GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

Similar documents
Preliminary Disclosure; Application for Approval; Operating Permits, Volume 2: Licences and Approvals; and Abandonment Approval and

Draft Mine Closure Plan. 17 October 2018 Longlac & Geraldton

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass

Base Metal and Iron Ore Mining

Environmental Impact Assessment (EIA)

Environmental Design Criteria for Project Engineering

Operating and Reclamation Plan

Appendix B Stormwater Site Plan Submittal Requirements Checklist

PROPOSED TERMS OF REFERENCE ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR CANADIAN NATURAL RESOURCES LIMITED HORIZON NORTH PIT EXTENSION PROJECT

Grassy Mountain Gold Project Environmental Evaluation - Draft Outline

Environmental Resource Inventories. What are ERIs? Significance of information How to use them

DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF MINING AND RECLAMATION. Coal Refuse Disposal - Site Selection

Environmental Information Worksheet

TABLE OF CONTENTS. Page

Annex F Scoping Checklist

PRELIMINARY DRAFT RULE LANGUAGE 8/28/2014 MNDNR SILICA SAND RECLAMATION Reclamation Plan Requirements

Reclamation Manual Design Data Collection Guidelines Chapter 5 Typical Design Data Package Template

TERMS OF REFERENCE ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR CANADIAN NATURAL RESOURCES LIMITED S PROPOSED HORIZON NORTH PIT EXTENSION PROJECT

Introduction. They can help ensure that all key issues and elements have been considered; They help ensure that the review process is systematic; and

February Reference Section in Supplemental. Reference Section in Consultants Reports. Reference Section in Application. TOR No.

RECLAMATION PLAN FOR. (name of Mine) MINING OPERATION

EIS TABLE OF CONTENTS

Information Requirements Table for Liquid Waste

GUIDELINES to the MINING ACT

NICO COBALT-GOLD-BISMUTH-COPPER PROJECT Community Scoping Session Environmental Overview

Code of Practice for Exploration Operations

Proposed Terms of Reference for EIA studies

ARTICLE 6 EXCAVATION OF MINERAL MATERIALS

ENVIRONMENTAL RESOURCE PERMIT APPLICATION

Nottawasaga Valley Conservation Authority

Water Development Plan Template

Santoy 8 Satellite Mine at the Seabee Gold Mine. Technical Review Comments. on the. Environmental Impact Statement.

REGISTRATION PURSUANT TO. PART X of THE ENVIRONMENTAL PROTECTION ACT FOR THE NUGGET POND CROWN PILLAR. Newfoundland and Labrador

ELECTRICAL TRANSMISSION LINES & SUBSTATIONS

BEFORE THE OHIO POWER SITING BOARD

Terms of Reference. As Required by the Environment Act For Preparation of an Environmental Assessment Report

Chapter 6 Erosion & Stormwater Study Team

APPENDIX M CEQA Initial Study Checklist

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER QUALITY PROGRAM ADMINISTRATIVE CODE

List of Figures... xii. List of Tables... xiii. List of Appendices...xv. Glossary... xvii Project Summary and Facility Overview...

Water Resources Management Plan

City of Bishop. Environmental Checklist Form

CITY OF JENKS EARTH CHANGE PERMIT APPLICATION

SCHEDULE. 1 Part 10 of the Health, Safety and Reclamation Code for Mines in British Columbia is repealed and the following is substituted:

Environmental Protection and Enhancement Act Guide to Content for Industrial Approval Applications

Attachment 1 WORLD BANK ENVIRONMENT, HEALTH AND SAFETY GUIDELINES 1 MINING AND MILLING UNDERGROUND (INTERIM)

TERMS OF REFERENCE. Notes for NEPA for Generic Terms of Reference

August 3, The proposed action thus includes Site Plan approval for the Fire Department and Amended Site Plan approval for the Ambulance Corps.

Comparative Evaluation Option #1 & Option #2

INSTRUCTIONS FOR PREPARATION OF APPLICATION FORM FOR SURFACE MINING PERMIT AND/OR RECLAMATION PLAN

FINAL TERMS OF REFERENCE ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR THE PROPOSED

Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans)

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

CCSD#1 Stormwater Standards

Magino Project Environmental Impact Statement. Technical Support Document Water Management Plan

Regulation of Mines In South Florida

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT MCMANUS ASH POND A (AP-1) 40 CFR (c)(1)(i)-(xii)

Northern Mine Decommissioning and Reclamation Guidelines

The Construction General Permit and Erosion Prevention and Sedimentation Control

Environmental characterisation and mine water monitoring

REQUIRED INFORMATION Please check the following boxes that apply to your lot or parcel and complete the other requested information.

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw

CONSTRUCTION SPECIFICATION FOR DEWATERING

DESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas.

Model Riparian Buffer Ordinance.

GUIDELINES FOR PREPARATION OF MINE CLOSURE PLAN

WASA Quiz Review. Chapter 2

STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW

EAGLE S NEST PROJECT

CMPDI. 4.6 Mine Closure Plan

SECTION TEMPORARY ENVIRONMENTAL CONTROLS

Environmental Regulation & Mine Permitting in Ontario

December 19, Submitted to: Yukon Government, Environment Box 2703 Whitehorse, YK Y1A 2C6

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT. Replacement Span and Plaza Expansion APPENDIX E

Independent Expert Engineering Investigation and Review Panel. Report on Mount Polley Tailings Storage Facility Breach. Appendix G: Water Balance

Inrushes and Subsidence

Plan Requirement Guidance for Quartz Mining Projects

Florida Department of Environmental Protection. Bureau of Mining and Minerals Regulation. Regulation of Mines. Howard J. Hayes, Program Administrator

Grizzly Oil Sands ULC

SCRCA SECTION 28 WETLAND POLICY

Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

TERMS OF REFERENCE FOR THE PREPARATION OF A FOCUS REPORT. Regarding the Goldboro Gold Project Proposed by Anaconda Mining Inc.

15A NCAC 13A.0109 STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES - PART 264 (a) Any person who

Guide to Content for Energy Project Applications

Papua New Guinea LNG Project. Environmental and Social Management Plan Appendix 11: Reinstatement Management Plan PGGP-EH-SPENV

Department of the Army Permit Application

CHAPTER ONE : INTRODUCTION

TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements

PROVINCE OF BRITISH COLUMBIA MINISTRY OF ENERGY AND MINES

DEVELOPMENT OF AQUIFER TESTING PLANS. Brent Bauman, P.G. / Erin Lynam, Aquatic Biologist

Chapter MINERAL EXTRACTION AND MINING OPERATIONS

INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR

BLOCKING AND FILLING SURFACE DRAINAGE DITCHES

LEHIGH PERMANENTE QUARRY RECLAMATION PLAN AMENDMENT

Operations Mine Site, Tote Road and Railway

D.G.S.W. Pitakumbura Manager (Groundwater Studies) Groundwater Section NWS&DB. Groundwater recharge or deep drainage or

City of Mississauga Environmental Impact Studies Terms of Reference 2002

JW/docDM AEE for Non-Minimum Impact Activities

VIRGINIA POLLUTION ABATEMENT APPLICATION FORM D MUNICIPAL EFFLUENT AND BIOSOLIDS

Transcription:

PROVINCE OF NEW BRUNSWICK DEPARTMENT OF ENERGY AND RESOURCE DEVELOPMENT Minerals and Petroleum Development Branch GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

Guide to the Development of a Mining and Reclamation Plan in New Brunswick TABLE OF CONTENTS i INTRODUCTION... 1 REQUIRED ELEMENTS... 1 EXECUTIVE SUMMARY... 1 PART 1. BACKGROUND SURVEY... 1 1. Company Information... 1 1.1 Address... 1 1.2 Principal Contacts... 1 2. Site Location... 1 2.1 Geographical Setting... 1 2.2 Land Use... 1 2.3 Access... 1 2.4 Ownership... 1 3. Geology... 1 3.1 Unconsolidated Geology... 1 3.2 Bedrock... 2 3.3 Ore Geology... 2 3.4 Seismicity... 2 4. Hydrology... 2 4.1 Climate... 2 4.2 Surface Water... 2 4.3 Groundwater... 2 5. Biology... 2 5.1 Vegetation... 2 5.2 Wildlife... 2 5.3 Aquatic Life... 2 6. Site History... 2 7. Environmental Sensitivities... 2 8. Socioeconomic Sensitivities... 2 PART 2. MINING PLAN... 3 1. Mine Site Description... 3 1.1 Ore Reserves... 3 1.2. Mining Methods... 3 1.3 Mine Site Layout... 3 1.3.1 Mine Workings... 3 1.3.2 Surface Infrastructure... 3 2. Mining Operations... 3 2.1 Development Timeline... 3 2.2 Mining Methods... 3 2.3 Ore Processing Plan... 3

Guide to the Development of a Mining and Reclamation Plan in New Brunswick ii 2.3.1 Plant Design and Flowsheet... 3 2.3.2 Concentrate Handling... 3 2.3.3 Thiosalt Management... 3 2.4 Water Management Plan... 3 2.4.1 Surface Water Runoff... 3 2.4.2 Potable Water... 3 2.4.3 Mine Water... 3 2.4.4 Water Balance and Loadings... 4 2.5 Waste Management Plan... 4 2.5.1 Air Emissions... 4 2.5.2 Tailings Management... 4 2.5.3 Waste Rock Storage... 4 2.5.4 Water Treatment... 4 2.5.5 Solid Waste Disposal and Storage... 4 2.5.6 Hazardous Products... 4 2.6 Environmental Monitoring... 4 2.7 Physical Stability... 4 2.8 Progressive Reclamation... 4 2.9 Emergency Preparedness Plan... 5 2.10 Site Security and Safety... 5 2.11 Temporary Shutdown Procedure... 5 3. Impacts... 5 3.1 Environmental... 5 3.2 Economy and Employment... 5 3.3 Transportation... 5 PART 3. RECLAMATION PLAN... 5 1. Infrastructure Removal... 5 1.1 Buildings and Equipment... 5 1.2 Utilities... 5 1.3 Transportation Access... 5 2. Site Stabilization... 5 2.1 Contouring and Grading... 5 2.2 Re-vegetation... 5 2.3 Crown Pillars... 5 2.4 Backfilling, Bulkheads and Shafts... 6 2.5 Tailings Pond Stabilization... 6 3. Site Description at Closure... 6 4. Site Safety and Security... 6 5. Post Reclamation Monitoring... 6 6. Schedule of Work... 6 7. Reclamation Cost Estimate... 6 7.1 Capital Construction Costs... 6 7.2 Long Term Maintenance, Monitoring and Treatment... 6

Guide to the Development of a Mining and Reclamation Plan in New Brunswick 1 INTRODUCTION The user is directed to the Guide to the Mine Approval Process in New Brunswick for direction on the approval process and the submission of the Mining and Reclamation Plan. The following is intended as a guide to the creation of a Mining and Reclamation Plan as per the legislative requirements of the Province of New Brunswick. The following format also assists in amalgamating the information requirements as set out in the Mining Plan, Reclamation Plan, and Environmental Impact Assessment (EIA) Registration document as required by the Mining Act and Regulations, and the Clean Environment Act, EIA Regulation 87-83. This suggested general format will assist the proponent to develop a thorough and consistent plan that will be acceptable to the Standing Committee on Mining and the Environment (SCME) and streamline the mine approval process. It is the responsibility of the project proponent to investigate and obtain all the data necessary to formulate the Mining and Reclamation Plan. REQUIRED ELEMENTS EXECUTIVE SUMMARY A summary of the document is required and should highlight all major findings, issues and conclusions. PART 1. BACKGROUND REVIEW The purpose of Part 1 of the Mining and Reclamation Plan is to provide necessary background data to serve as both a benchmark for comparison purposes and also to assist in evaluating environmental risks associated with this project. 1. Company Information Background information regarding full legal name of the company, location, and a brief synopsis of company experience is required. 1.1 Company Address A full mailing address and also the physical address of the company or principals shall be provided. 1.2 Principal Contacts A full list of all contacts is to be provided including the Owner(s) or President, Chief Executive Officer, and key project officers. 2. Site Location Provide the geographic location and a description of the project location. As a minimum, a large-scale (preferably 1:12,500) map should be provided showing the site location and major geographical features. 2.1 Geographical Setting Describe the topography, setting (whether lowland, upland, plateau, etc.), population density, vicinity of urbanization, etc. 2.2 Land Use Describe the existing land use for the mine site as well as the adjacent land uses. 2.3 Access Explain the existing methods of access to the site and the current state of transportation routes. 2.4 Ownership State the NB Parcel Identifier (PID) number for the property in question and the name(s) of the registered owner(s). Provide a property map for the area identifying adjacent properties and landowners. 3. Geology Describe the general geology of the project area and include site-scale maps. 3.1 Unconsolidated Geology Provide a general description of the geology of surficial sediments. Include description of soil type and characteristics, thickness, and aerial extent. A topographic

Guide to the Development of a Mining and Reclamation Plan in New Brunswick 2 profile should be provided showing the predevelopment elevations and major landforms. 3.2 Bedrock A general description of the bedrock geology is required for the immediate area including rock types, physical and chemical characteristics, and structure. A geological map of the project area should be provided outlining all major features including the surface expression of the ore body. 3.3 Ore Geology Describe the ore to be mined and include details on its location, physical characteristics, mineralogy, and structure. 3.4 Seismicity Provide general seismicity data for the project area location including the maximum likely event and expected seismic velocities. 4. Hydrology A map should be provided showing surface water drainage patterns, watershed(s), and groundwater flow characteristics. Wherever possible, site-specific data obtained by actual measurement is preferred over extrapolation of regional data. 4.1 Climate Indicate the climate for the project area including average temperatures, yearly rainfall, total snowfalls, average monthly rainfall, prominent wind directions, evaporation, etc. 4.2 Surface Water Describe the characteristics of the watershed(s) affected by the project and include drainage patterns, runoff characteristics, volumes of discharge, water quality or chemistry, and flood characteristics. Include a sediment survey of metal levels within any watercourse or discharge area (springs) that might be affected by the development or operation of the mine. 4.3 Groundwater Describe groundwater characteristics including flow patterns, the groundwater table, aquifers and aquitards, chemistry, recharge zones, discharge zones, location of drinking water supplies if applicable, etc. 5. Biology 5.1 Vegetation Provide survey results detailing the relative abundance of terrestrial plants including rare species that may be disturbed as a result of development. 5.2 Wildlife Provide survey results detailing the presence and habitat of wildlife in the area including any rare or endangered species that may be disturbed as a result of development. 5.3 Aquatic Life Provide survey results detailing the relative abundance of fish and benthos species in affected watercourses. 6. Site History An assessment of the archaeological potential of the project site should be provided including a brief history of prior land use if applicable. 7. Environmental Sensitivities Produce a list of sensitive environmental features that could potentially be impacted by mining development. This includes existence of rare plants, endangered species, sensitive habitats such as wetlands, water supplies, parks, and specially designated areas and protected zones. 8. Socioeconomic Sensitivities Produce a list of economically and socially valuable resources that may be impacted as a result of the mine development. This includes such items as forestry operations, agricultural land, recreational land, tourism, native land issues, etc. PART 2. MINING PLAN 1. Mine Site Description 1.1 Ore Reserves Submit a description of the total resources and resources including grade of the ore and an indication of mineable and non-mineable reserves based on the

Guide to the Development of a Mining and Reclamation Plan in New Brunswick 3 proposed mine plan. 1.2 Mining Methods The principle mining method (s) to be employed to extract the resource should be detailed in this section, including the rationale for choosing this method over others. This shall include typical equipment and processes likely to be used. A flowsheet diagram is recommended to illustrate the concept. 1.3 Mine Site Layout 1.3.1 Mine Workings The layout of the planned mined area and the surface expression of mining, either aboveground or underground, should be illustrated in appropriately scaled plans and sections. 1.3.2 Surface Infrastructure The layout of surface infrastructure including buildings, roads, services and all surface structures shall be detailed along with an attached map or engineering drawing shown at an appropriate scale. 2. Mining Operations 2.1 Development Time Line A schedule for the mining project should be summarized in this section and should include all major milestones from mine approval to estimated mine reclamation and closure. The use of a chart is recommended. 2.2 Mining Sequence The amount of surface disturbance and the sequence of mining will be outlined showing expected progression in annual intervals. Expected underground and open pit development is included here. Vertical sections of key mining areas are also recommended to illustrate the progression of mining faces. 2.3 Ore Processing 2.3.1 Plant Design and Flowsheet Information shall be provided describing the milling facility. The method and procedure to process the ore should be explained in general terms and with a flowsheet diagram. Particulars such as milling rate, use of reagents, volume of wastes, water usage, ore handling and storage and any necessary pollution controls should be explained. 2.3.2 Concentrate Handling Details should be provided for the proposed means of conveyance, storage and shipping of the concentrate including monitoring and protective measures. 2.3.3 Thiosalt Management Thiosalt generation should be addressed if applicable. This will include prediction of concentrations in effluent using a standard industry model and development of a thiosalt management plan. 2.4 Water Management Plan 2.4.1 Surface Water Runoff The seasonal surface drainage during operations should be detailed in this section. Key drainage routes shall be clearly shown across the site property and shall include all ditches, surface catchments, sewers, ponds, plant effluent locations, and streams. 2.4.2 Potable Water Potable water sources shall be detailed in this section and include estimates of water quality and quantity required. A method for protection and quality control of the potable source should be included. 2.4.3 Mine Water An acceptable method should be used to estimate the expected seasonal mine inflows and expected mine outflows or de-watering rate. The inflow and outflow rates shall be estimated for different stages of the expected mine development and life if expected to change. 2.4.4 Water Balance and Loadings A description of how the proponent intends to manage all site water in an environmentally safe manner should be included. A general hydrologic water balance should be estimated for the mine site in order to estimate loadings and impacts to the environment.

Guide to the Development of a Mining and Reclamation Plan in New Brunswick 4 2.5 Waste Management Plan An overall plan for the management of waste shall be provided for the site. Infrastructure required for waste management shall be included in a detailed engineering drawing. 2.5.1 Air Emissions Any air emissions from the plant site or other sources shall be detailed in this section and shall include a description of expected pollutants, estimated levels, and proposed mitigation and monitoring methods. 2.5.2 Tailings Management A tailings management plan shall be provided if applicable. Tailings storage impoundments shall conform to the Canadian Dam Associations guidelines for Dam Safety. An estimate of the rate of tailings discharged, its expected physical and chemical properties, method of disposal, and expected accumulation pattern over the life of the mine shall be provided. 2.5.3 Waste Rock Storage Similarly to tailings, the method and infrastructure required to provide waste rock storage shall be outlined. There shall be an estimate of the rate of waste rock produced, its expected physical and chemical properties, method of disposal, and expected accumulation pattern. 2.5.4 Water Treatment A description of all water treatment efforts shall be provided. This includes treatment of acid rock drainage and treatment of suspended solids. The methods used for water treatment shall be fully described and engineering drawings provided. The proponent shall discuss the reagents used, expected volumes, estimated water volume, estimated water quality before and after treatment, and the management of any byproducts (such as hydroxide sludge). 2.5.5 Solid Waste Disposal and Sewage An estimate of the volume and type of solid waste and sewage generated from the site should be outlined including a method for handling and storage of all such wastes. 2.5.6 Hazardous Products An outline of expected chemical, petroleum and other hazardous products to be used and stored on site shall be provided and include physical and chemical properties and plans for safe storage and handling. 2.6 Environmental Monitoring The proponent must submit a proposed plan for monitoring the environmental effects at key locations around the site. This will include surface water, effluents, groundwater, air quality, noise, seismic, and biological monitoring. Background monitoring stations should also be considered. For metallic mines, the project must adhere to federal Metallic Mining Effluent Regulations and perform aquatic environmental effects monitoring. The proposed monitoring plan should be outlined in this section. 2.7 Physical Stability Methods shall be provided to monitor and maintain the physical stability of the mine site before and during operations including site erosion and runoff controls, dusting, ground subsidence, slope stability, and stability of earthen structures such as tailings impoundments and rock piles. 2.8 Progressive Reclamation A plan shall be provided to include progressive reclamation into the mine development process. Details of the type of reclamation, the objectives and a time line should be explained. 2.9 Emergency Preparedness Plan An emergency preparedness plan must be presented and shall include the procedures to be followed in case of an environmental emergency. A list of contacts shall be provided. 2.10 Site Security and Safety The proponent must propose the security and safety measures to be performed on the mine site for each stage of the mining.

Guide to the Development of a Mining and Reclamation Plan in New Brunswick 5 2.11 Temporary Shutdown Procedure The proponent shall produce a definitive plan to complete reclamation obligations during the event of a temporary and/or longer term mine closure. This will include definitive time lines for reclamation and monitoring. 3. Impacts Potential impacts specific to the proposed mining project shall be defined in the following section along with suggested mitigation measures if the impact is negative. 3.1 Environmental Provide a summary of all predicted negative impacts and methods to prevent, minimize or mitigate them. 3.2 Economy and Employment An estimate of the economic impact should be briefly mentioned here including gross revenues, expected local expenditures, employment, salaries and potential contribution to taxes. 3.3 Transportation Provide information regarding the existing transportation network, which modes of transportation will be used to support the project, and what the external impacts will be from increased traffic or changes in traffic patterns. PART 3. RECLAMATION PLAN 1. Infrastructure Removal 1.1 Buildings and Equipment Describe how all buildings will be demolished and disposed of including all ancillary equipment, permanent and mobile. Note any permanent structures such as foundations expected to be left intact and give reasons why they will not be removed. 1.2 Utilities Describe how all electrical, pipeline, drainage channels, septic beds, landfills, water supplies, etc. will be demolished and disposed of, and if left intact, an explanation for doing so. 1.3 Transportation Access Describe how all roads, railways and other accesses will be removed to limit site access and the reasons for leaving any such infrastructure in place. 2. Site Stabilization 2.1 Contouring and Grading Describe all the areas on site that will be recontoured to achieve physical stabilization, to remove physical hazards, to achieve water management goals and to allow a growth medium for revegetation. This includes any excavations, waste rock piles, and foundations left in place. 2.2 Re-vegetation Describe efforts toward establishing an effective ground cover for revegetation and any active vegetation efforts. Indicate species of vegetation to be used, the target areas, and the objectives of the work. 2.3 Crown Pillars If crown pillars are expected to be an issue from underground mining then a plan should be presented to explain how the proponent would ensure long-term stability from crown pillar subsidence and collapse. Indicate what reclamation efforts will be required to secure crown pillars and what monitoring will be required. 2.4 Mine Openings Describe how all pits, tunnels (adits), shafts, and other openings will be secured from being a public and/or environmental hazard and the reasons for the particular method. 2.5 Tailings Pond Stabilization A concept is required to address how any tailings ponds and associated water and waste management structures will be reclaimed upon mine closure. This should include estimates of final waste volumes and the expected environmental condition and the stability of such structures. 3. Site Description at Closure Present a conceptual description of the mine site after closure and how it may differ from the original geographic and environmental setting. Indicate potential land uses post mine closure. Describe any new facilities which are expected to be constructed after mine closure such as

Guide to the Development of a Mining and Reclamation Plan in New Brunswick 6 water management structures, water treatment facilities, monitoring stations, etc. 4. Site Safety and Security If necessary, describe measures that will be required to maintain site security and safety after mine closure. 5. Post-Reclamation Monitoring Estimate and give a concept of what type of postclosure monitoring will be required to validate the success of the mine reclamation efforts and site stabilization. Indicate if water quality, aquatic surveys, vegetation surveys, or erosion/subsidence monitoring will be required and what the schedule and time line for this monitoring is expected to be. 6. Schedule of Work Present a conceptual schedule of the reclamation work in terms of milestones or projects and clearly indicate a reasonable time line to complete such work. 7. Reclamation Cost Estimate The proponent is required to submit a reasonable cost estimate to complete the reclamation plan in order to provide a basis for the financial security the Province requires in case the proponent is unable to meet its reclamation obligations. The company must state the form and amount of security for the project. 7.1 Capital Construction Costs Prepare a reasonable cost estimate to complete the work as described in the reclamation plan. This will include a breakdown of all phases of the plan and consider capital costs, labour costs, and administrative costs. 7.2 Long-Term Maintenance, Monitoring and Water Treatment If applicable, prepare a reasonable estimate of the expected annual costs to perform maintenance on remaining site infrastructure, perform monitoring and to perform water treatment. Include an estimate of the duration of post-closure presence on site.