LAKE SHORE BOULEVARD WEST

Similar documents
CONSTRUCTION SPECIFICATION FOR TEMPORARY PROTECTION SYSTEMS

ONTARIO PROVINCIAL STANDARD SPECIFICATION

CONSTRUCTION SPECIFICATION FOR NOISE BARRIER SYSTEMS

Specialty Applications. for Keystone Walls

July 5, 2018 Project No

CONSTRUCTION SPECIFICATION FOR PIPELINE INSTALLATION BY TUNNELLING

Special Provision No. 799F01 March 2012 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF NOISE BARRIER TABLE OF CONTENTS

Special Provision No. 599F01 May 2004 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF NOISE BARRIER TABLE OF CONTENTS

A. Section includes temporary excavation support and protection systems.

CONSTRUCTION SPECIFICATION FOR TUNNELLING

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT

Helical Pile/Anchor Deep Foundation MODEL SPECIFICATION

Misan University - College of Engineering Civil Engineering Department

SPECIAL INSPECTION AND TESTING AGREEMENT

Earth Retention Systems

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)

UNDERGROUND UTILITY CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION

Special Provision No. 599S22 March 2018 REQUIREMENTS FOR RETAINED SOIL SYSTEMS (RSS)

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT

The requirements for the above tender items are contained in OPSS 942.

Lantz-Boggio Architects, P.C LBA Project No

REQUIREMENTS FOR SERVICES UNDER THE RAILWAY CORRIDOR (NON-QR SERVICES)

1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe.

SPECIFICATIONS FOR STRUCTURAL EXCAVATION

DESIGN AND CONSTRUCTION OF DERRY ROAD AND CANADIAN NATIONAL RAIL GRADE SEPARATION

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF POLES

SECTION HORIZONTAL DIRECTIONAL DRILLING

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)

SECTION / ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM)


Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)

STANDARD DESIGN NOTES 1 / 2

DESIGN AND INSTALLATION OF THE SHORING AND DECKING FOR TTC YONGE STATION

CONSTRUCTION SPECIFICATION FOR EXCAVATING AND BACKFILLING - STRUCTURES

HYBRID EXCAVATION SUPPORT SYSTEM FOR THE UNION STATION REVITALIZATION PROJECT

STATEMENT OF SPECIAL INSPECTION FORM

CHAPTER 11: WALLS.

SPECIAL INSPECTION AGREEMENT

Upon speaking with the representatives with Technical Foundations as well as Walder Foundations, it was determined that:

CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS SCOPE...3 TS DEFINITIONS...3

Underpinning. Underpinning

Amendment to OPSS 416 (Nov 2013) Construction Specification for Pipeline and Utility Installation by Jacking and Boring

Advanced Construction Techniques. Underpinning. Underpinning

Statement of Special Inspection Requirements

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

ENGINEERING DIRECTIVE

CONSTRUCTION SPECIFICATION FOR GUIDE RAIL ENERGY ABSORBING TERMINALS

CONSTRUCTION SPECIFICATION FOR ERECTION OF POLES

Soldier Pile Walls Soil Nail Systems Secant Piling Soil Mix Walls Underpinning Slope Stabilization

CONSTRUCTION SPECIFICATION FOR STANDARD HIGHWAY FENCE

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES

SPECIFICATION OF JACKED ANCHOR FOR RETAINING STRUCTURES

PLANNING DEPARTMENT 701 OCEAN STREET, 4 TH FLOOR, SANTA CRUZ, CA (831) FAX: (831)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

SCALE BAR 1:2500 RM OF WOODLANDS OVERALL PLAN - LOW PRESSURE SEWER MAIN. Certificate of Authorization JESSICA MANNESS ENGINEERING, INC. No.

CONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION BY JACKING AND BORING

Construction Specification for General Excavation

SPECIAL INSPECTION AGREEMENT FORM

Soil Nailing Earth Shoring System A Ten-Year Update

CONSTRUCTION SPECIFICATION FOR ERECTION OF POLES

CONSTRUCTION SPECIFICATION FOR STANDARD HIGHWAY FENCE

CONSTRUCTION SPECIFICATION FOR CONCRETE BARRIERS

SPECIAL INSPECTION AGREEMENT

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES

CONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION BY JACKING AND BORING

CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE

CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING

This specification refers to the latest (current) edition of the following: For the purposes of this specification the following definitions apply:

MagnumStone Specifications Gravity

Table of Contents. List of Drawings

SPECIAL INSPECTION AND OBSERVATION PROGRAM CITY OF CONCORD BUILDING DIVISION. Project Address:

III. TECHNICAL SPECIFICATIONS DIVISION 56 BORED PIPE

GENERAL PLAN OF SERVICING

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

Excavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations.

UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04

ITEM 432 TUNNEL CONSTRUCTION

Chapter 3: Permit Procedures and Requirements

CONSTRUCTION SPECIFICATION FOR CONCRETE FOOTINGS AND MAINTENANCE PLATFORMS FOR HIGH MAST LIGHTING POLES

SECTION TRENCHING & BACKFILLING

SUPPLEMENTARY SECTION: STANDARD SPECIFICATIONS PAGE 1 STORMWATER MAINS & CULVERTS MAY 2018

CONCRETE FORMWORK. .2 CSA , Supplement No.1 to CAN/CSA , Engineering Design in Wood. .4 CSA O151, Canadian Softwood Plywood.

Sport Systems Canada Inc. Section Angle Framed Bleachers Page 1

TABLE OF CONTENTS. 1.0 INTRODUCTION 1.1 Greenstone Structural Engineered Panels 1.2 Drawing and Element Numbers

CONSTRUCTION SPECIFICATION FOR POLE ERECTION

APPENDIX I. Conceptual Design - Salem Road and McKay Road Trunk Watermain and Sanitary Sewer

CONSTRUCTION SPECIFICATION FOR STANDARD HIGHWAY FENCE

5-20 FOUNDATION REPORT/GEOTECHNICAL DESIGN

1 Introduction. 2 Office Locations/Map. 3 General Requirements. 4 Structures and Planting. 5 Equipment Crossings. 6 Excavations. 7 Utility Crossings

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOR UNDERGROUND UTILITIES

CONSTRUCTION SPECIFICATION FOR GROUNDING

The designer shall also submit additional information required by the University as described and underlined below.

Northport Berth 3 design and construction monitoring

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS

Installation and Maintenance Manual for EMH Freestanding Workstation Jib Cranes

PUBLIC WORKS DEPARTMENT GENERAL NOTES

City of Westerville Guide to Commercial Inspections

Transcription:

R512 1 1x 2 5 7 8 8x 9 10 10x 11 12 1 1 15 70 5100 9120 80 8750 12000 8750 80 5120 170 5200 20 90 8100 800 555 ASSUMED OUTLINE OF ABUTMENT FOOTING ASSUMED OUTLINE OF ABUTMENT FOOTING R5125 DIMENSIONS AND ELEVATIONS OF EXISTING BRIDGE FOOTINGS TO BE VERIFIED ON SITE EXISTING T.T.R. BRIDGE 72 EXISTING BRIDGE COLUMN (TYP.) EXISTING BRIDGE ABUTMENT CANADIAN NATIONAL RAILWAY TRACKS 8 8 CANADIAN NATIONAL RAILWAY TRACKS 8 SHOTCRETE 150mm THICK AIR CANADA CENTRE AIR CANADA CENTRE H H B B H B H FH H V N M L K J H G F E D C B A 12000 9700 2180 5120 1 10000 585 2180 9700 R5122 R5121 R5120 EXISTING L.R.T. R5119 R5117 R511 R5115 R511 R511 BB AA R5112 R512 5700 27 ±21 _PWR 2797 TIEBACK ENCROACHMENT = 500± ±219 TIEBACK ENCROACHMENT = 7200± 750Ø CONC. STORM B 00 1000Ø HOLE FILLER 19 1 00 Bell Canada 00 00 11 Bell Canada ±211 H H FH 09 125 187 2725 200 SPACES @ 1950 c/c = 8850 100 200 100 200 1950 1950 INCOMING HUDRO DUCTBANK INCOMING HUDRO DUCTBANK 5 W200x CORNER BRACE CONTRACTOR TO DAYLIGHT EXISTING BELL CONDUIT PRIOR OF CAISSON INSTALLATION B ALL WORK TO RELOCATE AND/OR PROTECT BELL STRUCTURE AND CABLING MUST BE COMPLETE PRIOR TO EXCAVATION WORK BEGINNING. IF THE PROPOSED EXCAVATION FAL WITHIN THE PREFERRED MCR HORIZONTAL CLEARANCE OF 1.0M FROM EXISTING BELL CABLE/CONDUIT THEN BELL AUTHORIZED DRAWINGS MUST FIRST BE PROVIDED FOR THE CABLE AND CONDUIT TO BE EXPOSED/SUPPORTED/PROTECTED BY A BELL APPROVED CONTRACTOR. A BELL APPROVED INSPECTOR MUST BE ONSITE DURING ANY CONSTRUCTION ACTIVITIES IN THE VICINITY OF BELL INFRASTRUCTURE. ANY DAMAGES TO BELL PLANT AT TIME OF CONSTRUCTION WILL RESULT IN A CLAIM TO HINES CANADA, 200 KING STEET WEST, SUITE 1805,, CANADA M5H T. PLEASE CO-ORDINATE WITH KEN BUTT 1-0-579 PRIOR TO WORK COMMENCING. TIEBACK ENCROACHMENT = 8800± W10x11 STUBBED WALER 1107 172 1550 1550 1577 1709 1950 1950 1950 195 1950 1950 170 SPACES @ 1950 c/c = 5850 170 CONTRACTOR TO DAYLIGHT EXISTING BELL CONDUIT PRIOR OF CAISSON INSTALLATION INCOMING HUDRO DUCTBANK 750Ø CONC. STORM PILES 89 TO 108 ARE STRUCTURALLY INTEGRATED INTO CRASH WALL SYSTEM (PILES ONLY) PILES AND FILLERS TO BE CONSIST OF 0MPa AND 15MPa RESPECTIVELY. ALL WORK TO RELOCATE AND/OR PROTECT BELL STRUCTURE AND CABLING MUST BE COMPLETE PRIOR TO EXCAVATION WORK BEGINNING. IF THE PROPOSED EXCAVATION FAL WITHIN THE PREFERRED MCR HORIZONTAL CLEARANCE OF 1.0M FROM EXISTING BELL CABLE/CONDUIT THEN BELL AUTHORIZED DRAWINGS MUST FIRST BE PROVIDED FOR THE CABLE AND CONDUIT TO BE EXPOSED/SUPPORTED/PROTECTED BY A BELL APPROVED CONTRACTOR. A BELL APPROVED INSPECTOR MUST BE ONSITE DURING ANY CONSTRUCTION ACTIVITIES IN THE VICINITY OF BELL INFRASTRUCTURE. ANY DAMAGES TO BELL PLANT AT TIME OF CONSTRUCTION WILL RESULT IN A CLAIM TO HINES CANADA, 200 KING STEET WEST, SUITE 1805,, CANADA M5H T. PLEASE CO-ORDINATE WITH KEN BUTT 1-0-579 PRIOR TO WORK COMMENCING. 11 SPACES @ 000 c/c = 000 GARDINER EXPRESSWAY (ABOVE) ±15781 1958 5 1550 0 SPACES @ 1950 c/c = 78000 2 SPACES @ 000 c/c = 78000 GARDINER EXPRESSWAY (ABOVE) LAKE SHORE BOULEVARD WEST TIEBACK ENCROACHMENT = 800± 180 185 28 SPACES @ 1950 c/c = 500 ±10750 ±2597 EXISTING TIEBACKS GENERAL CONTRACTOR IS NOT TO DISTURB 18 YONGE STREET PERMANENT WEST SHORING WALL. AT ANY POINT DURING THE WORK 18 YONGE CONDOMINIUMS 18 YONGE STREET, TORONTO, ON. GENERAL CONTRACTOR TO SHAVE ENCROACHING PORTION OF 18 YONGE STREET TEMPORARY NORTH SHORING WALL TO TO FACILITATE CONSTRUCTION OF RAMP STRUCTURE. PILES 151 TO 17 ARE STRUCTURALLY INTEGRATED INTO CRASH WALL SYSTEM (PILES AND TIEBACK) PILES AND FILLERS TO BE CONSIST OF 0MPa AND 15MPa RESPECTIVELY. OPENINGS TO BE CREATED AT PERMANENT TIEBACK LOCATIONS TO ALLOW FOR REVIEW AND MAINTENANCE. PILES 17 TO 19 ARE STRUCTURALLY INTEGRATED INTO CRASH WALL SYSTEM (PILES ONLY) PILES TO BE CONSIST OF 0MPa CONCRETE. 18 YONGE CONDOMINIUMS 18 YONGE STREET, TORONTO, ON. CUT PILE AND FILLERS AND REINFORCE WITH SHOTCRETE AND NAI AS NECESSARY. NOTIFY SHORING ENGINEER OF FIELD DIMENSION TO VERIFY DESIGN ASSUMPTIONS. ±98 2850 2850 172 YONGE STREET 11 01-FEB-201 100% CD SUBMISSION FOR REVEIW 01-AUG-2015 50% CD SUBMISSION 1 1-OCT-201 0% DD SUBMISSION EXTENDED FOR 12 HOURS Tel.: 1-798-005 Fax: 1-798-0518 EXCAVATION SHORING KEY PLAN AND NOTES 01-FEB-201 LAKE SHORE BOULEVARD WEST 1:200 SH1

18 YONGE CONDOMINIUMS 18 YONGE STREET, TORONTO, ON. ±2597 ±10750 TIEBACK ENCROACHMENT = 800± 2 SPACES @ 000 c/c = 78000 11 01-FEB-201 100% CD SUBMISSION FOR REVEIW 01-AUG-2015 50% CD SUBMISSION 1 1-OCT-201 0% DD SUBMISSION GARDINER EXPRESSWAY (ABOVE) EXTENDED FOR 12 HOURS LAKE SHORE BOULEVARD WEST Tel.: 1-798-005 Fax: 1-798-0518 EXCAVATION SHORING PARTIAL PLAN AND NOTES 01-FEB-201 1:100 SH2

G R5119 ±219 SPACES @ 1950 c/c = 8850 FH F CONTRACTOR TO DAYLIGHT EXISTING BELL CONDUIT PRIOR OF CAISSON INSTALLATION R5117 AIR CANADA CENTRE E 9700 R511 D C 2180 11 01-FEB-201 100% CD SUBMISSION FOR REVEIW 585 R5115 01-AUG-2015 50% CD SUBMISSION B TIEBACK ENCROACHMENT = 7200± 1 1-OCT-201 0% DD SUBMISSION 10000 R511 Bell Canada B 00 ALL WORK TO RELOCATE AND/OR PROTECT BELL STRUCTURE AND CABLING MUST BE COMPLETE PRIOR TO EXCAVATION WORK BEGINNING. IF THE PROPOSED EXCAVATION FAL WITHIN THE PREFERRED MCR HORIZONTAL CLEARANCE OF 1.0M FROM EXISTING BELL CABLE/CONDUIT THEN BELL AUTHORIZED DRAWINGS MUST FIRST BE PROVIDED FOR THE CABLE AND CONDUIT TO BE EXPOSED/SUPPORTED/PROTECTED BY A BELL APPROVED CONTRACTOR. A BELL APPROVED INSPECTOR MUST BE ONSITE DURING ANY CONSTRUCTION ACTIVITIES IN THE VICINITY OF BELL INFRASTRUCTURE. ANY DAMAGES TO BELL PLANT AT TIME OF CONSTRUCTION WILL RESULT IN A CLAIM TO HINES CANADA, 200 KING STEET WEST, SUITE 1805,, CANADA M5H T. PLEASE CO-ORDINATE WITH KEN BUTT 1-0-579 PRIOR TO WORK COMMENCING. EXTENDED FOR 12 HOURS A 27 750Ø CONC. STORM 200 2725 INCOMING HUDRO DUCTBANK 1000Ø HOLE FILLER ±211 09 125 11 SPACES @ 000 c/c = 000 5 1550 B B R511 BB 5700 5 750Ø CONC. STORM TIEBACK ENCROACHMENT = 8800± ±15781 Tel.: 1-798-005 Fax: 1-798-0518 AA ±21 H R5112 EXCAVATION SHORING PARTIAL PLAN H H B GARDINER EXPRESSWAY (ABOVE) 01-FEB-201 LAKE SHORE BOULEVARD WEST 1:100 SH

R512 1 1x 2 5 7 8 8x 9 10 10x 70 5100 9120 80 8750 12000 8750 80 5120 170 5200 20 ASSUMED OUTLINE OF ABUTMENT FOOTING R5125 DIMENSIONS AND ELEVATIONS OF EXISTING BRIDGE FOOTINGS TO BE VERIFIED ON SITE EXISTING T.T.R. BRIDGE 72 EXISTING BRIDGE ABUTMENT CANADIAN NATIONAL RAILWAY TRACKS EXISTING BRIDGE COLUMN (TYP.) H B V N M L 1 5120 2180 R512 2797 19 1 187 100 200 100 200 1950 1950 INCOMING HUDRO DUCTBANK INCOMING HUDRO DUCTBANK W200x CORNER BRACE W10x11 STUBBED WALER 1107 172 1550 1550 1577 1709 1950 1950 1950 195 1950 1950 170 SPACES @ 1950 c/c = 5850 170 PILES 89 TO 108 ARE STRUCTURALLY INTEGRATED INTO CRASH WALL SYSTEM (PILES ONLY) PILES AND FILLERS TO BE CONSIST OF 0MPa AND 15MPa RESPECTIVELY. 1958 0 SPACES @ 1950 c/c = 78000 11 01-FEB-201 100% CD SUBMISSION FOR REVEIW 00 9700 R5122 Bell Canada 01-AUG-2015 50% CD SUBMISSION 1 1-OCT-201 0% DD SUBMISSION FH K _PWR 00 H EXTENDED FOR 12 HOURS H J R5121 00 11 CONTRACTOR TO DAYLIGHT EXISTING BELL CONDUIT PRIOR OF CAISSON INSTALLATION TIEBACK ENCROACHMENT = 500± AIR CANADA CENTRE H H 12000 R5120 EXISTING L.R.T. ALL WORK TO RELOCATE AND/OR PROTECT BELL STRUCTURE AND CABLING MUST BE COMPLETE PRIOR TO EXCAVATION WORK BEGINNING. IF THE PROPOSED EXCAVATION FAL WITHIN THE PREFERRED MCR HORIZONTAL CLEARANCE OF 1.0M FROM EXISTING BELL CABLE/CONDUIT THEN BELL AUTHORIZED DRAWINGS MUST FIRST BE PROVIDED FOR THE CABLE AND CONDUIT TO BE EXPOSED/SUPPORTED/PROTECTED BY A BELL APPROVED CONTRACTOR. A BELL APPROVED INSPECTOR MUST BE ONSITE DURING ANY CONSTRUCTION ACTIVITIES IN THE VICINITY OF BELL INFRASTRUCTURE. ANY DAMAGES TO BELL PLANT AT TIME OF CONSTRUCTION WILL RESULT IN A CLAIM TO HINES CANADA, 200 KING STEET WEST, SUITE 1805,, CANADA M5H T. PLEASE CO-ORDINATE WITH KEN BUTT 1-0-579 PRIOR TO WORK COMMENCING. Tel.: 1-798-005 Fax: 1-798-0518 EXCAVATION SHORING PARTIAL PLAN G R5119 ±219 SPACES @ 1950 c/c = 8850 01-FEB-201 1:100 SH

10 10x 11 12 1 1 15 20 90 8100 800 555 ASSUMED OUTLINE OF ABUTMENT FOOTING CANADIAN NATIONAL RAILWAY TRACKS SHOTCRETE 150mm THICK 0 SPACES @ 1950 c/c = 78000 180 28 SPACES @ 1950 c/c = 500 2850 8 8 8 ±98 185 CUT PILE AND FILLERS AND REINFORCE WITH SHOTCRETE AND NAI AS NECESSARY. NOTIFY SHORING ENGINEER OF FIELD DIMENSION TO VERIFY DESIGN ASSUMPTIONS. 172 EXISTING TIEBACKS 2850 GENERAL CONTRACTOR TO SHAVE ENCROACHING PORTION OF 18 YONGE STREET TEMPORARY NORTH SHORING WALL TO TO FACILITATE CONSTRUCTION OF RAMP STRUCTURE. 11 01-FEB-201 100% CD SUBMISSION FOR REVEIW 01-AUG-2015 50% CD SUBMISSION PILES 151 TO 17 ARE STRUCTURALLY INTEGRATED INTO CRASH WALL SYSTEM (PILES AND TIEBACK) PILES AND FILLERS TO BE CONSIST OF 0MPa AND 15MPa RESPECTIVELY. OPENINGS TO BE CREATED AT PERMANENT TIEBACK LOCATIONS TO ALLOW FOR REVIEW AND MAINTENANCE. PILES 17 TO 19 ARE STRUCTURALLY INTEGRATED INTO CRASH WALL SYSTEM (PILES ONLY) PILES TO BE CONSIST OF 0MPa CONCRETE. 1 1-OCT-201 0% DD SUBMISSION EXTENDED FOR 12 HOURS 18 YONGE CONDOMINIUMS 18 YONGE STREET, TORONTO, ON. GENERAL CONTRACTOR IS NOT TO DISTURB 18 YONGE STREET PERMANENT WEST SHORING WALL. AT ANY POINT DURING THE WORK Tel.: 1-798-005 Fax: 1-798-0518 EXCAVATION SHORING PARTIAL PLAN 01-FEB-201 1:100 18 YONGE SH5

77.55 77.5 18 YONGE CONDOMINIUMS 18 YONGE STREET, TORONTO, ON. 77.1 77.0 77.0 77.1 77. 77.5 77. 77.2 77.25 77.21 77.1 77.1 7.50 7.00 7.20 MATCH LINE - SEE BELOW ±9.50 TOP OF WEATHERED BEDROCK ±8.50 TOP OF SOUND BEDROCK 8.0 8.50 7.00 5.20 SOUTH ELEVATION TIEBACK ENCROACHMENT = 1200± CANADIAN NATIONAL RAILWAY TRACKS SHOTCRETE MIN. 150mm THICK 800 BOND LENGTH P = 120kN 900 FREE LENGTH 15 81.50 77.1 77.1 77.11.95 150 Ø.8 YONGE STREET.5.52 MATCH LINE - SEE ABOVE 7.20 EXISTING L.R.T. TUNNEL SOIL NAI SEE SCHEDULE 150 Ø 5200 BOND LENGTH ±70.0 TOP OF WEATHERED BEDROCK P = 10kN 7000 FREE LENGTH EXISTING T.T.R. BRIDGE ABUTMENT DETAI ASSUMED 75.0 (TO BE CONFIRMED 11 01-FEB-201 100% CD SUBMISSION FOR REVEIW ±9.0 TOP OF WEATHERED BEDROCK ±8.0 TOP OF SOUND BEDROCK ±9.0 TOP OF SOUND BEDROCK 01-AUG-2015 50% CD SUBMISSION 7.00.25 (TO BE CONFIRMED.20 1 1-OCT-201 0% DD SUBMISSION SOUTH ELEVATION EAST ELEVATION/ - YONGE STREET RAMP EXTENDED FOR 12 HOURS ±70.0 TOP OF WEATHERED BEDROCK ±9.0 TOP OF WEATHERED BEDROCK ±70.0 TOP OF WEATHERED BEDROCK ±9.0 TOP OF WEATHERED BEDROCK SOUTH ELEVATION - YONGE STREET RAMP Tel.: 1-798-005 Fax: 1-798-0518 ±70.20 TOP OF WEATHERED BEDROCK EXCAVATION SHORING ELEVATIONS ±9.20 TOP OF WEATHERED BEDROCK ±9.50 TOP OF WEATHERED BEDROCK ±8.50 TOP OF WEATHERED BEDROCK EAST ELEVATION 01-FEB-201 ±70.20 TOP OF WEATHERED BEDROCK 1500 (TYP.) ±9.20 TOP OF WEATHERED BEDROCK ±9.50 TOP OF WEATHERED BEDROCK ±8.50 TOP OF WEATHERED BEDROCK ROCK PINS (TYP.) EAST ELEVATION 000 (TYP.) 1500.25 (ASSUMED) AS INDICATED SH

9 7.7. 79..7.7 78.7 9.8 1 0..8 78 0.8.8.8.9 1.9.9 7. 7.50 EXISTING L.R.T. TUNNEL W200x CORNER BRACE (TYP.) ±70.0 TOP OF WEATHERED BEDROCK.1550 ±9.0 TOP OF WEATHERED BEDROCK ±9.0 TOP OF SOUND BEDROCK 9.50 9.0 9.10 ±8.0 TOP OF SOUND BEDROCK 8.70 7.00 7.00.25 (TO BE CONFIRMED.25 (TO BE CONFIRMED 5.20 WEST ELEVATION. 5 TEMPORARY PLATFORM FOR PILE INSTALLATION. GENERAL CONTRACTOR TO CONFIRM. 8. 7... 81.20 80 EXISTING T.T.R. BRIDGE PIERS AND ABUTMENT DETAI ASSUMED.0. 78 78.20 75.20 SEE BELOW.9.9 5.7 9.5 8.9 7 W10x11 STUBBED WALER 75.20 W200x CORNER BRACE (TYP.) 72.20 72.20 ±70.0 TOP OF WEATHERED BEDROCK ±9.0 TOP OF SOUND BEDROCK 9.50 9.20 9.10 9.10 8.80 8.80 8.00 7.00 11 01-FEB-201 100% CD SUBMISSION FOR REVEIW 10 0-DEC-2015 RE-ISSUED FOR PERMIT 9 12-NOV-2015 RE-ISSUED FOR PERMIT 8 15-SEPT-2015 RE-ISSUED FOR PERMIT 7 18-AUG-2015 ISSUED FOR PERMIT 01-AUG-2015 50% CD SUBMISSION 5 09-JUNE-2015 ISSUED FOR TENDER 02-JUNE-2015 ISSUED FOR TENDER 10-APRIL-2015 ISSUED FOR TENDER 2 27-FEB-2015 100% DD SUBMISSION 1 1-OCT-201 0% DD SUBMISSION NO.25 (TO BE CONFIRMED REMARKS DATE.20 EXTENDED FOR 12 HOURS NORTH ELEVATION CRASH WALL PILES TO BE INTEGRATED ABOVE-GRADE. SEE PROJECT STRUCTURAL DRAWINGS. 8.20 8.80. EXISTING T.T.R. BRIDGE ABUTMENT DETAI ASSUMED.0 8. 1.5.5. 1 00. SHOTCRETE 150mm THICK 81.20 1 1000 2 Tel.: 1-798-005 Fax: 1-798-0518 5 78.20 CUT PILE AND FILLERS AND REINFORCE WITH SHOTCRETE AND NAI AS NECESSARY. NOTIFY SHORING ENGINEER OF FIELD DIMENSION TO VERIFY DESIGN ASSUMPTIONS..5 SEE ABOVE A 75.20 72.20 EXCAVATION SHORING ELEVATIONS ±70.0 TOP OF WEATHERED BEDROCK ±9.0 TOP OF SOUND BEDROCK 9.0.20 01-FEB-201 RAMP SLOPE ASSUMED POTENTIAL LOCATION OF BRIDGE WING WALL TO BE CONFIRM VIA TEST PIT INVESTIGATION TO VERITY SHORING DESIGN ASSUMPTION..20 NORTH ELEVATION AS INDICATED SH7

GARDINER EXPRESSWAY T.H.E.S. LAKE SHORE BOULEVARD WEST ±2900 00mm Water Main 2100mm Filtered Water Tunnel 1200mm R.C.P. Stm. Sewer Rogers Cable 00mm V.P. San. Sewer ±9.29 TOP OF WEATHERED BEDROCK ±8.29 TOP OF SOUND BEDROCK 525mm V.P. Stm. Sewer Aband'd 9.9 TIEBACK ENCROACHMENT = 8500± 100mm PVC Rescu Transp. ±2199 P = 800kN 500mm H.P. Gas Transmission Line Bell Canada FREE LENGTH ±77.0 1000 Ø 7.00 7.50 15 8.0.25 (TO BE CONFIRMED 5.20 ±9.0 TOP OF WEATHERED BEDROCK ±8.0 TOP OF SOUND BEDROCK EXISTING MANHOLE BEYOND DETAI ASSUMED P = 800kN TIEBACK ENCROACHMENT = 8800± ±180 Bell Canada 750Ø CONC. STORM 7. 8500 FREE LENGTH P = 550kN ±.97 7.00 5.20 1000 Ø 7.20 15 8.50.25 (TO BE CONFIRMED T.H.E.S. Bell Canada Cable T.H.E.S. 00mm Water Main ±9.7 TOP OF WEATHERED BEDROCK ±8.7 TOP OF SOUND BEDROCK 00mm R.C.P. Stm. Sewer EXISTING L.R.T. TUNNEL ±7.99 TIEBACKS TO BE GRAVITY GROUTED 100mm Gas Main ±7. ±195 TIEBACK ENCROACHMENT = 00± 00mm V.P. San. Sewer P = 800kN T.H.E.S. 150mm Gas Main Aband'd ±7.5 750Ø CONC. STORM 7500 FREE LENGTH ±.9 Bell Canada 7.00 7.50 15 8.70.25 (TO BE CONFIRMED 5.20 ±.80 TIEBACK ENCROACHMENT = 900± TIEBACK ENCROACHMENT = 500± ±.78 TIEBACK ENCROACHMENT = 900± EXISTING T.T.R. BRIDGE DETAI ASSUMED ±.9 Bell Canada T.H.E.S. Cable T.H.E.S. 00mm Water Main 00mm R.C.P. Stm. Sewer ±9.99 TOP OF WEATHERED BEDROCK ±8.99 TOP OF SOUND BEDROCK EXISTING L.R.T. TUNNEL ±8. TIEBACKS TO BE GRAVITY GROUTED ±158 100mm Gas Main 750Ø CONC. STORM T.H.E.S. 150mm Gas Main Aband'd ±7. P = 800kN Bell Canada 500 FREE LENGTH 7.00 7.50 15 9.10.25 (TO BE CONFIRMED 5.20 T.H.E.S. Bell Canada 00mm R.C.P. Stm. Sewer ±70.0 TOP OF WEATHERED BEDROCK ±9.0 TOP OF SOUND BEDROCK EXISTING L.R.T. TUNNEL TIEBACKS TO BE GRAVITY GROUTED ±9.27 00mm Water Main ±128 T.H.E.S. 750mm R.C.P. Stm. Sewer P = 800kN Bell Canada 000 FREE LENGTH 7.00 7.50 15 9.50.25 (TO BE CONFIRMED 5.20 ±70.0 TOP OF WEATHERED BEDROCK ±9.0 TOP OF SOUND BEDROCK 000 BOND LENGTH P = 50kN P = 550kN 000 BOND LENGTH P = 500kN 8500 FREE LENGTH 000 FREE LENGTH.20 7.00 75.20 72.20 0 9.20 0 8.00.25 (TO BE CONFIRMED 11 01-FEB-201 100% CD SUBMISSION FOR REVEIW 01-AUG-2015 50% CD SUBMISSION 1 1-OCT-201 0% DD SUBMISSION EXTENDED FOR 12 HOURS YONGE STREET ±.55 1950x2550 STORM CULVERT 7.0 TIEBACK ENCROACHMENT = 1500± CANADIAN NATIONAL RAILWAY TRACKS ±.80 81.20 TIEBACK ENCROACHMENT = 17200± CANADIAN NATIONAL RAILWAY TRACKS ±. 81.20 000 BOND LENGTH P = 50kN 7500 FREE LENGTH 1500 UNDER SIDE OF FILLER ±70.27 TOP OF WEATHERED BEDROCK ±9.27 TOP OF SOUND BEDROCK Tel.: 1-798-005 Fax: 1-798-0518 78.20 78.20.20 ±9.5 TOP OF WEATHERED BEDROCK ±8.5 TOP OF SOUND BEDROCK P = 850kN 5500 BOND LENGTH P = 1150kN P = 950kN 500 BOND LENGTH 18000 FREE LENGTH 1000 FREE LENGTH P = 850kN 9500 FREE LENGTH 5500 FREE LENGTH.20 7.00 75.20 72.20 15 8.80.25 (TO BE CONFIRMED ±70.27 TOP OF WEATHERED BEDROCK ±9.27 TOP OF SOUND BEDROCK P = 1100kN 1000 FREE LENGTH 500 BOND LENGTH P = 850kN 500 FREE LENGTH 8500 BOND LENGTH P = 2kN 5500 BOND LENGTH P = 100kN 500 BOND LENGTH 17000 FREE LENGTH 8500 FREE LENGTH.20 75.20 72.20 72.89 (TO BE CONFIRMED EXISTING TIEBACK 18 YONGE CONDOMINIUMS 18 YONGE STREET, TORONTO, ON. 70.00 EXISTING SHORING 18 YONGE CONDOMINIUMS 18 YONGE STREET, TORONTO, ON. ±9.92 TOP OF WEATHERED BEDROCK ±8.92 TOP OF SOUND BEDROCK EXISTING SHORING EXISTING TIEBACK #8 THREADBAR 9.25 (TO BE CONFIRMED 7.00 SELF SUPPORTING NATURE OF VERTICAL ROCK FACE TO BE ASSESSED BY PROJECT GEOTECHNICAL ENGINEER. INSTALL ROCK FACE PROTECTION AS DEEMED NECESSARY 10 8.20.25 (ASSUMED) EXCAVATION SHORING S 01-FEB-201 AS INDICATED SH8

TIEBACK SCHEDULE ROCK PIN SCHEDULE PILE SCHEDULE SOIL NAIL SCHEDULE 11 01-FEB-201 100% CD SUBMISSION FOR REVEIW 01-AUG-2015 50% CD SUBMISSION 1 1-OCT-201 0% DD SUBMISSION EXTENDED FOR 12 HOURS Tel.: 1-798-005 Fax: 1-798-0518 EXCAVATION SHORING SCHEDULE AND 01-FEB-201 AS INDICATED SH9

NOTES A.1. REFERENCES CODES AND STANDARDS 1. Architectural drawings parking level P1 received by email on Oct. 07, 201 and parking level P dated 09.2.201 prepared by Adamson Associates Architects. 2. Survey drawings: a. Drawing no. 0-10-025-2 dated Nov. 01, 2010 prepared by Delph & Jenkins Limited. b. Topographic Sketch reference no. 0-22-5-0-A dated August 20, 201 and reference no. 0-22-5-0-B dated September 2, 201 prepared by J. D. Barnes Limited.. Existing Structures: a. 18 Yonge Condominiums - 18 Yonge Street, Toronto, Ontario A. Shoring drawings SH1, SH2 and SH (issued for tender dated 0.0.0) prepared by Isherwood Associated B. Structural drawing S-101 dated August 2, 200. b. Gardener Expressway: Drawing nos. S-2-, S-2-, S-2- and S-2-11 (issue, as constructed, Dec. 19) prepared by A. D. Margison and Associates, Limited. c. Harbour Light Rail Transit: Drawing nos. R1-1-S-117/2 dated 89.02.10, R1-1-S-11/2 dated 89.02.10, R1-1-S-115/2 dated 89.02.10, R1-1-S-118/2 dated 89.02.10, R1-1-S-120/1 dated 88.11.17 and R1-1-S-2/ dated 87.0.18 prepared by Toronto Transit Commission.. PUCC drawing in dwg. format file name Bay_Yonge.dwg. 5. Geotechnical Invertigation project 1000058 (Revision 0) dated August 29, 201 prepared by.. Toronto As-Built drawings: a. Yonge Lakeshore Developments Limited Storm Sewer on Bay Street drawing no. U-292-O0 (issue, April 20, 200, revised as per City's comments) prepared by Riaboy Engineering Ltd. b. Yonge Street to Fleet Street drawing no. 1 of 2 dated April190 prepared by City of Toronto Department of Works Sewer Section. 7. CSA A2.2 - M Methods of Test for Concrete 8. CSA A2.1 - M Concrete Materials and Methods of Construction 9. Segments of the Canadian National Building Code (CNBC) 10. Segments of the Canadian Highway Bridge Design Code CAN/CSA - S/S.1-00 (CHBDC). 11. Segments of the Ontario Building Code (OBC). 12. Design conforms to OPSS 59 performance level 2 maximum displacement requirements. A.2. DESIGN ASSUMPTIONS 1. The current design scheme illustrates a temporary shoring system capable of supporting between 7m and 1.2m of overburden. 2. The current design is based upon the assumption that the assumed existing structure foundation configurations, elevations and loads indicated on the shoring drawings are correct. Should any or all of these assumptions change, redesign of the shoring may be required. See General Notes. 1000 Ø DRILLED SHAFT 1000 Ø FILLER CAISSON SCALE 1:20 000 c/c U.N.O - SEE PLAN FOUNDATION WALL (BY OTHERS) DRAINAGE CAVITY (BY OTHERS) TYPICAL CAISSON WALL DETAIL - SOUTH WALL PLATE & WEDGES BY TENDON SUPPLIER SEE TABLE 250 INTERLOCK 75 MAX. TRIM ANGLE TO FIT AS NECESSARY (LOADS GREATER THAN 800kN) 0mm INTERNAL STIFFENER PLATE. IN LINE WITH PILE WEB, WELD TO PILE AND ANGLE. DRILLED SHAFT FILLER CAISSON SCALE 1:20 1950 c/c U.N.O - SEE PLAN FOUNDATION WALL (BY OTHERS) 279 INTERLOCK DRAINAGE CAVITY (BY OTHERS) TYPICAL CAISSON WALL DETAIL - WEST/NORTH WALL PLATE & WEDGES BY TENDON SUPPLIER SEE TABLE (LOADS GREATER THAN 800kN) 0mm INTERNAL STIFFENER PLATE. IN LINE WITH PILE WEB, WELD TO PILE AND ANGLE. 75 MAX. (TYP.) B. DESIGN PARAMETERS 1. K = 0.5 (north and west walls) K = 0.28 (east and south walls) 2. g = 21 kn/m³ - No hydrostatic pressure. q = 1. kn/m² (west wall) q = 12 kn/m² (elsewhere). Cooper E-90 track loading 5. Strand tieback design based upon: a. Tieback sound bedrock bond = 00kPa b. Anchor alternatives are subject to review by the Shoring Engineer. Anchor capacity to be confirmed by extended performance and performance test tiebacks as noted on drawing elevations. Shoring Engineer to witness all tieback testing. Provide 5 working days notice to the Shoring Engineer prior to tieback testing. c. Shoring Contractor to provide strand anchors of adequate capacity for all 200% performance test. d. Shoring Contractor to provide calibrated hydraulic test jacks and all assistance requiered by the Shoring Engineer to carry out all tieback testing.. Permanent tiebacks to be upsized for sacrificial steel or double corrosion protection. Contractor proposals to be reviewed to the Shoring Engineer's satisfaction. 7. Supernormal loads applied to the shoring, other than indicated on these drawings, are subject to review by the Shoring Engineer. 8. Design complies with the requirements of the OBC. C. MATERIA 1. Structural steel to be new or sound used material conforming to CAN/CSA G0.21-M92, grade 50W. 2. See pile table for pile sizes.. Alternative grades or sections of equivalent strength may be substituted subject to the Shoring Engineer s approval.. Concrete a. caisson wall - 0 MPa full depth for piles, MPa full depth for fillers. b. Crash wall integrated caisson wall - 0MPa full depth for piles, 15MPa full depth for fillers. c. West, south and east caisson wall - MPa full depth, piles and fillers. d. Strand tieback grout - Strength selection at the discretion of the Shoring Contractor (minimum grout strength 25 MPa). Use of high early strength grout is not permitted. 5. Lagging to be hardwood of full thickness shown u.n.o. Use no Poplar.. All welding to comply with CSA W59 and to be carried out by C.W.B. certified welders. 7. All welds shown or implied to be 10mm fillet, all around and both sides u.n.o. D. GENERAL NOTES 1. Verify the configuration and elevation of all existing and adjacent structure foundations and slabs during the demolition phase of the work. Report same prior to start of shoring construction to the Shoring Engineer. 2. Secure encroachment agreements and municipal permits where shoring components will be installed outside of project property limits.. Reduce grade to top of shoring. Provide and maintain a level stable working platform for shoring construction equipment.. Excavate in advance to remove any underground obstructions, backfill and compact with on site materials or controlled engineered backfill. 5. Locate and identify all existing underground and/or overhead services and structures near shoring, protect and relocate as necessary. Do not drill or excavate before all services and structures have been located.. Advise shoring Engineer of any potential interference with any elements of the excavation shoring system and of any discrepancies from information presented on the shoring drawings before shoring construction begins. 7. Layout pile locations and check all dimensions. Report any discrepancies to the Shoring Engineer. Do not use shoring drawings for setting out. Refer to project legal survey and architectural drawings for setting out. 8. Dewater in advance as necessary to at least 1.0m below the lowest excavation elevation. All dewatering systems to be designed by a Professional Engineer. Installed dewatering systems must assure that the stability and security of the excavation shoring and structures in proximity to the shoring are maintained and not compromised. L200x200x25 BY 25 LONG, TRIM TO FIT TEE CUT FROM W10x97 x 00 LONG ALL WELDS SHOWN OR IMPLIED TO BE 12mm FILLET UNLESS NOTED OTHERWISE. TYPICAL TIEBACK CONNECTION DETAIL FOR CAISSON WALL 2x25mm PLATE STIFFENER BOTH SIDES AT EACH ANCHOR LEVEL, WELD TO OUTSIDE WEB 50 150 270 PLATE & WEDGES BY TENDON SUPPLIER SEE TABLE L200x200x25 BY 00 LONG, TRIM TO FIT 00x00x25 PLATE ALL WELDS SHOWN OR IMPLIED TO BE 10mm FILLET UNLESS NOTED OTHERWISE. 217 ELEVATION STITCH WELD 100mm @ 500mm SPACING (LOADS GREATER THAN 800kN) 25mm INTERNAL STIFFENER PLATE. IN LINE WITH PILE WEB, WELD TO PILE AND ANGLE. STITCH WELD 100mm @ 500mm SPACING L200x200x25 BY 550 LONG, TRIM TO FIT TEE CUT FROM W10x97 x 00 LONG ALL WELDS SHOWN OR IMPLIED TO BE 12mm FILLET UNLESS NOTED OTHERWISE. TYPICAL DOUBLE TIEBACK CONNECTION DETAIL FOR CAISSON WALL SEE SCHEDULE 500 MPa THREADBAR. SEE SCHEDULE 00x00x20mm PLATE. SHIM AND GROUT BEHIND PLATES TO ASSURE TIGHT FIT TO BEDROCK 75 MAX. ELEVATION TRIM ANGLE TO FIT AS NECESSARY 11 01-FEB-201 100% CD SUBMISSION FOR REVEIW 01-AUG-2015 50% CD SUBMISSION 1 1-OCT-201 0% DD SUBMISSION EXTENDED FOR 12 HOURS E. PROCEDURE 1. Drill holes for piles, utilizing temporary liners, mud drilling and/or other methods as necessary to prevent groundwater inflow or loss of soil into the pile holes. 2. Provide pile holes large enough that piles may be set plumb despite misalignment of holes.. Set piles, wedge and fill holes with concrete specified. Withdraw liners if used.. Excavate in stages to suit shoring work. 5. Excavate to neat faces for lagging installation. Excavation contractor to shave / trim caisson wall to front face of soldier piles, or as directed by the Owner / General Contractor / Project Manager.. Install lagging in maximum 1500 lifts. Should caving or raveling occur, reduce lift height. Fill all voids behind lagging with granular on site material or imported granular fill rammed in place. Leave no excavation without lagging overnight. 7. In wet ground provide spacers to create 10mm gaps between individual lagging boards, place filter material behind lagging to allow passage of water without loss of soil fines. 8. Do not excavate more than 500 below brace elevations until bracing is installed and stressed. 9. Tieback performance tests are to be carried out. See Design Parameters. Performance test installations and stressing are to be witnessed by the Shoring Engineer. Do not proceed with production anchor procurement or installation until performance test results are reviewed by the Shoring Engineer. 10. All working tiebacks are to be proof tested to 150 % of their design load, held at this load for ten minutes and if no appreciable creep is observed, reduced to design load and lock in at 110%. Halt tieback testing if movement out of site exceeds 12 mm. Notify Shoring Engineer immediately. 11. Tiebacks, braces and/or rakers are to be installed without delay to minimize ground movements. All tieback free lengths are to be completely filled with bentonite-cement fill. F. FIELD REVIEW AND MONITORING BY OWNER 1. Field review and monitoring, as noted below, are integral to the shoring design process. They are required elements of the shoring design presented within these drawings and are necessary to ensure that the shoring system is performing in accordance with shoring design assumptions. 2. In accordance with the Ontario Building Code, TERRAPROBE is to provide (at owner's cost) field review to verify that the shoring works are constructed and are performing in general conformance with the design drawings.. Carry out pre-construction condition survey of all structures within the influence of shored excavations.. Precision level surveying of adjacent structures and ground surface is to be carried out on a weekly basis until new construction reaches street elevation. Increase monitoring as directed by the Shoring Engineer. 5. Monitor all piles for horizontal and vertical movements at their tops and at all anchor points at least weekly. Increase monitoring as directed by the Shoring Engineer. Monitoring of CN Railway Tracks and adjacent shoring walls shall follow CN guidelines.. Vibration monitoring at the shoring wall adjacent to Gardiner Expressway is to be carried out until new construction reaches grade elevation. 7. Inclinometers and multi-point extensometers are to be installed at key locations as shown on the drawings for high-precision pile deflection measurements. 8. TERRAPROBE staff can provide the required monitoring and testing. If monitoring by others, all monitoring reports to be distributed within working days of completion to the Shoring Engineer. All tieback test results are to be provided within working days of completion to the Shoring Engineer. DYWIDAG #8 (25mmØ) THREADBAR 517 MPa CONFORMING TO CSA G0.18/ASTM A15 TYPICAL DOUBLE PILE TIEBACK CONNECTION DETAIL SPHERICAL NUT OR WASHERS AND NUT 00x00x19mm PLATE. TYPICAL THREADBAR ROCK PIN CONNECTION DETAIL AT BEDROCK 10 50 COMPRESSIBLE MATERIAL TO ALLOW FOR PROOF TESTING OF ALL ANCHORS STEEL NAIL (SEE SCHDULE) ANCHOR GROUT 150 MIN. 75 75 25 TO 8 MAX. 100x100x 11mm / mm Ø WWM MAIN WIRE MESH 200x200x1 PLATE SET ON SHOTCRETE FACE ADDITIONAL MESH MAT 00x00 (HAVING PROPERTIES OF MAIN MESH) INSTALLED AS INDICATED SHOTCRETE TYPICAL SOIL NAIL DETAIL AS SHOWN THREADBAR CONNECTION DETAIL AT BEDROCK Tel.: 1-798-005 Fax: 1-798-0518 G. SHORING AND CN RAILWAY TRACK MONITORING BY OWNER 1. The monitoring shall include both tracks and the shoring wall. 2. Monitoring reading interval shall be daily from the first day of shoring wall installation, during shoring wall installation, during structure excavation, and at all times when the excavation is in an open condition and the shoring wall is under load during all stages of the work and until all the shoring wall is removed.. Daily visual monitoring of the ground behind the shoring wall shall be performed. If any movement of the soil is observed, it shall be immediately reported to CN.. Daily visual monitoring of the track(s) behind the shoring wall shall be performed. If any movement of track is observed, it shall be immediately reported to CN. 5. It is required that monitoring targets to be placed: 5.1. At top of each pile 5.2. At all tieback levels on each pile. 5.. At a mid-point between two consecutive level of tiebacks. 5.. If there is only one row of tieback on the selected pile, it is required to have two targets on the pile, one at the tieback level and the second one at mid-point between the dredge line and the tieback.. It is required to monitor the track(s) as well as shoring wall piles. The maximum spacing between the targets on each rail of each track shall be meters. 7. No open excavation shall be left without visual inspection during long period of time. 8. For filler caisson monitoring, it is required to install a series of inclinometers, to be placed on at least at one fourth of bays between king piles. 9. Inclinometers shall be installed in filler caissons. 10. All inclinometers to be protected by steel casing at least 00 mm above the ground and 1000 mm below the ground. 11. All inclinometers shall be installed such that initial readings could be obtained prior to first day of excavation. 12. Inclinometer reading interval shall be daily from the first day of shoring wall installation, during shoring wall installation, structure excavation, and at all times when the excavation is in an open condition and the shoring wall is under load during all stages of the work. H. PROTECTION BY GENERAL CONTRACTOR 1. Protect all excavations and shoring from the actions of all weather. EXCAVATION SHORING NOTES AND DETAI 01-FEB-201 AS INDICATED I. HEALTH AND SAFETY 1. All work to be carried out in accordance with the Occupational Health and Safety Act latest revision. SH10

_SWR Se Te Ue Ve 887 859 8077 D H B H B FH 01-FEB-201 100% CD SUBMISSION FOR REVEIW 2 18-DEC-2015 FOR COORDINATION 1 1-OCT-2015 FOR COORDINATION STRUCTURAL CAISSON REFER TO STRUCTURAL DRAWINGS FOR DETAI 0 22-SEPT-2015 FOR COORDINATION _TTC _PWR NP-1 B12 B1 NP- NP-2 NP-1 NP-2 NP- B1 B12 75 582 B B 100 1950 2281 175 152 872 2 11 258 1H:1V OPEN CUT 200 200 STRUCTURALLY INTEGRATED PILES (TYP.) 200 W0x52 STUB OUT WALER 9 SPACES @ 1950 c/c = 17550 200 2207 1H:1V OPEN CUT EXTENDED FOR 12 HOURS H D Tel.: 1-798-005 Fax: 1-798-0518 81 - NORTH PORTAL EXCAVATION SHORING PLAN 01-FEB-201 1:100 A. L. R. P. M. P. SH11

77.5 77.51 77.70 77.8 W0x52 STUB OUT WALER 77.58.92 ±72.80 TOP OF WEATHERED BEDROCK 72.00 72.00 ±71.80 TOP OF SOUND BEDROCK 100 UNDER SIDE OF FILLER ±72.80 TOP OF WEATHERED BEDROCK ±71.80 TOP OF SOUND BEDROCK 100 UNDER SIDE OF FILLER 5.20.20 0.00 (ASSUMED) 0.00 (ASSUMED) 0.00 (ASSUMED) 59.00 59.00 59.00 SOUTH ELEVATION NORTH ELEVATION 77.8 77.8.00.00 000 FREE LENGTH W0x52 STUB OUT WALER 000 FREE LENGTH 000 BOND LENGTH P = 250kN SEE SCHEDULE 7.00 70.0 U/S OF PILE AND FILLER 72.00 (ASSUMED) 100 UNDER SIDE OF FILLER ±72.80 ASSUMED TOP OF WEATHERED BEDROCK ±71.80 ASSUMED TOP OF SOUND BEDROCK 000 BOND LENGTH P = 250kN 15 71.50 ±72.80 ASSUMED TOP OF WEATHERED BEDROCK ±71.80 ASSUMED TOP OF SOUND BEDROCK 01-FEB-201 100% CD SUBMISSION FOR REVEIW P = 150kN 2 18-DEC-2015 FOR COORDINATION 1 1-OCT-2015 FOR COORDINATION 0 22-SEPT-2015 FOR COORDINATION 11 BAY FUTURE PHASE 2 ROCK PINS (TYP.) FUTURE 11 5.20.20 FUTURE 11 BAY STREET CONSTRUCTION EXTENDED FOR 12 HOURS 1.00 11 BAY FUTURE PHASE 2 ROCK PINS (TYP.) 1.00 0.00 (ASSUMED) 0.00 (ASSUMED) 59.00 59.00 DRILLED SHAFT FILLER CAISSON 1950 c/c U.N.O - SEE PLAN PILE SCHEDULE TIEBACK SCHEDULE Tel.: 1-798-005 Fax: 1-798-0518 FOUNDATION WALL (BY OTHERS) SCALE 1:20 DRAINAGE CAVITY (BY OTHERS) TYPICAL CAISSON WALL DETAIL 81 - NORTH PORTAL EXCAVATION SHORING ELEVATIONS AND SCHEDULES 75 MAX. PLATE & WEDGES BY TENDON SUPPLIER TRIM ANGLE TO FIT AS NECESSARY SEE TABLE (LOADS GREATER THAN 800kN) 0mm INTERNAL STIFFENER PLATE. IN LINE WITH PILE WEB, WELD TO PILE AND ANGLE. 01-FEB-201 L200x200x25 BY 75 LONG, TRIM TO FIT TEE CUT FROM W10x97 x 00 LONG TYPICAL TIEBACK CONNECTION DETAIL FOR CAISSON WALL ALL WELDS SHOWN OR IMPLIED TO BE 12mm FILLET UNLESS NOTED OTHERWISE. AS INDICATED R. P. A. L. M. P. SH12