Green River Diversion Rehabilitation

Similar documents
Dams Information Sheet. Student Page. A dam is a structure that. Often. Beavers are nature s. They use to block the flow

Report to the House and Senate Committees on Appropriations

Supplemental Watershed Plan Agreement No. 10 for Neshaminy Creek Watershed Core Creek Dam (PA-620) Bucks County, Pennsylvania

Notice of Intent to Prepare a Draft Environmental Impact Statement for the

Managing Idaho Power Company s Hydro Projects During Drought Conditions The Benefits of Communication and Collaboration

Session B6- Installation of Denil fishways and eel ladders at brownfield sites

COUGAR DOWNSTREAM PASSAGE

Icicle Creek Water Resource Management Strategy

Agency Organization Organization Address Information. Name United States Department of Agriculture

Case Studies II: Downstream Fish Passage at High Head Dams

Notice of Intent to Prepare a Draft Environmental Impact Statement for the Intake. Diversion Dam Fish Passage Project, Dawson County, Montana

Low Impact Hydropower Institute AMENDED Application for Low Impact Hydropower Certification: Island Park Hydroelectric Project

Projects must fall under one of the nine categories listed in Table 1.

Design and Development of Fish Passage Facilities for Shortnose Sturgeon at a Northeast Hydropower Project

Dams: Conditions & Capacity

Columbia River System Operations Environmental Impact Statement Newsletter

L e s s o n 1 INTRODUCTION TO HYDROELECTRIC POWER

Media and Information Packet for Project Sponsors. Working with the News Media to tell the Watershed Story

Upper Colorado River Endangered Fish Recovery Program

9.0 PROJECT FUNDING 9.2 FUNDING OF WATER DEVELOPMENT PROJECTS

Water/Energy Symposium

Low Impact Hydropower Institute 34 Providence Street Portland, ME Tel. (207) Fax (206)

Forest Plan Amendment to Remove the Layng Creek Municipal Watershed Management Plan

Small Project Proposal

Penobscot II: Penobscot Habitat Blueprint Barrier Prioritization Tool: Assessing the Ecological Impacts of Barriers in the Penobscot River Basin

BAY DELTA CONSERVATION PLAN/ CALIFORNIA WATERFIX

STEM Project: It s All Water Under the Dam

BATTLE CREEK HYDROELECTRIC PROJECT FERC NO LICENSE AMENDMENT APPLICATION FOR BATTLE CREEK SALMON AND STEELHEAD RESTORATION PROJECT

Issues in Klamath River Dam Relicensing

Chapter 2 Project Objectives and Purpose and Need

2.1 Overview. Chapter 2 Project Objectives and Purpose and Need

Yale Hydroelectric Project FERC Project No APPLICATION FOR NEW LICENSE FOR MAJOR PROJECT Volume I

Battle Creek Salmon and Steelhead Restoration Project January 2017

LESLIE JAMES EXECUTIVE DIRECTOR COLORADO RIVER ENERGY DISTRIBUTORS ASSOCIATION (CREDA)

April 29, 2016 VIA ELECTRONIC FILING. Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

PREFACE PREFACE. Red Rock. Project. Master Plan Project. Master Plan 2015

Utilizing Partners to Build Partnerships & Capacity. Danny McBride Intermountain Region Partnership Coordinator U.S.

I. Project Title: Capital Improvement Projects in the Grand Junction, Colorado area.

Emergency Pumping Plant Fish Protection Screens at California's Red Bluff Diversion Dam

A collaborative strategy for optimizing management of the river corridor. Wednesday, June 2, 2010

TEXAS STATE SOIL & WATER CONSERVATION BOARD. Agency Overview

March 16, The Honorable Donald J. Trump President of the United States The White House 1600 Pennsylvania Ave. N.W. Washington, DC 20500

Overview of the Bureau of Reclamation. Michael L. Connor Commissioner Bureau of Reclamation

Integrating Biodiversity & Infrastructure Priorities

Klamath River Renewal Project Dam Removal RFQ Informational Meeting August 29, 2018 Klamath Falls, OR

Warm Springs Hydro LLC 5203 South 11 th East Idaho Falls, ID

Interview Summary October 14, 2009

Programmatic Environmental Assessment Forest-Wide Erosion Abatement USDA Forest Service Shawnee National Forest

Fisheries Restoration Planning in the Klamath Basin

Grafton Hydro, LLC. 55 Union Street, 4 th Floor Boston, MA, USA Tel: Fax: October 9, 2015

EQ #21- Why is there a Water Crisis in the Klamath Basin? A CASE STUDY OF WATER STRESS

5.2 Comprehensive Development and Recommended Alternative. 5.4 Consistency with Comprehensive Plans

FERC Relicensing of Hawks Nest Project (FERC NO. 2512) Glen Ferris Project (FERC NO )

Federal Regulation. Copyright 2011 Gary A. Robbins. All rights reserved.

5.2 Comprehensive Development and Recommended Alternative. 5.4 Consistency with Comprehensive Plans

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SACRAMENTO DISTRICT 1325 J STREET SACRAMENTO CA PUBLIC NOTICE

Upper Santa Clara River Watershed Arundo/ Tamarisk Removal Program (SCARP)

The Colorado River Basin Water Supply and Demand Study. World Water Week Stockholm 2017 August 27 September 1

PacifiCorp Klamath Hydroelectric Project Proposed Interim Operations Habitat Conservation Plan for Lost River and Shortnose Suckers

Dworshak Reservoir Master Plan March Walla Walla District. Environmental Assessment. Dworshak Reservoir Master Plan Ahsahka, Idaho

Chehalis River Basin Flood Damage Reduction Project

Attachment 9. Hydraulic Report

Ceresco Dam Removal Project. Michigan Watershed Summit March 25, 2015 Luke Trumble, P.E., MDEQ-WRD Jay Wesley, MDNR-Fisheries

Natura 2000 and Hydropower. Hydropower and Fish Workshop Brussels 29 May, 2017

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.

1. Why is NB Power recommending Life Achievement as the best option?

Colorado River. Drainage Basin 250,000 mi 2. 1,450 miles long. Originates at over 10,000 ft in the Rocky Mtns in CO. Flows in the Gulf of California

Welcome STEP 1: STEP 2: STEP 3:

WESTERN U.S. RIVER CONSERVATION AT THE ALTAR OF ENDANGERED SPECIES

Charter: Great Lakes Region Aquatic Habitat Connectivity Collaborative

PUBLIC NOTICE. Attn: Ms. Barbara Wiggins 1013 State Farm Road Boone, North Carolina 28607

[FWS R3 FHC 2016 N110]; [FXFR FF03F00000] Fisheries and Habitat Conservation; Draft Supplemental Environmental Impact

Environmental Impact Statement (EIS)/ Section 106 Public Meeting Proposed Alternatives. December 14, 2017

MILL CREEK FLOOD CONTROL PROJECT OPERATIONS AND MAINTENANCE DRAFT ENVIRONMENTAL IMPACT STATEMENT SUPPLEMENT I

DAM REMOVALS IN THE BASQUE COUNTRY

Removal of the Last Fish Barrier on the Lower Rogue River Shane K. Cline, PE HDR Inc, Portland, OR

Use of PL Watershed Authority and Watershed Planning Requirements in the Regional Conservation Partnership Program (RCPP) April 2016

KILARC RESERVOIR PLANNING UNIT Cow-Battle Creek Watershed

DECISION MEMO FOR CATEGORICAL EXCLUSION HOLY JIM CREEK CROSSING REPLACEMENT

Water Infrastructure Needs in the Columbia River Basin Legislative Council on River Governance

Dam Safety Modifications at Cherokee, Fort Loudoun, Tellico, and Watts Bar. SUMMARY: This notice is provided in accordance with the Council on

21 Century Colorado River Budget

Drought, Clean Water Act, ESA, & Other Challenges Facing Irrigated Agriculture

Upper Mississippi River Conference 2016 Action Agenda: Raise the Grade

KANSAS CITY DISTRICT. Clinton Lake s Role in the Wakarusa Watershed. Samantha Jones, Park Manager Clinton & Hillsdale Lakes 5 November 2014

FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D. C June 29, 2009

CALFED Ecosystem Restoration Program (ERP)

1. Introduction SITES RESERVOIR PROJECT DRAFT EIR/EIS 1-1

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.

4. Present Activities and Roles

Subject: Technical Memorandum Number 2 Noxious Weed Surveys

SOAP LAKE FLOODPLAIN PRESERVATION PROJECT

THE KBRA S UNWARRANTED AND COSTLY SUBSIDIES

CIGB technical committee Integrated Operation of Hydropower Stations and Reservoirs

July 28, OVERVIEW: Lower Clearwater Exchange Project (Idaho)

Jordan River Basin. Planning for the Future. Salt Lake County Watershed Symposium (August 11, 2011) Todd Stonely Utah Division of Water Resources

Welcome to the Boulevard Lake Dam Class Environmental Assessment. Public Information Session #1. June 14, 2016

Colorado River Basin Salinity Control Programs. Kib Jacobson Colorado River Basin Salinity Control Program Manager

Session A7 - A Systematic Approach to Improve Passage at Dams Necessary for Recovery of Endangered Atlantic Salmon in Maine

DECISION MEMO LOWER STILLWATER FISHERY ENHANCEMENT U.S. FOREST SERVICE DUCHESNE RANGER DISTRICT ASHLEY NATIONAL FOREST DUCHESNE COUNTY, UTAH

Transcription:

USDA Natural Resources Conservation Service-Utah Wallace F. Bennett Federal Building 125 S. State Street Room 4010 Salt Lake City, UT 84138-1100 Green River Diversion Rehabilitation National Environmental Policy Act (NEPA) Public Scoping Project Description The Natural Resources Conservation Service (NRCS) and Utah Department of Agriculture and Food (UDAF) are analyzing alternatives to repair damage to the Green River diversion structure from the late 2010 and early 2011 flood event. The diversion structure was constructed in the early 1900 s and has been modified over the years to maintain the structure. During the 2010/2011 flood events, flows in the Green River caused severe damage to the diversion structure compromising its structural integrity. If the dam fails, water delivery to two irrigation canals, a historic irrigation water wheel delivery system, and one hydropower plant would be eliminated. The United States Fish and Wildlife Service (USFWS) is proposing to install a fish barrier, through funding from the United States Bureau of Reclamation (USBOR), at the entrance to the west irrigation and hydropower plant canal to prevent Endangered Species Act (ESA) listed fish species from entering the canal and/or hydropower plant. As part of the dam repair, upstream and downstream fish passage may also be incorporated into the design. These fish protection and passage components are proposed for inclusion in the Green River diversion rehabilitation project to help reduce fish mortality of ESA listed fish species populations in the Green River. The NRCS is analyzing alternatives to rehabilitate the structure and conceptual alternatives that have been identified during the scoping process include the following: No Action: The diversion would be left in its existing condition. Repair Existing Diversion: Repair the existing diversion to safely pass flood events without causing damage. Replace Existing Diversion: Demolish the existing diversion and install a new diversion in the same location. Replace Diversion Downstream: Demolish the existing diversion and install a new diversion downstream of the existing structure. Replace Diversion Upstream: Demolish the existing diversion and install a new diversion upstream of the existing structure. Diversion Decommissioning: Completely remove the diversion from the river and stabilize the diversion site. Fish Passage Upstream/Downstream: Construct a passage system on the dam to allow safe upstream and downstream passage of fish over the diversion. Boat Passage Upstream/Downstream: Construct a passage system on the dam to allow safe upstream and downstream passage of boats over the diversion. Electric Fish Barrier: Install an electric fish barrier to prevent fish from swimming down the raceway to the powerhouse and irrigation canal. Other Alternatives: Other alternatives identified by the public and project team during scoping will be analyzed during the NEPA process to rehabilitate the diversion.

Green River Diversion Rehabilitation NEPA Analysis This project is being partially funded by the NRCS Emergency Watershed Protection (EWP) program to restore the damage from the 2010/2011 flood events and stabilize the structure. A National Environmental Policy Act (NEPA) Programmatic Environmental Impact Statement (EIS) was prepared by NRCS for the EWP program; however, the repair of this diversion structure does not fit within the analysis parameters of the Programmatic EIS. NRCS, as the lead federal agency, is initiating additional NEPA analysis in the form of an Environmental Assessment to analyze impacts to the natural and human environment from this project. The Environmental Assessment will comply with the Council on Environmental Quality s regulations at 40 CFR Parts 1500-1508 which require an evaluation of potential environmental impacts associated with federal projects and actions. The USBOR is proposing to fund the installation of the fish barrier and is a cooperating agency in the NEPA analysis.

Figure 1 Green River Diversion Rehabilitation

Figure 2 Green River Diversion Rehabilitation

Figure 3 Green River Diversion Rehabilitation

Green River Diversion Rehabilitation Photos Diversion Dam looking Northwest. Diversion Dam looking Northeast. Waterwheel Raceway looking North. Waterwheel Raceway looking South.

Green River Diversion Rehabilitation Photos Damaged Concrete on West Side of Diversion. Undercutting on West Side of Diversion. Damaged Concrete on Low-Level Slide Gate. Damaged Concrete on West Side of Diversion.

Green River Diversion Rehabilitation Photos Damaged Concrete on West Side of Diversion. Raceway looking Downstream on West Side of Diversion.