Problem Screening Guideline January, 2016

Similar documents
Concept Development Guideline January, 2018

TSM Limited Scope Project Delivery Process Activity Descriptions November 2017

SAFETY ASSESSMENTS FOR LOCAL TRANSPORTATION FACILITIES IN NEW YORK STATE

Scope Management Guideline July, 2017

Scope Management Guideline January, 2016

Final Design Guideline

Work Breakdown Structure Element Dictionary Preliminary Engineering

WELCOME COMMUNITY ADVISORY GROUP MEETING #2

TRANSPORTATION IMPACT STUDIES

Request for Proposals. Hillsdale Pedestrian/Bicyclist Bridge Design

Scope of Work. Project Approach and Understanding. Task 1: Study Initiation and Administration

CHAPTER 2. VISION, GOALS AND MTP FRAMEWORK

Corridor Advisory Group and Task Force Meeting #2

MONITORING IMPLEMENTATION AND PERFORMANCE

City of Menifee. Public Works Department. Traffic Impact Analysis Guidelines

RESOLUTION NO

Peterborough County Road Safety Audit Guideline Pilot

SBCAG STAFF REPORT. MAP-21/FAST Act Performance Measures and Targets. MEETING DATE: September 20, 2018 AGENDA ITEM: 4H

EXHIBIT A SCOPE OF SERVICES FOR FINANCIAL PROJECT ID TRANSPORTATION SYSTEM MANAGEMENT & OPERATIONS (TSM&O) GENERAL CONSULTANT SERVICES

2 Purpose and Need. 2.1 Study Area. I-81 Corridor Improvement Study Tier 1 Draft Environmental Impact Statement

Moving Forward 2040 Long Range Transportation Plan Bicycle Mobility Master Plan Transit Master Plan

Safety Performance Management Targets. Transportation Policy Board January 11, 2018

GUIDE FOR THE PREPARATION OF TRAFFIC IMPACT STUDIES

SECTION 10 UTILITIES

MEMO DATE: February 12, SOL on Transportation Impact Study Guidelines. District Executives

FLORIDA DEPARTMENT OF TRANSPORTATION. District Six Intermodal Systems Development Office

2. Guiding Principles, Objectives, and Policies

EXHIBIT A. SCOPE OF SERVICES District-Wide Traffic Operations/Safety Studies (Work Group 6.1)

Proposed Comprehensive Update to the State of Rhode Island s Congestion Management Process

Chapter 2 Transportation Element Goals, Objectives and Policies

CMNAA. Central Manatee Network Alternatives Analysis Alternatives Public Meeting CMNAA STUDY PROCESS. STUDY AREA 17th St. W

SAMPLE. in Comments section the structure number and the

Mobility and System Reliability Goal

Between existing Interstate 70 in St. Louis, MO to west of the IL 203 Interchange on existing I-55/70 in Madison, IL

Addendum #3 to the Regional Transportation Plan

Exhibit A Mn/DOT Contract No

6 CHARTING PERFORMANCE

ARROWS RANSPORTATION LAN

Arterial Management Plan Methodology

14.0 TRANSPORTATION PLANNING RULE COMPLIANCE

Introduction. Performance Measurement. Pg. 01

TECHNICAL MEMORANDUM

State of New Jersey Department of Transportation. Change Control Board Procedures

Standard Performance Attributes for Transportation Projects

Florida Department of Transportation. Lane Elimination

Comprehensive Transportation Study for Glencoe, MN

TTAC STAFF REPORT. State Targets for the MAP-21/FAST Act National Highway Performance Program. MEETING DATE: August 2, 2018 AGENDA ITEM: 5

EXHIBIT A SCOPE OF SERVICES INTERCHANGE JUSTIFICATION REPORT (IJR) FOR INTERSTATE 75 AT OVERPASS ROAD

PERFORMANCE-BASED PLANNING AND PROGRAMMING

Highway / Utility Guide

BUSINESS DISTRICT REVITALIZATION FUND $450,000 FOR DMP IMPLEMENTATION

Long Range Transportation Plan Project Status Update

Application of Road Safety Audits to Urban Streets

FY 2019 Unified Planning Work Program FINAL. Regional Intergovernmental Council. June 14, Kanawha Putnam Metropolitan Planning Organization

DISTRICTWIDE MODAL DEVELOPMENT OFFICE (MDO) RAIL CONSULTANT SERVICES SCOPE OF SERVICES FM# Ad # 19627

Summary of transportation-related goals and objectives from existing regional plans

APPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies

ACTIVE TRANSPORTATION ADVISORY COMMITTEE. Memphis MPO March 30, 2015

Traffic Study Guidelines

Article 16 Traffic Impact Analysis

2045 Long Range Transportation Plan Scope

METROPOLITAN PLANNING ORGANIZATION MEMORANDUM OF UNDERSTANDING FOR THE COASTAL REGION METROPOLITAN PLANNING ORGANIZATION BETWEEN

Mendocino Forest Products Grading For Industrial Land Improvements

NJTPA Region. Bergen Essex Hudson Hunterdon Jersey City Middlesex Monmouth Morris. Newark Ocean Passaic Somerset Sussex Union Warren

Winston-Salem Urban Area Metropolitan Planning Organization (WSMPO) Prioritization 4.0 Evaluation Criteria and Point Assignment Process

PERFORMANCE-BASED PLANNING AND PROGRAMMING

Williamsport Area Transportation Study Metropolitan Planning Organization

Traffic Impact Study Guidelines. City of Guelph

REQUEST FOR QUALIFICATIONS

Joint Meeting- Stakeholder Committee & Technical Committee

Regional Transportation Performance Measures

CITY OF JACKSONVILLE 2030 MOBILITY PLAN STUDY UPDATE GOALS, OBJECTIVES, AND PERFORMANCE MEASURES PREPARED FOR: CITY OF JACKSONVILLE

CROWS LANDING CORRIDOR PLAN

Section 5: Performance-Based Planning

TRANSPORTATION RELATIONSHIP TO OTHER ELEMENTS OF THE PLAN AND COUNTY REGULATIONS VISION FOR TRANSPORTATION PLANNING ROAD NETWORK SECTION 7

INVESTMENT SCENARIOS CHAPTER Illustrative Investment Approaches Public Outreach 6-1

MPO/RPO Briefings. MPO/RPO Briefing. Briefing Topics Plan framework o NCDOT Policy to Projects process o Relationship to local/regional plans

Winston-Salem Urban Area Metropolitan Planning Organization (WSUAMPO) Prioritization 3.0 Evaluation Criteria and Point Assignment Process

I-270 NORTH EA PERFORMANCE MEASURES IN NEPA

Traffic Impact Study Requirements

Will County Freight Advisory Council Meeting. April 11, 2017

PROJECT SCOPING PHASE ~ SCOPE OF SERVICES MAIN STREET BRIDGE OVER WINOOSKI RIVER CITIES OF BURLINGTON & WINOOSKI VERMONT

1.1 PUBLIC INVOLVEMENT

Central Manatee Network Alternatives Analysis

Guidelines for the Submission of a Transportation Study Level 2

This module discusses the types of available crash data and identifies their uses in highway safety in order to improve safety management and

There are two (2) amendments for which staff is requesting recommendation to the Transportation Policy Council this month:

HIGHWAY 71 CORRIDOR IMPROVEMENT STUDY BELLA VISTA BYPASS MISSOURI STATE LINE BENTON COUNTY

DISTRICTWIDE MODAL INSPECTION CONSULTANT SERVICES SCOPE OF SERVICES FM# and Ad # and 19626

KANSAS WORK ZONE SAFETY AND MOBILITY PROCESSES AND PROCEDURES

NC General Statutes - Chapter 136 Article 3A 1

EXHIBIT A SCOPE OF SERVICES FOR DISTRICTWIDE CONSULTING ENGINEERNG SERVICES STRUCTURES DESIGN

Memorandum. FROM: Jim Ortbal Rosalynn Hughey Barry Ng TO: HONORABLE MAYOR, CITY COUNCIL. DATE: June 16, 2017

CHAPTER 8 TRANSPORTATION ELEMENT

NJDOT: Asset Management Strategies and Tools

I-17 and Happy Valley Road Diverging Diamond Interchange (DDI)

Dated: January 2015 TRANSPORTATION IMPACT STUDY GUIDELINES

PROPOSED SCOPE OF WORK: REGIONAL ANALYSIS AND LONG-RANGE PLAN FOR EXPANSION OF SUBMARINE SHIPBUILDING

TOWN OF BARGERSVILLE DEPARTMENT OF DEVELOPMENT TRAFFIC STUDY GUIDELINES

Florida Department of Transportation District Four KICK-OFF MEETING. I-95 at Southern Boulevard (SR 80) Project Development and Environment Study

Transcription:

Problem Screening Guideline January, 2016 Check the Capital Project Delivery website to ensure this is the current version

Table of Contents Purpose... 1 Introduction... 1 The following are the major work efforts involved in PS Screening... 2 Review Problem Statement... 2 Request Management System Input... 2 Check for Conformance to CIPD Goals... 3 Coordination with Subject Matter Experts... 3 Problem Statement Review Recommendation... 3 Data Collection... 4 Review Problem Statement... 4 Conduct Field Trip... 4 Request Management System Input... 4 Perform Supplemental Data Collection (2105)... 4 Conduct Field Meeting/Investigation... 5 Request Crash Rates and Crash Records... 6 Analyze Crash Rates and Crash Records... 7 Obtain Existing Traffic Data... 7 Conduct Existing Traffic Analysis... 7 Perform Preliminary Utility Investigation... 7 Revised Problem Statement Scope/Project Limits... 8 Alternatives... 9 Develop Order-of-Magnitude Cost Estimates... 9 Prepare Draft Problem Screening Report... 9 Prepare Final Problem Screening Report... 9 CPSC/CPC Approval... 9

Purpose The purpose of this document is to provide guidance on performing the Problem Screening Phase of the NJDOT Project Delivery Process. This guide is intended for use by the Division of Capital Investment Strategies, Division of Project Management and others involved in this phase of work. Introduction Problem Screening (PS) is the first phase of work in the New Jersey Department of Transportation (NJDOT) Project Delivery Process. As such, all Problem Statements are first introduced to the Department in this phase. Problem Statements are submitted from different sources such as an NJDOT Management System, Metropolitan Planning Organization (MPO), or internal/external stakeholder. The purpose of this PS Phase is to verify the problem, discuss the need and recommend a course of action. Two Department service areas take the lead in the execution of the PS Phase; Capital Investment Planning and Development (CIPD) and the Division of Project Management (DPM). Each service area contributes to the Problem Screening Recommendation Report, which is routed to the Capital Program Screening Committee (CPSC)/ Capital Program Committee (CPC) for approval. The Division of Capital Investment Planning and Development performs the initial portion of the PS Screening effort. CIPD staff evaluates the Problem Statement and to ensure that it is in agreement with the Statewide Capital Investment Strategy goals and Complete Streets Policy and determine the path that a Problem Statement could reasonably follow. CIPD staff also evaluates existing NJDOT data (traffic/crash data, bicycle and pedestrian) to determine if the problem is in concern or conflict with any other existing or proposed work. It is important to note that the PS Screening should be performed with only the existing data that is readily available within the NJDOT from various databases or from past studies. Only, if absolutely necessary, data will be obtained by contracting out to consultant. Decisions are made in the PS Screening effort that will dictate the direction of each Problem Statement, which may include, but not be limited to, advancement of the Problem Statement to the Concept Development (CD) Phase, advancement of the Problem Statement to Maintenance or Operations for a quick fix, or withdrawal of the Problem Statement. The Division of Project Management (DPM) performs Field Investigation. A critical task of the Field Investigation is coordination with internal stakeholders (e.g., Subject Matter Experts (SMEs)) and, if needed, with the external stakeholders (such as local officials). The Field Investigation should be done within 60-90 working days. Revision 4 Pg 1 of 10 Released: 01/2016

The following are the major work efforts involved in PS Screening Review Problem Statement The Problem Statement is a document that describes an apparent transportation problem. It identifies the type of transportation problem (e.g., safety, congestion, operational, etc.), the location of the problem, route, milepost, limits, municipality and county. The Division of Capital Investment Planning and Development (CIPD) receives and reviews all Problem Statements submitted from internal/external stakeholders and weighs its merit against data and information contained in the Department s various management systems. Upon receipt of the Problem Statement, CIPD: Reviews and checks the Problem Statement form (TP-1) to ensure that all pertinent information regarding the transportation problem in question is included and the problem is well defined. Reviews the Problem Statement for possible duplication of an existing project/proposed project/problem Statement. Request Management System Input During the Problem Statement Review, it is imperative that a search of all the management systems be conducted to determine the ranking/priority of the Problem Statement, which will support the need to advance the transportation problem. The following are the nine management systems in the Department: 1. Safety Management System 2. Congestion Management System 3. Drainage Management System 4. Bridge Management System 5. Pavement Management System 6. Maintenance Management System 7. Rock Fall Management System 8. Smart Growth Management System 9. Pedestrian Safety Management System CIPD sends a memo to the owners of applicable management systems and other SMEs requesting the following information: Relative ranking/priority on the management system Available traffic data Recently completed or concurrent work-orders/projects Other relevant information The request memo includes a brief description of the problem being investigated, milepost, county and municipality. Revision 4 Pg 2 of 10 Released: 01/2016

Check for Conformance to CIPD Goals It is imperative that all Problem Statements are effectively, efficiently and consistently screened in agreement with the Department s 10-Year Statewide Capital Investment Strategy and project prioritization. As such, CIPD: Identifies whether correcting the potential transportation deficiency noted in the Problem Statement is in general conformity to NJDOT s Capital Investment Strategy goals and objectives and is consistent with the Complete Streets Policy. Recommends advancing the Problem Statement provided funding is available and subject to asset category investment targets. Checks if a Problem Statement is listed in a NJDOT Management System and identifies ranking/priority of the transportation problem. Coordination with Subject Matter Experts During the Problem Statement Review, CIPD will coordinate with several SMEs (e.g., Bureau of Traffic Engineering, Bicycle, Pedestrian Office, and Operations) to investigate if the Problem Statement can be addressed with a quick fix (such as striping work, signage, etc). Coordination with other SMEs such as the Bureau of Traffic Data and Safety, Pavement and Drainage Units, and the Division of Project Management for possible quick fix solutions and management systems evaluations may also be required. Sometimes the SMEs may recommend that geometric improvements may be needed and, due to the complexity of the transportation problem, it should advance to a Field Investigation. Problem Statement Review Recommendation Once the Problem Statement has been reviewed and checked for conformance with CIPD goals, CIPD is prepared to make the following decisions and recommendations: Advance Problem Statement to Concept Development Advance to the Bureau of Maintenance Engineering & Support or Traffic Engineering & Investigations if the Problem Statement appears to be a quick fix project. Any quick fix by means of maintenance work order should take the opportunity to improve safety, access and mobility for non-motorized travel without compromising the safety, efficiency or function of the facility. Similar to projects involving construction and recreation, all maintenance projects must provide alternate routes for bicyclists and pedestrians during the repair of the street. Advance to a Field Investigation because there is not enough information in the Problem Statement Review to make a decision of which path the Problem Statement should follow. A copy of the Management System Input and any other documentation will be provided to DPM by CIPD. Withdraw Problem Statement due to lack of need or duplication. A Problem Screening Report is prepared to document all findings of the Problem Statement review. The report is provided to the Problem Statement initiator and the Division receiving the Problem Revision 4 Pg 3 of 10 Released: 01/2016

Screening (DPM or Maintenance). Once decisions and recommendations are made, Problem Statement database updates are made to reflect changes in status until the Problem Statement is assigned. Data Collection Review Problem Statement The Division of Project Management receives all requests for Field Investigations from CIPD. Upon receipt of the Field Investigation Request, the Project Manager: Reviews and checks the Problem Statement form (TP-1) to ensure that all the pertinent information regarding the transportation problem in question is included and the problem and project goals are well defined. Verifies the problem by contacting the author; uses the straight line diagram to verify problem location. If there is missing information, DPM contacts the author of the Problem Statement and completes the information. Obtains all data collected during the Problem Statement Review. Such data includes, but is not limited to, recent Management System Input, Traffic Data/Crash Data, etc. Conduct Field Trip CIPD notifies DPM that a field investigation is needed for a particular problem. A field investigation would be necessary to further define the problem and provide a cursory evaluation of potential constraints to advancement. The Project Manager may conduct the first field visit without the SMEs in order to become familiar with the transportation problem, surrounding area and potential issues. The first field visit should also be used to generate questions and prepare for any meetings with the SMEs. Request Management System Input The Management System Input will be provided in the Problem Statement Review Package. However, the information may be outdated depending on when the Problem Statement Review or Request for Management System Input was completed. A comparison of the updated Management System Input versus the input from the Problem Statement Review will be performed to reassess the need of the Problem Statement. Perform Supplemental Data Collection (2105) Additional data and information may be needed to assess the transportation problem. Requests for NJDOT data should be made by the Project Manager unless the Project Manager authorizes a consultant to do so. The Project Manager may: Request all data and information needed to evaluate the Problem Statement. Revision 4 Pg 4 of 10 Released: 01/2016

Obtain As-built plans and jurisdictional plans by submitting an Engineering Documents Unit Plan Request Form to the Engineering Documents Unit. Send a request to the Bureau of Traffic Engineering and Investigations for traffic signal plans. This request should include route number, milepost, municipality and county. Request other pertinent document and information from appropriate external source. Conduct Field Meeting/Investigation Field visits with internal stakeholders (SMEs) and external stakeholders (e.g., local officials) to the project site are essential to verify and evaluate the Problem Statement and existing conditions. It also allows an informal meeting to discuss some of the important issues in the field and potential solutions. The field visit should include the following: Soliciting information on existing conditions, note existing features such as utility, ROW, access, drainage, environmental constraints, ITS, transit, bicycle and pedestrian accommodations, etc. and verifying information previously obtained (e.g., structure number), and other issues not covered in the Problem Statement. Discussing potential solutions to the problem. Potential solutions should consider safe access and mobility for all users. Confirming the Problem Statement with input received from the SMEs and external stakeholders in the field. Determine if the project needs to be further studied in Concept Development or can be addressed as a Maintenance project. If it is determined that there is no need, the Problem Statement will be withdrawn. Identifying other potential stakeholders. The Project Manager: Determines the SMEs that should attend the field visit, which will depend on the type of transportation problem to be solved. Prepares project information to distribute to attendees. This may include, maps, Straight Line Diagram (SLD) of the site, Problem Statement, photos, crash data, etc. Disseminates the project information to the appropriate SMEs and requests their presence on the field visit. Provides some guidance to each SME so that they know what is expected of them. Plan to either collect the information gathered in the field or within a set time after they return to the office. Revision 4 Pg 5 of 10 Released: 01/2016

Some potential Internal/External Stakeholders that are invited to attend may be: Applicable SME Units Municipal/County Representative Municipal/County Engineer Local Police Department FHWA Typically, the SMEs that are always invited to attend are Environmental and Quality Management Services. Request Field Investigation Environmental Screening The Environmental Screening is performed to identify environmental concerns, constraints or fatal flaws (wetlands, protected flora and fauna, parkland, etc.) that could influence the range of possible solutions and decision of which path the Problem Statement will follow. A determination is made during the initiation of the Field Investigation whether the screening would be performed by the Bureau of Landscape Architecture and Environmental Solutions (BLAES) or a DPM consultant. If the screening is to be done by BLAES staff, the Project Manager: Requests (via an e-mail) to the BLAES Manager to have an Environmental Specialist assigned to the study. The BLAES Manager will inform the Project Manager when an Environmental Specialist has been assigned. Meets with the Environmental Specialist to discuss the project scope and limits. Sends a memo to the assigned staff with a copy to the Manager requesting the Environmental Screening. The request must include three copies of a map or an aerial. The map(s) or aerial(s) shall be at a reasonable scale (project specific), and shall have the project study area depicted. Ideally, the Environmental Specialist would attend the field visit. Provides the consultant with a copy of the final Environmental Screening Report (ESR) performed by the Environmental Specialist (if a consultant is involved). If Environmental Screening is to be performed by a DPM consultant, the Project Manager will coordinate with BLAES and the DPM consultant. A copy of the draft and final Environmental Screening will be provided to the Environmental Specialist with a copy to the Environmental Manager. Request Crash Rates and Crash Records Crash Rates become critical in supporting the need for the Problem Statement, especially when the Problem Statement is not listed in the Safety Management System. Crash Rates determine how an overall section of the roadway where the Problem Statement is located compares with the statewide average rate. Revision 4 Pg 6 of 10 Released: 01/2016

Crash Records or Police Reports are also a strong indicator of whether a segment of a roadway with deficient or substandard elements is actually in need of repair and attention and thus, further support the need for the Problem Statement. The Project Manager will submit a request for crash rates and crash summary reports (via an Analysis Request Form sent by e-mail) from the Bureau of Safety Programs (BSP). Crash rates and Crash Summary Reports will include all data for crashes occurring at the specified location for the past three years. They also help identify unsafe areas of roadway where repairs are needed. Analyze Crash Rates and Crash Records The Project Manager or DPM consultant will analyze the crash rate, crash summary reports and identify crash type with overrepresented crashes that may be associated with any known sub-standard features that may be the contributing element. Obtain Existing Traffic Data The data should consist of Average Daily Traffic (ADT), Peak hour volumes, pedestrian and bicycle counts, transit ridership or truck percentages, and should be obtained from existing files and databases if possible. The Project Manager: Checks the Bureau of Transportation Data Development Database to obtain existing traffic counts. This Database can be found in the NJDOT-Intranet traffic website. Checks past studies for traffic counts or bicycle/pedestrian counts that were done in the vicinity of the transportation problem. Conduct Existing Traffic Analysis Existing Traffic Analysis (motorists, pedestrians and bicyclists) may be conducted by analyzing traffic data or by performing Level of Service Analysis (LOS). This information will help the department to determine whether improvements to the roadway in question are warranted. The DPM consultant or Project Manager: Performs LOS analysis for the study location. Documents results of the analysis in the Field Investigation Report. Perform Preliminary Utility Investigation A Preliminary Utility Investigation becomes particularly important for drainage Problem Statements. Sometimes it is helpful to know what subsurface utility is along the roadway to determine possible utility impacts and resulting order of magnitude estimate for any proposed solutions. Through observation, the Project Manager records existing visible utilities/potential utilities impacts while conducting the Field Meeting/Investigation. Revision 4 Pg 7 of 10 Released: 01/2016

Field Investigation Screening Local Outreach Meeting (optional depending on the complexity of the project) Early communication with local officials is critical in thoroughly defining the need. Local officials are familiar with the area; know the issues surrounding the transportation problem. As such, they will be able to provide detailed input as to the existing conditions or perceptions of the existing conditions (how it is affecting their town, traffic patterns, pedestrian patterns, future plans, etc.) and contribute to the project need. Local outreach is important to reach consensus in defining the problem and possibly finding a range of solutions to the problem. The Project Manager: Requests (via an e-mail) a Local Officials Meeting from the Division of Community and Constituent Relations (CCR). CCR will coordinate with the city, township, municipal Manager, Administrator, or appropriate representative a time and location convenient for the local officials. The location is usually within the host s municipal offices or on-site. The meeting should be set at least three weeks in advance. CCR will notify the Project Manager of the date, time and place of the meeting. Sometimes the Project Manager may assist CCR in arranging the Local Officials Meeting and authorize the Task Order Consultant to contact the municipality via email or telephone. Therefore, it is important to notify CCR and invite them to the Local Officials Meeting. Prepares meeting materials. These may include map/aerial of transportation problem location, management system input and an agenda. Prepares meeting minutes to document input from local officials. Minutes will be incorporated in the Field Investigation Report. A copy of the minutes will be sent to the local officials. Solicits additional data or information that the DOT does not gather. Additional data needs will depend on the type of problem. This may include police reports of the most recent crashes, a copy of township master plan, bicycle/pedestrian plans, transit plans, traffic studies conducted by county or local municipality, information about recently completed or pending work orders. Revised Problem Statement Scope/Project Limits The Project Manager analyzes the collected data, meets with SMEs and external stakeholders again to determine if the transportation problem identified is correct and based on their input, the Project Manager: Reviews the original Problem Statement. Further refines the definition of the Problem Statement. The main reason to refine the definition of the Problem Statement and project limits is to thoroughly verify and define the problem and overall project goals. Revision 4 Pg 8 of 10 Released: 01/2016

Alternatives A discussion should be undertaken by all stakeholders to consider the range of alternatives. Develop Order-of-Magnitude Cost Estimates The Project Manager or DPM consultant will develop approximate cost estimates for a range of improvements if appropriate. Prepare Draft Problem Screening Report The draft Problem Screening Report is prepared by CIPD and documents all the work that was completed during Field Investigation and includes the findings and recommendations. It may contain the following: Original Problem Statement Management System Rankings/Input Traffic/Crash Data (when appropriate) Environmental Screening Report Minutes of Field Trip Investigation and Local Officials Meeting (provided by DPM) Photographs Recommendation to advance to Concept Development for further study, Maintenance for the implementation of Quick Fix Solution, withdraw the Problem Statement or defer to a future Study & Development Program. Prepare Final Problem Screening Report CIPD will incorporate comments received from reviewing the draft Problem Screening Report into the final report. The report includes an Executive Summary, management Systems Overview, Risk Analysis, the Field Investigation summary if applicable, and the Final Problem Statement Screening Recommendation. CPSC/CPC Approval CPC Approval is requested by CIPD when the project advances to maintenance or CD without a field investigation. CPC approval is requested by DPM when a field investigation is performed. When the Field Investigation is completed, the Project Manager: Prepares a memo on behalf of the Executive Regional Manager to the CIPD Director to inform of the Field Investigation findings and recommendations. Request for advancement by CPC is made at this time. Revision 4 Pg 9 of 10 Released: 01/2016

CIPD: Reviews the Field Investigation recommendations and, if appropriate, requests that the proposed project be placed on the CPSC Agenda for recommendation and approval. If appropriate, checks if funding is available to advance the proposed project for further study. Revision 4 Pg 10 of 10 Released: 01/2016