Risk management Principles and guidelines

Similar documents
SA/SNZ HB 89:2013. Australian/New Zealand Handbook. Risk management Guidelines on risk assessment techniques. Superseding HB SA/SNZ HB 89:2013

SA/SNZ HB 436:2013. Risk management guidelines Companion to AS/NZS ISO 31000:2009 SA/SNZ HB 436:2013. Australian/New Zealand Handbook

Australian/New Zealand Standard

AS/NZS ISO 9004:2011. Managing for the sustained success of an organization A quality management approach AS/NZS ISO 9004:2011

AS/NZS ISO 30301:2012

AS/NZS 10002:2014. Australian/New Zealand Standard. Guidelines for complaint management in organizations AS/NZS 10002:2014

Australian/New Zealand Standard. Plywood Structural Part 1: Determination of structural properties Test methods

Australian/New Zealand Standard

AS/NZS ISO 9001:2016. Quality management systems Requirements AS/NZS ISO 9001:2016. Australian/New Zealand Standard. Superseding AS/NZS ISO 9001:2008

AS/NZS :2014. Methods of sampling and testing asphalt AS/NZS :2014. Part 8: Voids and volumetric properties of compacted asphalt mixes

AS/NZS ISO 9004:2011 Managing for the sustained success of an organization A quality management approach

Australian/New Zealand Standard

Australian/New Zealand Standard

AS/NZS 4505:1998 AS/NZS

Australian/New Zealand Standard

Australian/New Zealand Standard

AS/NZS :2015

Australian/New Zealand Standard

AS/NZS :2012. Plywood Structural AS/NZS :2012. Part 0: Specifications. Australian/New Zealand Standard. Superseding AS/NZS :2008.

AS/NZS :2015

AS/NZS :2016. Australian/New Zealand Standard. Structural steel. Part 2: Welded I sections. Superseding AS/NZS :2010 AS/NZS 3679.

AS/NZS :2015. Scaffolding AS/NZS :2015. Part 3: Prefabricated and tube-and-coupler scaffolding. Australian/New Zealand Standard

AS/NZS :2016. High-strength steel fastener assemblies for structural engineering Bolts, nuts and washers AS/NZS :2016

Australian/New Zealand Standard

AS/NZS :2016. Windows, external glazed, timber and composite doors Methods of test AS/NZS :2016

AS/NZS 8016:2013. Australian/New Zealand Standard. Governance of IT enabled projects. Superseding AS/NZS 8016(Int):2010 AS/NZS 8016:2013

AS/NZS ISO 19158:2013

Australian/New Zealand Standard

AS/NZS :2014. Heat pump water heaters Performance assessment AS/NZS :2014. Part 1: Air source heat pump water heaters

Australian/New Zealand Standard

AS/NZS :2015

AS/NZS ISO 14174:2013

Australian/New Zealand Standard

AS/NZS 1595:1998. Cold-rolled, unalloyed, steel sheet and strip AS/NZS 1595:1998. Australian/New Zealand Standard. Superseding AS 1595:1981

Australian/New Zealand Standard

Australian/New Zealand Standard

SA/SNZ TS 8019:2016. Technical Specification. Governance of benefits realization for IT enabled investments SA/SNZ TS 8019:2016

AS/NZS 1365:1996. Tolerances for flat-rolled steel products AS/NZS 1365:1996. Australian/New Zealand Standard. Superseding AS 1365:1986

AS/NZS 5377:2013. Collection, storage, transport and treatment of end-of-life electrical and electronic equipment AS/NZS 5377:2013

AS/NZS :2012. Information technology equipment Energy performance of computers AS/NZS :2012

Australian Standard. Guidelines for the selection of quality management system consultants and use of their services AS ISO ISO 10019:2005

AS/NZS 2425:2015. Australian/New Zealand Standard. Bar chairs in reinforced concrete Product requirements and test methods AS/NZS 2425:2015

Australian/New Zealand Standard

AS/NZS 4804:2001. Occupational health and safety management systems. General guidelines on principles, systems and supporting techniques

Australian/New Zealand Standard

Australian/New Zealand Standard

Australian/New Zealand Standard

Australian/New Zealand Standard

AS/NZS :2014. Guide to the protection of structural steel against atmospheric corrosion by the use of protective coatings AS/NZS 2312.

AS/NZS Supplement 1:2003

Australian/New Zealand Standard

AS/NZS :2016. High-strength steel fastener assemblies for structural engineering Bolts, nuts and washers AS/NZS :2016

AS/NZS :2012. Specification for preservative treatment AS/NZS :2012. Part 5: Glued laminated timber products

AS/NZS :2012. Specification for preservative treatment AS/NZS :2012. Part 2: Reconstituted wood-based products

Australian/New Zealand Standard

RISK MANAGEMENT GUIDELINES

AS/NZS ISO 9000:2000 Quality management systems Fundamentals and vocabulary

Australian/New Zealand Standard

AS/NZS 3760:2010. In-service safety inspection and testing of electrical equipment AS/NZS 3760:2010. Joint Australian New Zealand Standard

AS/NZS :2014 AS/NZS :2014. Demand response capabilities and supporting technologies for electrical products

Australian/New Zealand Standard

AS/NZS 2589:2007 AS/NZS

Australian/New Zealand Standard

AS/NZS :2012. Specification for preservative treatment AS/NZS :2012. Part 3: Plywood. Australian/New Zealand Standard

AS/NZS 3010:2005 AS/NZS

Australian/New Zealand Standard

AS/NZS 3518:2013. Acrylonitrile butadine styrene (ABS) compounds, pipes and fittings for pressure applications AS/NZS 3518:2013

Australian/New Zealand Standard

Asset management Management systems Requirements

AS/NZS 2728:2013. Prefinished/prepainted sheet metal products for interior/exterior building applications Performance requirements AS/NZS 2728:2013

AS AS Australian Standard. Fire safety audits. This is a free 7 page sample. Access the full version online.

AS/NZS 3012:2003 AS/NZS

Australian/New Zealand Standard

This is a free 15 page sample. Access the full version online. HB 90.1:2012 The Small Business Handbook Guide to ISO 9001:2008

Australian/New Zealand Standard

AS/NZS :2003. Structural design actions AS/NZS :2003. Part 3: Snow and ice actions. Australian/New Zealand Standard

AS/NZS :2003. Plumbing and drainage AS/NZS :2003. Australian/New Zealand Standard. Part 3: Stormwater drainage

On-site domestic wastewater treatment units

Electrical installations Marinas and boats

Australian/New Zealand Standard

Australian/New Zealand Standard

Australian/New Zealand Standard

Technical Specification

Handbook. Arrangements for the recognition and acceptance of conformity assessment results. HB ISO/IEC Guide 68:2002 HB 18.

Australian/New Zealand Standard

Australian/New Zealand Standard

AS/NZS Supplement 1:2002

AS/NZS :2008. Polybutylene (PB) plumbing pipe systems AS/NZS :2008. Part 2: Polybutylene (PB) pipe for hot and cold water applications

AS/NZS :2015. Plumbing and drainage AS/NZS :2015. Part 1: Water services. Australian/New Zealand Standard. Superseding AS/NZS 3500.

Australian/New Zealand Standard

Australian/New Zealand Standard

Australian Standard. Qualification of welders for fusion welding of steels AS AS

Australian/New Zealand Standard

AS/NZS 4765:2017. Australian/New Zealand Standard. Modified PVC (PVC-M) pipes for pressure applications. Superseding AS/NZS 4765:2007 AS/NZS 4765:2017

AS/NZS 1477:2017. Australian/New Zealand Standard. PVC pipes and fittings for pressure applications. Superseding AS/NZS 1477:2006 AS/NZS 1477:2017

Australian/New Zealand Standard

Australian/New Zealand Standard

AS/NZS 5131:2016. Australian/New Zealand Standard. Structural steelwork Fabrication and erection AS/NZS 5131:2016

AS AS Australian Standard. Wear-resistant white cast iron. This is a free 6 page sample. Access the full version online.

Asset management Overview, principles and terminology

Transcription:

AS/NZS ISO 31000:2009 Joint Australian New Zealand International Standard Risk management Principles and guidelines Superseding AS/NZS 4360:2004 AS/NZS ISO 31000:2009

AS/NZS ISO 31000:2009 This Joint Australian/New Zealand Standard was prepared by Joint Technical Committee OB-007, Risk Management. It was approved on behalf of the Council of Standards Australia on 6 November 2009 and on behalf of the Council of Standards New Zealand on 16 October 2009. This Standard was published on 20 November 2009. The following are represented on Committee OB-007: Australian Computer Society Commerce Commission New Zealand Committee IT-012 Department of Education and Early Childhood Development Victoria Emergency Management Australia Engineers Australia Environmental Risk Management Authority New Zealand Financial Services Institute of Australia The Institute of Internal Auditors Australia Institution of Professional Engineers New Zealand International Association of Emergency Managers La Trobe University Law Society of New South Wales Massey University Minerals Council of Australia Ministry of Economic Development (New Zealand) New Zealand Society for Risk Management Risk Management Institution of Australasia The University of New South Wales University of Canterbury New Zealand Keeping Standards up-to-date Standards are living documents which reflect progress in science, technology and systems. To maintain their currency, all Standards are periodically reviewed, and new editions are published. Between editions, amendments may be issued. Standards may also be withdrawn. It is important that readers assure themselves they are using a current Standard, which should include any amendments which may have been published since the Standard was purchased. Detailed information about joint Australian/New Zealand Standards can be found by visiting the Standards Web Shop at www.saiglobal.com.au or Standards New Zealand web site at www.standards.co.nz and looking up the relevant Standard in the on-line catalogue. For more frequent listings or notification of revisions, amendments and withdrawals, Standards Australia and Standards New Zealand offer a number of update options. For information about these services, users should contact their respective national Standards organization. We also welcome suggestions for improvement in our Standards, and especially encourage readers to notify us immediately of any apparent inaccuracies or ambiguities. Please address your comments to the Chief Executive of either Standards Australia or Standards New Zealand at the address shown on the title page. This Standard was issued in draft form for comment as DR 09063.

AS/NZS ISO 31000:2009 Australian/New Zealand Standard Risk management Principles and guidelines Originated as AS/NZS 4360:1995. Third edition 2004. Revised and redesignated as AS/NZS ISO 31000:2009. COPYRIGHT Standards Australia/Standards New Zealand All rights are reserved. No part of this work may be reproduced or copied in any form or by any means, electronic or mechanical, including photocopying, without the written permission of the publisher. Jointly published by Standards Australia, GPO Box 476, Sydney, NSW 2001 and Standards New Zealand, Private Bag 2439, Wellington 6140. ISBN 978-1-86975-127-2

ii PREFACE This Standard was prepared by Joint Standards Australia/Standards New Zealand Committee OB-007, Risk Management to supersede AS/NZS 4360:2004, Risk management. When AS/NZS 4360:1999 was revised in 2004 (as part of a routine five yearly revision), it was decided by the Joint Australian/New Zealand Committee OB-007 that rather than undertake a similar revision in 2009, Standards Australia and Standards New Zealand would promote the development of an international standard on risk management which would then be adopted. In 2005 the International Organization for Standardization (ISO) established a working group to develop the first international risk management standard using AS/NZS 4360:2004 as the first draft. The standard development process included extensive public consultation in Australia and New Zealand and resulted in the publication of ISO 31000:2009. The main variations to AS/NZS 4360:2004, as outlined in the Introduction, are as follows: (a) Risk is now defined in terms of the effect of uncertainty on objectives. (b) The principles that organizations must follow to achieve effective risk management have now been made explicit. (c) (d) There is much greater emphasis and guidance on how risk management should be implemented and integrated into organizations through the creation and continuous improvement of a framework. An informative Annex describes the attributes of enhanced risk management and recognizes that while all organizations manage risk in some way and to some extent this may not always be optimal. The process described for managing risk is identical to that in AS/NZS 4360:2004. This Standard is identical with, and has been reproduced from ISO 31000:2009, Risk management Principles and guidelines. Minor changes have been made to the Introduction to address the application of the Standard in Australia and New Zealand. As this Standard is reproduced from an International Standard, the following applies: (i) Its number does not appear on each page of text and its identity is shown only on the cover and title page. (ii) In the source text this International Standard should read this Australian/New Zealand Standard. The term informative is used to define the application of the annex to which it applies. An informative annex is only for information and guidance.

iii CONTENTS Page 1 Scope...1 2 Terms and definitions...1 3 Principles...7 4 Framework...8 4.1 General...8 4.2 Mandate and commitment...9 4.3 Design of framework for managing risk...10 4.3.1 Understanding of the organization and its context...10 4.3.2 Establishing risk management policy...10 4.3.3 Accountability...11 4.3.4 Integration into organizational processes...11 4.3.5 Resources...11 4.3.6 Establishing internal communication and reporting mechanisms...12 4.3.7 Establishing external communication and reporting mechanisms...12 4.4 Implementing risk management...12 4.4.1 Implementing the framework for managing risk...12 4.4.2 Implementing the risk management process...13 4.5 Monitoring and review of the framework...13 4.6 Continual improvement of the framework...13 5 Process...13 5.1 General...13 5.2 Communication and consultation...14 5.3 Establishing the context...15 5.3.1 General...15 5.3.2 Establishing the external context...15 5.3.3 Establishing the internal context...15 5.3.4 Establishing the context of the risk management process...16 5.3.5 Defining risk criteria...17 5.4 Risk assessment...17 5.4.1 General...17 5.4.2 Risk identification...17 5.4.3 Risk analysis...18 5.4.4 Risk evaluation...18 5.5 Risk treatment...18 5.5.1 General...18 5.5.2 Selection of risk treatment options...19 5.5.3 Preparing and implementing risk treatment plans...20 5.6 Monitoring and review...20 5.7 Recording the risk management process...21 Annex A (informative) Attributes of enhanced risk management...22 Bibliography...24

iv INTRODUCTION Organizations of any kind face internal and external factors and influences that make it uncertain whether, when and the extent to which they will achieve or exceed their objectives. The effect this uncertainty has on the organization s objectives is risk. All activities of an organization involve risk. Organizations manage risk by anticipating, understanding and deciding whether to modify it. Throughout this process they communicate and consult with stakeholders and monitor and review the risk and the controls that are modifying the risk. This Standard describes this systematic and logical process in detail. This is a new standard for managing risk that supersedes AS/NZS 4360:2004. It builds upon the processes contained in the superseded standard. While all organizations manage risk to some degree, this Standard establishes a number of principles that need to be satisfied before risk management will be effective. This Standard recommends that organizations should have a framework that integrates the process for managing risk into the organization's overall governance, strategy and planning, management, reporting processes, policies, values and culture. Risk management can be applied across an entire organization, to its many areas and levels, as well as to specific functions, projects and activities. Although the practice of risk management has been developed over time and within many sectors to meet diverse needs, the adoption of consistent processes within a comprehensive framework helps ensure that risk is managed effectively, efficiently and coherently across an organization. The generic approach described in this Standard provides the principles and guidelines for managing any form of risk in a systematic, transparent and credible manner and within any scope and context. The relationship between the principles for managing risk, the framework in which it occurs and the risk management process described in this Standard is shown in Figure 1. When implemented and maintained in accordance with this Standard, the management of risk enables all organizations to, for example (a) increase the likelihood of achieving objectives; (b) encourage proactive management; (c) be aware of the need to identify and treat risk throughout the organization; (d) improve the identification of opportunities and threats; (e) achieve compatible risk management practices between organisations and nations; (f) comply with relevant legal and regulatory requirements and international norms; (g) improve financial reporting; (h) improve governance; (i) improve stakeholder confidence and trust; (j) establish a reliable basis for decision making and planning; (k) improve controls; (l) effectively allocate and use resources for risk treatment; (m) improve operational effectiveness and efficiency; (n) enhance health and safety performance as well as environmental protection; (o) improve loss prevention and incident management;

(p) (q) (r) minimize losses; improve organizational learning; and improve organizational resilience. v This Standard is intended to meet the needs of a wide range of stakeholders including (i) those accountable for achieving objectives and therefore ensuring that risk is effectively managed within the organization as a whole or within a specific area, project or activity; (ii) those responsible for developing risk management policy within their organization; (iii) those who need to evaluate an organization effectiveness in managing risk; and (iv) developers of standards, guides, procedures, and codes of practice that in whole or in part set out how risk is to be managed within the specific context of these documents. Organizations with existing risk management processes can use this Standard to critically review, align and improve their existing practices. Those whose risk management framework has been based on AS/NZS 4360:2004 will thereby benefit from the additional concepts and practices in this Standard. In this Standard, the expressions risk management and managing risk are both used. In general terms, risk management refers to the architecture (principles, framework and process) for managing risks effectively, and managing risk refers to applying that architecture to particular risks.

vi a) Creates value b) Integral part of organizational processes c) Part of decision making Mandate and commitment (4.2) Establishing the context (5.3) d) Explicitly addresses uncertainty e) Systematic, structured and timely f) Based on the best available information g) Tailored h) Takes human and cultural factors into account i) Transparent and inclusive j) Dynamic, iterative and responsive to change k) Facilitates continual improvement and enhancement of the organization Continual improvement of the framework (4.6) Design of framework for managing risk (4.3) Monitoring and review of the framework (4.5) Implementing risk management (4.4) Risk assessment (5.4) Risk identification (5.4.2) Risk analysis (5.4.3) Communication and consultation (5.2) Monitoring and review (5.6) Risk evaluation (5.4.4) Risk treatment (5.5) Principles Framework (Clause 3) (Clause 4) Process (Clause 5) Figure 1 Relationships between the risk management principles, framework and process

1 AUSTRALIAN/NEW ZEALAND STANDARD Risk management Principles and guidelines 1 Scope This International Standard provides principles and generic guidelines on risk management. This International Standard can be used by any public, private or community enterprise, association, group or individual. Therefore, this International Standard is not specific to any industry or sector. NOTE For convenience, all the different users of this International Standard are referred to by the general term organization. This International Standard can be applied throughout the life of an organization, and to a wide range of activities, including strategies and decisions, operations, processes, functions, projects, products, services and assets. This International Standard can be applied to any type of risk, whatever its nature, whether having positive or negative consequences. Although this International Standard provides generic guidelines, it is not intended to promote uniformity of risk management across organizations. The design and implementation of risk management plans and frameworks will need to take into account the varying needs of a specific organization, its particular objectives, context, structure, operations, processes, functions, projects, products, services, or assets and specific practices employed. It is intended that this International Standard be utilized to harmonize risk management processes in existing and future standards. It provides a common approach in support of standards dealing with specific risks and/or sectors, and does not replace those standards. This International Standard is not intended for the purpose of certification. 2 Terms and definitions For the purposes of this document, the following terms and definitions apply. 2.1 risk effect of uncertainty on objectives NOTE 1 An effect is a deviation from the expected positive and/or negative. NOTE 2 Objectives can have different aspects (such as financial, health and safety, and environmental goals) and can apply at different levels (such as strategic, organization-wide, project, product and process). NOTE 3 Risk is often characterized by reference to potential events (2.17) and consequences (2.18), or a combination of these. NOTE 4 Risk is often expressed in terms of a combination of the consequences of an event (including changes in circumstances) and the associated likelihood (2.19) of occurrence. COPYRIGHT

AS/NZS ISO 31000:2009 Risk management - Principles and guidelines This is a free sample only. Purchase the full publication here: https://shop.standards.govt.nz//catalog/31000%3a2009%28as%7cnzs+iso%29/view Or contact Standards New Zealand using one of the following methods. Freephone: 0800 782 632 (New Zealand) Phone: +64 3 943 4259 Email: enquiries@standards.govt.nz