Employees ISO14001 renewed. collaboration with municipality TEL: +66 (0) ext visitors on factory tour. 280person s

Total floor area Employees. ISO14001 renewed

picture Establishment

Toshiba Group Site Information 2017 (2016/4/1-2017/3/31)

Development of products and environmental technologies, Environmental consideration point. For Industrial Use

322persons. visitors on. factory tour. municipality Contact Corporate Management Centre

Excellent ECP Certified Product B-EX6T B-FP3D. <Energy saving> - Highest energy savings in standby power. <Energy saving> - Lowest power in sleep mode

1.Outline. 2.Products Main products. 3.Environmental policy (Revised: 5 March 2018)

Toshiba Group Site Information 2016 (2015/4/1-2016/3/31)

ENVIRONMENTAL REPORT

Development of products and environmental technologies, Environmental consideration point. Renewable energy using with solar panel

Fujitsu Components Group Environmental Report FY2015

Fujitsu Components Group Environmental Report FY2014

Environmental Management

Top Message. OSG Corporation President and Coo COMMITTED TO CUSTOMER NEEDS COMMITTED TO THE ENVIRONMENT COMMITTED TO COMMUNICATION.

C. Gigantic Carbon Co., Ltd.

2. Effective use of resources. 3. Promotion of reduction, reuse and recycle of waste. 4. Prevention of environmental contamination

2. Effective use of resources. 3. Promotion of reduction, reuse and recycle of waste. 4. Prevention of environmental contamination

Collaboration with Society / Initiatives for Preserving Biodiversity

Environment Report Environmental Management Pursuing green management

ENVIRONMENTAL REPORT 2018

Outline of Phosphoric Acid Fuel Cell (PAFC) Package by Fuji Electric

Executive Summary. 2. CSR Commitment and Strategy. A. Corporate Social Responsibility Policy.. B. Strategy and Structure.

with ASE Japan s 2016 Environmental Report

PFU Environmental Action Plan (Eighth Plan: Fiscal Fiscal 2018)

Environmental Report 2016

Proposal for amendment to the legal inspection regulation for electrical products

Environmental Report 2010

We will strive to coexist in harmony with the environment and society, as a globally responsible corporation. Environmental Policy

Environmental impact reduction management Preventing global warming

Consideration of the Environment

HKICEREM Pilot School Project - Carbon Footprint Report

HPBS [ HIGH PERFORMANCE BUILDING STANDARD]

KANSUI (Ver. 2)

PART A. 3. Production Capacity 3.6 Million TPA Cement 4. Year of Establishment th September 2015 PART B WATER AND RAW MATERIAL CONSUMPTION

Environmental Vision 2020 Fuji Electric will

Environmental Conservation

ENVIRONMENTAL AUDITING

PROJECT CLEAN AIR CHARTER PHASE II

Environmental Instruction

Joint Crediting Mechanism Guidelines for Developing Sustainable Development Implementation Plan and Report CONTENTS

An Environmental Management System (EMS) Designed for Global Deployment

Environmental Protection. Update. Report Environmental Protection and Safety. Location South Carolina Plant

Message from the Managing Director SPEC Environmental & Occupational Health and Safety (EHS) Policy.. 6

Promotion of "Three Greens" based on "Environmental Vision 2050" Process Environmental Promotion Committee. ECP Promotion Committee

Recycling Resources. Reducing Waste

with ASE Japan s 2017 Environmental Report

Fujitsu Components Group Environmental Report FY2018

TOTO GROUP Integrated Report Financial and Non-Financial Data

Contributing to the Development of a Sustainable Society as an Environmentally Advanced Company

SRIXON SPORTS MANUFACTURING(THAILAND) CO.,LTD

YKK BANGLADESH PTE. LTD.

1) OUR VIEW OVER PROCUREMENT 2) CSR PROCUREMENT CRITERIA 3) GREEN PURCHASING EFFORTS 4) STANDARD PROCUREMENT PROCEDURES

Green Procurement Standards

Amount of energy consumed (crude oil equivalent): 104,000 kl INPUT OUTPUT. Total amount of materials generated: 70,300 tons

Collaboration with Society

Environmental Management

Fiscal 2016 Environmental data sheet

GREEN PROCUREMENT GUIDELINES

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors

Pollution Control Policies & Good Practice For Industry in Thailand

1. SRB Company Profile 2. President Message Industrial Director Message Collaborator Message: Environment Energy Saving GENKI Waste

Reducing Our Environmental Impact

Environmental Audit Report

Conceptual plan. Table 1:Area Statement for proposed Corporate Office Complex AREA STATEMENT: -

Form V is to be filled before 30th September annually; for the period from 1st April to 31st March PART A. Company Information

SHREE CEMENT LTD..~..~..~ ii. Regd. Office:. 0. ~ ~. ~ BANGUR NAGAR, POS': BOX NO.33, BEAWAR , RAJASTHAN, INDIA ~ 66~~'" 'Its ~s 71 66

Communication on Progress. Year : 2018

PTPD-T-N01-S Yokogawa Group Green Procurement Guidelines Version 4.3

Units. ton ton TJ TJ TJ TJ m 3

VRF V4+K Series 50Hz. Commercial Air Conditioners Commercial Air Conditioner Division Midea Group

par30 Features Applications Replacements Save up to 87% Family look design High efficacy Various beam angles Long life up to 40,000 hours

Environmental Report 2007

Efficient Use of Resources

Make A Positive Difference


Welcome to the Teijin Aramid Health, Safety and Environment (HSE) Report 2016.

Manufacturing Environmentally Friendly Products Under Independent Standards

Message from Environmental Preservation Chief. Major environmental activities in 2013

Environmental Statement Update

european suppliers OF Waste-tO-eNergy technology everything you always WaNteD to KNOW about Waste-tO-eNergy

Addressing Global Warming

Eisai Environmental Report 2017

Introduction of the latest Technology of Energy Conservation

Hazardous Waste Treatment Technology

NGK Group's Green Procurement Standard

Japanese Experience of Wastewater Management

Point wise reply. There is no change in water requirement and wastewater generation. However, water balance enclosed as Annexure-I.

Panasonic Activities. Green Procurement & Green Products. Oct. 7, 2005

Annual Report on Environmental Statistics 2017

SUSTAINABILITY POLICY. Bonava AB (publ) ( )

Sample ENVIRONMENTAL MONITORING PLAN

<Environmental Policy>

Details (1) Engineering & Development Center. Status of Environmental Law Compliance. Environmental Load Data. Environmental load data

POLLUTION CONTROL DEPARTMENT Ms. MAKARA TAPPOON. Asian Network Workshop th - 28 th November, 2014 Okayama, Japan

School Environmental Management Plan

Model Product Description and Specifications

Environment. Environmental Philosophy and Policy (Charter on the Global Environment) Isuzu Group Environmental Promotion Scheme.

Environmental Management Report

Environmental Report. Environmental management. Social background. JTEKT s concept. Promotion structure

Transcription:

99 Moo. 9, Tambol Muangwan, Aumphur Nampong, Khon Address Kaen 40310, Thailand Total floor Lot area 95516m² 9720m2 area Establishment 2300perso 2003/6 Employees day ns ISO14001cert ISO14001re 2005/8 2011/7 ification date newed Major Relay and Switches Products Environmental CommunicationFY2010 Information visitors on 1000perso 20 disclosure factory tour ns AC Divistion / HR & GA Dept. / Safety Contact TEL: & Environment Sect. Message from Compliance Administrator In FY2011 we continued to improve our environmental activity at PEWTH Khon Kaen Factory. We have promoted our CO 2 reduction, Zero Waste, Non Use Chemical substance actions, and also expanded our CSR activities. collaboration with municipality +66(43)421-285-95 20items Main activities in FY2010 Compliance Administrators Mr. Jittaphum Quobutra Target CO2 Emission reduction under 8 themes (Followed items aiming for reduction) Waste recycle rate 98% Result CO2 Emission reductions of 118,014 kg-co2 /Yr. Recycle rate 99% (Refer : EPR report on Mar '2011) CSR-DIW Project ( Project from Ministry of Industrial Work) FY2011 Big Cleaning Project, Tree Planting Project, ECO Exibition and Research Energy Natural for Society. Products of Environmentally-conscious information Relay Products Relay Series J & L Point of environmentally-conscious - Evaluation and selection of suppliers that follow company regulation. - Supplier has evaluation material and raw material meeting RoHS Requirements (ICP Data) - Promote CSR activity - Zero waste Switch Products Snap action switches - QV, NV, FJ, IMV switch Detection switches - FTμ,FT-2Way switch Terminal socket Point of environmentally-conscious - Evaluation and selection of suppliers that follow company regulation. - Supplier has evaluation material and raw material meeting RoHS Requirements (ICP Data) - Promote CSR activity - Zero waste

Environmental performance data Year displayed in graph ex) 2011: April 1, 2010 - March 31, 2011 Energy : 1000kl CO2 Emission : 1000t-CO2 Electricity LPG 0.01 4.57 4.30 3.92 4.29 5.58 2.64 2.16 2.03 1.85 2.03 Calculation standards CO2 emission = (Amount of electric power use in kwh x 0.5385 kgco2/kwh ) + (Amount of town LPG in m3 x 3.000 kgco2/m3) Water : 1000m³ Waste : 1000t, % Final disposal Total Recycle rate Municipal 0.7 98.3 98.5 48.4 58.0 44.7 52.5 57.9 0.36 19.3 0.50 26.5 0.28 29.3 0.2 0.00 0.01 Chemical substances Material balance of controlled substances FY2011 into air Handled 26.31 Recycled 52.05 0.00 Key target reduction substances : t Removed as Products 0.00 15.65 19.11 15.34 21.77 into waterway Transferred 09 10 11 0.00 into soil 10.09 0.00 About The Panasonic Group's Chemical Substances Management in Factories http://panasonic.net/eco/factory/chemical_substance/ About the above data

Compliance FY2011 <Air pollutant measurement results> Facility name SOx Nm³/h NOx ppm Particulate g/nm³ Working Area 5.00 0.62 1.51 1 time / Year Exhaust Stack 400.00 0.78 1.21 1 time / Year <Water pollutant measurement results> COD BOD Nitrogen Phosphorus Waste Water Treatment Waste Water Treatment Facility name 400.00 120.00 83.12 60.00 20.00 8.75 4 Time/year 4 Time/year <Noise and vibration> Measurement Area Noise db DT Assembly 90.00 76.10 87.00 1 time / Year NT Vibration db DT NT *: The strictest value out of those specified by laws, ordinances or agreements. *(not applicable):the meaning when the facility is exempted from the regulation. About excess of legal value Improvement of direction by government, or point outs by neighbor Occurrence situation Countermeasure

Environmental Policy We, Panasonic Electric Works (Thailand) Co., Ltd. (Khon Kaen Branch), perform to achieve our business management with utilizing natural sources and considering environment as the manufacturing company which produces relays, switches and connectors in compliance with; 1. We comply with the environmental related regulations and the environmental consideration matters which has agreed with the relevant organizations. 2. We save natural resources and measure the environmental aspects during the process of all business activities between production, sales, services and scraps. 3. This environmental policy is opened to the public. 4. We promote the environmental objectives and target for the reduction of energy, chemical substances and other wastes in order to achieve the environmental policy. 5. We tackle to the environmental improvement continually with the communication to the inside and outside of the company such as each environmental relevant organizations.

Aiming to reduction of environmental impact Title : Energy Conservation Project. The Energy Conservation Project by Energy Team of PEWTH-KK for continuous improvement such as; 1. Heat Exchange Efficiency Improvement of Air Condition -> Energy Saving = 31,985 Kwh/Y 2. Installation Inverter Control Monitor Fan of Cooling Tower -> Energy Saving = 31,985 Kwh/Y 3. Control On-Off Period Time of Air Conditioner -> Energy Saving = 2,467 Kwh/Y 4. Installation of Temperature Autometic Control to Air Conditioner -> Energy Saving = 42,764 Kwh/Y 5. Change Thermostat from Bi-Metal Type -> Energy Saving = 18,391 Kwh/Y 6. Bi-Metal Type to electronic Type -> Energy Saving = 8,218 Kwh/Y 7. Take off high Bay Fixture light in unnecessary areas -> Energy Saving = 8,218 Kwh/Y 8. Change Lamp 28 watt to Compact Lamp 8 watt -> Energy Saving = 699 Kwh/Y Total CO2 Emission Reductions = 118,014 kg-co2 /Yr. Title : Green Factory in PEWTH-KK - Planted trees project ( Green Factory ) around factory. - Clean factory " Big Cleaning Day " and promotion of recycle activity. - Reduce Non-Hazardouse waste by generation for sale. - Distribute the tree for employee (Gift Birth Day ) every month to planting. - Have keep grass from graden to make compost and manure for garden and avoid use of chemicals. Environmental Communication Emergency preparedness and response Company has established, implemented and maintains a procedure to identify potential emergency situations and potential accidents, and conducts a periodic review. Every employee in company must undergo Emergency Prepareness and Response Training. Our company must take proactive measures to prevent environmnetal impacts. Course of Training 1. Fire Fighting Drill. -> 2 Time/Yr. 2. Fire Evacuate Drill. -> 1 Time/Yr. 3. Chemical Leakage (Mass). -> 1 Time/Yr. 4. Fire Aid Drill -> 1 Time/Yr.