BIOLOGICAL MANGANESE REMOVAL A VERY SUSTAINABLE WATER TREATMENT TECHNOLOGY. Peter Baudish. Sinclair Knight Merz

Similar documents
MWUA 92 nd Annual February Meeting & Trade Show

TARCUTTA TREATMENT PLANT IRON AND MANGANESE REMOVAL. Peter Outtrim. Riverina Water County Council

OPERATORS PERSPECTIVE : OPTIMISATION OF A NEW PACKAGE WATER TREATMENT PLANT. Melina Entwistle. North East Water Authority

Iron/Manganese Package Plant Pre-Engineered Ground Water Treatment. Village of Bolivar, NY

GOSFORD S EXPERIENCE IN MANAGING IRON AND MANGANESE. Michelle Pankhurst & Michael Redrup. Gosford City Council

SIMPLE SOLUTIONS TO MANGANESE PROBLEMS. Jeff Roscoe. North East Region Water Authority

ISR (IRON SPECIFIC RESIN)

6.5 Filtration General

Figures...vii Tables... ix Acknowledgments... xi Foreword... xiii Preface...xv

Specific Gravity 2.69 Minimum Bed Depth 24 Inches (600mm) Effective Size Freeboard 40% minimum Uniformity Coefficient 1.4 Service Flow Rate

CASE STUDIES FOR POLLUTION ENGINEERING. Degassing of dissolved Hydrogen Sulfide from Drinking Well Water

ENVIRONMENTAL ENGINEERING LECTURE 3: WATER TREATMENT MISS NOR AIDA YUSOFF

BENEFITS OF THERMOPHILIC DIGESTION AT CHRISTCHURCH WASTEWATER TREATMENT PLANT

Trident. Package Water Treatment System

OPTIMISING FILTRATION AT DUNGOG WTP. David Turner. Hunter Water Australia

Comparing the Leopold Clari-DAF System to Upflow Contact Clarification

Well Water Quality Update and Next Steps. Public Works Commission Meeting April 17,

Treatment Processes for Potable Water

Removal of iron and manganese from groundwater: a study of using potassium permanganate and sedimentation

Morton Treatment Plant Process Performance Evaluations: The Removal of Microbial Nutrients

Treatment of all source water influent & effluent for user application, be it commercial, industrial, domestic, to defined & required standards.

Full scale pilot test of a novel technology to remediate alkaline coal mine water using high-surface media at Acomb Mine Water Treatment Scheme, UK

Kohalpur Small Town Drinking Water Supply Project Kohalpur, Banke, Nepal

CASE STUDY: BREAKTHROUGH CENTRATE TREATMENT AT REDCLIFFE WASTE WATER TREATMENT PLANT

Long Point Water Treatment Plant Process Evaluation and Design Upgrades for Performance Enhancement; Dover, DE

AD26 Systems for Iron, Manganese, Sulfide and Arsenic Removal

Unit Treatment Processes in Water and Wastewater Engineering

PUBLIC WATER SYSTEM ANNUAL REPORT

Water Safety Plan Guide Surface Water Abstraction Rivers, Streams and Infiltration Galleries Version 1, Ref P1.1

An Unmanned Approach for the Optimization of a Chemical Injection Program at a Salt Water Disposal Facility

CTB3365x Introduction to Water Treatment

DRINKING WATER QUALITY MANAGEMENT PLAN 2013/2014 REPORT HINCHINBROOK SHIRE COUNCIL SP62

MANZ SLOW SAND FILTER

RESEARCH ON NATURAL POWDERED ZEOLITE INFLUENCE ON DRINKING WATER TREATMENT IN THE DRUSKININKAI III WATER WORKS

AQUAVENDOR AUTO. Ultrafiltration Unit SETUP OPERATING INSTRUCTIONS

J.K. ENGINEERING LTD. CONSULTING * RESEARCH * DEVELOPMENT

AERALATER. Packaged Iron and Manganese Removal

Optimizing Filter Conditions for Improved Manganese Control During Conversion To Biofiltration [Project #4448]

WEFTEC.06. Lake Okeechobee, Actiflo, peroxone, surface water, Cyanobacteria

Removal of Manganese from Drinking Water. Key Words: greensand, oxidation, adsorption, filtration, biological

the faculty for factory program (FFF), Jordan

OVERCOMING CHLORAMINATION OPERATIONAL PROBLEMS AT WILLOW GROVE WATER TREATMENT PLANT. Brendan Holt. Gippsland Water Authority

Water Treatment & Purification Chemicals

Membrane BioReactor: Technology for Waste Water Reclamation

Optimisation of granular media filtration: impact of chemical conditioning Con Pelekani & Loreline Kerlidou SA Water & Allwater

CITY OF SUMNER: CENTRAL WELL DEVELOPMENT

ODOUR CONTROL STRATEGIES ON THE REGIONAL OUTFALL SEWER. Adrian Harper. Gippsland Water

PRO. Safe, clean drinking water on tap anywhere, anytime with UF-PRO Ultrafiltration Units...

BIOLOGICAL FILTRATION FOR SUSTAINABLE TREATMENT OF GROUNDWATER WITH HIGH IRON AND MANGANESE CONTENT A CASE STUDY FROM OVERSTRAND MUNICIPALITY

Treatment options for hydrogen sulfide. Testing for hydrogen sulfide

USING PARTICLE COUNTERS TO OPTIMISE WATER TREATMENT PLANTS. Michelle Colwell. Michelle Colwell, Water Treatment Technologist.

Seasonal Source Water Quality and Treatment Challenges Town of Newburgh s Chadwick Lake Filtration Plant

DRINKING WATER QUALITY MANAGEMENT PLAN 2015/2016 REPORT HINCHINBROOK SHIRE COUNCIL SP62

DE Ferro Natural Water Treatment

Acid Sulphate Soils: Identification and Management in NZ s Largest Airport

CITY OF LOMITA CYPRESS WATER PRODUCTION FACILITY OFF-LINE TESTING

SECURING THE SHIRES WATER SUPPLY. Barry Jones. Eurobodalla Shire Council

Renovation of the Filters at the Soldier Canyon Filter Plant in Fort Collins, Colorado

The 2013 University of Oklahoma International WaTER Conference

AMMONIA REMOVAL USING MLE PROCESS EXPERIENCES AT BALLARAT NORTH. David Reyne. Central Highlands Water Authority

BLENDING EVALUATION AS A TOOL FOR MANAGING DISTRIBUTION SYSTEM WATER QUALITY. Kylee Dewis

DRINKING WATER TREATMENT AND DISTRIBUTION. PROF. A.O. OLANIRAN F Department of Microbiology University of KwaZulu-Natal Westville Campus

OPTIMISATION OF GRANULAR MEDIA FILTRATION: IMPACT OF CHEMICAL CONDITIONING

THE BOSSIER CITY WATER TREATMENT PLANT (Background and Current Process Layout )

WATER FILTRATION EQUIPMENT LWF Series Commercial Water Filters

Groundwater Treatment Facility Operations Martin State Airport August 2018 Chuck Trione, Project Lead

OPERATION OF BAC FILTERS IN COLD WATER AN ORANGE WTP STUDY. Geoff Warren. Geoff Warren, Water Treatment Supervisor, Orange City Council

Rawal Lake Water Treatment Plant Rawalpindi, Pakistan

This is the site setup with the bioreactor located at the west side and the wetlands at the east side. The area draining to the bioreactor via the

Innovative Groundwater Treatment. Sarah Wilson, Anna Comerton and Elia Edwards OWWA/OMWA Joint Annual Conference London, ON; May 4-7, 2014

The Membrane Wastewater Treatment Plant in Ihn Layman s report

JUAN DE FUCA PROVINCIAL PARK: CHINA BEACH ANNUAL REPORT January 2017 September BC Parks. Phone No: Thomas.Porsborg.gov.bc.

Maintaining Subsurface Drip Irrigation Systems

Drinking Water Production Using Moving Bed Filtration

Removal of Manganese by Microfiltration in a Water Treatment Plant*

Science Exploration. DHRITI BHATTACHARJEE Class : VII/C Roll No : 31

Water Quality Guidelines for Turkeys

EXECUTIVE SUMMARY AND TECHNICAL INFORMATION

OXIDATIVE PRECIPITATION OF Fe AND Mn BY AIR/SO 2

Dissolved Oxygen (DO):

In-situ Removal of Arsenic - Experiences of DPHE-Danida Pilot Project

Meeting Manganese Removal Goals: A Pilot Study

EHS SMART-Treat Onsite Moving Media Treatment System

Innovative technology for phosphate removal from dewatered sludge supernatant

This is the 2 nd module of training course titled: Submerged Soils for Rice Production

Watch Water. Katalox-Light. W Water. A and. T Technology. CH Chemicals. Presented by Mr. Deepak Chopra (GM)

INDUSTRIAL FILTRATION EQUIPMENT LWS Filter Series

Manganese Removal in the Poconos A Success Story. Hemlock Farms Community Association

COWRA S WATER TREATMENT PLANT - A CHANGE IN PROCESS CONTROL PHILOSOPHY. Ken Keliher. Cowra Council

WELL, WELL, WELL DRIFT WELL RECOMISSIONING, AN OPERATORS PERSPECTIVE. Adrian Cameron. Tamworth Regional Council

Zero Liquid Discharge Project Extends Potable Water Supplies

SMELT BAY PROVINCIAL PARK Overflow Parking ANNUAL REPORT April 2015 to September BC Parks

Reed Bed Treatment Solutions and Forced Bed Aeration

WATER TECH 2009 BANFF, ALBERTA, CANADA

Disinfection and Disinfection Byproducts (DBP)

DAFF AIR DISPERSION REVAMP. Wes Wilkie. Goulburn Valley Water

Greater Kegalle Water Treatment Plant Kegalle, Sri Lanka

Government Center Water Treatment Plant Kamphaeng Phet Province, Thailand

Treatment of Groundwater for Iron and Manganese. While Avoiding Taste and Odor Mark Carlson

Written submission from Scottish Water

Transcription:

BIOLOGICAL MANGANESE REMOVAL A VERY SUSTAINABLE WATER TREATMENT TECHNOLOGY Paper Presented by: Peter Baudish Author: Peter Baudish, Water Treatment Practice Leader, Sinclair Knight Merz 4 th Annual WIOA NSW Water Industry Engineers & Operators Conference St Stanislaus College, Bathurst 20 to 22 April, 2010 4 th Annual WIOA NSW Water Industry Engineers & Operators Conference Page No. 115

BIOLOGICAL MANGANESE REMOVAL A VERY SUSTAINABLE WATER TREATMENT TECHNOLOGY Peter Baudish, Water Treatment Practice Leader, Sinclair Knight Merz ABSTRACT The presence of manganese often results in consumer complaints associated with black particulates that cause staining and generally lowers public perception of water quality. Waimakariri District Council (NZ) encountered such problems when a new source was developed for the Woodend Water Supply. A biological filter was chosen in preference to conventional physico-chemical treatment processes that have been traditionally used for manganese removal. This paper provides a summary of the processes undertaken in developing and implementing an operational biological filter that has very high manganese removal efficiencies, uses no chemicals and has a lower capital and operational cost than conventional removal processes. Performance characteristics and operational issues of the filter are presented and discussed. KEY WORDS Water Treatment, Manganese, Iron, Biological Manganese Removal 1.0 INTRODUCTION Woodend is a small town of about 2500 population located in the Waimakariri district, Canterbury, NZ. Chinnerys Road bores were the original source for Woodend. This source has elevated iron concentrations averaging 0.54 mg/l, and is in terms of the New Zealand Drinking Water Guidelines is a (microbiologically) unsecure source. Iron was removed by aeration and filtration, with disinfection also required. The Gladstone Park well was commissioned in 1999 to replace the Chinnerys Road bores. It is 200m deep and is a (microbiologically) secure source. As such it required no specific treatment for pathogen removal. It was an untreated groundwater supply, without filtration or disinfection. The supply has a manganese concentrations of approximately 0.05 mg/l. After approximately two years of trouble free operation of the Gladstone Park well, black particulate material started appearing in the supply system, resulting in the staining of clothing and raising significant concern among consumers. This resulted in numerous complaints being made to the Waimakariri District Council (WDC) and reduced public confidence in the supply. A review of possible treatment process options identified chemical oxidation, catalytic oxidation and various hybrids of these processes followed by, or in conjunction with, filtration as the conventional approaches available. Biological filtration was also identified as a possible treatment technology. The potential for a chemical free option was of considerable interest to the Woodend community as there was reluctance to introduce chemicals to their high quality chemical free water supply. Biological treatment was selected for trialling in parallel with conventional catalytic treatment for comparison. Though the latter is not discussed here, it performed to expectations. 4 th Annual WIOA NSW Water Industry Engineers & Operators Conference Page No. 116

2.0 DISCUSSION 2.1 Characteristics of Iron and Manganese Bacterial Growth Bacteria living in environments where there is no light require an alternative energy source to achieve growth. Iron and manganese bacteria that occur naturally in groundwater have specifically evolved to make use of the small amounts of energy released when oxygen reacts with soluble un-oxidised manganese or iron (Mn 2+ or Fe 2+ ). The energy is used by the bacteria to assimilate carbon dioxide, achieving biological growth with the iron (or manganese) accumulating around bacterial cells and being incorporated into bacterial sheaths. The bacterial biomass formed is dense and robust compared to chemical floc or chemically oxidised forms of iron and manganese (Fe(OH) 3 and MnO 2 ). Filtration rates of over 30m/hr are achievable. The rate of head loss build-up is also relatively slow (because of the dense nature of the biomass) resulting in long filter run lengths. Variables that influence the biological activity include redox potential (Eh), dissolved oxygen (DO) concentration, manganese concentration, ph and temperature, (Ref1), and simplified in Table 1. Table 1: Indicative parameters for biological manganese and iron removal and source water quality Optimum Parameters for Typical Water Quality of Biological Removal Sources Parameter Manganese Iron Gladstone Park Chinnerys Road Dissolved oxygen >5 mg/l 0.2 0.5 mg/l 1.6 2.1 mg/l 6.4 9.0 mg/l ph 7 to 8.5 6 to7 6.9 7.3 6.4 6.8 Redox potential 400 to 600 mv 0 to 200 mv -10 to -60 mv 10 to 50 mv Hydrogen sulphide <0.01 <0.01 Nil Nil Iron 0.04 mg/l 0.54 mg/l Manganese 0.049 mg/l 0.004 mg/l In respect of the Gladstone Park source, the ph was just in the range for manganese removal, while DO was too low without supplementary aeration. The redox potential also appeared on the low side. While these factors were given due consideration, field observations that biological manganese removal was occurring naturally within the reticulation system was evidence that the process had potential, especially since the addition of aeration upstream of the existing filter could be easily achieved and might be the only extra process requirement. 2.2 Pilot Trials Pilot trials were undertaken in five stages with the broad objective of developing an understanding of the treatment performance characteristics of biological filtration compared to conventional treatment processes. Stage I Objective establish colonies of manganese bacteria in the trial filter and assess the effectiveness of the biological manganese treatment for the Gladstone Park source: Water from the Woodend reticulation was passed through the filter continuously without backwashing for a period of six weeks. 4 th Annual WIOA NSW Water Industry Engineers & Operators Conference Page No. 117

Bacterial colonies established rapidly (within 3 to 4 weeks), with excellent manganese removal being achieved as shown in Figure 4. Iron removal also improved during the seeding period, though the incoming iron was already at low levels. Figure 5 shows the presence of dark biomass in the filter backwash water. 0.06 0.05 Manganese (mg/l 0.04 0.03 0.02 0.01 0 17/12/03 8/01/2004 16/1/04 Dissolved Mn (out) 28/1/04 2/02/2004 Figure 4: Manganese Removal, Stage I Figure 5: Backwash Discharge Stage II Objective Identify backwashing frequency and flow rates required to clean the filter and their impact on manganese removal efficiency: The filter was operated for approximately three weeks, and backwashed every 5-7 days. Sampling showed that the DO levels in the filtered water was above 5 mg/l and manganese was removed from the incoming level of 0.050mg/L to levels generally below the detection limit of 0.005 mg/l. In spite of the more frequent backwashing biological activity was maintained. Stage III Objective Assess filter performance when the supply was switched from the Gladstone Park to the high iron / low manganese Chinnerys Rd Source for a short period of time: The trial was run for a period of approximately 2-weeks to mimic what would happen if a switch to Council s backup source was required A high degree of iron removal occurred immediately, with the iron levels dropping from an incoming 0.54mg/L to below the detection limit of 0.02 mg/l in the filter outlet within three hours of switchover. However there was some evidence of manganese bleed from the biofilter. Stage IV Objective Assess re-establishment of manganese removal on change back to the Gladstone Park source: The biological filter quickly adapted to the new conditions, with manganese removal to below the detection limit achieved within one day of switchover. Stage V Objective Media trials. Three media designs were trialled. A 40% higher flow rate was observed for the 1.0-1.4mm sand compared to the 0.8-1.2mm sand and 1.0-1.4mm sand-garnet dual media. Manganese removal was equally good. The pilot trials showed that biological filtration was extremely effective at removing manganese and iron, and was able to treat both Gladstone Park and Chinnerys Road sources effectively with no change in filter set-up. In spite of a number of uncertainties, the trials gave sufficient confidence to proceed with modifications of the existing AVG filter the full-scale filter, This was endorsed by the Council and Woodend Residents Association. 4 th Annual WIOA NSW Water Industry Engineers & Operators Conference Page No. 118

2.3 Full Scale Trial Results Converting the existing AVG filter to a biological manganese filter required several modifications including repairs to the existing structure and piping, replacement of sand media, construction of backwash tanks and a disposal system to sewer as well as the addition of an air injection system to the raw water supply. The filter performance for the period April 2005 to June 2006 is summarised in Figure 6. 2500 0.10 A B C D E 0.09 2000 0.08 B3 D1 0.07 Filter Headloss (mm) 1500 1000 B1 0.06 0.05 0.04 Manganese (mg/l) 500 Aerator ON 6th June B2 Aerator OFF 5th Sept. Aerator ON 12th Sept. 0.03 0.02 0.01 0 0.00 08/04/05 08/05/05 07/06/05 07/07/05 06/08/05 05/09/05 05/10/05 04/11/05 04/12/05 03/01/06 02/02/06 04/03/06 03/04/06 03/05/06 02/06/06 02/07/06 Filter Headloss Mn - Filter Inlet Mn - Filter Outlet Mn - Reservoir Outlet Figure 6: 14 Months of full scale operations of biological filter Over the 14 months of operation there were about seven backwashes with the Gladstone Park source, represented by the steep vertical drop in the head loss curve. For the most part, the rising head loss curves of the AVG filter are somewhat jagged, reflecting the intermittent operation of the filter as it starts and stops several times throughout the day. There are also some unexplained changes in the head loss trends where there may have been a partial automatic backwash, possibly caused by the introduction of air into the filter. These anomalies have not been investigated, as they did not appear to have significant impact on the manganese removal efficiency of the filter. The graph presented in Figure 4 has been broken into five time periods A, B, C, D, and E and the performance of the filter during these discrete periods is discussed in the following sections. Period A: For the first month the AVG filter was operated without an aerator. Though clearly no removal of manganese was taking place as (the post filter manganese was identical to the incoming manganese) there was head loss accumulation in the AVG filter. When the filter was backwashed, the colour of the backwash water was a very rusty colour. It appeared therefore that the very low levels of iron (0.05 mg/l) were being completely removed. 4 th Annual WIOA NSW Water Industry Engineers & Operators Conference Page No. 119

Period B: An aerator unit was installed, commissioned and then operated for three months from June 6 to September 5, 2005. After only four weeks the filtered manganese level was below 0.01 mg/l where it remained for three weeks. The manganese then hovered between 0.01 and 0.02 mg/l (B2) for a month and then dropped below 0.0005 mg/l, the manganese detection limit. At the end of this phase the aerator was turned off. Manganese levels immediately spiked upwards within a day (B3). After a week the aerator was turned on and manganese levels immediately returned to below 0.01 mg/l. Period C: The AVG filter was switched to the Chinnerys Rd source for a period of 10 days 18 to 27 October 2005 (Figure 7). 2500 1.0 0.10 2000 0.8 0.08 Filter Headloss (mm) 1500 1000 0.6 0.4 Iron (mg/l) 0.06 0.04 500 0.2 0.02 0 0.0 0.00 18/10/2005 19/10/2005 20/10/2005 21/10/2005 22/10/2005 23/10/2005 24/10/2005 25/10/2005 26/10/2005 27/10/2005 28/10/2005 Headloss Iron - Filter Inlet Iron - Filter Outlet Manganese - Filter Inlet Manganese - Filter Outlet Figure 7: Chinnerys Rd Iron removal and head loss characteristics In contrast to a backwash cycle of the order of two months for the Gladstone Park source, backwashing was required every two to three days with the Chinnerys Rd supply. As with the pilot trials bleed of manganese was observed. Period D: After reverting from Chinnery s Rd to the Gladstone Park source the filter performance did not recover, with post filter manganese levels remaining around 0.02-0.025 mg/l. This was not investigated immediately as manganese levels exiting the service reservoir remained low. In about mid February 2006 dissolved oxygen levels were checked and found to be relatively low due to a malfunctioning blower. The very high spike (D1) occurred when the aerator was completely removed for repair. Period E: Since repair of the aerator in February 2006, and now with four year of operation manganese levels have consistently averaged under 0.01 mg/l, while the water exiting the service reservoir has been usually non detectable. 4 th Annual WIOA NSW Water Industry Engineers & Operators Conference Page No. 120

3.0 CONCLUSIONS Manganese bacteria are adaptable and appear to be able to effectively remove manganese under raw water quality conditions outside of the optimum range reported in the literature. A full scale biological filter is very cost effective and requires no chemicals. Biological manganese removal pilot scale trials are effective for predicting the performance of a full scale plant. The Woodend filter was capable of operating for over two months without backwashing when treating the Gladstone Park water in biological manganese removal mode. The biological filtration process is very robust, and is capable of coping with frequent starting and stopping of supply of the filter operations as well as short term treatment of the Woodend s emergency source the iron rich Chinnerys Rd well - though some manganese bleed was observed when operating in this mode. Following the introduction of a manganese removal process there may be a delayed but short term increase in dirty water complaints. This is probably due to the biofilms of manganese bacteria that live on reticulation pipe walls being starved of their energy source, then dying and sloughing off. Overall both the pilot trials and full scale operations confirmed the feasibility of biological manganese treatment at Woodend with high manganese removal efficiencies possible on the Gladstone Park source. The process was extremely efficient at removing manganese, with the average filtered water manganese levels achieved being under 0.010mg/L. 4.0 ACKNOWLEDGEMENTS This paper is based on Biological Removal of Manganese in a Community Water Supply by Matthew Sheppard and Peter Baudish of SKM, and Gary Boot of Waimakamri Council. That paper contains further details of the investigations and pilot trials that led to implementation of the full scale system 5.0 REFERENCES Biological Removal of Manganese in a Community Water Supply, M. Sheppard, P. Baudish, G. Boot, NZWWA Conference August 2006, Hynds Paper of the year (Gold Award), reprinted Journal NZWWA, December 2006. From Conventional to Biological Removal of Iron and Manganese in France, Mouchet (1992) Journal American Water Works Association, 4 th Annual WIOA NSW Water Industry Engineers & Operators Conference Page No. 121