LS 2519 CONCRETE PAVER PAVEMENT RECONSTRUCTION

Similar documents
SECTION INTERLOCKING PRECAST CONCRETE UNIT PAVERS

INTERLOCKING CONCRETE PAVERS SECTION 02780

SECTION PAVING SLABS ON AN AGGREGATE BASE

SECTION PAVING SLABS ON AN AGGREGATE BASE

SECTION INTERLOCKING CONCRETE PAVERS

SECTION INTERLOCKING CONCRETE PAVERS

CONCRETE TILE PAVERS

GUIDE SPECIFICATION FOR CONSTRUCTION USING WILLOW CREEK CONCRETE PAVERS

PAVING SLABS ON AGGREGATE BED FOR ROOF PLAZA DECKS

A. Division 01 Specification Sections, Drawings, General Conditions, Supplementary General Conditions, and Special Conditions apply to this section.

PAVING SLABS ON A CONCRETE BASE

TURFSTONE PAVERS SECTION CONCRETE GRID PAVEMENTS (1995 MasterFormat Section 02795)

SECTION INTERLOCKING CONCRETE PAVEMENT ON A CEMENT TREATED BASE

SECTION PAVING SLABS ON AN AGGREGATE BASE

SECTION CONCRETE GRID PAVEMENTS (1995 MasterFormat Section 02795)

SECTION CONCRETE GRID PAVEMENTS (Turfstone) (1995 MasterFormat Section 02795)

BITUMEN-SET PRECAST CONCRETE PAVING SLABS

SECTION PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)

TECH SPEC. Guide Specification for the Construction of Interlocking Concrete Pavement

Tech Spec 9. Guide Specification for the Construction of Interlocking Concrete Pavement SECTION INTERLOCKING CONCRETE PAVERS

Specification Guide and Installation Overview

Installation Specifications for Interlocking Concrete Pavements

ICPI TECH SPEC NUMBER 2 Construction of Interlocking Concrete Pavements

GUIDE SPECIFICATIONS FOR CONSTRUCTION OF THE AQUAPAVE PERMEABLE ON-SITE STORMWATER SOURCE CONTROL SYSTEM

Installation Guidelines

Construction Specification for Concrete Unit Pavers

SECTION CONCRETE GRID PAVEMENTS (1995 MasterFormat Section 02795)

SECTION PERMEABLE INTERLOCKING CONCRETE PAVEMENT EP Henry ECO Brick Stone

PERMEABLE INTERLOCKING CONCRETE PAVEMENT

SECTION CONCRETE PAVING SLABS SET IN MORTAR

DRIVABLE GRASS GUIDELINE FOR NON PLANTED DRY INFILL INSTALLATIONS

SECTION ECO-CITYLOCK PERMEABLE INTERLOCKING CONCRETE UNIT PAVING

CONSTRUCTION SPECIFICATION FOR CONCRETE UNIT PAVERS

GUIDELINE FOR PLANTED INFILL INSTALLATIONS. Please read prior to installation, and have proper equipment and safety precautions in place.

DRIVABLE GRASS GUIDELINE FOR DRIVABLE TURF INSTALLATION

1. Concrete pavers, with ungrouted joints, over sand base. a. Large precast sections in random mix with smaller concrete pavers

TECH SPEC. Construction of Interlocking Concrete Pavements

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF INTERLOCKING CONCRETE PAVERS

Construction Specification for Concrete Unit Pavers

BIO-AQUIFER STORM SYSTEM

SECTION 1 BIO-INFILTRATION BUMP OUTS (BIBO)

Narrow Modular Pavers (NMP) for Sand-Set Installations

1.03 Submittals A. Submit the following in accordance with Section 01300:

SECTION TRENCHING

SECTION UNIT PAVERS

Stanford University Facilities Design Guidelines SECTION ASPHALT UNIT PAVING. A. ASTM C-33 Standard Specification for Concrete Aggregates.

Section (1997 Section 02795) PERMEABLE, FLEXIBLE and PLANTABLE CONCRETE EROSION CONTROL SYSTEM

SECTION ASPHALT PAVING AND SURFACING

PERMEABLE INTERLOCKING PAVERS

PERMEABLE PAVERS PHYSICAL AND GEOMETRICAL CHARACTERISTICS - PAVERS DRIVEWAYS, PERMEABLE DRIVEWAYS & PATIOS CHARACTERISTICS CSA A231.

SECTION CONTROLLED LOW STRENGTH MATERIAL

Section CONCRETE SIDEWALKS. 1. Payment for concrete sidewalks is on square foot basis.

ADDENDUM NO. 1 TO THE INVITATION TO BID - ITB # RAMP & SIDEWALK REPAIR PROJECT CITY OF ANN ARBOR, MICHIGAN

Student Services & Classroom Addition

MSCAA /04 ITEM P-219 RECYCLED CONCRETE CRUSHED AGGREGATE BASE COURSE DESCRIPTION MATERIALS

Design, Construction and Maintenance of Interlocking Concrete Pavement Crosswalks

CITY OF FARGO SPECIFICATIONS ASPHALT LEVELING COURSE

1.1 RELATED DOCUMENTS

Section 403. DRAINAGE STRUCTURES

STANDARD DETAIL SPECIFICATIONS FOR STREET CONSTRUCTION, WALKWAYS, AND PAVEMENT RESTORATION CITY OF EDEN PRAIRIE, MINNESOTA INDEX

SECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT

ICPI TECH SPEC NUMBER 3

SECTION TRENCHING, BACKFILLING AND COMPACTION. B. Provide necessary sheeting, shoring and bracing.

(SIZE) MANHOLES CATCH BASINS AND DITCH INLETS -Item No. ADJUSTING AND REBUILDING MANHOLES, CATCH BASINS AND DITCH INLETS - Item No.

SECTION EROSION CONTROL DEVICES

CHARACTERISTICS CSA A TECHO-BLOC Compressive strength psi [45 MPa] min.

1. Payment for concrete sidewalks is on square foot basis. a. Limits for measurement for trench excavation as follows:

SECTION BITUMINOUS CONCRETE PAVING

Narrow Modular Pavers (NMP) for Mortar-Set Concrete Tiling Installations

Drainage structure refers to manholes, catch basins, leaching basins, inlets and drop inlets. Drainage structures are designated as follows.

A Guide for the Specification of Mechanically Installed Interlocking Concrete Pavements

Construction Specification for Utility Adjustments

SECTION 521 PAVERS. Materials shall be furnished by the Contractor in accordance with Section 200.

SECTION EARTHWORK

SECTION ASPHALTIC CONCRETE PAVING

Stanford University Facilities Design Guidelines SECTION STONE FINES PAVING. American Society for Testing and Materials.

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT

MagnumStone Specifications Gravity

SECTION STRUCTURAL EXCAVATION FOR STRUCTURES

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING

INDEX DESCRIPTION MATERIALS APPROVAL FOR BASE COURSE CONSTRUCTION MEASUREMENT PAYMENT 6

SECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT

US-airfield pavers FAA P-502.doc INTERLOCKING CONCRETE PAVEMENT CONSTRUCTION FOR AIRPORT

KU Design Guidelines APPENDIX II PERMEABLE BITUMINOUS PAVEMENT

for Mortar-Set Concrete Tiling Installations

ROOF BALLAST MATERIALS ARCHITECTURAL CONCRETE PAVING SLABS SRS LEVELING BLOCK SYSTEM INSTALLATION PART GENERAL 1.

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

SECTION SPECIFICATION FOR STONEBRIDGE RETAINING WALL SYSTEM

Stabilizer Solutions, Inc. All Rights Reserved. Page 1 of 5

UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** SECTION TABLE OF CONTENTS

Allen & Sherriff Architects, Inc Yonge Street, S202, Richmond Hill, Ontario L4C 5K9 Tel: Fax: File Ref.

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods

Section 25 Aggregate Subbase

AMENDMENTS TO OPSS 408 (OCT 89) CONSTRUCTION SPECIFICATION FOR ADJUSTING OR REBUILDING MANHOLES, CATCH BASINS, DITCH INLETS AND VALVE CHAMBERS

SECTION EROSION CONTROLS

Item P-219 Recycled Concrete Aggregate Base Course

CHARACTERISTICS CSA A TECHO-BLOC Compressive strength 50 MPa [7200 psi] min. 50 MPa [7200 psi] min.

CITY OF WINDSOR STANDARD SPECIFICATIONS JULY 2012 S-31 KEYHOLE EXCAVATION TABLE OF CONTENTS

SECTION RIGID PAVEMENT. 1. Portland Cement Concrete (PCC) pavement. 2. Section Aggregate Base Course.

A.2.a Random Riprap... Table

Transcription:

LS 2519 CONCRETE PAVER PAVEMENT RECONSTRUCTION A. Section Includes B. References C. Quality Assurance D. Submittals E. Delivery, Storage and Handling F. Environmental Conditions G. Summary H. Concrete Pavers I. Bedding and Joint Sand J. Edge Restraints K. Demolition L. Base Preparation M. Installation of Sand and Concrete Pavers N. Field Quality Control O. Method of Measurement P. Basis of Payment A. Section Includes Concrete paver units Bedding and joint sand B. References American Society of Testing and Materials (ASTM): C 33, Specification for Concrete Aggregates. C 136, Method for Sieve Analysis for Fine and Coarse Aggregate. C 140, Sampling and Testing Concrete Masonry Units. C 144, Standard Specification for Aggregate for Masonry Mortar. C 936, Specification for Solid Interlocking Concrete paving Units. C 979, Specification for Pigments for Integrally Colored Concrete. D 698, Test Methods for Moisture Density Relations of Soil and Soil Aggregate Mixtures Using a 5.5-lb (2.49 kg) Rammer and 12-in. (305 mm) drop. LS 2519-1

D 1557, Test Methods for Moisture Density Relations of Soil and soil Aggregate Mixtures Using a 10-lb (4.54 kg) Rammer and 18-in. (305 mm) drop. D 2940, Graded Aggregate Material for Bases or Subbases for Highways or Airports. C. Quality Assurance Installation shall be by a contractor and crew with at least one year of experience in placing interlocking concrete pavers on projects of similar nature. Contractor shall conform to all local and state licensing and bonding requirements. D. Submittals Submit shop or product drawings and product data. Submit full size sample(s) of replacement concrete paving unit(s) to indicate color and shape selections. Color will be selected by the City from manufacturer s available colors. Submit sieve analysis for grading of bedding and joint sand. Submit test results from an independent testing laboratory for compliance of paving unit requirements to ASTM C 936 or other applicable requirements. Provide a layout, pattern and relationship drawing of paving joints to existing pavement fixtures within each removal and replacement area. E. Delivery, Storage and Handling Deliver concrete pavers to the site in steel banded, plastic banded or plastic wrapped cubes capable of transfer by forklift or clamp lift. Unload pavers at job site in such a manner that no damage occurs to the product. Sand shall be covered with waterproof covering to prevent exposure to rainfall or removal by wind. The covering shall be secured in place. Coordinate delivery and paving schedule to minimize interference with normal use of roadway and buildings adjacent to paving. LS 2519-2

F. Environmental Conditions Do not install sand or pavers during heavy rain or snowfall. Do not install sand and pavers over frozen base materials. Do not install frozen sand. G. Summary Reconstruction of indicated paver pavement area(s) shall consist of careful diamond saw cutting through the existing pavers where indicated by the City, removal of the indicated pavers from the existing sand leveling course, salvage of intact pavers for re-use, supply new pavers to replace damaged pavers, placement and compaction of sand leveling course, installation of salvaged and new pavers to conform with pavement line and grade, and installation of joint sand. Sweeping, disposal and general site clean-up shall also be included. H. Concrete Pavers Concrete pavers shall be supplied by a member of the Interlocking Concrete Pavement Institute (ICPI). Product name(s)/shape(s), color(s), overall dimensions and thickness of the paver(s) shall be 4 x 8 x 3.15 rectangular concrete pavers shall be used. Color shall be approved by the Engineer, prior to ordering the pavers. Pavers shall meet the following requirements set forth in ASTM C 936, Standard Specification for Interlocking Concrete Paving Units: Average compressive strength of 8,000 psi (55 Mpa) with no individual unit under 7,200 psi (50 Mpa). Average absorption of 5% with no unit greater than 7% when tested in accordance with ASTM C 140. Resistance without damage to 50 freeze-thaw cycles when tested in accordance with ASTM C 67. LS 2519-3

I. Bedding and Joint Sand Note: The type of sand used for bedding is often called concrete sand. Screenings and stone dust can be unevenly graded and have an excess amount of material passing the No. 200 (75 m) sieve. Bedding sands with these characteristics shall not be used. The Contractor shall submit sand gradation to the City Engineer for approval. The submittal shall contain a list of projects where this gradation has been successfully used. Bedding and joint sand shall be clean, non-plastic, free from deleterious or foreign matter. The sand shall be natural or manufactured from crushed rock. Limestone screenings or stone dust that do not conform to the grading requirements in Table 1 shall not be used. The sands shall be as hard as practically available. Note: If the hardness of the bedding sand is not sufficient or questionable for the application, contact the ICPI for information and specifications on assessing bedding sand durability under heavy traffic loads. Grading of sand samples for the bedding course and joints shall be done according to ASTM C 136. The bedding sand shall conform to the grading requirements of ASTM C 33 as shown in Table 1. Table 1 Grading Requirements for Bedding Sand ASTM C 33 Sieve Size Percent Passing 3/8 in. (9.5 mm) 100 No. 4 (4.75 mm) 95 to 100 No. 8 (2.36 mm) 85 to 100 No. 16 (1.18 mm) 50 to 85 No. 30 (0.600 mm) 25 to 60 No. 50 (0.300 mm) 10 to 30 No. 100 (0.150 mm) 2 to 10 Note: Bedding sand may be used for joint sand. However, extra effort in sweeping and compacting the pavers may be required in order to completely fill the joints. If joint sand other than bedding sand is used, the gradations shown in Table 2 are commended. Joint sand should never be used for bedding sand. LS 2519-4

The joint sand shall conform to the grading requirements of ASTM C 144 as shown in Table 2 below: Table 2 Grading for Joint Sand ASTM C 144 Natural Sand Manufactured Sand Sieve Size Percent Passing Percent Passing No. 4 (4.75 mm) 100 100 No. 8 (2.36 mm) 95 to 100 95 to 100 No. 16 (1.18 mm) 70 to 100 70 to 100 No. 30 (0.600 mm) 40 to 75 40 to 100 No. 50 (0.300 mm) 10 to 35 20 to 40 No. 100 (0.150 mm) 2 to 15 10 to 25 No. 200 (0.075 mm) 0 0 to 10 J. Edge Restraints New and re-installed pavers shall be restrained by adjacent pavers to remain inplace, existing street castings and/or concrete curbs or header beams. K. Demolition The City and the Contractor shall agree on the pavement areas(s) to be reconstructed. The perimeter lines shall be diamond saw cut using the wet process along existing paver joints. All pavers inside the perimeter shall be removed. All pavers cut by the sawing shall also be removed. All intact pavers, as agreed by the City, shall be salvaged for re-use. All damaged pavers and pavers with saw cuts shall be disposed of. LS 2519-5

L. Base Preparation Note: For installation on a compacted aggregate base, be aware that the top surface of the pavers may be 1/8 to ¼ in. (3 to 6 mm) above the final elevations after compaction. This difference in initial and final elevation is to compensate for possible minor settling. Verify that base is dry, uniform, even and ready to support sand, pavers and imposed loads. Perform all required base repairs as directed by the City. M. Installation of Sand and Concrete Pavers Final sand leveling or base course shall be carefully established using string lines or other method approved by the City. Place sand or base, level and compact as required. Place pavers to match existing running bond pattern. Saw cut pavers as required for street castings, pavement edge, etc. Units cut no smaller than one-third of a whole paver are to be used along edged subject to vehicular traffic. Pavers should be placed somewhat proud of the final surface grade. Joints between the pavers on average shall be between 1/16 in. and 3/16 in (2 mm to 5 mm) wide. Use a low-amplitude, high-frequency plate vibrator to vibrate the pavers into the sand to final surface grade. Use Table 3 below to select size of compaction equipment: Table 3 Minimum Centrifugal Compaction Force Paver Thickness Compaction Force 60 mm 3000 lbs. (13 kn) 80 mm 5000 lbs. (22 kn) Vibrate the pavers, sweeping dry joints sand into the joints and vibrating until they are full. This will require at least two or three passes with the vibrator. Do not vibrate within 3 ft. (1 m) of the unrestrained edges of the paving units. All work to within 3 ft (1 m) of the laying face must be left fully compacted with sand-filled joints at the completion of each day. Sweep off excess sand when the job is complete. LS 2519-6

The final surface elevations shall not deviate more than 3/8 in. (10 mm) under a 10 ft. (3 m) long straight edge. The surface elevation of pavers shall be 1/8 to ¼ in. (3 to 6 mm) above adjacent drainage inlets, concrete collars or channels. Positive gutter line drainage to catch basins is mandatory. All sand and debris shall be removed from catch basins at completion of project. N. Field Quality Control After removal of excess sand, check final elevations for conformance to the drawings. All work that does not conform to the noted requirements shall be removed and re-done. O. Method of Measurement City of Lakewood will measure and pay by the total square yards of paver pavement removed and replaced for salvaged and new pavers. The area of all street castings shall be deducted from the area of reconstructed paver pavement. P. Basis of Payment Item Unit Description LS 2519 SY Concrete Pavement Reconstruction END OF SECTION LS 2519 LS 2519-7