Request For Information (RFI) For a. Spectrum Management & Monitoring System (SMMS)

Similar documents
Project Overview for the Open Data Platform RFP

WENTWORTH INSTITUTE OF TECHNOLOGY

Design and Development of the ASEAN Secretariat s Enterprise Resource Planning (ERP) System ASEAN SECRETARIAT. Request for Proposal

Township of Severn REQUEST FOR PROPOSAL. Architectural & Professional Services Fire Station Replacement

Request for Proposal Robstown Independent School District ERate

An evaluation of the Irish Remote Interpreting Service (IRIS) Request for Tenders

Request for Proposal. Outsourced IT & Managed Services. ISSUED DATE: April 12, 2018 SUBMISSION DATE: May 18, 2018 AT 4:00 pm EST

Request for Proposal For: 2018 American Bar Association Temporary Services

DEPARTMENT OF DEFENSE HANDBOOK ACQUISITION OF SOFTWARE ENVIRONMENTS AND SUPPORT SOFTWARE

1 August 2018 RFQ No11543 REQUEST FOR QUOTATION (RFQ)

CUSTOMER NAME Security Awareness Education Request for Proposal. Program Content & Hosting Services Date

REQUEST FOR EXPRESSION OF INTEREST FOR THE

RFP Clause No. Details Clarification sought Bank's Response

Please note the following policy concerning communication between Consultants and the City of Dublin during the announcement and selection process:

Communications and Media Commission Request For Quotation (RFQ) DEVELOPMENT OF SPECTRUM MANAGEMENT POLICIES AND CAPACITY. ISSUE DATE: July 20, 2010

Enterprise Availability Management

ATTACHMENT 1 COVER LETTER AND INSTRUCTIONS ON TENDERING PROCEDURES

REQUEST FOR QUALIFICATIONS

ATTACHMENT 1 COVER LETTER AND INSTRUCTIONS ON TENDERING PROCEDURES. CPG/2124/2017 Political Economy Analysis (PEA) of Colombia s Agriculture Sector

Casework Technical Support (Social Welfare - Project Management)

1 Management Responsibility 1 Management Responsibility 1.1 General 1.1 General


Financial Institutions Reporting Solution

CITY OF BEEVILLE, TEXAS

PayPass Mag Stripe Vendor Testing Process (Cards & Devices)

Expression of Interest (EoI) Documents regarding Installation of 4G WiFi Hostspot Services in the Shivaji University Campus, Kolhapur

SELECTION CRITERIA AND PROCESS

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk

NORTHEAST TEXAS PUBLIC HEALTH DISTRICT (NET HEALTH) REQUEST FOR PROPOSALS (RFP)

REQUEST FOR EXPRESSION OF INTEREST (EOI)

Request for Solutions: High Energy Laser (HEL) Flexible Prototype. 11 December 2018

REQUEST FOR PROPOSAL

BUTLER COUNTY EDUCATIONAL SERVICE CENTER GOVERNING BOARD NOTICE TO BIDDERS

1 Revision History Revision 1 11/2/2017 Original Version

Invitation to Tender for the Provision of

REQUEST FOR QUALIFICATIONS STATEMENT (RFQ) CONSTRUCTION MANAGEMENT AT RISK SERVICES FOR THE GREENWOOD HIGH SCHOOL GYMNASIUM GREENWOOD, SOUTH CAROLINA

REQUEST FOR PROPOSAL

Request for Proposal REQUEST FOR PROPOSAL. Systems Maintenance & Integration

Quaid e Azam Solar Power (Pvt.) Ltd. Tender Document for Acquisition of ERP Solution

Construction Industry Training Board (CITB)

Request for Proposal for Annual Financial Audit Services

Information for Contractors Regarding Public Works Projects

RFP Restructuring Advisory Committee: Water and Sewer Question and Answer. Question Cut-Off 2/13/17

Statewide POLICY P700 Rev 2.0

Peoples Steel Mills Ltd.

Invitation to Tender for the Provision of

Strategic Plan for the Canadian Mental Health Association- PEI Division

QUERIES /CLARIFICATIONS REGARDING CONSULTANCY SERVICES FOR 100 MW SOLAR PV PROJECT AT BAHAWALPUR. Response / Clarification

Support to Development of a Global Competency Framework for UHC. Request for Proposals (RFP) Bid Reference 2018/HIS/HWF/HPS/01

Request for Quote (RFQ) Information Technology Department Review

LOS ANGELES COUNTY SHERIFF S DEPARTMENT REQUEST FOR INFORMATION RFI NUMBER 491-SH PERSONNEL TRACKING MANAGEMENT SYSTEM

INTERNATIONAL FOUNDATION FOR ELECTORAL SYSTEMS (IFES) RFQ/11/055

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District

City of Tacoma Department of Public Utilities - Tacoma Power

REQUEST FOR PROPOSAL: WIOA Integrated Data Systems Report

STATE OF MAINE DEPARTMENT OF HEALTH AND HUMAN SERVICES (Office of MaineCare Services) RFI # Request for Information Advanced Data Analytics

REQUEST FOR PROPOSAL (RFP) CONTENTS OF RFP : Cover Page Scope of Work Instructions to Bidder(s)

INTERNATIONAL STANDARD

LEGAL AND HUMAN RIGHTS CENTRE

Request for Proposal for Implementation of ERP and Webbased ERP- like Solutions

HOUSING AUTHORITY OF THE CITY OF BOULDER (dba Boulder Housing Partners)

Invitation to Tender. Development Legal Services. August 2015

LOS ANGELES COUNTY SHERIFF S DEPARTMENT REQUEST FOR INFORMATION RFI NUMBER 570SH MANUAL OF POLICY-PROCEDURE ARCHIVAL AND RETRIEVAL SYSTEM

Purchasing and Procurement Policy

RFP IP-Based Surveillance Camera System

IFP No: 05/18 INVITATION FOR PREQUALIFICATION FOR TRAVEL MANAGEMENT SERVICES FOR THE GENERAL SECRETARIAT OF THE ORGANIZATION OF AMERICAN STATES

Amity School District 4J

The Need of the Computer-Aided Spectrum Management

Invitation to Negotiate (ITN) Statewide Travel Management System ITN No D. Questions and Answers ITN Amendments

DRAFT. Request for Proposal for Construction Manager at Risk Services ASHRAE. New Headquarters Building. Peachtree Corners, GA

REQUEST FOR PROPOSAL

Port Moresby, Papua New Guinea Application Deadline: 4 th August, 2017 Support in the Design of an integrated Environment Title:

MOHAWK VALLEY WATER AUTHORITY PROCUREMENT POLICIES AND PROCEDURES

West Valley Library Parking Lot Repair with Porous Asphalt

Procurement Process: Architects & Professional Engineering Services. Procurement.

Agenda Item. Issue under Consideration: Contract #12-037, Technology Assessment Master Agreement

QSS 0 Products and Services without Bespoke Contracts.

Materials Recycling. Waste Wood Grinding Request for Proposal

REQUEST FOR PROPOSAL. HRIS Human Resources Information Software Fort Morgan, Colorado

Supplier Diversity. EXPRESSION OF INTEREST (including Pre-Qualification Requirements)

BIDDING DOCUMENTS (PROCUREMENT OF GOOD AND SERVICES)

REQUEST FOR PROPOSAL: Construction Management at Risk Services Hamilton International Air Cargo Logistics Facility. RFP Components

CRISP Azure Migration Consulting Services. All responses due no later than Friday, July 21 st, at 5pm EST

VILLAGE OF VERNON HILLS REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER AT RISK SERVICES. Part I: Proposal Information

STRATEGIC COMUNICATIONS SERVICES

Information for Contractors Regarding Public Works Projects

Guidelines for Assessors

CONSTRUCTION MANAGEMENT SERVICES

Illinois Valley Regional Dispatch RFP Disclaimer Logging Recorder

REQUEST FOR PROPOSAL INFORMATION TECHNOLOGY SUPPORT SERVICES

DATE: 02/05/2018. REQUEST FOR PROPOSAL: No. RFP/2018/UNHCR/PSP/MENA/002 FOR THE ESTABLISHMENT OF A FRAME AGREEMENT FOR THE PROVISION OF

Florida Department of Transportation 719 S. Woodland Boulevard DeLand, Florida Addendum 2

City of Lincoln, Nebraska Request for Proposal (RFP) Consulting Services for JD Edwards World Software A7.3 Migration to World Software A9.3.

Reference B Project Management Requirements

Section M: Evaluation Factors for Award HQ R LRDR Section M: Evaluation Factors for Award For HQ R-0002

EXPRESION OF INTEREST (EOI)

Expanding Hydropower and Pumped Storage s Contribution to Grid Resiliency and Reliability RFI#: DE-FOA

10 CRITICAL STEPS REQUIRED FOR EFFECTIVE EPC BOP COST MANAGEMENT RENEWABLE ENERGY PROJECTS

Connoisseur Solutions Project Procurement Management

INSTRUCTIONS TO BIDDERS

Transcription:

Request For Information (RFI) For a Spectrum Management & Monitoring System (SMMS)

Table of Contents 1 Introduction... 3 1.1 About Iraq CMC... 3 1.2 The Iraq CMC Objectives... 3 1.3 RFI Process... 4 2 Technical... 8 2.1 SMMS Overview... 8 2.2 Spectrum Management... 10 2.3 Spectrum Monitoring... 13 2.4 Interfaces between Spectrum Management & Spectrum Monitoring Systems... 14 3 Delivery & Support... 15 4 Legal 4.1 Indicative Contract Terms for the RFP... 15 4.2 Involvement of Third Parties... 16

1 Introduction 1.1 About Iraq CMC The Iraq Communications and Media Commission, hereafter referred to as CMC, is the National Regulatory Authority (NRA) for the Republic of Iraq. It is the body responsible for the regulation of the electronic communications industry and markets within Iraq. The CMC project team is supported by Ernst & Young and InterConnect Communication in this RFI process. 1.2 The Iraq CMC Objectives At the highest level, CMC objective is: The development of a system for allocating a finite resource (the radio spectrum) by appropriate means to users who value the spectrum and who will offer services to others for the security and the economic and social benefit of the nation-state of Iraq This Request for Information relates to CMC s intention to deploy a national Spectrum Management & Monitoring System (SMMS) in Iraq. This SMMS is budgeted by the Government of Iraq. With reference to Figure 1, there are 18 provinces in Iraq with 10 largest cities accounting for around 68% of population. CMC will manage the spectrum in the whole of Iraq and will monitor the use of spectrum in the areas to be identified. Figure 1: Iraq provinces and largest cities

1.3 RFI Process Purpose of this RFI CMC will evaluate responses from potential bidders for the provision of an SMMS system as described at a high level in this RFI to support their key objectives described in sub-section 1.2. Through this RFI process, CMC aims: I. To understand Suppliers technical solutions, offerings and value added features and services including training, support and maintenance; II. To understand the benefits and disadvantages of each Supplier s offering; III. To come to a shortlist of Suppliers who will be invited to make a proposal for the SMMS system through a comprehensive request for proposal (RFP) process to be released shortly after the RFI process.. CMC may arrange meetings with Suppliers after responses are received to ensure that CMC understands the proposed solutions and provide an opportunity for CMC and the Supplier to clarify any outstanding points. CMC aims to have an open, constructive business relationship with selected suppliers to understand the possible lifecycles of the to-be-deployed SMMS and evolution. In particular, CMC would like to understand options to deploy the system in phases, evolving capabilities and coverage smoothly over time.

Timeline of this RFI CMC aims to conclude the RFI phase of procurement by the 8th July 2013. The various activities and associated dates are as follows. No Event Required by 1 RFI released to Supplier Close of Play (COP) 22 May 2013 2 Supplier to confirm intention to submit a response by e-mail to the Primary Contact 3 Supplier questions Supplier may submit any questions by e-mail to the Primary Contact 4 Response to Supplier questions CMC will provide a response to all Supplier questions 6 Submission of responses All responses must be received by 3 pm Iraq time on this date to be considered valid 7 Suppliers presentations CMC may require Supplier to present their responses to the project team. If needed, the location and/or method of these presentations will be decided later. 8 CMC evaluation: Supplier will be notified if they have been successful (shortlisted) for the next phase COP 29 May 2013 COP 7 June 2013 COP 11 June 2013 18 June 2013 Week commencing 1 July 2013 8 July 2013 Table 1 Suppliers attention is directed to the various dates. In particular, Suppliers should note that CMC will not consider responses to this RFI received after 3 pm Iraq time 18 June 2013.

Structure of this RFI There are two major areas that Suppliers are requested to provide information on: I. Technical Information: a. Technical aspects of core and optional hardware & software features of the systems described in Section 2; b. Delivery & Support: Includes the delivery mechanism and follow on support based on requirements provided in Section 3. II. Financial information : shall contain the financial qualifications of the firm to participate in such projects such as: a. Financial capacity of the company b. The last three audited financial reports c. The detailed overview of the company such as structure and ISO certification. Suppliers should also note Section 4: Legal and provide responses accordingly, where applicable. RFI Responses Condition Suppliers should note that a response to this RFP does not commit CMC to any course of action resulting from its receipt and that it may, at its discretion: Reject any or all responses without reason; Reject any response which does not conform to the instructions and specifications expressed; Shortlist Suppliers based upon its own set of criteria; CMC is not bound to disclose the details of such criteria and may at any time alter its criteria; Terminate this RFI. RFI Responses Guidelines CMC requests responses as follows: 1) High level design for the SMMS solution proposed (see Section 2)..

2) Description of the proposed SMMS solution architecture to include hardware and software, operation management including tools and reporting features, security management, standardized internal and external interfaces, any proprietary interfaces, interfaces between spectrum management and spectrum monitoring systems, scalability of each element, and resilience and reliability. 3) High level product roadmap to include planned future hardware and software features and differentiation from competition. 4) Support and services available such as deployment, integration, system development and support, maintenance, configuration and other services which the Supplier believes could add value. 5) Relevant experience, reference customers, test beds, pilot systems where spectrum management or spectrum monitoring systems have been deployed. 6) Details of any project management services that can be provided to CMC to ensure successful implementation and evolution. 7) The capability of supplier to support the deployment of its SMMS solution and follow- support and maintenance in Iraq. 8) Assumptions should be detailed in the response at the end of the section within which they occur. The Supplier is encouraged to seek clarifications before proceeding on the basis of an assumption. 9) For the RFP CMC encourages consortia with the main contractor (prime supplier) identified in the response to this RFI.. 10) In a consortium, the prime Supplier may provide more than one proposal with different Suppliers. Responses should be in PowerPoint 1997/2003 format and comprise no more than 50 slides. In the event that CMC requires a Supplier s presentation, the responses will form the basis of that follow up presentation (see Table 1). The Supplier shall highlight its capability and its offerings in the slides and not in attachments. All responses will be held in strict confidence and shall not be shared with other Suppliers or organizations. Primary Point of Contact Communications and Media Commission (CMC) / Governmental Contracting Department Baghdad / Al- Masbah / Hay Babel, District 929, Street 32, Building 18 E-mail: c.contracts@cmc.iq www.cmc.iq

Questions & Answers Regarding this RFI Suppliers should ask any questions in writing to the primary point of contact by the dates shown in Table 1. Responses to questions will be obtained from the CMC team members and responses given will be circulated to all Suppliers who have received the RFI. Outcome Upon completion of the review process CMC will update the outcome to Suppliers who have submitted responses.cmc is under no obligation to request a formal proposal or to enter into an agreement with any company submitting a response to this RFI. CMC may select a multi-supplier solution to satisfy any eventual requirements. Evaluation Criteria CMC may review each response using the following criteria: Solutions proposed, evolution flexibility, range of products and services; Supplier s delivery and support capabilities; Supplier s capability, experience and proven track record; Supplier s delivery performance including consistent right first time on-time delivery; Supplier s financial and operational stability. 2 Technical 2.1 SMMS Overview CMC is interested in evaluating various options. Based on functionality and commercial offerings CMC will formulate an appropriate procurement strategy for Iraq in order to fulfil short and long term objectives of enhanced economic and social wellbeing and compliance with international obligations. Figure 2 shows a block diagram of components in a typical integrated spectrum management and monitoring system that CMC may seek to deploy (As included in Recommendation ITU-R SM.1537).

Figure 2: Example of a Typical Spectrum Management and monitoring high level functional diagram (as included in Recommendation ITU-R SM. 1537) Whilst Figure 2 is a typical solution, CMC is open to any solutions that meet its objectives. CMC does not wish to dictate a solution. Figure 3 depicts a high level functional diagram of a typical SMMS. Typically spectrum management and spectrum monitoring are separate systems joined by way of an interface across which information passes. However, since the project is at its specification stage, detailed requirements are being evolved. As such Suppliers are requested, based on technical guidelines described in this RFI, to put forward solutions for three scenarios ranging from basic to comprehensive SMMS with an evolution path between the three It is for the Supplier, based on its solution, to optimize the evolution path by stating product supply, staff

competency required, and time span. Suppliers are requested to provide diagrams for the three scenarios in respective sections (sub-sections 2.2 and 0). Suppliers will not be rejected or excluded from this RFI or from the subsequent RFP process, if only one solution is proposed. Figure 3: Spectrum Management and monitoring high level functional diagram Whilst Figure 3 is a typical solution, CMC is open to any solutions that meet its objectives. CMC does not wish to dictate a solution. 2.2 Spectrum Management The CMC s intention in procuring a spectrum management system (SMS) is to acquire the capability to perform a variety of electromagnetic compatibility calculations, handle different scheduled administrative procedures and store the records of all national spectrum users in an electronic data base. The capabilities required include: Engineering tools;

Issuing licenses; Notifying internal and external bodies about frequency assignments; Providing periodic management reports; Interference management; Supporting coordination with other administrations; Charging for frequency usage. In addition, the SMS facility is required to be connected to a spectrum monitoring system (see sub-section 2.3 and 2.4). The spectrum monitoring system will be used to carry out all type of monitoring missions, including identification of unauthorized spectrum use and resolve cases of (harmful) interference. Figure 4 depicts an intermediate level functional diagram of the spectrum management sub-system that maybe adopted by CMC; Suppliers are requested to provide similar diagrams for three scenarios including core components, any additional sub-level functionality, and additional optional elements proposed for increased level of functionality, operational flexibility and enhanced level of performance. Suppliers may add additional elements, as they see necessary. In Figure 4, the interface between spectrum management system and spectrum monitoring system is shown within the boundary of the spectrum management system; this is for illustration only.

III. Figure 4: Spectrum Management System high level diagram Suppliers are requested to provide information on the following: I. Architecture: Describe, through a suitable diagram, the role and breakdown of each sub-system including the items listed in the following paragraphs; II. Internal Interfaces: This refers to internal interfaces within the spectrum management sub-systems, e.g. interface from engineering function to administrative function. Information should be provided about the degree of integration of various modules; III. External interfaces: a. With external databases/standards bodies, e.g. to ITU, other SMMS, and foreign regulators;

b. With external users, e.g. license applicants, licensees submitting complaints and vendors; c. Details on integration aspects and related requirements for a. and b. above. IV. Hardware specifications including: a. Processing power, memory figures, physical limitations, space, and power requirements; b. Reliability & availability figures; c. Backup systems; d. Roadmap and products life cycle. V. Software specifications including: a. Core and optional features descriptions; b. Development roadmap. VI. Operations support system a. Financial tools; b. Statistics and reporting tools for each sub-system; c. Planning tools including specifications of the types e.g. microwave link modelling, range of frequencies covered and propagation algorithms used; d. Users interfaces; e. Configuration management for spectrum management modules and spectrum monitoring modules ; f. Fault management for spectrum management modules and spectrum monitoring modules. 2.3 Spectrum Monitoring Figure 5 depicts an intermediate level functional diagram of the spectrum monitoring sub-system that maybe adopted by CMC. Any specifications implied are for guidelines only; CMC is open to any solutions that meet its objectives. Suppliers are requested to provide similar diagrams for three scenarios including core components, any additional sub-level functionality, and additional optional elements proposed for increased level of functionality, operational flexibility and enhanced level of performance. Suppliers may add additional equipment as they see necessary.

Figure 5: Spectrum Monitoring System high level diagram 2.4 Interfaces between Spectrum Management & Spectrum Monitoring Systems As implied by the above diagrams, separate spectrum management and spectrum monitoring solutions are assumed. Typically spectrum management system users can command spectrum monitoring assets and spectrum monitoring staff can query spectrum management information. Given this, Suppliers are requested to provide information on how the interface and communication between the spectrum management and spectrum monitoring solutions is realized and provide information on its characteristics. Spectrum monitoring systems are typically dispersed in order to cover the required geography. Suppliers are requested to provide information on how communication within the monitoring network is provided and hence the form of the bearers needed between assets.

Suppliers are requested also to provide information on integration of modules and requirements of interfaces required between the spectrum management and spectrum monitoring systems and its sub-systems. 3 Delivery & Support Suppliers are requested to put forward proposals on system delivery: A high level/typical project plan/milestones for the three scenarios; Reliance on third parties; Phased delivery and evolution; Deployment risks; Support infrastructure during deployment phase, system evolution and maintenance; Test, installation and commissioning; Reference system/test bed; Professional services offered including the migration of existing disparate data sets. 4 Legal 4.1 Indicative Contract Terms for the RFP Suppliers should assume that the following terms and conditions will apply: The project will comprise one or more phases with payment milestones; Performance will be determined by acceptance testing and other quantitative performance measures; Payments will be conditional upon performance; A performance bond will be required; The contract will be made and determined under the laws of Iraq; International firms may bid direct to CMC; The successful Supplier will need to register a local company in Iraq though this need will only occur after contract award; Local support is required; The goods and services supplied will be fit for purpose, procured against a specification. Supplier should indicate any specific terms & conditions associated with their proposed solutions.

4.2 Involvement of Third Parties Suppliers should identify areas where it is considered that third parties (including sub-contractors) may be required to provide services and/or required during the deployment and commissioning phase. Suppliers should identify all such third parties in their responses along with details of the proposed 3 rd party s involvement. CMC recognizes that at this point companies who may provide goods and services may not be identifiable. In this case, a description of the services and nature of the likely supplier will be sufficient.