COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

Similar documents
COON CREEK WATERSHED DISTRICT PERMIT REVIEW. KTJ 314, LLC Blaine, MN 55449

COON CREEK WATERSHED DISTRICT PERMIT REVIEW Mississippi Dr Coon Rapids, MN SQ FT Residence on 0.64 Acre Lot

COON CREEK WATERSHED DISTRICT PERMIT REVIEW th Ave NE Ham Lake, MN 55304

COON CREEK WATERSHED DISTRICT PERMIT REVIEW th Lane NE East Bethel, MN 55005

COON CREEK WATERSHED DISTRICT PERMIT REVIEW

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) /

Water Resources Management Plan

Stormwater Management. Cayuga County NY 20 July 2016 Presenter : John B. Zepko, CPESC

E. STORMWATER MANAGEMENT

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1500 OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS

Phase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac)

Appendix B Stormwater Site Plan Submittal Requirements Checklist

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans)

Appendix B Construction SWPPP Short Form

Incorporating Restoration Planning and Transportation Controls into the Valley Creek Watershed Act 167 Stormwater Management Plan

Storm Water Permitting Requirements for Construction Activities. John Mathews Storm Water Program Manager Division of Surface Water

Minneapolis Impound Lot Facility Improvements Minneapolis, MN BCWMC

Stormwater Local Design Manual For Houston County, Georgia

MODEL Stormwater Local Design Manual. City of Centerville

City of Fairmont Storm Water Pollution Prevention Plan Annual Public Meeting. June 11, 2018

EROSION AND SEDIMENT CONTROL STANDARDS CITY OF OVERLAND PARK DRAFT

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw

Appendix A Stormwater Site Plan Report Short Form

Local Stormwater Design Manual. City of Fairburn

Instructions for Notice of Ground Disturbance Form:

S.O.P. No. HMD

CITY OF JENKS EARTH CHANGE PERMIT APPLICATION

City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017

Municipal Stormwater Management Plan Prepared For The Borough of Cape May Point By Van Note-Harvey Associates VNH File No.

PRELIMINARY DRAINAGE REPORT NEWCASTLE FIRE STATION OLD STATE HIGHWAY

Municipal Stormwater Ordinances Summary Table

Typical Local Erosion Control Requirements (Storm Water Management Authority, Inc.)

APPENDIX N Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports

Will County Site Development Permit Submittal Checklist TAB 1 PROJECT OVERVIEW

Warner Robins Stormwater Local Design Manual

SECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1

Coon Creek Watershed District RULES

Environmental Information Worksheet

TOWN OF BETHLEHEM SWPPP APPLICATION REVIEW CHECKLIST

TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SPECIFICATIONS AND SCOPE 105.1

Permit Application Review Permit No Received complete: March 19, 2019

Chapter 3 Dispersion BMPs

INDIAN CREEK WATERSHED PLAN EXECUTIVE SUMMARY

Project Priority List scoring worksheet - stormwater Guidance document

APPENDIX I. Plan Reviewer Checklist

Middle Tennessee State University (MTSU) Stormwater Plan Review Checklist

Memorandum. Creekside Woods I & II Plymouth, MN BCWMC Summary: General Background & Comments. Floodplain

UMD Storm Water Program Construction Requirements. Greg Archer, MBA Environmental Compliance Specialist

KANKAKEE COUNTY PLANNING DEPARTMENT APPLICATION FOR CLASS I & II GRADING AND DRAINAGE/STOMRWATER PERMIT APPLICATION

Clean Water SRF WATER RESOURCE RESTORATION Sponsored Projects. APPLICATION COMPLETENESS CHECKLIST September 2014

Sediment Control Practices

I. Welcome & Introductions WPAC History (Paul Racette, PEC)

Stormwater Management Permit Application LESS Than One Acre. Public Works Department st Ave East Kalispell, Montana (406)

ADDENDUM NUMBER TWO. A. SECTION ADVERTISEMENT FOR BIDS 1. REVISE Sealed Bid Date/Time/Location paragraph to read as follows:

Overview of Section 2

Performance Standards Compliance Checklist

Construction Phasing Bad

Example 1: Pond Design in a residential development (Water Quantity calculations for a Wet Pond and Wet Extended Detention Pond)

STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW

WELCOME TO THE CONSTRUCTION STORMWATER PERMIT WEBINAR

5G. Consider Approval of 50% Plans for Northwood Lake Improvement Project (NL-1), New Hope

STANDARD PLAN FOR MINOR EARTH DISTURBANCES

Guidance on each of the 23 basic elements follows: Plan Index showing locations of required items: The plan index should include a list of the

3.3 Acceptable Downstream Conditions

Please print or type.

IV. ENVIRONMENTAL IMPACT ANALYSIS G. HYDROLOGY/WATER QUALITY

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall

Practices that capture and temporarily store the WQ v before allowing it to infiltrate into the soil.

CONSTRUCTION PLAN CHECKLIST

Richland County Department of Public Works Engineering (Land Development) Division

Section 6: Stormwater Improvements

Earth Dikes and Drainage Swales

Memo. To: From: cc: For further assistance please contact Ben Ruzowicz, GSWCC Technical Specialist at (706)

POST-CONSTRUCTION STORMWATER MANAGEMENT FOR EROSION CONTROL PROFESSIONALS

Module 4 Regulatory requirements for Land Disturbing Activities

STORM DRAINAGE DESIGN MANUAL

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination

4.4.6 Underground Detention

Dawson County Public Works 25 Justice Way, Suite 2232, Dawsonville, GA (706) x 42228

Planning Considerations for Stormwater Management in Alberta. R. D. (Rick) Carnduff, M. Eng., P. Eng. February 20, 2013.

Guide for the draft 2018 NPDES/SDS Construction Stormwater General Permit

ES Inspection and Maintenance of MS4 Structural Controls* Document Identification Number Date: March 14, 2018

Design Example Residential Subdivision

MS4 Programs: Quality, the Other Stormwater Q. Dan Bounds, PE, D.WRE IAFSM March 9, 2017

Guidance Document for Storm Water Pollution Prevention Plan (SWPPP) Submittal. A2 Plat showing building lot numbers/boundaries and road layout/names:

Items in this checklist identify the base requirements that are to be provided by the design professional.

BCWMC Capital Improvement Program (Approved with Minor Plan Amendment July 2017)

SUPPORTING DOCUMENT STORMWATER BEST MANAGEMENT PRACTICE (BMP) INFEASIBILITY WORKSHEET FOR ON-SITE STORMWATER MANAGEMENT

Stormwater Management Studies PDS Engineering Services Division ES Policy # 3-01

Hoosier Creek Watershed All of Ely drains into Hoosier Creek, which runs north to south along the west side of Ely. Hoosier Creek, Hydrologic Unit Cod

Erosion & Sedimentation Control Policy

STORM DRAINS AND IRRIGATION

Primer introduction to watershed management Plan Process highlight the major steps of plan development Project types look at some examples of common

Lake Elmo, MN Code of Ordinances STORM WATER AND EROSION AND SEDIMENT CONTROL

Description. Installation and Implementation Requirements

CHELTENHAM TOWNSHIP Chapter 290: WATERSHED STORMWATER MANAGEMENT Article IV: Stormwater Management

PRELIMINARY DRAINAGE STUDY

iswm TM Criteria Manual City of Azle Section 14 City of Azle Subdivision Ordinance DRAFT-June Chapter 1

Transcription:

PAN 16-112, Westwood Middle School, Page 1 of 6 COON CREEK WATERSHED DISTRICT PERMIT REVIEW MEETING DATE: August 22, 2016 AGENDA NUMBER: 10 FILE NUMBER: 16-112 ITEM: Westwood Middle School RECOMMENDATION: Approve with 3 Stipulations APPLICANT: PURPOSE: LOCATION: Spring Lake Park Schools Westwood Middle School 1415 81 st Avenue NE, Spring Lake Park, MN 55432 Addition of a parking lot for buses. 711 91 st Avenue NE, Blaine

PAN 16-112, Westwood Middle School, Page 2 of 6 APPLICABILITY: 1. Any work within or adjacent to a Public ditch within the Watershed District. 2. One or more cumulative acres of land disturbance 3. The lands and waters that have been, or may be covered by the regional flood. 4. High infiltration soils 5. Highly erodible soils EXHIBITS: 1) Stormwater Mgmt. Report from Anderson-Johnson Assoc. (AJA) dated 6-29-16, revised 8-1-16, received 8-8-16. 2) Geotechnical report from Braun Intertec dated 6-24-16, received 7-12-16 3) Plan Set from AJA dated 8-4-16, received 8-8-16. 4) Infiltration Basin Maintenance plan, no date, received 8-8-2016. PREVIOUS ACTION TAKEN: This was presented at the July 25, 2016 Board meeting with the following eight stipulations: 1. Receipt of escrows. 2. Site needs to provide filtration prior to any infiltration. 3. The applicant must acknowledge that they will conduct a post construction test on the stormwater features. The Coon Creek Watershed District shall be notified prior to the test to witness the results. 4. Provide a Maintenance Plan that is consistent with District Maintenance standards for each STP (infiltration basin and pervious pavers). 5. Subwatershed maps to confirm routing for the existing and proposed scenarios. 6. A defined curb cut and stabilization for the flow from the driveway to the infiltration area to ensure pretreatment and erosion protection.

PAN 16-112, Westwood Middle School, Page 3 of 6 7. After initial grading completely surround the proposed infiltration basins with erosion control measures to prevent the basin from clogging. 8. Provide pretreatment into infiltration basin. Rain Guardians or riprap are options at curb cuts to provide pretreatment. FINDINGS: Pre-application Meeting: The project as submitted has not received a general review during a pre-application meeting. Ditches: There is a public ditch on the property. The public ditch is County Ditch 17 according to the public drainage map. The observed elevations through this property are 893 ft MSL at the downstream end and 893.6 ft MSL at the upstream end. There is no work proposed on the County Ditch. Alternatives to repair and additional drainage have been considered and reviewed. The ditch is a 4th order stream. The ditch serves the primary role of a. Collector system The ditch serves approximately 0 acres of agricultural land. Land use in the area is toward residential. There are no flooding concerns upstream and/or downstream. The ditch has been inspected. Existing elevations, slopes and condition of ditch are good. The ditch is not in need of repair. Ditch Hydraulics: A crossing of the ditch is not proposed. Erosion and Sediment Control: Soils affected by the proposal are Lino, Isanti, and Zimmerman. Stabilizing vegetation is proposed for disturbed areas within seven (7) days of rough grading. Soil stockpiles have been proposed to be fitted with sediment-trapping measures to prevent soil loss. Adjacent properties and stormwater ponds are protected from sediment deposition. Construction schedules detailing when sediment trapping measures will occur; stabilization of earthen structures and the general timing of construction phases have been provided. Stormwater runoff does pass through a sediment basin or other sediment trapping BMP with equal or greater storage capacity. Stabilization adequate to prevent erosion has been provided at the outlets of all storm sewer pipes. All storm sewer inlets are protected from sediment-laden water during construction.

PAN 16-112, Westwood Middle School, Page 4 of 6 All work adjacent to water or related resource has taken precautions to contain sediment, and stabilize the work area during construction. Provisions have been made to minimize transport of sediment (mud) by runoff or vehicle racking onto the paved surface. Provisions have been made for cleaning road surfaces where sediment is transported by the end of the day. Construction entrance points are clearly located on the erosion and sediment control plan. The erosion and sediment control plan provides for the repair and maintenance of all temporary and permanent erosion and sediment control practices. Dewatering: Shallow ground water does not exist on site. The project does not require dewatering. Floodplain: There is floodplain on the property according to the District model and FEMA. The project does not propose to place fill within the floodplain. There are no flooding concerns upstream and/or downstream. Groundwater: Geotechnical information collected in May 2016 and indicates long term groundwater elevation is present at 7.5 feet below the surface. The site is within a Municipal Drinking Water Supply Area (DWSMA). The project site is not within the Emergency Response Area/10 Year Well Head Protection Area/Drinking Water Supply Management Area. The proposal does not contain a land use discouraged or prohibited by the Safe Drinking Water Supply Act (SDSA). Historic Sites: The proposed project does not include sites of historic or archeological significance. Local Planning & Zoning: The proposed project is consistent with local planning and zoning. There is an approved local water plan. Property owners affected by changes in drainage have been notified and acknowledge the changes proposed. Maintenance: The Owner of the Stormwater Management features and treatment practices is Spring Lake Park School District. The Stormwater Treatment Practices (STPs) consisting of the following: Stormwater Treatment Practices Number Pervious pavement with underground filtration basin 2 Raingarden 1

PAN 16-112, Westwood Middle School, Page 5 of 6 Inspection and maintenance of stormwater facilities will be the responsibility of Spring Lake Park School District. A maintenance agreement has been prepared. The applicant has submitted a Maintenance Plan for each Stormwater Treatment Practice. Easements: The proposed project does not include ditch maintenance easement. A ditch maintenance easement is not required. A maintenance access to all storm water management features is provided. Stormwater & Hydrology: Infiltration is not allowed within the project area from roadways and parking lots without pretreatment as this project area is within 1 mile of a DWSMA. The 1-inch infiltration may be achieved. The stormwater management system utilizes pervious pavement which directs runoff to an underground filtration area. The project also utilizes a raingarden. Stormwater leaving the site is discharged into a welldefined receiving channel and routed to a public drainage system. Drainage sensitive uses do not exist downstream from the proposed site. The rate of post-development runoff from the site does not exceed predevelopment rates, or rates which would interfere with sensitive downstream land uses based on the current design. Properties and waterways downstream from the project are protected from erosion due to increases in the volume, velocity and peak water flow rates of stormwater runoff. Concentrated storm water leaving a site is discharged directly into a well-defined natural or man-made off-site receiving channel or pipe. On-site constructed storm water conveyance channels are constructed to withstand the expected velocity from a 2-year frequency storm without erosion at the swale to the infiltration basin. Water Quality: The proposed project does not cause an exceedance of State water quality standards. The project does not contribute to the adverse impact of wetlands through inundation or volume of flow. All work adjacent to wetlands, waterbodies and water conveyance systems are protected from erosion. The proposal will not detrimentally affect the existing water quality of the receiving water. The proposal will not cause extreme fluctuations of water levels or temperature changes. Impairments: This project is within one (1) mile and drains to an Impaired Water. The Impaired Water is aquatic life. Springbrook Creek is impaired for Aquatic Life (Macroinvertebrates). There is not an EPA approved Total Maximum Daily Load (TMDL) or Waste Load Allocation (WLA) for this water. There are new impervious surfaces proposed as part of this project. Wetlands: Wetlands do not exist on-site according to the 1987 Federal manual, NWI, PWI and Soil Survey. Wetland Replacement Plan: A wetland replacement plan has not been submitted and is not required.

PAN 16-112, Westwood Middle School, Page 6 of 6 Wildlife: The proposed project does not include endangered or threatened species, rare natural communities, colonial waterbird nesting sites, migratory waterfowl concentration areas, deer wintering areas or wildlife travel corridors. Performance Escrow: $3,715.00 Wetland Escrow: N/A There are not ditch liens on the property. ISSUES/CONCERNS: ISSUE Escrows: $2,000 + (3.43 ac * $500) = $3,715.00 Groundwater: The applicant must acknowledge that they will conduct a post construction test on the infiltration/filtration systems. The Coon Creek Watershed District shall be notified prior to the test to witness the results. Stormwater & Hydraulics: Model appears to meet rate control; however, drainage maps were not provided to ensure accurate Subcatchment delineation. NEED 1. Receipt of escrows. 2. The applicant must acknowledge that they will conduct a post construction test on the stormwater features. The Coon Creek Watershed District shall be notified prior to the test to witness the results. 3. Subwatershed maps to confirm routing for the existing and proposed scenarios. RECOMMENDATION: Approve with 3 Stipulations Stipulations: 1. Receipt of escrows. 2. The applicant must acknowledge that they will conduct a post construction test on the stormwater features. The Coon Creek Watershed District shall be notified prior to the test to witness the results. 3. Subwatershed maps to confirm routing for the existing and proposed scenarios.