99 Moo. 9, Tambol Muangwan, Aumphur Nampong, Khon Address Kaen 40310, Thailand Total floor Lot area 95516m² 9720m2 area Establishment 2300perso 2003/6 Employees day ns ISO14001cert ISO14001re 2005/8 2011/7 ification date newed Major Relay and Switches Products Environmental CommunicationFY2010 Information visitors on 1000perso 20 disclosure factory tour ns AC Divistion / HR & GA Dept. / Safety Contact TEL: & Environment Sect. Message from Compliance Administrator In FY2011 we continued to improve our environmental activity at PEWTH Khon Kaen Factory. We have promoted our CO 2 reduction, Zero Waste, Non Use Chemical substance actions, and also expanded our CSR activities. collaboration with municipality +66(43)421-285-95 20items Main activities in FY2010 Compliance Administrators Mr. Jittaphum Quobutra Target CO2 Emission reduction under 8 themes (Followed items aiming for reduction) Waste recycle rate 98% Result CO2 Emission reductions of 118,014 kg-co2 /Yr. Recycle rate 99% (Refer : EPR report on Mar '2011) CSR-DIW Project ( Project from Ministry of Industrial Work) FY2011 Big Cleaning Project, Tree Planting Project, ECO Exibition and Research Energy Natural for Society. Products of Environmentally-conscious information Relay Products Relay Series J & L Point of environmentally-conscious - Evaluation and selection of suppliers that follow company regulation. - Supplier has evaluation material and raw material meeting RoHS Requirements (ICP Data) - Promote CSR activity - Zero waste Switch Products Snap action switches - QV, NV, FJ, IMV switch Detection switches - FTμ,FT-2Way switch Terminal socket Point of environmentally-conscious - Evaluation and selection of suppliers that follow company regulation. - Supplier has evaluation material and raw material meeting RoHS Requirements (ICP Data) - Promote CSR activity - Zero waste
Environmental performance data Year displayed in graph ex) 2011: April 1, 2010 - March 31, 2011 Energy : 1000kl CO2 Emission : 1000t-CO2 Electricity LPG 0.01 4.57 4.30 3.92 4.29 5.58 2.64 2.16 2.03 1.85 2.03 Calculation standards CO2 emission = (Amount of electric power use in kwh x 0.5385 kgco2/kwh ) + (Amount of town LPG in m3 x 3.000 kgco2/m3) Water : 1000m³ Waste : 1000t, % Final disposal Total Recycle rate Municipal 0.7 98.3 98.5 48.4 58.0 44.7 52.5 57.9 0.36 19.3 0.50 26.5 0.28 29.3 0.2 0.00 0.01 Chemical substances Material balance of controlled substances FY2011 into air Handled 26.31 Recycled 52.05 0.00 Key target reduction substances : t Removed as Products 0.00 15.65 19.11 15.34 21.77 into waterway Transferred 09 10 11 0.00 into soil 10.09 0.00 About The Panasonic Group's Chemical Substances Management in Factories http://panasonic.net/eco/factory/chemical_substance/ About the above data
Compliance FY2011 <Air pollutant measurement results> Facility name SOx Nm³/h NOx ppm Particulate g/nm³ Working Area 5.00 0.62 1.51 1 time / Year Exhaust Stack 400.00 0.78 1.21 1 time / Year <Water pollutant measurement results> COD BOD Nitrogen Phosphorus Waste Water Treatment Waste Water Treatment Facility name 400.00 120.00 83.12 60.00 20.00 8.75 4 Time/year 4 Time/year <Noise and vibration> Measurement Area Noise db DT Assembly 90.00 76.10 87.00 1 time / Year NT Vibration db DT NT *: The strictest value out of those specified by laws, ordinances or agreements. *(not applicable):the meaning when the facility is exempted from the regulation. About excess of legal value Improvement of direction by government, or point outs by neighbor Occurrence situation Countermeasure
Environmental Policy We, Panasonic Electric Works (Thailand) Co., Ltd. (Khon Kaen Branch), perform to achieve our business management with utilizing natural sources and considering environment as the manufacturing company which produces relays, switches and connectors in compliance with; 1. We comply with the environmental related regulations and the environmental consideration matters which has agreed with the relevant organizations. 2. We save natural resources and measure the environmental aspects during the process of all business activities between production, sales, services and scraps. 3. This environmental policy is opened to the public. 4. We promote the environmental objectives and target for the reduction of energy, chemical substances and other wastes in order to achieve the environmental policy. 5. We tackle to the environmental improvement continually with the communication to the inside and outside of the company such as each environmental relevant organizations.
Aiming to reduction of environmental impact Title : Energy Conservation Project. The Energy Conservation Project by Energy Team of PEWTH-KK for continuous improvement such as; 1. Heat Exchange Efficiency Improvement of Air Condition -> Energy Saving = 31,985 Kwh/Y 2. Installation Inverter Control Monitor Fan of Cooling Tower -> Energy Saving = 31,985 Kwh/Y 3. Control On-Off Period Time of Air Conditioner -> Energy Saving = 2,467 Kwh/Y 4. Installation of Temperature Autometic Control to Air Conditioner -> Energy Saving = 42,764 Kwh/Y 5. Change Thermostat from Bi-Metal Type -> Energy Saving = 18,391 Kwh/Y 6. Bi-Metal Type to electronic Type -> Energy Saving = 8,218 Kwh/Y 7. Take off high Bay Fixture light in unnecessary areas -> Energy Saving = 8,218 Kwh/Y 8. Change Lamp 28 watt to Compact Lamp 8 watt -> Energy Saving = 699 Kwh/Y Total CO2 Emission Reductions = 118,014 kg-co2 /Yr. Title : Green Factory in PEWTH-KK - Planted trees project ( Green Factory ) around factory. - Clean factory " Big Cleaning Day " and promotion of recycle activity. - Reduce Non-Hazardouse waste by generation for sale. - Distribute the tree for employee (Gift Birth Day ) every month to planting. - Have keep grass from graden to make compost and manure for garden and avoid use of chemicals. Environmental Communication Emergency preparedness and response Company has established, implemented and maintains a procedure to identify potential emergency situations and potential accidents, and conducts a periodic review. Every employee in company must undergo Emergency Prepareness and Response Training. Our company must take proactive measures to prevent environmnetal impacts. Course of Training 1. Fire Fighting Drill. -> 2 Time/Yr. 2. Fire Evacuate Drill. -> 1 Time/Yr. 3. Chemical Leakage (Mass). -> 1 Time/Yr. 4. Fire Aid Drill -> 1 Time/Yr.