Just-in-Time System. Dr S G Deshmukh

Similar documents
JIT AND Lean Operations 14-1

JUST IN TIME. Manuel Rincón, M.Sc. October 22nd, 2004

Just-In-Time (JIT) Manufacturing. Overview

Dennis Bricker Dept of Mechanical & Industrial Engineering The University of Iowa. JIT --Intro 02/11/03 page 1 of 28

Just In Time (JIT) Quality and Reliability Engg. (171906) H I T. Hit suyo na mono O Iru toki iru dake Tasukuran

OM (Fall 2016) Outline

Outline. Push-Pull Systems Global Company Profile: Toyota Motor Corporation Just-in-Time, the Toyota Production System, and Lean Operations

Chapter 13. Lean and Sustainable Supply Chains

SCM 302 OPERATIONS MANAGEMENT JIT

JIT and Lean Operations. JIT/Lean Operations

Chapter 11. In-Time and Lean Production

Lean Operations. PowerPoint slides by Jeff Heyl. Copyright 2017 Pearson Education, Inc.

Lean Operations. Copyright 2012 by The McGraw-Hill Companies, Inc. All rights reserved.

Outline. Pull Manufacturing. Push Vs. Pull Scheduling. Inventory Hides Problems. Lowering Inventory Reveals Problems

Learning Objectives. 1. Explain how lean systems improve internal and supply chain operations

Operations Management - 5 th Edition

Historical Phases of Production

Operations Management

Lecture 9 MBF2213 Operations Management Prepared by Dr Khairul Anuar. L9: Lean synchronization

Lean Principles. Jerry D. Kilpatrick. This article was originally written for and published by MEP Utah in 2003 (

Ch 26 Just-In-Time and Lean Production. What is Lean Production? Structure of Lean Production System. Activities in Manufacturing.

Chapter 3 JUST IN TIME SYSTEM

Flow and Pull Systems

INTRODUCTION 1. When manufacturing processes of products being examine through customer s perspective, we will be able to identify 2 types of processe

INTRODUCTION 1. When manufacturing processes of products being examine through customer s perspective, we will be able to identify 2 types of processe

How much money can you add to the bottom line with good inventory management?

PRINCIPLES OF LEAN MANUFACTURING. Purdue Manufacturing Extension Partnership (800)

Improving Scrum with. Lean Thinking Nuno Rafael SGMUN 2016

Real Lean vs Pretend Lean

Process Mapping What It Means for You. FAQs. Desired Results. 5) What are Fastenal s objectives? 1) What is a process mapping?

A PM on Lean Production Randel Ltd.

Manufacturing Systems Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology, Madras

Lean Distribution. Mark Kushner, COO Lloyed Lobo, Director Business Development

Finished goods available to meet Takt time when variations in customer demand exist.

Value Stream Analysis and other

Generic Case Study. Initial Condition. 1. Stability

This appendix includes the title and reference number for every best

Lean and Agile Systems. Rajiv Gupta FORE School of Management October 2013 Session 6

CHAPTER 3.0 JUST-IN-TIME (JIT) MANUFACTURING SYSTEMS

Toyota s 14 Steps to Becoming Lean

Supply Chain Management. Dr Mariusz Maciejczak

Lean Implementation challenges in Discrete manufacturing Industries

International Journal of Scientific & Engineering Research Volume 8, Issue 12, December-2017 ISSN

IT 470a Six Sigma Chapter X

STUDY OF JIT IMPLEMENTATION ISSUES IN INDIAN MANUFACTURING INDUSTRIES

LEAN MANUFACTUING-CONCEPT, LIMITATION, APPLICATIONS: AN OVERVIEW

Pull Systems: Overview, Challenges and Success Factors

10 Steps to Reduce Manufacturing Costs

Lean Principles in Facility Management

1. Lowering the costs is one of the objectives of the production and logistics function

ACTIVITY 8: QUESTION. Identify some ways in which businesses can lose stock. ACTIVITY 8: ANSWER

TEN STEPS to Lean Electrical Controls

Managing for Daily Improvement

PLUS VALUE STREAM MAPPING

Session III. LEAN Enterprise and Six Sigma

Lean Basics Overview. EMC 2011 Training. NCDENR April Copyright 2010 EMC Corporation. All rights reserved.

Copyright 2000 Society of Manufacturing Engineers MANUFACTURING INSIGHTS. An Introduction to Lean Manufacturing

"Value Stream Mapping How does Reliability play a role in making Lean Manufacturing a Success " Presented by Larry Akre May 17, 2007

MAS BEST PRACTICE SKILLS EVENT LEAN AWARENESS WORKSHOP

Profit = Price - Cost. TAKT Time Map Capacity Tables. Total Productive Maintenance. Visual Control. Poka-yoke (mistake proofing) Kanban.

The Realities of Modern Manufacturing

Five Tips to Achieve a Lean Manufacturing Business

INTEGRATION OF JUST IN TIME AND TOTAL QUALITY MANAGEMENT WITH SUPPLY CHAIN MANAGEMENT: MANUFACTURING INDUSTRY PERSPECTIVE

APICS PRINCIPLES OF OPERATIONS MANAGEMENT TOPIC OUTLINE CONCEPTS AND APPLICATIONS

BPIF SPECIALIST SERVICES PROCESS IMPROVEMENT

LEAN PRODUCTION FACILITY LAYOUT.

JUST IN TIME (JIT), LEAN, AND TOYOTA PRODUCTION SYSTEM (TPS)

Review on Elements for Just in Time Implementation in Indian Service Sector

Level & Stable Operations

Visual Controls : Applying Visual Management to the Factory

SUPPLIER EVALUATION AND PURCHASING IN JIT ENVIRONMENT-A SURVEY OF INDIAN FIRMS

Real-time Visibility. RFID-enabled Applications for Manufacturing. Reference Guide OATSystems

Optimizing Inplant Supply Chain in Steel Plants by Integrating Lean Manufacturing and Theory of Constrains through Dynamic Simulation

Beyond Lean Manufacturing

The Toyota Way. Using Operational Excellence as a Strategic Weapon. Chapter 1 9/11/ Ps. September 11, 2014

CHAPTER 1 INTRODUCTION

SpeasTech Smart Products

NAME Fall, The definition of quality that involves the product functioning as expected without failure is

Manufacturing Information Systems. deden08m.com 1

Implementing VMI to Reduce Direct and Indirect Cost

Strategies for the Implementation of JIT Purchasing

Lean Manufacturing Implementation in Small and Medium Industry

The entire presentation kit is having 2 main directories as below. Just in Time. 01 Introduction

Subbu Ramakrishnan. Manufacturing Finance with SAP. ERP Financials. Bonn Boston

Presented by Renaldo de Jager 11-1

LEAN MANUFACTURING & TPM.

THE CHALLENGES TO THE IMPLEMENTATION OF LEAN MANUFACTURING

One-off Batch High volume production (mass production) One-off: Custom - built kitchen Batch: Olympic medals High volume: Garden table / chairs

Chapter 6: Part2 Benchmarking & JIT. Mohd Zaizu Ilyas

Ashvath Sharma (Correspondence) +

Lean 101: An Introduction

The basic concept of waste

Lean Checklist Self-Assessment

Sharing Your Lean System For Total Success

CHAPTER 1 INTRODUCTION

November 17, NYS Lean Basics What is Lean & How Does it Work?

Online Course Manual By Craig Pence. Module 12

Managing Operations. John R. Birge The University of Chicago Graduate School of Business.

Value Add not Overhead The Next 10 Years

GOOD MORNING AND WELCOME

Transcription:

Just-in-Time System Dr S G Deshmukh

Difficulty in Production! Demand is uncertain and variable. Same equipment and people are used to make a variety of products. Switching products takes time.(imagaine changing over from say dark shade to light shade in a paint manufacturing!) Things may go wrong(murphy s law!) Materials are defective. Deliveries are variable (late). Equipment fails, people make mistakes, etc. And so many other reasons..

Solution 1: Use Inventory Use inventory to: Match supply with varying demand. Act as a buffer Allow production of a variety of products on the same equipment, tools etc. Overcome defective materials, late deliveries, equipment failures, mistakes, etc.

Typical Production Forecast demand based on classical methods Produce in large lots (to reduce expensive setups) & economics of scale PUSH product to customer.(even if he/she doesn't want!) Large lot sizes mean: Large work-in-process inventories. Large final product inventories. Slow response to changes and defects. Opaque view of the ground!

Solution 2: Use Just-In-Time Use just-in-time to identify and solve problems that create inventory. Reduce setup costs to switch products. Expose yourself to problems rather than hiding under the cover of inventory! Eliminate defective materials, late deliveries, equipment failures, mistakes, etc.

Just-in-Time Production Produce in small lots to replenish stock actually sold. Sales PULL product (and parts) through plant. Get pulse of the market! Small lot sizes mean: Small work-in-process inventories. Small final product inventories. Quick response to changes and defects.

What is Waste? Waste is anything other than the minimum amount of equipment, materials, parts, space, and worker s time, which are absolutely essential to add value to the product. Shoichiro Toyoda President, Toyota

Different Kinds of Waste Waste from Over-production Waste of Motion Transportation waste Processing waste Defective Products Excess Inventory Information waste Energy waste Manpower waste

Elimination of Waste JIT attempts to eliminate all costs (waste) that DO NOT ADD any value to a product. Machining, Packaging, Assembling etc. add value to a product BUT Moving, Storing, Counting, Sorting etc add COST but No Value to a product. Hence try to eliminate them.

What is Just-in-Time? Management philosophy of continuous and forced problem solving. Supplies and components are pulled through system to arrive where they are needed when they are needed. Originated in Japan; Popularized by Toyota; now used globally.

Steps to Reduce Setup Time Separate setup into preparation (while machine is running) and actual setup (while machine is stopped). Do as much as possible while the machine is running. Move material closer and improve material handling. Standardize and improve tooling.

Comment INVENTORY is an Undesirable cost. By LOWERING it, Hidden quality and Production impediments are revealed. Simplification and Elimination through Problem Solving, continuous improvement is the key.

JIT Just-in-time (JIT): A highly coordinated processing system in which goods move through the system, and services are performed, just as they are needed, JIT lean production JIT pull (demand) system JIT operates with very little fat

American Production and Inventory Control Society (APICS) definition of JIT "a philosophy of manufacturing based on planned elimination of all waste and continuous improvement of productivity. encompasses successful execution of all manufacturing activities required to produce final product, from design engineering to delivery and including all stages of conversion from raw material onward.

Goals of JIT A manufacturing process that is so streamlined, cost efficient, quality oriented and responsive to customer, that it becomes a strategic weapon. The goals in most cases consists of : Produce product only on demand. Produce a perfect quality product. Reduce the cost of manufacturing. Integrate and to optimize every step of manufacturing process. Develop manufacturing Flexibility Keep commitments made to customers and suppliers

Pull/Push Systems Pull system: System for moving work where a workstation pulls output from the preceding station as needed. (e.g. Kanban) Push system: System for moving work where output is pushed to the next station as it is completed

JIT Through Product design Process design Personnel/organizational elements Manufacturing planning and control

Enabler : Product Design Standard parts Modular design Highly capable production systems Concurrent engineering Use of CAD/CAM Use of CFD

Enabler.. Process Design Small lot sizes Setup time reduction Manufacturing cells Limited work in process Quality improvement Production flexibility Little inventory storage

Production Flexibility Reduce downtime by reducing changeover time Multi-tools, workstations Use preventive maintenance to reduce breakdowns Cross-train workers to help clear bottlenecks Use many small units of capacity Use off-line buffers Reserve capacity for important customers

Enabler : Personnel/Organizational Elements Workers as assets Cross-trained workers Belief in improvement by workers Continuous improvement Cost accounting Organic element of human being!! Leadership/project management

Enabler.. Planning & Control Level loading Pull systems Visual systems (Andon, alarms etc.) Close vendor relationships Reduced transaction processing Preventive maintenance

Models for supplier Arms Length Model Closed, Competitive Evaluation on lowest bid Data/Information sharing very limited Inspection based quality regime No shared R&D Partnership Model Collaboration based Multi-criteria evaluation of sources Sharing of data/information encouraged Participative attitude towards quality Shared R&D

Buyer Supplier Relationship Buyer Action Attributes Supplier Action Attributes Joint Action Attributes Outcome Attributes

Buyer Action Fewer suppliers Long term contract Increased volume to suppliers Supplier evaluation/certification Training and audit Freight consolidation Stable production schedule Performance evaluation

Supplier Action.. SPC Close proximity Quality circle Flexible suppliers Reduced set ups Increased customer support

Joint Action Mutual trust & cooperation Information sharing Joint design & development Continuous improvement

Outcome Frequent & reliable deliveries Small shipment Reduced paperwork Shared perceptions Flexibility in everything!

Benefits Cooperation, reduced inventory, quality at low cost, better planning and control, less paperwork improved communication

Kanban as a Control System Kanban: Card or other device that communicates demand for work or materials from the preceding station Kanban is the Japanese word meaning signal or visible record Paperless production control system Authority to pull, or produce comes from a downstream process.

Kanban.. fixed quantity bins or containers or pallets used to signal replenishment needs (reminiscent of traditional two-bin system of stock control). When first bin empty, new full bin moved in within usage time from the second bin). With well-designed floor layouts, system adds considerably to efficiency of operational environment. integration of computer systems internally & externally with suppliers systems so Kanban data & instructions can flow between linked systems.

Youtube on JIT (10.56 minutes) https://www.youtube.com/watch?v=cb FKBf1rOyo

Frank Sinatra sings JIT (2.18 minutes) https://www.youtube.com/watch?v=ric Q26arWAs

NPTEL session By Prof G Srinivasan (IIT Madras) on JIT (51 minutes) https://www.youtube.com/watch?v=zjx 7zCjLjyw

Suppliers JIT objective: Frequent on-time deliveries of small lots of high quality. Buyer and supplier form JIT partnerships to eliminate: Unnecessary activities. In-plant inventory. In-transit inventory. Poor suppliers.

Transitioning to a JIT System Get top management commitment Decide which parts need most effort Obtain support of workers Start by trying to reduce setup times Gradually convert operations Convert suppliers to JIT Prepare for obstacles

Barriers to migration Management may not be committed Workers/management may not be cooperative Suppliers may resist Why?

Benefits of JIT Systems Reduced inventory levels High quality Flexibility Reduced lead times Increased productivity

Benefits of JIT Systems..cont d Increased equipment utilization Reduced scrap and rework Reduced space requirements Pressure for good vendor relationships Reduced need for indirect labor

Benefits of JIT.. Contd. Part Cost: Low scrap, Low Inventory Quality: Fast detection, Corrections Design: Fast Response to Engineering changes Administration Efficiency: Fewer suppliers, minimal expediting, less paper work Productivity: Reduced rework/inspection delay, reduced parts

Quality JIT exposes quality problems by reducing inventory. JIT limits number of defects produced with small lots. JIT requires TQM. Statistical process control. Worker involvement & empowerment. Immediate feedback.

JIT is flow JIT Is Flow is Hirano and Furuya s book which gives an extensive practical overview of JIT/Lean. http://www.amazon.com/ Jit-Is-Flow-Hiroyuki- Hirano/dp/0971243611

Interesting book.. https://store.kobobooks.c om/en-us/ebook/toyotasupply-chainmanagement-a-strategicapproach-to-toyota-srenowned-system

Toyota Global.. http://www.toyotaglobal.com/company/vision_philosophy/ toyota_production_system/just-intime.html

Summary JIT as a philosophy Attack on elimination of waste Pull based system Critical Factors Involvement of top management Simplified processes Orientation towards inventory