WELCOME! Mill Creek Daylighting Technical Feasibility Study. Thank you! Open House December Please sign in and get a comment form.

Similar documents
Logan River at Rendezvous Park, Channel and Floodplain Restoration: Crack Willow (Salix fragilis) Issues and Management Strategies

Welcome to the Boulevard Lake Dam Class Environmental Assessment. Public Information Session #1. June 14, 2016

Wildlife Habitat Management on State Land

Urban Riparian & Stream Restoration Program: Management & Photo Monitoring. Texas Water Resource Institute

Leaside to Main Infrastructure Refurbishment Project Strengthening the transmission system in your neighbourhood

OBSERVED CLIMATE IMPACTS ON ECOLOGY AND WILDLIFE

TABLE OF CONTENTS 5.0 FOREST MANAGEMENT PLANNING...

Table D1: WC-R1 to WC-R3 (Wilket Creek Park)

Strength. Performance. Passion. Paris Pit CAP. September 25, 2012

CITY OF NEW WESTMINSTER. Bylaw No. 7033, 2005 RIPARIAN AREAS PROTECTION BYLAW

Public Information Centre September 19 th, 2017

Northeast 9/27/2011. Agenda for Tonight: Setting the Stage: Background Information. Alberta's Population Highlights. Edmonton s Highlights

Table of Contents. List of Tables. 11. Advantages and Disadvantages

Transportation Association of Canada Environmental Achievement Award Nomination Submission:

Burns Paiute Tribe s s Wildlife Acquisitions

ANCR INDIVIDUAL RESPONSES SUMMARY: 2/11/04 WATER RESOURCES GOALS AND OBJECTIVES

Conceptual Design and Feasibility of a Natural Fishway at the Fremont BART Weir, Alameda Creek, California

Los Angeles River Master Plan Update DRAFT Vision, Goals, and Actions

LYNCH WOODS. Site Analysis & Design Concept. February 25, 2010 LYNCH WOODS Town of Brighton

Magino Project Environmental Impact Statement. Technical Support Document Draft Fish Habitat Compensation Plan

MANZANITA LAKE PLANNING UNIT Willow Creek Watershed

COUNTY COMPREHENSIVE PLAN

Town of Aurora Stream Management Master Plan PUBLIC INFORMATION CENTRE May 1 st, 2018

Carp Creek 2013 Summary Report

Prioritizing Climate Change Impacts and Action Strategies

Valley Line LRT. Project Update & Citizen Working Groups Overview Public At Large Recruitment Meeting Citizen Working Group B River Valley

San Bernardino County Flood Control District. Ecological Resource Specialist

RIVER ACCESS STRATEGY GUIDING PRINCIPLES & STRATEGIES

Welcome. Public Information Event. Dufferin Sanitary Trunk Sewer (STS) System Improvements Municipal Class Environmental Assessment Study

Project Goals and Scoping

Jan Moryk, Project Manager, Environmental Monitoring and Data Management Section, TRCA

COTTON CREEK CULVERT REPLACMENT

PRINCE GEORGE NATURAL AREAS AND THE EFFECTS OF CLIMATE CHANGE: CASE STUDY

RIPARIAN AREAS REGULATION

South St. Vrain / Hall Meadows Restoration Planning August 20, 2015

Theme General projections Trend Category Data confidence Climatology Air temperature

Lynnwood Link Extension 2013 Draft EIS Comments and Responses. Page 275

SDC 2.0 Working Group: Goals, Actions and Targets Nature + Water

Jan Moryk, Project Manager, Environmental Monitoring and Data Management Section, TRCA

DIRECTIONS FOR STRATEGY DEVELOPMENT

Response of Wildlife to Riparian Habitat. David A. Manuwal College of Forest Resources UW

Sustainable Natural Environment Fish Habitat

Temporary Watercourse Crossing: Culverts

CHAPTER 3 Environmental Guidelines for WATERCOURSE CROSSINGS GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR

RIPARIAN CORRIDOR STUDY FINAL CITY CREEK MANAGEMENT PLAN TABLE OF CONTENTS

7.0 CHAPTER. Wildlife Habitat

OurFuture. Protecting. March Ontario Provincial Plans and Conservation Authorities

S.R. 4007, Section 14B PADEP Environmental Assessment Form. Enclosure C Description of Aquatic Habitat

Section 7 Environmental Constraints

Habitat Grant Projects Clinton River Watershed

Stream Health. Stream Bugs Our Stream Health Communicators. Upper Nottawasaga River Stream Health. NVCA Science & Stewardship

The Nature Conservancy Cosumnes River Preserve Franklin Boulevard Galt CA 95632

LIST OF TECHNICAL APPENDICES

2015 Monitoring Report Year 2 Harmon Property Stream Restoration Aurora, Ohio. Corps Permit Number Prepared by:

Chapter 9 Wetlands Park Study Team

7.0 WATER-BASED CONTROL MEASURES

3.6 Riparian Ecosystem Wildlife

SHORELINE INVENTORY AND RESTORATION PLANNING

3.6 Construction Methods

Attachment C Applicant s Proposed Mitigation Statement Alaska DOT&PF Northern Region Pilot Station Airport Relocation Project POA

The Norwich Street Bridge

Gravel Pit Objections

Moonlight Aquatic Organism Passage Project

Aquatic Mitigation Riverside Oxbow and Sycamore Creek Restoration

Chines Integrated Stormwater (Watershed) Managerrient Plan

TABLE OF CONTENTS. TOC-i

CROSBY BROOK RESTORATION STUDY BRATTLEBORO, VT

Appendix M. Criteria, Measures and Indicators for Effects Assessment

The primary advantages of the Yandukin Drive Area Crossing concepts are: The primary disadvantages of the Yandukin Drive Area Crossing concepts are:

DECISION MEMO FOR CATEGORICAL EXCLUSION HOLY JIM CREEK CROSSING REPLACEMENT

U n i v e r s i t i e s & M e d i c a l D i s t r i c t. Off-campus Neighborhood Development

Temporary Stream Crossing

Temporary Stream Crossing

Frequently Asked Questions Connecting Palo Alto

STAFF REPORT WASHINGTON STATE PARKS AND RECREATION COMMISSION COVERED SHELTERS AND BIKE RACKS

Wetland Resources Cultural, Historical and Environmental Significance

Join the Conversation!

CATEGORY a protection of the natural environment, its ecosystems and biodiversity.

Great Lakes Coastal Wetland Monitoring: Support of Restoration Across the Basin

8. A. AQUATIC HABITATS

Kittitas County Voluntary Stewardship Plan

RIPARIAN CORRIDOR STUDY FINAL PARLEYS CREEK MANAGEMENT PLAN TABLE OF CONTENTS

In July 2000, City Council adopted an. Environmental Protection Program for. the City of North Vancouver.

4. What is Item A called? a. Eckman dredge b. Secchi disk c. Van Dorn sampler d. Ponar sampler

ROSS VALLEY FLOOD PROTECTION & WATERSHED PROGRAM U.S. ARMY CORPS OF ENGINEERS CORTE MADERA CREEK PROJECT. Community Meeting.

Community Services and Utilities & Environmental Protection Report to UE The SPC on Utilities and Environment Page 1 of April 25

S.R. 2027, Section 02B PADEP Environmental Assessment Form. Enclosure C Description of Aquatic Habitat

Lesson 2-2: Riparian Zones

Understanding and Restoring Natural Floodplain Function. Gary James CTUIR Fisheries Program Manager

Chapter 10 Natural Environment

16.1 Significant and Unavoidable Impacts

Wetland and Watershed Management Planning FAQ

BMP 5.4.2: Protect /Conserve/Enhance Riparian Areas

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SACRAMENTO DISTRICT 1325 J STREET SACRAMENTO CA PUBLIC NOTICE

APPENDIX 8. NORTHERN GROUND ELECTRODE LINE WATERCOURSE CROSSING ASSESSMENT BOOKLETS

CLAREMONT CONSERVATION COMMISSION CONSERVATION PLAN Adopted 7/21/2016

COTTONWOOD CREEK RECLAMATION PHASE I & II

Appendix E : Guidelines for Riparian Buffer Areas

Silicon Valley Rapid Transit Corridor Final Supplemental EIR

3. SHIRLEY S BROOK / WATTS CREEK SUBWATERSHED STUDY COMMITTEE RECOMMENDATION

Transcription:

WELCOME! Daylighting Technical Feasibility Study Open House December 2016 Please sign in and get a comment form. Thank you!

WHAT IS DAYLIGHTING? Daylighting refers to the process of re-establishing creeks and streams that have been altered to concrete channels or diverted to pipes. Many jurisdictions around the world have undertaken daylighting projects to restore their creek and ravine systems.

BACKGROUND is one of 12 ravines within Edmonton contributing flow to the North Saskatchewan River. is a prominent feature of Edmonton s river valley and ravine system, and provides key ecosystem services such as biodiversity, aquatic and upland wildlife habitat, and regional ecological connectivity. Prior to development activities dating back to the early 20th century, was a free-flowing stream connected to the North Saskatchewan River about 500m downriver of the Low Level Bridge. 1924 Air Photo with approximate creek alignment shown 1967 Air Photo with approximate creek alignment shown

BACKGROUND CONTINUED In the 1960 s was permanently diverted through a tunnel to the North Saskatchewan River to facilitate development of a freeway system. In 1972, the James MacDonald Bridge and connecting ramps to Connors Road and 98 Avenue were completed, and the channel was filled in. Due to public opposition, the proposed freeway in Mill Creek Ravine was never completed. Early transportation plan showing the diversion of 1978 Air Photo with approximate creek alignment (blue) and diversion tunnel (red) shown

VISION Restoration of the connectivity between and the North Saskatchewan River is a key priority of the City of Edmonton for enhancing Edmonton s ecological network. It is also a priority for Alberta Environment and Parks due to the potential for re-establishing spawning habitat for native fish species. Restoration of the channel will: Re-establish the natural hydrologic and hydraulic regimes that connect to the North Saskatchewan River Improve water quality Support biodiversity Provide recreation and cultural opportunities

TECHNICAL FEASIBILITY STUDY As part of its 2016 budget, City Council authorized a Technical Feasibility Study to: Determine the technical feasibility for daylighting this reach of Identify constraints to daylighting, including existing transportation and utility infrastructure Determine possible routes for daylighting Explore options for aquatic and terrestrial wildlife passage Explore options for pedestrian and cycling along the restored creek Develop three conceptual design options for daylighting Prepare cost estimates Identify funding sources and options for staging.

EXISTING CONDITIONS Existing channel at 90 Avenue inlet to tunnel at 94 Avenue Ravine Park north of tunnel diversion

EXISTING CONDITIONS Ravine Park at Connors Road Connors Road bridge at approximate alignment of original Existing original channel north of 98 Avenue

STUDY AREA NORTH SASKATCHEWAN RIVER 98 AVENUE JAMES MACDONALD BRIDGE CONNORS ROAD 95 AVENUE 94 AVENUE SCONA ROAD 93 AVENUE Study Area Likely Daylighting Corridor

EXISTING TRAILS AND WALKWAYS NORTH SASKATCHEWAN RIVER 98 AVENUE JAMES MACDONALD BRIDGE CONNORS ROAD 95 AVENUE 94 AVENUE SCONA ROAD l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l 93 AVENUE Study Area Likely Daylighting Corridor Stairs Gravel Trails Shared Use Paths Sidewalks Pedestrian Bridges B LRT Conflict Points Bus Stops Future LRT Station Access across LRT Tracks B LRT

TECHNICAL FEASIBILITY The study has determined that it is technically feasible to daylight the lower reach of. The key technical findings include: The roadways are the most significant and costly constraint The size of the roadway crossings will have the greatest ecologic and recreational impact Buried utility conflicts are manageable Several retaining walls will be required to create space for the creek The creek slope is moderately steep and erosion protection measures are required Very high creek flows need to be diverted to the existing tunnel Fish spawning habitat gains will be greatest near the creek mouth but fish passage and spawning further upstream will be possible To provide spawning habitat, it will be necessary to remove some trees from Henrietta Muir Edwards Park

THE WAY WE GREEN DEVELOPMENT OF DAYLIGHTING CONCEPTS Three daylighting concepts were developed based on engineering constraints and consideration of ecological and recreational opportunities. The three daylighting concepts proposed are: Concept 1: Ecological Focus Concept 2: Trail Connectivity Focus Concept 3: Destination Park Focus

DEVELOPMENT OF DAYLIGHTING CONCEPTS WHAT WE HEARD Feedback from the November 16 open house assisted in identifying guiding principles and design priorities for concept development. You told us that you valued the following: Accessibility, walking along creek Trail connectivity to the greater River Valley trail system Connection to nature or habitat that encourages wildlife use Recreational, dog walking and picnic opportunities Balance of naturalized areas and of man-made elements Access points from adjacent neighbourhoods No traffic noise Educational opportunities Urban park connected to the Muttart LRT station

WHAT WE HEARD WHAT WE DID What We Heard What We Did Create fish spawning habitat Fish spawning habitat provided in every concept Simplify and/or re-design road network Don t change the road network Create new habitat, restore ecosystem and improve biodiversity Provide a natural aesthetic, nonmanmade character Extend current uses of the creek and ravine Make the area a destination, provide education opportunities Create wetland habitat Road network re-design provided in every concept Concept 2 (Trails Focus) limits changes to shifting 98 Avenue Concept 1 (Ecology Focus) emphasizes new habitat, biodiversity and strong ecological connectivity Concepts 2 (Trails Focus) and 3 (Destination Park Focus) provide this to a lesser degree All concepts include naturalized vegetation Concept 1 (Ecology Focus) has fewest man-made elements, Concept 3 (Destination Park Focus) provides a balanced mix of natural and man-made elements All concepts extend current uses of the ravine to some extent Concept 3 (Destination Park Focus) focuses on destination elements, connection with the Muttart and includes a learning centre Wetlands are provided in all concepts

WHAT WE HEARD WHAT WE DID What We Heard What We Did Plan for the future, think longterm and don t rush Save mature trees / include many trees in final design Ensure high functioning trail system Historical recognition of past uses Consider winter usage Improve sense of safety around road network, ensure paths go under roads Make creek swimmable and allow for canoe access Consider alignment through Gallagher Park and Muttart Consider flooding All concepts account for known parks, transportation and utility infrastructure plans including the Valley Line LRT All concepts can be staged based on funding availability All concepts retain as many of the existing trees as possible All concepts include large areas with new treed areas All concepts have at least one trail that ties into existing system Where trails are lost, replacement paths will provide equivalent or improved connectivity All concepts include the potential to incorporate various interpretive values through signage and other educational material Each concept has a trail or space that could be used for cross-country skiing and snowshoeing All concepts include trails with road underpasses Vegetation will screen traffic from view, further increasing sense of security As an urban creek, the water quality cannot be made suitable for swimming Water depths are not expected to be conducive to canoeing or kayaking Significant technical constraints and conflicts exist with this option and thus it was not selected as one of the three concepts High flows will be diverted through the existing tunnel to river Creek to be well below existing infrastructure

FISH SPAWNING HABITAT AND WETLANDS A key project objective is to create new fish spawning habitat in the daylighted. The biggest habitat gains would be near the creek s confluence with the river. The targeted fish species would be Northern Pike. Northern pike spawning habitat could be created through the development of small in-stream and off-stream wetlands. All three of these concepts include wetlands within Henrietta Muir Edwards Park, and involve some tree removals. Other species, such as white sucker and walleye may spawn in creek reaches having gravelly substrate. Examples of fish spawning habitat.

HINTERLAND WHO S WHO Species that can be expected within a daylighted Bird Species (left to right,top to bottom) Belted Kingfisher, Black-capped Chickadee, Downy Woodpecker, Great Blue Heron, Least Flycatcher, Yellow Warbler, Mallard, Northern Saw-whet Owl, Ruffled Grouse, Sharp-skinned Hawk, Song Sparrow Mammal Species (left to right) Mule Deer, Porcupine, Coyote, Least Chipmunk, Red Squirrel, Snowshoe Hare Fish Species (left to right, top to bottom) Long Nose Sucker, Brook Stickleback, Northern Pike, Spottail Shiner, Trout-perch, Flathead Minnow, Walleye, White Sucker

WHAT WOULD YOU LIKE TO SEE? Maps are available on adjacent tables. Please provide your comments on the following topics: Memorable Experiences / Favourite Places Key Issues and Concerns Idea Map

NEXT STEPS The three daylighting concepts will be refined based on input from tonight s open house. The final report will be presented to City Council in early 2017. Council will then provide guidance regarding next steps. If the daylighting initiative proceeds, the City of Edmonton will work with other levels of government to identify funding opportunities for the design and construction stages of the project.