Willamette National Forest McKenzie River Ranger District

Similar documents
Decision Notice and Finding of No Significant Impact

Preliminary Decision Memo Recreation Residence Septic Repairs

Decision Memo. Delta A Septic Repair (#33)

Environmental Assessment

DECISION NOTICE FINDING OF NO SIGNIFICANT IMPACT (FONSI)

Introduction. Background

The Galton Project Kootenai National Forest. The Galton Project

Draft Decision Memo Santiam Junction Maintenance Station Truck Shop Extension

The following recommendations will need to be re-evaluated given the recent fire at the Kennedy Meadows Pack Station.

Decision Memo. USDA Forest Service Mountain Home Ranger District, Boise National Forest Boise County, Idaho

Bear River Planning Unit. Fish, Plant, and Wildlife Habitat BEAR RIVER PLANNING UNIT

IDT Discussions on HRM Expansion Compiled on April 10, 2014

Hungry Horse-Glacier View Ranger District

Preliminary Decision Memo 2015 Recreation Residence Projects Odell Lake

Draft Decision Memo OHV Trails 22 and 42 Reroute Project

EXECUTIVE SUMMARY INTRODUCTION LEGAL AND POLICY FRAMEWORK. Wild and Scenic Rivers Act

OUTREACH NOTICE DETAIL/VACANCY

FALL RIVER MILLS PLANNING UNIT Pit-McCloud River Watershed

Lake Britton Planning Unit. Fish, Plant, and Wildlife Habitat LAKE BRITTON PLANNING UNIT

Information for File # ARC

File Code: 1900 Date: June 14, Dear Interested Parties,

Environmental Assessment

Forest Plan Amendment to Remove the Layng Creek Municipal Watershed Management Plan

STAFF REPORT WASHINGTON STATE PARKS AND RECREATION COMMISSION COVERED SHELTERS AND BIKE RACKS

AREA STRUCTURE PLAN SW W4M CAMROSE COUNTY BYLAW ## JULY 2017(REVISED) PREPARED BY: AUSTROM CONSULTING &VICINIA PLANNING & ENGAGEMENT INC.

FINDING OF NO SIGNIFICANT IMPACT OWL CREEK GRAVEL PIT EXPANSION U.S. FOREST SERVICE

Further information of project proposals is available on the World Wide Web at:

Lambson Draw On/Off Allotment Livestock Conversion Decision Notice

DECISION MEMO OREGON DEPARTMENT OF TRANSPORTATION (ODOT) SAND SHED CINDER PIT EXPLORATION PROJECT

Decision Memo for the City of Detroit Root Rot Timber Sale Project

Cass County Soil Erosion & Sedimentation Control Program

Decision Memo Sawtooth Trail #3634 Reroute

MEMORANDUM OF UNDERSTANDING BETWEEN THE COLORADO TRAIL FOUNDATION AND UNITED STATES DEPARTMENT OF AGRICULTURE FOREST SERVICE

The Marsh Project: An Ecosystem Services Approach to NEPA Project Planning

Cass County Soil Erosion & Sedimentation Control Program

Article 7. COMMERCIAL AND MIXED USE ZONES

Pole Creek Timber Salvage Project Specialist Report. Transportation. Introduction. Regulatory Framework / Management Direction

Coconino National Forest Red Rock Ranger District. File Code: Date:

CATEGORICAL EXCLUSION WORKSHEET: RESOURCE CONSIDERATIONS

PROJECT INFORMATION Warren Falls Parking Lot Expansion Project

Environmental Assessment

LOWER DRUM PLANNING UNIT Yuba-Bear River Watershed

Dolores River Management Plan. (Update of the 1990 Dolores River Corridor Management Plan)

Ridgeline Energy SUP Anemometer Towers & SODAR Project Project Proposal & Public Scoping

The Wyoming Wildlife Advocates also value the Caribou-Targhee National

City of Lowell. A Profile of the Lowell Community

Yale Hydroelectric Project FERC Project No APPLICATION FOR NEW LICENSE FOR MAJOR PROJECT Volume I

PROJECT INFORMATION Moosalamoo National Recreation Area Campground Timber Management Project

Recreation Report Kimball Hill Stands Management Gold Beach Ranger District, Rogue River-Siskiyou National Forest Date: April 27, 2016

Information for File # ARC

Hiawatha: Your Great Lakes National Forest

Hiawatha: Your Great Lakes National Forest

I am posting this letter, along with maps on the National Forests in North Carolina website, at:

Preliminary Decision Memo 2017 BPA Utility Corridor Maintenance and Danger Tree Project

DETAILED IMPACT ANALYSIS OF MARMOT BASIN LONG RANGE PLAN

Eldorado National Forest; California; Eldorado National Forest Over-Snow Vehicle. Notice of intent to prepare an environmental impact statement.

ENVIRONMENTAL ASSESSMENT

DECISION MEMO MANHATTAN FUELS REDUCTION PROJECT U.S. FOREST SERVICE CANYON LAKES RANGER DISTRICT LARIMER COUNTY, CO

2147 Newport Place NW RECEIPT REQUESTED Washington, DC 20037

Decision Memo for Pax Ponderosa Pine Planting Project

Center Horse Landscape Restoration Project Summary Selected Action (Draft Record of Decision (DROD))

Outreach Notice Forestry Technician (Integrated Resources), GS

Boulder Gulch Off-Highway Vehicle (OHV) Restoration Project Page 1

DECISION NOTICE AND FINDING OF NO SIGNIFICANT IMPACT. Bend-Fort Rock Ranger District Deschutes National Forest Lake County, Oregon

(OSV) Use Designation Environmental Impact Statement. Notice of intent to prepare an environmental impact statement.

Decision Memo. Cabin #5 Electric, Water, Septic Improvements

Land Use 27/02/2015. LUF Plans and Process. Provincial Land Use Direction

Sustainable Recreation

DECISION NOTICE & FINDING OF NO SIGNIFICANT IMPACT RAT RIVER RECREATIONAL TRAIL

Notice of Proposed Action. Colorado Department of Transportation

Preliminary Market Analysis and Feasibility Assessment for the Fish Lake Historic Site

Introduction. Methodology for Analysis

Chapter 3 FEDERAL POLICIES SOUTH DAKOTA DRAINAGE MANUAL

Storrie and Rich Fire Area Watershed Improvement and Forest Road 26N67 Re-alignment Project

DECISION MEMO Lazyman Repeater Shelter and Tower Replacement

McKenzie River Ranger District, Willamette National Forest Lane County, Oregon

Miller Pasture Livestock Water Pipeline Extension Proposed Action

PROJECT INFORMATION Manchester Ranger District Apple Tree Release and Maintenance Project

Public Scoping Meetings

Mosby Sports & Outdoor Recreation Facility

Municipal Service Review

Recreation and Scenery Specialist Report

Forest Glen Recreation Residence Tract Septic Tank Replacement Proposed Action 05/04/2010

Fontana Project Scoping Record August 2013

Proposed Action for Motorized Travel Management on the North Kaibab Ranger District

CLEARWATER TOWNSHIP WATER QUALITY ACTION PLAN

Health and Safety Manager. Mt. Hood National Forest Gifford Pinchot National Forest GS

TABLE OF CONTENTS. Introduction. Lower Platte South NRD Past and Present 1. Map of Lower Platte South NRD 2. Vision for the Future 3.

Tom Sherman Land Acquisition

Schedule of Proposed Action (SOPA) 10/01/2008 to 12/31/2008

REVIEW OF THE CLASSIFICATION FOR MOTOR VEHICLE USE IN THE PILLSBURY STATE FOREST. Background

GOOD NEIGHBOR POLICY

Fall River Mills Planning Unit. Fish, Plant, and Wildlife Habitat. LCP Volume II Supporting Analysis for Recommendations

National Forests and Grasslands in Texas

Draft Pine Mountain Late- Successional Reserve Habitat Protection and Enhancement Project

USDA Forest Service Stewardship Contracting Proposal

Apache-Sitgreaves NFs Springerville Ranger District OUTREACH NOTICE. Respond by February 26, 2016

PLANNING SERVICES DEPARTMENT REPORT

San Gabriel Mountains National Monument Need to Change Analysis June 2015

Article I Development Code Applicability

Transcription:

United States Department of Agriculture Forest Service Willamette National Forest McKenzie River Ranger District 57600 McKenzie HWY McKenzie Bridge, OR 97413 File Code: 1950 Date: October 8, 2008 To Interested Public, The McKenzie River Ranger District will be preparing an environmental assessment to analyze a long-term (approximately 20 years) Master Plan for Big Lake Youth Camp (BLYC) and the authorization of a special use permit (SUP). The previous Master Plan for BLYC is now expired, so a new plan for the future is required. The purpose of the Master Plan is to guide short and long-term improvements to the Camp to meet the desired future condition. This project will be named the Big Lake Youth Camp Master Plan EA Project. Background The BLYC is located along the eastern shore of Big Lake in the Willamette National Forest, McKenzie River Ranger District. Sisters, OR is approximately 20 miles to the east of the project area, which is accessed off Highway 20 at the Big Lake Road/Hoodoo Ski Area entrance, and located about 4 miles south of Highway 20 (see Figure 1). The legal description of the area is T14S, R72E, and Section 11 of the Willamette Meridian, Linn County, Oregon. The project area located within the current Big Lake Youth camp SUP boundary is classified by the Willamette National Forest Plan as Management Area 12b: Developed Recreation Special Use Sites and the area outside the existing camp is classified as Management Area 10f: Dispersed Recreation Lakeside Setting. The Oregon Seventh-Day Adventists operate the BLYC through a special use permit with the USDA Forest Service. The McKenzie River Ranger District of the Willamette National Forest administers the special use permit. The Willamette National Forest Land and Resource Management Plan (Forest Plan) requires comprehensive and detailed master plans be developed for campgrounds on National Forest System lands managed under a special use permit by non-forest Service entities (page 219). The Oregon Seventh-Day Adventists are currently seeking approval of a master plan and authorization of a SUP for the BLYC to implement the proposed master plan actions. The master plan serves as a basis for agreement between the Forest Service and Oregon Seventh- Day Adventists. It displays the overall strategy that the Oregon Seventh-Day Adventists intend to carry out in managing the BLYC for the next 20 years. Instead of considering individual Caring for the Land and Serving People Printed on Recycled Paper

projects in a piecemeal manner, the master plan allows managers to see the entire picture, resulting in better decisions regarding management of the project area. The Forest Service is responsible for taking the Master Plan through the National Environmental Policy Act (NEPA) process. The NEPA environmental assessment will analyze the effects of the proposed management for the BLYC. The USFS, as the landowner and permitting agency, will determine what types and level of improvements and facilities can be undertaken during the implementation of the 20-year master plan. Activities included as part of the Master Plan that are not implemented within five years of the project decision, may be re-examined to determine the need for supplemental NEPA analysis and documentation. Purpose & Need The purpose of this project is to approve a long-term Master Plan and authorize a SUP for the BLYC. The current master plan has expired, so a new one is needed. The purpose of the Master Plan is to guide short and long-term improvements to the Camp to meet the desired future condition. A Master Plan is needed to identify improvements to occur at BLYC over the next 20 years. These improvements are needed to ensure a quality outdoor recreation experience in an area designated by the WNF Plan for developed recreation. Improvements to existing facilities, new facilities, and restoration activities are needed to enhance camp accessibility and housing, provide quality on-site experiences for visitors, improve camp infrastructure, improve visitors sense of arrival, and enhance the natural environment at the BLYC. The Master Plan will provide a vision to meet the following specific needs: 1) Enhance recreational opportunities and experience 2) Expand the BLYC s capacity 3) Expand and improve BLYC s facilities and services 4) Meet various accreditation organization and state standards 5) Implement an environmental preservation and education plan 6) Reduce visual impacts and enhance natural setting Project Activities are needed to: 1) Enhance Recreational Opportunities and Experience Improve current or construct new recreational facilities to provide updated and improved facilities. Provide new recreational opportunities through the construction of new facilities Better define physical spaces for separate uses; e.g., eat, play, sleep. 2

2) Expand The BLYC s Capacity Increase the current capacity of 325 to better meet public demand and provide for a more enjoyable experience. 3) Improve And Expand BLYC s Facilities And Services, Move various infrastructures to more suitable locations Better accommodate guests Provide room for new facilities Enhance Accessibility 4) Meet Various Accreditation Organization And State Standards Address Oregon Department of Human Services (ODHS) standards for the dining hall and health clinic Address Oregon Department of Environmental Quality (ODEQ) standards for the drainfield Improve the camp facilities to meet accreditation standards of the American Camping Association (ACA) Improve the horse corral and stables to meet specifications for a certified program through the Certified Horsemanship Association (CHA) Provide facilities within the camp to comply with the Americans with Disabilities Act (ADA) 5) Implement an Environmental Preservation and Education Plan Revegetate areas denuded by heavy foot traffic Relocate buildings that are or hold the potential to impact water quality Removal of hazard trees and potential fire fuels Development of an environmental camp policy Creation of environmental education programming for camp guests 6) Reduce Visual Impacts and Enhance Natural Setting Use materials and detailing that blend with or complement the surrounding environment Restore features of the natural landscape within the camp Establish setbacks to protect sensitive areas in the natural landscape Proposed Action The proposed action includes the expansion of the BLYC Special Use Permit (SUP) boundary by approximately 25 acres, as shown in Figure 2. This expansion would support an increase in overall capacity from approximately 325 to a peak capacity of 460 persons to better meet public demand. Construction of new buildings and facilities, primarily within the new SUP area, are proposed, as well as the removal of a few existing facilities. In addition, the staff parking area would be upgraded, and the current maintenance building would be remodeled for alternate uses. The table listed below identifies the proposed activities, as well as the phase during which these 3

activities are anticipated to occur. Phase 1 represents activities that are expected to primarily occur during the initial 1-5 years after the NEPA decision, while Phase 2 represents those projects that are to occur later in time. Table 1. Proposed New Buildings and Facilities in the proposed BLYC Master Plan Facilities Number Units of Measure (Totals) ft 2 Miles Gallons Acres/Spaces Phase Housing Duplex Cabins for Campers 8 10,000 1, 2 Employee Housing 3 7,500 1, 2 Guest Cabins 3 1, 2 Dining Dining Hall 1 10,500 1 Recreation Equestrian Center 1 4,160 1 Indoor Recreation Center 1 6,300 2 Outdoor Swimming Pool & Hot Tub 1 2 Equestrian Trail 0.4 1 Mountain Biking Trail 0.6 1 Support Welcome Center 1 4,000 1 Outdoor Amphitheaters 2 9,000 1, 2 PCT Shelter 1 600 2 Trip Center 1 3,500 2 Environmental Education Center 1 2,000 2 Mountain Bike Storage Building 1 800 2 Medical Health Clinic 1 2,000 1,2 Maintenance Maintenance Center 1 5,000 1 Pump House 1 1 Utilities & Infrastructure Water Tanks 3 3,000 1 Waste Water* 1 Power (Central Generator) 1 1 Fuel (Propane Tank) 1 20,000 1 Parking 0.8/151 1 Roads 1.02 1 * This would likely be built when needed, based on the required treatment for the new buildings. Information The Big Lake Youth Camp Master Plan Environmental Assessment (EA) will analyze the effects on the environment from the proposed action and compare it to the no action alternative. 4

Preliminary issues identified through district scoping relate to the effects of the project on: Riparian Reserves and Aquatic Conservation Strategy Concerns over increased development Activities adjacent to wilderness The Big Lake Youth Camp Master Plan EA is scheduled to be released for public comments in July 2009. To focus your comments on this Proposed Action, please consider the following questions: 1. Are there alternative ways to meet the purpose of the project other than the proposed action we offer, which you would like the Forest Service to consider and analyze? 2. Is there any information about the project area, which you believe is important in the context of the proposed activities, which the Forest Service might have overlooked? 3. For you or the group you represent, what are the potential effects of this proposal that you are particularly concerned about? Please include the following information with your comments: name, address, telephone number, title of the document or project on which the comment is being submitted. Comments would be most helpful if received by November 7, 2008, so they can be considered in the planning process. Please send any comments to Kevin Bruce (Project Team Leader). He may be reached by mail at the McKenzie River Ranger District, 57600 McKenzie Hwy, McKenzie Bridge, OR 97413; by phone at (541) 822-7260; or by e-mail at kbruce@fs.fed.us 5

Figure 1. General vicinity map for the BLYC.

Figure 2. Proposed BLYC Master Plan.