TABORA INVESTMENT FORUM 19 th JULY 2013 AT SERENA HOTEL DAR ES SALAAM

Similar documents
Resourcing. the African Development Bank for accelerated performance and effective delivery: Eastern Africa Regional Perspective

TANZANIA RAILWAYS CORPORATION

TABORA Opportunities for Investment

Breakout Session 2: Development of the Dar es Salaam Port March 17, :30 12:30

The United Republic of Tanzania GROSS DOMESTIC PRODUCT 2017

SMAK Kaombwe, Project Manager, CDC, Rwanda & Tanzania

Tanzania Ports Authority. TPA PORT PROJECTS TO BE SUPPORTED BY DEVELOPMENT PARTNERS AND PPPs

Multi-year Expert Meeting on Transport, Trade Logistics and Trade Facilitation

Tanzania Ports Authority

DESTINATION: LA MERCY

COWI TANZANIA LTD WELCOME TO OUR WORLD OF CONSULTANCY WITHIN ENGINEERING, ENVIRONMENT AND ECONOMICS

Presentation on Initiatives to Improve Cargo Handling at the Port of Mombasa. Muhamad A. Jezan Resident Representative

SECTOR ASSESSMENT (SUMMARY): TRANSPORT AND INFORMATION AND COMMUNICATION TECHNOLOGY 1

Sugar cane suitable areas available

SILVER SPRINGS HOTEL,NAIROBI,2ND NOVEMBER,2015

INFRASTRUCTURE PARTNERSHIPS FOR AFRICAN DEVELOPMENT (ipad) EAST AFRICA AUGUST 2009 KILIMANJARO KEMPINSKI HOTEL DAR ES SALAAM, TANZANIA

Examples of Eligible Projects. Project Category Description Examples

Kosovo s PPP Policy, Legal, & Institutional Framework

Introduction of Project for Formulation of Master Plan on Logistics in Northern Economic Corridor

Investments in Transport Infrastructure Projects

Unlocking the potential of private seed companies to commercialize beans seed in Tanzania: Experiences from bean seed system project.

Sectors of operation. Capacity building & skill set development. Area development. Agri and food infrastructure. Industrial infrastructure

Vivien Foster & Cecilia Briceño-Garmendia, World Bank

SINGLE CUSTOMS TERRITORY

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

COMMON GUIDELINES OF THE NORTHERN CORRIDOR TRANSPORT POLICIES AND IMPLEMENTATION PLAN

TMS CONSULTANTS LTD TARGETED PARTICIPANTS FOR TANZANIA INTERNATIONAL PUBLIC-PRIVATE PARTNERSHIP (PPP) EXHIBITIONS AND CONFERENCES

Across Africa, Beyond Borders

TANZANIA S FIVE YEARS DEVELOPMENT PLAN ON POVERTY ALLEVIATION AND AREAS WHERE NGOS CAN CONTRIBUTE

WORKING WITH IFIS BOARD OF TRADE OF METROPOLITAN MONTREAL

INVESTMENT OPPORTUNITIES IN PORT FACILITIES

SECTOR ASSESSMENT (SUMMARY): LOGISTICS 1

14TH SUMMIT ON THE NORTHERN CORRIDOR INTEGRATION PROJECTS: 26TH JUNE 2018 SAFARI PARK HOTEL, NAIROBI KENYA

Comprehensive Transport and Trade System Development Master Plan in the United Republic of Tanzania. Final Report. Volume 1.

Facilitation of Landlocked Transit Cargo. IAPH Conference Abuja 18 th Sep, 2018

INSTITUTIONAL ARRANGEMENT FOR CORRIDOR MANAGEMENT: SUCCESS & CHALLENGES

Transport and logistics innovation towards the review of the Almaty Programme of Action in 2014

WORLD BANK GROUP INFRASTRUCTURE ACTION PLAN AFRICA REGION FY

ACCDAR Adapting to Climate Change in Coastal Dar es Salaam. Laura FANTINI, Liana RICCI

The Water Resources of the Nile Basin

Embassy of Denmark in Vietnam 2 / 10

Performance and Initiatives in the Transport Sector ( )

WE BELIEVE IN GREEN DESIGN AND CUSTOMER SATISFACTION WE ARE PROUD TO GIVE YOU OUR EXPERIENCE COVERAGE. Highway Design Projects

KEYSTONE PARK LOGISTICS, WAREHOUSING & LIGHT INDUSTRIAL PRECINCT

Dry ports as an enabler of trade - UNCTAD s experience

SUEZ CANAL ECONOMIC ZONE. 1/30

Freight transport policy and measures in Norway

Dar es Salaam Regional PPP Risk Allocation Workshop

Status of Myanma Railways & Current Development Projects

AL-AMEEN ENGINEERING COLLEGE DEPARTMENT OF CIVIL ENGINEERING CE RAILWAYS AIRPORT AND HARBOUR ENGINEERING QUESTION BANK

SECTOR ASSESSMENT (SUMMARY): TRANSPORT, AND INFORMATION AND COMMUNICATION TECHNOLOGY. 1. Sector Performance, Problems, and Opportunities

Concept Symposium 2016 Governing the Front End of Major Projects

b. Develop urban roads/states highways and National highways for the development of tourism, trade and commerce.

SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1

FREIGHT CORRIDORS AND GATEWAYS: DEVELOPMENT APPROACH AND EVALUATION CRITERIA COMPARISON IN NORTH AMERICA AND THE EUROPEAN UNION

Kenya s Infrastructure

INTERNATIONAL WATERS IN AFRICA COOPERATION AND GROWTH

Seminar on Sharing Success Stories and Challenges in e-governance/e- Administration

Airports in the Region Case Study

SERBIA. JSC Serbian Railways. Terms of Reference for Lender s Monitor Advisor

VALLIAMMAI ENGINEERING COLLEGE DEPARTMENT OF CIVIL ENGINEERING CE RAILWAYS AIRPORT AND HARBOUR ENGINEERING QUESTION BANK

SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1

The World WORLD.

2008 Investor Site Visit - Maputo

TANZANIA Food Security Update May 2010

SECTOR ASSESSMENT (SUMMARY): TRANSPORT, AND INFORMATION AND COMMUNICATION TECHNOLOGY. 1. Sector Performance, Problems, and Opportunities

Private Sector Participation in the Uganda Water Sector: Past, Present Future of Small-Town Water Supply

TRANSPORT SECTOR OVERVIEW

Joh. Achelis & Söhne GmbH. Head Office: Langenstraße 30 P.O. Box Bremen Bremen Germany

8.00 Water Supply and Sanitation for the towns Bambari and Bozoum. Central Africa

Donat BAGULA Executive Secretary, NCTTCA

EVALUATION ON POLICY FORUM S COMMUNITY RADIO PROGRAMMES ON EXTRACTIVE AND ACCONTABILITY 2017

UNIT 1 QUESTION BANK. Part A

The Tanzania COUNTRY BRIEF

Infrastructure Development

EAC Energy Security Policy Framework

Hong Kong International Airport Medium & Long Term Development Plans. The British Chamber of Commerce 18 July 2012

ZAMBIA NATIONAL FARMERS UNION. THE ZNFU SUBMISSIONS ON THE ROLE OF ICTs IN NATIONAL DEVELOPMENT

TRANSPORT. Networks that move Zimbabwe forward

Project Data Sheet BASIC PROJECT DATA. Systematization of Argeş and Dâmboviţa Rivers for navigation and other uses "Danube Bucharest Canal"

SECTOR ASSESSMENT (SUMMARY): ENERGY

INDUSTRIAL OUTPARCELS AVAILABLE WITH RAIL ACCESS BUILD TO SUIT OPTIONS. The Moser Group, Inc.

Eastern & Central Africa

Building climate resilience

Global Infrastructure practice in East Africa

Megatrends transforming Tanzania s agri-food systems: Towards inclusive economic transformation?

Megatrends transforming Tanzania s agri-food systems: Towards inclusive economic transformation?

2018 PROPOSED AIRPORT CONSTRUCTION PROJECTS*

UNHABITAT Lake Victoria Region Water and Sanitation Initiative:

YOUR GATEWAY TO GLOBAL DISTRIBUTION

YOUR GATEWAY TO GLOBAL DISTRIBUTION

The Victorian Transport Plan (Department of Transport, 2008).

Scoping horticulture in Tanzania. Presentation by:

W W W. D VA N TA G E C O R P. C O M

NELSAP AT A GLANCE. Overview of NELSAP

SECOND TRANSPORT AND ECONOMIC CORRIDOR. Lamu Port South Sudan Ethiopia Transport (LAPSSET) Corridor

Ex-Ante Evaluation (for Japanese ODA Loan)

WATER UTILITIES PERFORMANCE REVIEW REPORT 2012/2013 REGIONAL WATER UTILITIES & DAWASCO

FINANCING SUSTAINABLE GROWTH IN PAPUA NEW GUINEA

Tanzania Rice. Introduction. Production

Transcription:

TABORA INVESTMENT FORUM 19 th JULY 2013 AT SERENA HOTEL DAR ES SALAAM Presentation on Tabora and Government initiative on improving infrastructures for investments attraction in Tabora region By Longino K.Kazimoto Assistant Administrative Secretary Regional Commissioner s Office, Tabora TABORA ADMINISTRATIVE MAP 1

PREAMBLE Largest region in the country with 75,685 Sq Km. Endowed with natural resources 44% of its area covered by gazetted forest reserves. Ranks third country wide in having livestock amounting to 3.29 million 36,437Ha of land already set aside in Tabora region for investment purposes POPULATION DISTRIBUTION DISTRICT POPULATION COVERAGE (Km2) Nzega 502,252 7,319 Igunga 399,727 6,912 Uyui 396,623 11,806 Urambo 192,781 6,110 Sikonge 179883 27,873 Tabora 226,999 1,615 Kaliua 393358 14,050 TOTAL 2,291,623 75,685 2

GOVERNMENT INITIATIVES ON IMPROVING INFRASTRUCTURE Improvement of Roads, Air transport, Railways, Electricity, water supply and sanitation, Telecommunication and ports are among Tanzania Government priority undertakings in the medium term plan 2013-2016. 1. ROADS The region s road network amounts to 5,527.04 Km,comprisedof: a) Trunkroads-965.80Kmwith16%pavedsurface. b) Regional roads - 977.54 Km largely unpaved (99% unpaved surface) c) District roads- 3,583.70 Km largely unpaved. d) All categories of roads are passable throughout the year with exception of four district roads (425 Km) that were upgraded to regional roads status in year 2010/11. 3

ROADS (Continued ) Five projects for upgrading roads to bitumen standard are implemented now in Tabora region: Nzega-Tabora, 115 km Tabora-Nyahua, 85 km Tabora-Urambo94 km Kaliua Kazilambwa 56 km Tabora-Sikonge35,km These projects are funded by Tanzania Government and the roads link Tabora region to neighbouring regions. Ndono- Urambo road Tabora Ndono road Puge Tabora Road Tabora Nyahua Road 2. AIR TRANSPORT Tabora has one Airport with 2 run ways, one oriented at 13/31 (1786m x 46m) and upgraded recently to bitumen standard. The airport handles aircrafts with sitting capacity up to 72 passengers for aircrafts such as ATR-72, F.50, DASH8andthelike. Upgrading of this airport funded by world bank (TZS 11.65 Billion) 4

8/16/2013 Phase I of upgrading project of Tabora Airport already handed over to TAA for use. Phase II commences within 2013/2014 financial year by World Bank funding, covering the second runway, apron and taxiway, installation of airfield ground, lighting system and Navigational Aids such as DME/VOR. The European Investment Bank (EIB) accepted funding of construction of a new Terminal Building, access road, car parking, and new Control Tower. The project was completed and handed over to TAA for use in May 2013 The development Plan forecasted to year 2027 for this airport covers the following: Extended taxiway system and apron Expanded Fuel Farm New RFF facility New airtraffic control tower/met bulding Extension of apron and terminal cargo building. Provision of GA hangar and maintenance of facilities The airport can offer such connections 5

3. RAILWAY TRANSPORT Railway transport plays a big role in Tanzania economy thus railways rehabilitation is one of top listed Tanzania government priorities. Tabora is the largest railway transport terminal in central and western part of Tanzania. Five districts (Uyui, Tabora, Nzega, Urambo and Kaliua) are served by the Central railway line, making total length ofrailwaylinein Taboraregiontobe604Km. RAILWAY TRANSPORT (Continued ) Government strategies to improve railway transport include:- a) Spot improvement of railway line. b) Partnership with the private sector (PPP Model) to implement projects geared to enable the railway line to allow use of heavy locomotives for efficiency of performing rail transport services. c) Removal of speed restrictions by relaying light rails (52.12lb/yd and 60lb/yd) with 100lb/yd and strengthening of bridges to carry weights of 25-32tons/axle. 6

RAILWAY TRANSPORT (Continued ) Upgrading of the entire network to standard gauge (i.e. 1435mm) from the current metre gauge (1000mm). Strengthening the bridges to carry 25-32 tons axle load and the track to be laid with at least 120lb/yd rails on concrete sleepers. 4. ELECTRICITY The major source of electricity for Tabora is the National Grid. Energy Sector has undergone reform geared towards involvement of private sector in power generation, transmission and distribution, entailing to create conditions for provision of safe, reliable, efficient, costeffective and environmentally friendly energy services. 7

ELECTRICITY(continued ) Major Power Projects in Tabora Region: US$ 670 million Back Borne Iringa Shinyanga 400kV transmission line (The compensation for People Affected by the Project(PAP) is completed and funds mobilization for the project implementation is in progress. Rural electrification Turn Key Phase I and II costing US$ 6.67 million and US$ 41.7 million respectively (Phase I is completed by 90% and tender document evaluation for Rural Electrification Turn Key Phase II is completed. 5. WATER SUPPLY AND SANITATION The main water source for Tabora Municipality is Igombe dam, contributing 90% of the total water production. TUWASA is an Autonomous water utility organization authorized to offer water supply and Sanitation services in the Tabora Municipality. Two programmes, one supported by Swiss Development Agency (SECO) and another, Water Sector Development supported by World Bank are implemented Upon completion of these programmes, water production capacity will increase from the current 15,000m 3 /day to 30,000m 3 /day and will accommodate the Municipal water demand to the year 2018. 8

WATER SUPPLY AND SANITATION (continued ) Lake Victoria water supply project Tanzania Government through the Ministry of Water already planned to undertake a water supply project from Kahama to Tabora via Nzega using Lake Victoria source. (The evaluation for Technical proposals submitted by various Consultant firms was done in June, 2013 and the evaluation for financial proposals is planned to be done in August, 2013). WATER SUPPLY AND SANITATION (continued ) Performance Indicator 2012/2013 2014/2015 Proportion of population living within the area with water network (%) 84 87 Increase water production from 15,000 30,000 current 15,000 m3 per day to 30,000 m3 per day, compared with the current demand of 25,000m3 Ratio of the total number of water 28.2 30 connections to the total number of households (%) Average hours of supply 19 24 Metering ratio (%) 78.5 100 Treated water storage capacity (Hours) Proportion of population served by sewer system (%) 47.2 32 6% 10% 9

6. TELECOMMUNICATION Telecommunication sector performance, is currently one of the fastest growing sector of the national economy, growing at an annual rateofover20%since2001. Tanzania has a National ICT Broadband Backbone (NICTBB) project, now with a live 7560km of Optic Fiber Cable infrastructure (shown on the adjacent map). NICTBB already connected to two major submarine cables of SEACOM (July, 2009) and EASSy (April, 2010) and we have access to a third cable TEAMS that has landing station at Mombasa-Kenya. Tabora already has three active service nodes of the NICTBB: at Tabora Nzega, and Igunga Towns Rwanda Burundi Zambia Uganda Malawi 83.54 48P 104.16 48P 78.53 48P 肯尼亚 Kenya Seacom International submarine cable Eassy International submarine cable TABORA DRY PORT DEVELOPMENT Tabora regional authority has already minded the Government through the Ministry of Transport to establish a Dry port in Tabora. Tabora could serve as a collection/storage facility and strategic food and cash crops reserve, livestock products and forest produce which could be easily destined to various parts of the country as well as outside the country due to its railway, trunk roads and air port connectivity.. There is potentiality of establishing a DRY PORT IN TABORA, and may turn to be an inland trade hub. TABORA IN 2025 INLAND TRADE HUB 10

THANK YOU FOR YOUR ATTENTION Visit our Website to access the main report of this presentation --- www.investintabora.com --- 11