATION 1/4 =1 CQ + MA 04-28-2015 Canning Warehouse 18 2 3.19
TENANT STAIR DETAILS STAIR TRANSITION @ FLOOR 1/2 =1 STAIR SECTION @ TREAD 1 1 1/2 =1 2 1 2 3 4 STAIR BASE DETAIL 1/2 =1 3 1. STEEL GUARDRAIL / CHANNEL, BLACKENED 2. TREADS HELD FROM WALL & GUARDRAIL TO CREATE SHADOW REVEAL 3. BUILT-UP WOOD BASE, CLEAR FINISH 4. WOOD TREADS FIXED AT STL. ANGLE @ EACH END, CLEAR FINISH CQ + MA 04-28-2015 Canning Warehouse 19
ENTRIES Vertical Wood Horizontal Wood Vertical Wood 1.22 PRIMARY ENTRY SOUTH 1/4 =1 PRIMARY ENTRY NORTH 1 1/4 =1 2 3 2.22 2 Reveal At Transition Typical, Ptd. Black 2.22 Sim 1 2 1. BRONZE / BLACK STEEL STOREFRONT THROUGHOUT 2. FEATURE WOOD DOOR PULL 3. SIGNAGE AMIDST GLAZING STOREFRONT PRIMARY ENTRY SOUTH 1/4 =1 STOREFRONT PRIMARY ENTRY NORTH (INT.) 3 1/4 =1 4 CQ + MA 04-28-2015 Canning Warehouse 20
ENTRIES Horizontal Wood 2 Horizontal Wood SECONDARY ENTRY EAST 1/4 =1 SECONDARY ENTRY SOUTH 1 1/4 =1 2 1 3 1. TUBE STEEL FRAMED GATE 2. PERFORATED WEATHERED STEEL SHEET 3. SLATTED COR-TEN GATE SEE PAGE 23 SEE PAGE 23 SEE PAGE 23 SEE PAGE 23 STOREFRONT SECONDARY ENTRY EAST 1/4 =1 STOREFRONT SECONDARY ENTRY SOUTH 1/4 =1 CQ + MA 04-28-2015 Canning Warehouse 21
ENTRY DETAILS ENTRY JAMB DETAIL 1 1/2 =1 ENTRY SOFFIT DETAIL 1 1 1/2 =1 2 CQ + MA 04-28-2015 Canning Warehouse 22
EXTERIOR STOREFRONT AND DOOR ELEVATIONS 1/4 =1 CQ + MA 04-28-2015 Canning Warehouse 23
EXTERIOR UNIT WINDOW ELEVATIONS 1/4 =1 1 1 UNIT WINDOW JAMB 1 1/2 =1 1 CQ + MA 04-28-2015 Canning Warehouse 24
Canning Warehouse Square Footage and Load Calculations 04.28.2015 (SF) = Square Feet Entire Building Floor (FUA) Floor Usable Area - SF Buildling Common Area Rentable Area - SF Load % 1 10,710 2,313 13,023 2 5,702-5,704 Total 16,412 2,313 18,727 12.4% Breakout By Floor Under Current Tenant Configuration Floor 1 (FUA) Floor Usable Area - SF Level 1 (FUA) Level 2 (FUA) % of Bldg L.1 1,185 1,185-6% L.2 1,346 1,346-7% L.3 1,129 1,129-6% L.4 1,174 1,174-6% L.5 1,462 696 766 8% L.6 1,593 823 770 9% L.7 1,714 821 893 9% L.8 444 444-2% L.9 1,397 437 960 7% L.10 1,329 646 683 7% L.11 1,600 768 832 9% L.12 1,742 944 798 9% Conference 297 297-2% Total 16,412 10,710 5,702 CANNING WAREHOUSE CANNERY DISTRICT BOZEMAN, MT DESIGN DEVELOPMENT CQ + MA 100% DD Set 04-28-2015 Canning Warehouse CQ + MA 04-28-2015 Canning Warehouse