Pre-Publication Draft - September 21, 2016 APD MARINE LOADING COLLECTION EFFICIENCY GUIDANCE

Similar documents
Title V. Model General Permit Template SERIES 2 LOADING RACKS. Template # SJV-LR-2-1

e-cfr Data is current as of October 16, 2017

Title V. Model General Permit Template SERIES 1 LOADING RACKS. Template # SJV-LR-1-1

RULE PHARMACEUTICAL AND COSMETIC MANUFACTURING OPERATIONS (Effective 10/18/88: Rev. Adopted & Effective 5/15/96)

DECLARATION OF INSPECTION

PRE-FIRE PLAN CERTIFICATION

MSC Guidelines for the Review of Inland Tank Barge Cargo Authority

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT FINAL DRAFT STAFF REPORT

DRAFT. AIR EMISSION PERMIT NO Total Facility Operating Permit IS ISSUED TO. NuStar Pipeline Operating Partnership LP

DALLAS COUNTY PARK CITIES MUNICIPAL UTILITY DISTRICT DROUGHT CONTINGENCY PLAN ADOPTED: APRIL 9, 2019 PREPARED BY:

MSC Guidelines for Review of Oceangoing Tank Barge Cargo Authority Procedure Number: C1-42 Revision Date: 08/01/2018

San Joaquin Valley Air Pollution Control District. Procedures for Quantifying Fugitive VOC Emissions At Petroleum and SOCMI Facilities

RULE CRUDE OIL STORAGE TANK DEGASSING OPERATIONS (Adopted 11/8/94) b. Has a storage capacity greater than 2,000 barrels.

RULE GASOLINE AND ROC LIQUID STORAGE TANK DEGASSING OPERATIONS (Adopted 11/8/94)

DRAFT Procedures for Quantifying Fugitive VOC Emission Sources at Petroleum Facilities

State of the Art (SOTA) Manual for Volatile Organic Compound Storage Tanks (greater than or equal to 2,000 gallons)

MSC Guidelines for the Review of Oceangoing Tank Barge Cargo Authority Procedure Number: C1-42 Revision Date: March 16, 2012

Baton Rouge Office Petroleum Drive Baton Rouge, Louisiana (225)

Methane Emission Standards for Crude Oil and Natural Gas Facilities

Newport News Shipbuilding Contractor Environmental, Health and Safety Resource Manual Paint Tracking Requirements

The rules and regulations, as part of this document, shall apply to all premises serviced by the public water system of the Northeast Water System.

RULES OF TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF AIR POLLUTION CONTROL

Guideline for In-Service Assessment of Ammonia Refrigeration Plants

2011 Barnett Shale Air Quality Compliance Update. 30 TAC & 40 CFR 98 Subpart W

Cargo Handling Sheet. Neodene 6. Document Date: 22 December 2017 Revision 8

Transmission Pipeline Opportunities. Advancing Project Development in India through Public Private Partnerships

Accreditation of Hot Tap Organizations

Cargo Handling Sheet Neodene 6 Document Date: 01 April 2018 Revision 9 Cargo Handling Sheets are for the use of vessels chartered by Shel Chemicals

Guidance for. LNG Fuel Ready Ships

(4) Production inspection is the inspection that must initially be conducted on each newly manufactured IBC.

AIR EMISSION PERMIT NO Administrative Amendment IS ISSUED TO. Magellan Midstream Partners, LP

TITLE 64 LEGISLATIVE RULE BUREAU FOR PUBLIC HEALTH SERIES 15 CROSS-CONNECTION CONTROL AND BACKFLOW PREVENTION. use.

East Building, PHH-30 U.S. Department New Jersey Avenue S.E. of Transportation Washington, D.C DOT-SP (SIXTH REVISION)

Page 1 Agricultural Superintendent (Inspector) Certification Programme (Vegetable Oils) Training Requirements List

EXPIRATION DATE: (FOR RENEWAL, SEE 49 CFR )

INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES

NSPS Subpart OOOO Overview

Cargo Handling Sheet. Methyl Alcohol (Methanol) Document Date: 01 April 2018 Revision 6

RESOLUTION MEPC.249(66) (Adopted on 4 April 2014) AMENDMENTS TO THE CODE FOR THE CONSTRUCTION AND EQUIPMENT OF SHIPS CARRYING DANGEROUS CHEMICALS IN

NSPS OOOOa Fugitive Emissions Requirements

Cargo Handling Sheet. Styrene Monomer. Document Date: 01 April 2018 Revision 9

SHIP ENERGY EFFICIENCY MANAGEMENT PLAN SEEMP. Edilberto Peralta Lloyd s Register Operations Manager Central and South America

Drought Contingency Plan for Denton County Fresh Water Supply District 6

CONTAINER INSPECTION JOB AID

Tanks built under these specifications shall meet the requirements of and

Frequently Asked Questions Regarding Rule 2260, Registration Requirements for Equipment Subject to California s Oil and Gas Regulation

CRYOGENIC FLUIDS CHAPTER 32

Guidance on Estimating Condensate and Crude Oil Loading Losses from Tank Trucks

PERMIT TO INSTALL. Table of Contents

Graphs as required by 46 CFR (b)(3) Curve of Loading Rate vs. Pressure Drop

Model Drought Contingency Plans

Maintenance Program Guideline for Owners of Ammonia Plants

AMENDATORY SECTION SECTION 1.07 DEFINITIONS

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

ConocoPhillips Company Americas Supply & Trading Q & Q Determination and Loss Control

Standards of Performance for Crude Oil and Natural Gas Production, Transmission and Distribution (40 CFR 60, Subpart OOOO) Air Quality Compliance

ROCHESTER PUBLIC UTILITIES PUBLIC WATER SYSTEM CROSS-CONNECTION CONTROL AND BACKFLOW PREVENTION PROGRAM FOR ROCHESTER, MINNESOTA

EXPIRATION DATE: August 31, 2018

Cargo Handling Sheet. Phenol. Document Date: 01 April 2018 Revision 9. Cargo Handling Sheets are for the use of vessels chartered by Shell Chemicals

RULE 344. PETROLEUM SUMPS, PITS AND WELL CELLARS. (Adopted 11/10/1994) 1. The provisions of this rule shall not apply to spill containments.

Cargo Handling Sheet. Styrene Monomer. Document Date: 23 January 2019 Revision 10

SANTA BARBARA COUNTY AIR POLLUTION CONTROL DISTRICT POLICIES AND PROCEDURES. Policy No Draft Div Pol Yr

Regulations of the People s Republic of China on the Emergency. Prevention and Handling of Marine Pollution Caused by Ships

Nancy Fitz U.S. EPA Office of Pesticide Programs December 9, 2014

Georgia Drycleaner Compliance Calendar

PERCHLOROETHYLENE DRY CLEANERS

Small Quantity Generator (SQG) of Hazardous Waste

TITLE 35 LEGISLATIVE RULES BUREAU OF ENVIRONMENT DIVISION OF ENVIRONMENTAL PROTECTION OFFICE OF OIL AND GAS

OCEMA Recommended Best Practice for the Acceptance and Transmission of Verified Gross Mass for U.S. Export Cargoes. June 28, 2016

The permit decrees that have been amended are indicated in italics. Permit decrees for the prevention of contamination

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT COMPLIANCE DEPARTMENT COM 2025

General Permit (GP-016A) for Manufacturing and Materials Handling Equipment

The permit decrees that have been amended are indicated in italics. Permit decrees for the prevention of contamination

Cooling Off State Investigations Show Reductions in Cooling Tower Emissions

RULE 4651 SOIL DECONTAMINATION OPERATIONS (Adopted April 16, 1992; Amended December 17, 1992; Amended September 20, 2007)

SECTION G. East Central Special Utility District DROUGHT CONTINGENCY PLAN

LOCK N SAFE LUMBER SORTER BIN RESTRAINT SYSTEMS. OPERATING & MAINTENANCE MANUAL Version MT. LNS Services A Division of Lexspan LP

APPROVAL CA (SECOND REVISION) ISSUED BY THE COMPETENT AUTHORITY OF THE UNITED STATES EXPIRATION DATE: December 31, 2022

Final Approval for Installation of Gasoline Dispensing Facility with Stage I Vapor Recovery

SOLAS Regulation 2 Verified Gross Mass

DEPARTMENT OF HOMELAND SECURITY U.S. CUSTOMS AND BORDER PROTECTION. CBP Dec

Air Regulatory Issues Unconventional Gas and Light Tight Oil Developments Infrastructure Consequences

Air Quality 101. Presentation to the Transportation and Environment Committee

CRYOGENIC FLUIDS CHAPTER 32

San Diego County Air Pollution Control District Old Grove Road San Diego, CA (858)

Revised Total Coliform Rule (RTCR) Level 1 Assessment Form

Regulatory Guide 2.19

Cargo Handling Sheet. Name: Mid Cut Fatty Alcohol. Document Date 6 May 2015 Original document

Revised Ship Inspection Report (SIRE) Programme

Revised Ship Inspection Report (SIRE) Programme

Cargo Handling Sheet. Name Palmerol Document Date 26 March 2015 Revision 1

New Source Performance Standards (NSPS) 40 CFR 60 Subpart OOOO for Storage Tanks

REPUBLIC OF PANAMA. Ministry of Finance and Treasury

ARTICLE IV CROSS CONNECTION CONTROL AND BACKFLOW PREVENTION

Backflow Prevention by Containment & Cross-Connection Control Program Easton Suburban Water Authority

Title V. Model General Permit Template SERIES 1 FLARES. Template # SJV-FL-1-1

ARKANSAS DEPARTMENT OF ENVIRONMENTAL QUALITY

POTENTIAL TO EMIT LIMITATIONS FOR PART 70 SOURCES. (Adopted 6/15/1995, revised 1/18/2001 and 1/20/2011)

TITLE 252. DEPARTMENT OF ENVIRONMENTAL QUALITY CHAPTER 690. WATER QUALITY STANDARDS IMPLEMENTATION SUBCHAPTER 1. INTRODUCTION

To ensure safety at sea. To prevent human injury or loss of life. To avoid damage to the environment and to the ship.

Transcription:

Introduction APD MARINE LOADING COLLECTION EFFICIENCY GUIDANCE TCEQ has indicated that it will publish the final version to its website during October 2016. For more information, visit www.tceq.texas.gov, or contact Peter Weaver at rpweaver@ilta.org. The TCEQ s previous guidance regarding marine loading collection efficiencies for ocean-going marine vessels has been 95 percent. With ILTA s noted commitments resulting in as many as 50 ship testing results, the TCEQ has evaluated the information confirming that collection efficiencies for inerted, ocean-going vessels were well beyond 95%, and in consideration of federal and state regulations applicable to ship loading, the TCEQ Air Permits Division (APD) agrees that a shift in our policy regarding collection efficiency is warranted. The control efficiencies listed below are supported by the test data and information submitted by ILTA. Category 1: 99.0% - No additional testing required Category 2: >99.0 to 99.49% 1 initial demonstration of compliance test within 12 months Category 3: 99.5 to 99.89% 1 test per year for 3 years Category 4: 99.9% 3 tests per year for 5 years Further, applicants that have accepted more stringent testing frequencies may revise their permits with the adjusted requirements. This change to testing requirements can be accomplished by permit alteration. However, if the permit holder proposes to increase loading throughput, a permit amendment will be necessary to account for potential actual increases as well as any possible increases from other facilities (such as storage tanks). Credit will be given for tests that have already been completed provided that the tests are deemed acceptable by the TCEQ and that they have been conducted over an appropriate time frame. If granted, credit for prior tests will be noted in the altered or amended permit. Use of the higher collection efficiencies by a regulated entity is contingent upon acceptance of revised permit conditions appropriate to the chosen category of collection efficiency. Note that the collection efficiencies represented by the applicant are enforceable representations, and the required tests will serve to demonstrate compliance. Any subsequent test that results in a measured collection efficiency lower than the represented value will be considered as a violation of the permit, and will be subject to possible enforcement action. For Title V sources, non-compliant tests must be reported as permit deviations. The use of 99% capture efficiency is acceptable for sources authorized under Permit by Rule (PBR) provided the regulated entity certifies to following the additional monitoring, inspection, and recordkeeping requirements indicated in the attached Special Condition No. 1. The use of collection efficiencies higher than 99% will require testing to demonstrate compliance and will not be authorized via PBR. Through this process, it has been well demonstrated that facilities adhering to the additional monitoring, inspection, and recordkeeping requirements in the attached Special Condition No. 1 have regularly achieved 99 percent capture efficiency. If an applicant commits to and follows these requirements, the facility should achieve 99 percent capture efficiency. Documentation of the compliance with the requirements in Special Condition No. 1 will serve as a demonstration of compliance rather than testing. As testing would not be required it would be acceptable to authorize a Page 1 09.21.2016

facility with 99% capture efficiency and representations of compliance required in the Special Condition No. 1 with the applicable PBR. Special Conditions for Category 1 (99.0%) 1. The following additional requirements apply to loading of a VOC which has a vapor pressure equal to or greater than 0.5 pounds per square inch absolute (psia) under actual storage conditions onto inerted marine vessels (ships). A. Before loading, the owner or operator of the marine terminal shall verify that the marine vessel has passed an annual vapor tightness test as specified in 40 CFR 63.565(c) (September 19, 1995) or 40 CFR 61.304(f) (October 17, 2000) within the previous twelve months. B. The pressure at the vapor collection connection of an inerted marine vessel must be maintained such that the pressure in a vessels cargo tanks do not go below 0.2 pounds per square inch gauge (psig) or exceed 80% of the lowest setting of any of the vessel s pressure relief valves. The lowest vessel cargo tank or vent header pressure relief valve setting for the vessel being loaded shall be recorded. Pressure shall be continuously monitored while the vessel is being loaded. Pressure shall be recorded at fifteen minute intervals. C. VOC loading rates shall be recorded during loading. The loading rate must not exceed the maximum permitted loading rate. D. During loading, the owner or operator of the marine terminal or of the marine vessel shall conduct audio, olfactory, and visual checks for leaks once every 8 hours for on-shore equipment and on board the ship. (1) If a liquid leak is detected during loading and cannot be repaired immediately (for example, by tightening a bolt or packing gland), then the loading operation shall cease until the leak is repaired. (2) If a vapor leak is detected by sight, sound, smell, or hydrocarbon gas analyzer during the loading operation, then a "first attempt" shall be made to repair the leak. Loading operations need not be ceased if the first attempt to repair the leak is not successful provided that the first attempt effort is documented by the owner or operator of the marine vessel and a copy of the repair log is made available to a representative of the marine terminal. (3) If the attempt to repair the leak is not successful and loading continues, emissions from the loading operation for that ship shall be calculated assuming a collection efficiency of 95%. (4) Date and time of each inspection shall be noted in the operator's log or equivalent. Records shall be maintained at the plant site of all repairs and replacements made due to leaks. These records shall be made available to representatives of the Texas Commission on Environmental Quality (TCEQ) upon request. Page 2 09.21.2016

Special Conditions for Category 2: (>99.0-99.49%) follows to demonstrate a collection efficiency of 99.49% as represented in the permit application. one vessel. The test shall be conducted within twelve months of the first loading of an inerted ocean-going marine vessel. Page 3 09.21.2016

Special Conditions for Category 3: (99.5-99.89%) follows to demonstrate a collection efficiency of (99.5 99.89%) as represented in the permit application. one vessel per year for 3 years. The first test shall be conducted within twelve months of the first loading of an inerted ocean-going marine vessel. 3. The following requirements apply if a test conducted per Condition 2 shows collection efficiency lower than assumed in permit emission calculations. A. Emissions from the tested ship shall be calculated at the measured collection efficiency instead of the efficiency assumed for permit calculations. B. Emissions from future instances of ship loading shall continue to be calculated at the lower measured collection efficiency until a test result confirming the permitted collection efficiency is obtained. C. As an alternative to assuming the lower measured collection efficiency for subsequent loading as specified in paragraph B, the regulated entity can assume the permitted collection efficiency in subsequent loading operations provided that the loading activity is monitored with an optical gas imaging instrument as defined in 30 TAC 115.358 and no leaks are observed. If a leak is observed, the lower measured collection efficiency must be used. The observations must occur during a minimum 6 hour period as close to the end of loading as possible. Page 4 09.21.2016

Special Conditions for Category 4: (99.9 %) follows to demonstrate a collection efficiency of 99.9% as represented in the permit application. three vessels per year for five years. The first test shall be conducted within twelve months of the first loading of an inerted ocean-going marine vessel. 3. The following requirements apply if a test conducted per Condition 2 shows collection efficiency lower than assumed in permit emission calculations. A. Emissions from the tested ship shall be calculated at the measured collection efficiency instead of the efficiency assumed for permit calculations. B. Emissions from future instances of ship loading shall continue to be calculated at the lower measured collection efficiency until a test result confirming the permitted collection efficiency is obtained. As an alternative to assuming the lower measured collection efficiency for subsequent loading as specified in paragraph B, the regulated entity can assume the permitted collection efficiency in subsequent loading operations provided that the loading activity is monitored with an optical gas imaging instrument as defined in 30 TAC 115.358 and no leaks are observed. If a leak is observed, the lower measured collection efficiency must be used. The observations must occur during a minimum 6 hour period as close to the end of loading as possible. Page 5 09.21.2016