EFRIGERATION INSTALLATION GUIDE

Similar documents
Master Insulation Guide Specification for Mechanical Systems

Plumbing Pipe Insulation Specification Submitted by: Armacell LLC. Plumbing Pipe Insulation Specification Armacell LLC 1

Quality NBR Insulation

FIRE STATION 55 June 14, 2010

INDUSTRIAL SYSTEMS. Application Manual for Piping Equipment. ARMASOUND INDUSTRIAL SYSTEMS - Application Manual for Piping Equipment

SECTION HVAC PIPING INSULATION

1/2 Ø. application manual

TOTALINE COPPER TUBING

Tube Insulation. Fiber Free

Pipe Supports Comparison

PRODUCT SELECTION GUIDE

Pipe and Equipment Insulations. Zeston. PVC Insulated Fitting Covers Installation Instructions for Hot, Cold and USDA Piping Systems

CUSH-A-THERM VAPOR BARRIER PROTECTION

Installation Instructions

SECTION PIPING INSULATION

GUIDE SPECIFICATION: MECHANICAL SYSTEMS

SUPERIOR CAL-SHIELDS Features & Benefits FAST

SECTION HVAC INSULATION

Wabo FireShield Model: FSH

NCCER Progress Blvd, Alachua, Florida Tel: (888)

379 Quick Installation Guide

079 Quick Installation Guide

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section PIPE AND EQUIPMENT INSULATION

Design & Construction Standards, Revised January

A. Section Fire Procection, HVAC & Plumbing Penetration Firestopping. B. Section Interior Painting: Painting insulation jacket.

B. Refer to Section : Air Distribution for lined ductwork requirements.

DSC BUILDING 1200 ALTERATIONS OCTOBER 2011 SECTION DUCT INSULATION

WARNING SOLVENT WELDING INSTRUCTIONS AQUARISE SAFE HANDLING AND STORAGE OF PIPE, FITTINGS & VALVES SOLVENT WELDING SOLVENT WELDING BASICS

SECTION DUCT INSULATION

FIVE STAR PRODUCTS, INC. (800)

SUPAFLEX SUPAFLEX DESCRIPTION TUBING:

A. ASTM E84 Standard Test Method for Surface Burning Characteristics of Building Materials

INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for CHILLED WATER SYSTEMS

INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for CHILLED WATER SYSTEMS

1. Division 23 Section "Hangers and Supports for HVAC Piping and Equipment" for pipe insulation shields and protection saddles.

Fitting instructions

ACOUSTICAL INSULATION (LAGGING) FOR PIPING AND EQUIPMENT

HT-406 Specification Guide

DIVISION 23 HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) SECTION HVAC INSULATION

D. Provide UL-approved assemblies for pipes and ducts passing through fire-rated floors, walls, or partitions as required.

2. Install the front plate insulation

We solved the science of safely insulating air ducts.

Application Guidelines

This specification describes the minimum requirements for industrial thermal insulation.

ITW INSULATION SYSTEMS

K-FLEX USA MECHANICAL INSULATION CONTENTS: SPECIFICATION GUIDE PRODUCT SELECTION GUIDE LEED CONTRIBUTION GUIDE

T TABLE OF CONTENTS SPUNWRAP COLLAR

ITEM 458 WATERPROOFING FOR STRUCTURES

Sheet Insulation - Rectangular ducts. Installation Manual

Cold Work Cladding Fabrication & Application

The Right Insulation for Cold Systems

ITW INSULATION SYSTEMS

B C M T e c h n i c a l, L L C A v o n I n d u s t r i a l D r. R o c h e s t e r H i l l s, M I P h o n e : T o l

ITW INSULATION SYSTEMS

ARMAFLEX SHEET AL / KY / AL-KY

We solved the science of safely insulating air ducts.

Installation Instructions Vinyl Glue Down Flooring - Pro

INSTALLATION GUIDELINE FOR TRYMER INSULATION ITW INSULATION SYSTEMS

IMTECH ADHESIVE SYSTEMS

NOTE: Components must be stored at 12 C (min) for at least 24 hours prior to use.

INSTALLATION GUIDELINE FOR TRYMER INSULATION ITW INSULATION SYSTEMS

A. Deliver material to job site in original, nonbroken, factory packaging, labeled with manufacturer's density and thickness.

Container Installation Guide

SANITARY WASTE AND VENT PIPING

Installation Instructions

Installation Guidelines: Magnolia

GUIDE SPECIFICATION: DUCT LINER

FLEXIBLE ARMAFLEX INSULATION WITH OUTER COVERING TO WITHSTAND MECHANICAL IMPACT. Protection against mechanical damage

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

Container Installation Guide

UBC Technical Guidelines Section Edition Insulation of Tanks, Steam and Condensate Piping Page 1 of 6

SECTION HANGERS AND SUPPORTS FOR PLUMBING

INSTALLATION GUIDELINE FOR TRYMER INSULATION ITW INSULATION SYSTEMS

WESTERN UNDERGROUND COMMITTEE GUIDE 3.4 (3.4/00/0565)

Application and Maintenance

General Applications Before applying, mix the pre-measured catalyst* into Liquid Roof by following label directions.

Daytona Beach Pier Building Renovation Jun 2010

State of Alaska Section State Office Building HVAC Fan Replacement MECHANICAL INSULATION

EXPERIENCE COUNTS! Specializing in more than just products we put the competitive advantage at your fingertips.

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION 2 DIVISION 05 METALS

UBC Technical Guidelines Section Edition Thermal Insulation for Piping Page 1 of 5

Self Adhesive EPDM TRAINING MANUAL

SECTION MECHANICAL INSULATION. A. Types of insulation specified in this section include the following:

Fascia Systems. oofing 7.1

Redi-Klad 1000 Pipe Insulation

ARIFLEX. Rubber Insulation Foam Tube & Foam Sheet

INSTALLATION GUIDELINES FOR CHILL WATER PIPE INSULATION

SECTION PRE-ENGINEERED BUILDING INSULATION

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

1850 x 40/50mm Raised Shower Tray Kit

Application Guidelines

INSTALLATION MANUAL. METAL INSULATED PANELS -ROXUL -Expanded Polystyrene

Product Information CHEMGLAZE B 9942 A/B. Coating for Casting Pits. Easy Application Chemglaze B 9942 A/B will bond to damp and wet surfaces.

A. This section includes pre-finished Higuera Hardwoods bamboo flooring and accessories for floors and stairs.

Installation Instructions. Important. Recommended Tools. Palladium Rigid Sheet/Rubrail or Palladium G2 Sheet/Rubrail. Storage

The Right Insulation for Indoor Air Quality

DUKE UNIVERSITY CONSTRUCTION STANDARDS

Transcription:

R EFRIGERATION INSTALLATION GUIDE

Golden Rules for Working with INSTALLATION Armaflex and good adhesive brushes1 fittings. mitered fabricated Use good quality tools and, in particular, fresh 520, 520 Black or 520 BLV Adhesive sharp non-serrated edge knives Armaflex Insulation must be dry and clean prior to application Apply Armaflex Insulations only when the pipes are clean, dry and unheated or uncooled. Surface to be insulated must be free of rust or debris. Never stretch insulation when sealing the joints. It is better to compress it slightly. Use pieces of Armaflex that are slightly longer than the section of pipe to be insulated. Always use the proper-size Armaflex for a particular sized pipe. Do not stretch it over the pipe! Do not crowd Armaflex-covered pipes. Space pipes to allow for the free circulation of air. Air movement is an extra safeguard against surface condensation of cold pipes, especially under hot, humid conditions. Proper sealing of all pipe insulation is important to minimize heat loss and control condensation. On cold lines, open pipe insulation joints may allow the formation of condensation, increasing the potential for or contributing to possible pipe or tubing corrosion. All Armaflex insulation joints must be sealed as shown in this guide. When using Armaflex outdoors, always paint with two coats of Armaflex WB Finish within seven days of installing the insulation. Allow proper drying times between coats. In double layer work, apply insulation with the side and end joints staggered. Use Armafix Insulation Pipe Hangers to prevent thickness compression and condensation gaps. Do not compress Armaflex at joists, studs, columns, ducts, hangers, etc. This is important because the insulation will lose thermal efficiency where it is compressed. On cold systems, surface condensation may occur where insulation is compressed. Armaflex on New Refrigeration Piping: The Slip-On Method The Slip-On Method is used when you can insulate new piping before it goes up or as it is being connected. All you do is slip the pipe insulation over the pipe or copper tubing. The inside of the Armaflex Pipe Insulation is coated with a powdered lubricant, making it easy to slip the insulation over the pipe. (NOTE: Small amounts of powdered lubricant may enter open ends of pipe or tubing. This dust must be kept out of refrigeration systems. Plug open ends of pipe before slipping on Armaflex Pipe Insulation.) Since Armaflex tubing is flexible, it will follow bends in tubing and can be slipped right over bent tubing, 45 sweat ells, 90 sweat ells and couplings. We would recommend wall thicknesses above 1/2 installed using 2

maflex 3 Allow the adhesive to set until tacky to the touch when joining surfaces; apply slight pressure to both ends. At the beginning, at every 12 to 18 feet and ends of piping runs, the insulation shall be adhered directly to the copper using a 2 strip of adhesive. Insulation should not be adhered to the pipe at the extreme low points in any piping run. When using 3/4 and 1-inch wall insulation, it is recommended to fabricate a miter-cut fitting cover. To do this, fabricate a miter cut using the Fabricating Fitting Covers from carton template. See the section on Fabricating Armaflex Tubes Fitting Covers. Use a length of Armaflex as long or slightly The Armaflex carton provides a convenient longer than the section of piping to be covered. miter guide with all angles necessary for NEVER STRETCH ARMAFLEX. normal installations. Since this is a contact-type adhesive, apply a Cut through the Armaflex tube at a 45 angle brush coating of 520, 520 Black or 520 BLV with the help of the miter template on the Adhesive to both butt ends to be joined. carton. Reverse the position of one of the sections in relation to the other so that an elbow is formed, and join the two sections using 520, 520 Black or 520 BLV Adhesive.

Slit open on the inside, taking care not to damage the opposite wall of the tube. Apply adhesive to the seam (not to the butt The Armaflex Insulation must be adhered to ends), allow to tack dry, and fit over the fitting. the pipe on both sides of the P-trap using Press the seams together working from the 520, 520 Black or 520 BLV Adhesive. ends toward the center of the elbow. Armaflex on Existing Refrigeration Piping: The Snap-On Method The Snap-On Method is used when pipe or copper tubing is insulated after it has been installed and connected. Finally, wet seal the butt ends to the incoming lengths of Armaflex tube. Cut the incoming lengths so that the butt joints are in slight compression. P-Trap Fittings When using 3/4 and 1-inch wall insulation, it is normally necessary to fabricate miter-cut fitting covers. This can be accomplished by using either a 45 miter layout or a 22.5 miter layout. With unslit tubular Armaflex Pipe Insulation, use a sharp knife to slit the Armaflex lengthwise on one side. Snap the insulation over the pipe. Brush-coat both slit surfaces with Armaflex 520, After fabrication, the 180 cover can be slit 520 Black or 520 BLV Adhesive. Push the along the inside radius so that it may be insulation down over the pipe to hold the snapped around the trap and then sealed with adhesive-coated surfaces apart while the Armaflex 520, 520 Black or 520 BLV Adhesive. dries. Segments are made by Adhere Armaflex to making two opposing Refrigeration pipe using 520 or 520 22.5 cuts and rotating suction line P-trap BLV Adhesive segment 180 Adhere Armaflex to pipe using Refrigeration suction 520 or 520 BLV Adhesive line P-trap Approximately 1/2 the distance Adhesive 520 between return bend and 90 elbow Outside measurement of return bend plus two wall thickness adhesive Approximately equal to one OD of All miters and cuts insulation must be attached using 520 Adhesive 2 4

Adhesive should be dry to the touch but tacky under slight pressure before joining surfaces. Test with back of fingernails. Armafix Insulation Pipe Hangers Armafix IPH (Insulation Pipe Hangers) and NPH (Nonhalogen Insulation Pipe Hangers) provide fast, reliable support for insulated pipes, an innovative alternative to traditional block and dowel methods. The pre-insulated hangers ensure optimum load bearing, protect against thickness compression, and prevent condensation gaps that could otherwise compromise system integrity. Armafix features a self-adhesive closure and an exclusive foam-to-foam bond. The insulated pipe hanger is adhered to Armaflex insulations using Armaflex 520, 520 Black or 520 BLV Adhesive. If the application is for clevis or saddle type of pipe hangers it is recommended that Armaflex Tape be wrapped around the Armafix prior to placing in the clevis or saddle hanger. To minimize the movement of Armafix, it is recommended that a pair of non-skid pads be adhered to the clamps. In addition to prevent loosening of the clamps, use of an anti-vibratory fastener, such as a nylon locking nut, is also recommended. If the insulation should become stuck to the pipe after applying adhesive, break the insulation loose by running a finger down the pipe. When the adhesive has air-dried, apply moderate pressure to the entire joint to assure a vapor-tight bond. Easy Application on Clevis (Saddle) Application with insulation Double-Layer Insulation: apply Armaflex with the side and the end joint staggered where possible. 3 Armaflex at Pipe Hanger Locations At pipe hanger locations where the insulation must resist compression, supporting devices must be used in combination with metal hanger shields. Clamp (Friction fit) 5

Traditional method Although timesaving Armafix IPH or NPH is recommended, you can use traditional supporting devices such as short lengths of wood dowels or wood blocks, which are the same thicknesses as the Armaflex. These supporting devices rest on the metal shield that is installed between the insulation surface and the pipe hanger. Short wood dowels, used singly or in multiples, may be used to support small-size pipes (see Figure 1). Larger-size pipes will require woodblocks approximately 1 x 3 or 1-1/2 x 4 by the Armaflex thickness, singly or in multiples. It is always best to curve the woodblock surfaces to match the curve of the pipe and the curve of the metal shield. The holes cut into the Armaflex to receive the supporting devices are to be undersized so the supporting devices fit tightly. Coat the supporting device with 520, 520 Black or 520 BLV Adhesive, and insert into the hole in the Armaflex while the adhesive is still wet; then coat the outer surface with adhesive as a vapor seal. To eliminate the possibility of large or heavy pipes from teetering on the woodblocks, it is recommended that 3/4 - or 1 -diameter wood dowels be placed at 4 o clock and 8 o clock positions with each woodblock (see Figure 2). FIG. 1 Wood inserts Wood inserts Metal shield Dowel Dowel Woodblock Metal shield FIG. 2 6

CORRECT USE OF ARMAFLEX 520, 520 BLACK OR 520 BLV ADHESIVE Before use, shake or stir the adhesive thoroughly. Use small cans of 520, 520 Black or 520 BLV Adhesive for actual insulation work to prevent it from drying too rapidly. Keep can covered to prevent drying. Use a brush with short, stiff bristles. Apply adhesive in a thin, uniform layer to both surfaces. 520, 520 Black or 520 BLV Adhesive becomes tacky between 2 to 5 minutes after application. This time will vary according to ambient temperatures and relative humidities. Avoid open times in excess of 10 minutes. Allow the adhesive to tack dry. The correct initial drying period is checked by the fingernail test : touch the surface with a fingernail; if the fingernail adheres to the surface and the joint feels tacky, the joint may be closed. The maximum adhesive force will be obtained when two tack-dry surfaces are brought together. Press the surfaces being joined together firmly for a short time only. If the surfaces are left to dry for too long a period, they will not adhere when pressed together. In this case, reactivate by applying a further film of adhesive. 520, 520 Black or 520 BLV Adhesive may not adhere to asphalt, bitumen, red-lead or cement surfaces. To clean tools, contaminated metal surfaces or surfaces which have talc applied, wipe with a cloth dampened with alcohol or acetone. In general, the application of adhesive should not be carried out when the ambient temperature is below 40 F. If working outdoors at temperatures between 40 F and 50 F, keep the can of adhesive indoors at 65 F until needed. Wet sealing: at times, two Armaflex surfaces or joints may require wet sealing for condensation control. This method will require compressed joints and overlapping surfaces. This is accomplished by applying wet adhesive between the surfaces and immediately closing in the desired position without any open time for the adhesive. The open time is defined as the period between first applying the adhesive and finally closing together the joint seam or surface. IMPORTANT INSTALLATION CONSIDERATIONS: All seams and joints of elastomeric insulation must be properly sealed with 520 or 520 BLV Adhesive, thereby preventing condensation between the insulation and the copper tubing. Installers of copper should avoid introducing applied stress to the copper. Applied stress can be a result of any manipulation, direct or indirect, resulting in stresses to the copper tubing. Under no circumstances should chlorinated solvents such as 1,1,1,-trichloroethane be used to clean a copper refrigeration system. Such solvents have been linked to rapid system failure. No acidic materials such as citric acid or acetic acid (vinegar) should be used on copper systems. Such acids are found in many cleaners. Self-evaporating lubricating oil, and even refrigerants themselves, can react with moisture to produce corrosive acidic materials such as acetic acid. Therefore, all soldered connections must be gas tight, as a leak could result in failure to a section of insulated copper tubing. Armaflex, when installed in accordance with Armacell specifications, will not cause stress corrosion cracking of copper tubing. Engineering Considerations: Appropriate wall thicknesses of insulation suitable for the environment and the operating conditions must be used to avoid condensation of the copper tubing. Extraneous chemicals or chemical-bearing materials, such as corrosive cleansers containing ammonia and/or amine salts, wood smoke, nitrates and ground or trench water, should not come into contact with the insulation. Where the layout of the system is such that condensation may form and run along uninsulated copper by gravitational force, a beginning run of insulation must be adhered completely to the copper tubing with 520 or 520 BLV Adhesive. This will prevent the entrance of water between the insulation and the copper. Copper used on refrigeration systems should comply with ASTM B 280 and should be from a reputable manufacturer. System Testing: When pressure testing copper tube systems, care must be taken not to exceed the specific yield point of the copper tube used. When testing copper tubing for leaks, use only a detector solution specifically designed for that purpose. It must be assumed that all commercially available soap and detergent products contain ammoniacal or amine materials which do contribute to the formation of stress cracks. Any insulation that has become wetted or saturated with refrigeration lubricating oils should be completely replaced. Such oils can react with moisture to form corrosive materials. 7

ARMACELL LLC 7600 Oakwood Street Extension Mebane, NC 27302 TEL. 919 304-3846 OR 800 866-5638 FAX 919 304-3847 E-MAIL info.us@armacell.com INTERNET www.armacell.com/us Armacell provides this information as a technical service. To the extent the information is derived from sources other than Armacell, Armacell is substantially, if not wholly, relying upon the other source(s) to provide accurate information. Information provided as a result of Armacell's own technical analysis and testing is accurate to the extent of our knowledge and ability, as of date of printing, using effective standardized methods and procedures. Each user of these products, or information, should perform their own tests to determine the safety, fitness and suitability of the products, or combination of products, for any foreseeable purposes, applications and uses by the user and by any third party to which the user may convey the products. Since Armacell cannot control the end use of this product, Armacell does not guarantee that the user will obtain the same results as published in this document. The data and information are provided as a technical service and are subject to change without notice. 017 005 04 08 NA NA 8 2008 Armacell LLC Printed in United States of America