Safe Operating Procedure

Similar documents
Safe Operating Procedure

Appendix F - NUCLEAR GAUGE & SEALED SOURCE SAFETY PLAN

Maryland Department of the Environment

Western Michigan University

Sealed Sources Safety Manual

Kansas Department of Transportation Standard Operating Manual

ARKANSAS DEPARTMENT OF HEALTH RADIATION CONTROL SECTION RADIOACTIVE MATERIALS PROGRAM LICENSING GUIDE INSTRUCTIONS FOR PREPARING AN APPLICATION

Radiation Safety Manual

HAZMAT Employee Training DOT/ NRC- Radioactive Materials Shipments Compliance with 49CFR and 10CFR 71 (02/2012)

CARDINAL SURVEYS COMPANY

Radiation Control Chapter RADIATION SAFETY REQUIREMENTS FOR WIRELINE SERVICE OPERATIONS AND SUBSURFACE TRACER STUDIES

Type II Inspection Worksheet

Type II Inspection Worksheet

Type II Inspection Worksheet

Type II Inspection Worksheet

Radiation Safety Operating Procedure. Shipping and Transporting

Western Michigan University

Type II Inspection Worksheet

Safety and Health Office phone , fax GUIDELINES FOR USE OF NUCLEAR MOISTURE/DENSITY GAUGES

RADIATION SAFETY PROGRAM

RADIOACTIVE MATERIALS REGULATORY GUIDE

Regulatory Guide 2.19

So Now You Are The RSO Radiation Safety Programs. Norman W. Henry III, MS,CIH SHBP (Safety and Health By Protection) comcast.

RADIATION PROCEDURES MANUAL Procedure Cover Sheet

RADIATION PROCEDURES MANUAL Procedure Cover Sheet

Procedures for Preparing and Loading the Package

ROAD TRANSPORT OF RADIOACTIVE MATERIAL REQUIREMENTS AND GUIDANCE NOTES FOR DRIVERS AND HANDLERS

MINNESOTA DEPARTMENT OF HEALTH

2. Before packaging or labeling the material, complete the appropriate checklist:

Type II Inspection Worksheet

PART E RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS

Standard Operating Procedure. Handling of Radioactive Material. PC-SOP-IM-005-v02

Hazardous Materials and Chemicals

RADIATION CONTROL - RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS

RULES OF TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF RADIOLOGIC HEALTH

MODEL SPEC 2-T USER S MANUAL

Date June 2, 2006 Page 1 of 5. Approved By

Carbon Canister Vapor Polisher

UNLOADING PROCEDURE FOR FRONTIER TECHNOLOGY CORPORATION MODEL SHIPPING PACKAGE WITH WEP PLUG FOR SOURCES IN HOLDERS

HELGET GAS PRODUCTS HAZARD COMMUNICATION PROGRAM

RADIOACTIVE WASTE MANAGEMENT PLAN

Type II Inspection Worksheet

4.0 PLACARDING STUDENT WORKBOOK

EASTERN MICHIGAN U N I V E R S I T Y SECURITY OF HAZARDOUS MATERIALS IN TRANSPORT

Wyoming Department of Transportation. Radiation Protection Program

Dangerous Goods and Rail Safety. A Technical Publication from the Co-ordination and Information Centre. Documentation Review

Dangerous Goods and Rail Safety. A Technical Publication from ALBERTA EDGE (ENVIRONMENTAL AND DANGEROUS GOODS EMERGENCIES) Documentation Review

Dangerous Goods and Rail Safety. A Technical Publication from the Co-ordination and Information Centre. Documentation Review

AND RADIATION SAFETY REQUIREMENTS FOR

RADIATION SAFETY INSPECTION CHECKLIST Section A : Contact Information (Principle Investigator) Last Name: First Name: Extension:

Chapter 7 Transportation of Radioactive Material

Laboratory Close-Out Guidelines

Nuclear Substance(Class 7) Receiving: RefresherTraining

FASHION INSTITUTE OF TECHNOLOGY OUTLINE FOR PREPARING WORK-SPECIFIC ENVIRONMENT, HEALTH AND SAFETY (EHS) PLAN

DEPARTMENT OF CIVIL AVIATION DANGEROUS GOODS INSPECTOR HANDBOOK

Performance-Based Inspection Field Guide

FASHION INSTITUTE OF TECHNOLOGY OUTLINE FOR PREPARING WORK-SPECIFIC ENVIROMENT, HEALTH AND SAFETY (EHS) PLAN

Training Requirements for this product

HAZMAT Employee Training D.O.T. Radioactive Material Shipments #7 (11/2010)

FACILITIES MANAGEMENT OFFICE OF ENVIRONMENTAL HEALTH AND SAFETY AERIAL WORK PLATFORM POLICY 09/06/17 Last Revision

CNSC Type II Inspections of Activities and Devices for Nuclear Substances and Radiation Device Licensees Group 3.2 Licensees

Welcome to the Foundation of a Radiation Safety Program (Nuclear) Webinar THE WEBINAR WILL BEGIN SHORTLY

NORTH AMERICAN STANDARD HAZARDOUS MATERIALS / TRANSPORTATION OF DANGEROUS GOODS INSPECTION PROCEDURE

WASTE MANAGEMENT PROGRAM

Radiation Safety Manual. Prepared by University Radiation Safety Committee in coordination with NMSU Environmental Health & Safety

Management of sources of ionising radiation

Radiation Safety Manual. Environmental Health and Safety

Radiation Safety at the University of Vermont

SCAFFOLDS Revision No: 3

EDMONDS COMMUNITY COLLEGE WASHINGTON STATE COMMUNITY COLLEGE DISTRICT 23

2/14/2017. Introduction & Objectives. Radiation Safety Program Structure. Massachusetts DPH Radiation Control Program

FCX Department of Occupational Health and Safety. Contents. Open-Hole Policy

INTERNATIONAL CYANIDE MANAGEMENT INSTITUTE Cyanide Transportation Verification Protocol

RSP-2 Page 1 of 12. Environmental Health and Safety Radiation Protection Committee

DGI Training Center HAZARDOUS MATERIALS TRANSPORTATION COMPLIANCE AUDIT CHECKLIST. Company: Contact: Contact Phone: Contact Audit Address:

CNSC Type II Inspections of Activities and Devices for Nuclear Substances and Radiation Device Licensees Group 3.5 Licensees

DANGEROUS GOODS PANEL (DGP) MEETING OF THE WORKING GROUP OF THE WHOLE

HEALTH AND SAFETY MANUAL

Radiation Safety Policy & Procedures

Nuclear Substances and Devices Regulations

PART 34 LICENSES FOR INDUS- TRIAL RADIOGRAPHY AND RADI- ATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS

Radioactive Material Safety Manual

HAZARD COMMUNICATION

Frequently asked questions. REGDOC , Security of Nuclear Substances: Sealed Sources

BCIT Safety Manual. Radiation Safety Program Manual. Part 6; Section 90

Swette Center for Environmental Biotechnology Radiation Safety Policy

Conway Underground East Driver Instructions. For LPG Truck Loading Terminals

Radiation Protection Program. Site Function: Ecology, Health and Safety Procedure No.: WYN Page: 1 of 29

By: Georgia Institute of Technology

HazMat Team Emergency Response Manual for Class 7 Transport Emergencies INFO-0764

Contractor EHS Program Attachments

Transporting radioactive material - Guidance on radiation and contamination monitoring requirements, and determining a Transport Index

KENORA DISTRICT SERVICES BOARD POLICY and PROCEDURE Page 1 of 8

"DOT HAZMAT GENERAL AWARENESS"

SHIPMENT/RECEIPT OF RADIOACTIVE MATERIAL RCT STUDY GUIDE

Installation, Operating and Maintenance Instructions Incognito Series Air Curtain

EMPLOYEE R-T-K, EMPLOYEE TRAINING, AND TRAINING RECORDS

ACCESS CONTROL AND WORK AREA SETUP RCT STUDY GUIDE State responsibilities in using or initiating a RWP.

SOURCE HOLDERS FOR RADIATION-BASED MEASUREMENT SOLUTIONS

Powered Industrial Truck/Forklift Operations Standards and Procedures. Disaster Cycle Services Standards & Procedures DCS SP DMWT

Transcription:

Safe Operating Procedure (Revised 3/17) SAFETY PROTOCOL: 241 AM (BE) NEUTRON PROBE Use of 241 Am (Be) neutron probes (gauges) is contingent upon prior approval by the UNL Radiation Safety Committee (RSC). To obtain RSC approval: Submit an Authorization for Radioactive Material Use request for review by the UNL RSC. Contact the UNL Radiation Safety Officer (RSO) for specific instructions. Agree to use this safety protocol or submit an alternative and equivalent procedure that you develop to meet your unique needs. All gauge users must be at least 18 years of age and have completed radiation safety training through EHS prior to handling or operating a gauge. Use of a gauge off of university property requires approval by the UNL Radiation Safety Officer. Contact the UNL Radiation Safety Officer (402-472-2157) for specific instructions. Physical Data Half-life of Am-241 = 432 years. The primary radiation hazard from an AmBe source is neutrons. Am-241 and Be produce neutrons of approximately 4.2 MeV at a rate of approximately 2200 neutrons/second per mci of Am-241. Dose rate at 1 meter = 0.005 rem/hr per Ci. Security When a portable gauge is not under the control and constant surveillance of an authorized user, it must be secured from unauthorized removal with tangible barriers created by a minimum of two independent physical controls. To comply with this security requirement, the two independent physical controls must prevent both 1) unauthorized removal of the gauge; AND 2) unauthorized removal of case containing the gauge. Proper implementation of this security requirement can be confusing. Contact the Radiation Safety Office if you have any questions regarding gauge security. In addition, it is important to note that the requirement for two independent controls applies when the gauge is transported or at a job site, if the gauge is not under the control and constant surveillance of the user (e.g., stopping during transport for lunch).

A gauge accountability use log must be completed each time a gauge is removed from the designated storage location. The use log must minimally contain the following information (see Appendix A for an example use log): Gauge identifying information (e.g. manufacture, model and serial number). Dates removed from and returned to the storage location. Individual removing and returning the gauge. Location of use. Radiation Protection Procedures 1. Standard Operating Procedures Before removing a gauge from its place of storage, ensure that the source is locked in the fully shielded position (e.g., keyed lock, padlock, mechanical control). Place the gauge in the transport case and lock the case. Verify that the transport case is marked/labeled as discussed in the transport section of this SOP and contains the necessary documents (copy of this SOP and current leak test data). Complete gauge accountability use log as previously described. Block and brace the gauge to prevent movement during transport and secure the gauge in or to the vehicle. Do not transport the gauge in the passenger compartment of the vehicle. Block and brace the gauge at a location in the vehicle as far from the occupants as practical. If the gauge is transported off university property or via public roads, follow all applicable Department of Transportation (DOT) requirements (discussed later in this safety protocol), including completion of an appropriate bill-of-lading prior to transport. Use the gauge according to the manufacturer's instructions and recommendations. Do not touch the unshielded source rod with your fingers, hands, or any part of your body. Do not place hands, fingers, feet, or other body parts in the radiation field from an unshielded source. Unless absolutely necessary, do not look under the gauge when the source rod is being lowered into the ground. If you must look under the gauge to align the source rod with the hole, follow the manufacturer's procedures to minimize radiation exposure. Verify the integrity of the connection between the source and cable prior to use to ensure the source does not separate from the cable. After completing each measurement in which the source is unshielded, immediately return the source to the shielded position. Always maintain constant surveillance and immediate control of the gauge when it is not in storage. At job sites, do not walk away from the gauge when it is left

on the ground. Take actions necessary to protect the gauge and yourself from danger of moving heavy equipment. Always keep unauthorized persons (e.g., individuals that are not trained radiation workers or members of the public) away from the gauge. Perform routine cleaning and maintenance according to the manufacturer's instructions and recommendations. Any maintenance on the gauge involving dismantling or removal of the source holder is prohibited and must only be performed by the manufacturer of the device. If gauges are used for measurements with the unshielded source extended more than 3 feet beneath the surface, use piping, tubing, or other casing material to line the hole from the lowest depth to up to 12 inches above the surface. If the piping, tubing, or other casing material needs to be less than 12 inches above the surface (e.g., in order to avoid interference with farm equipment in the field), cover the hole liner or take other steps to ensure that the hole is free of debris and it is unlikely that debris will re-enter the cased hole. In addition, the deepest end of the casing must be closed to ensure the gauge source would be contained in the casing if it became disconnected from the control wire. 2. Shielding Requirements The gauge is self-shielded, and under normal use does not require additional shielding. Gauges should always be stored with the source in the shielded position (i.e., source retracted). Storage locations should be selected to minimize radiation exposure to members of the public and employees. 3. Leak Testing and Physical Inventories Semi-annual leak tests and physical inventories of gauges are coordinated by the UNL Radiation Safety staff. Maintain a copy of the most current leak test data in the gauge case. 4. Bioassay Requirements There are no bioassay requirements for gauge users. 5. Dosimetry Gauge users will be issued neutron dosimetry that must be worn when using the neutron probe, including during transport. Extremity dosimetry is not required. Do not store dosimetry near the gauge. 6. Emergency Procedures If the source fails to return to the shielded position (e.g., as a result of being damaged, source becomes stuck below the surface, etc.) or if any other emergency or unusual situation arises (e.g., the gauge is struck by a moving vehicle, is in a vehicle involved in an accident, etc.): In the case of motor vehicle accident or injury accident, immediately notify local authorities.

Immediately secure the area and keep people at least 15 feet away from the gauge until the situation is assessed and radiation levels are known. However, perform first aid for injured individuals and remove them from the area only when medically safe to do so. If any heavy equipment is involved, detain the equipment and operator until it is determined there is no contamination present. Gauge users and other potentially contaminated individuals should not leave the scene until emergency assistance arrives. Notify the persons in the order listed below of the situation: Table 1. Emergency contact information. Name Work Cellular Home Joel Webb, RSO 402-472-2157 402-304-5333 402-465-9153 Tom Machacek, 402-472-8676 402-499-6164 402-420-5431 Asst. RSO UNL Police 402-472-2222 NA NA Follow the directions provided by the person contacted above. As necessary, the RSO will arrange for a radiation survey to be conducted as soon as possible by a knowledgeable person using appropriate radiation detection instrumentation. To accurately assess the radiation danger, it is essential that the person performing the survey be competent in the use of the survey meter. If the situation arises, the RSO will arrange for excavation to free a source that has become lodged below the ground surface. This must be done in such a way that the source integrity is not compromised. Source excavation may be done by directly withdrawing the access tube if possible, or by excavating the area near the tube and removing it. Dosimetry and radiation survey equipment shall be used in order to minimize the dose to the operators. If required by Title 180, Chapter 4, the RSO shall report the occurrence to State officials. Waste Disposal Surplus gauges shall be returned to the UNL Radiation Safety Office for proper disposal. Survey Meters A survey meter is not required for routine work with gauges.

Transportation Procedures The quantity of radioactive material in a typical portable gauge is not sufficient to trigger DOT vehicle placard requirements. Nor is a commercial driver s license required to transport a typical neutron gauge. However, radiation safety and DOT training are required for individuals involved in the use and transport of gauges. DOT training is required every three years. Per 180 NAC 13-005.01, the following requirements apply to each licensee who transports licensed material outside of the site of usage, as specified in the Department license, or where transport is on public highways. A special form certification must be maintained on file. This certification is provided by the manufacturer and maintained on file by EHS. Shipping papers are required whenever the gauge is transported off university property via public roads. Required shipping papers consist of a completed bill of lading, operating procedures, and emergency procedures. Bill-of-lading templates are provided in Appendices B and C of this SOP. Operating and emergency procedure requirements are met if a copy of this SOP is maintained with the gauge. Therefore, a copy of this SOP shall be included with the shipping papers. When the driver is not at the vehicle s controls, the shipping papers shall be either in a holder which is mounted to the inside of the door on the driver s side of the vehicle or on the driver s seat in the vehicle. Gauges must be transported in the manufacturer provided case. The transportation case for the Campbell Pacific Nuclear (Models 503DR and 503 Elite) gauges must meet the specifications for a type A package due to the quantity of radioactive material contained in the gauge. Transport cases provided by manufacturers meet this requirement. In addition, Type A testing results for the transport package must be maintained on file. This certification is provided by the manufacturer and maintained on file by EHS. Inspect the markings and labels prior to transport. If markings or labels are missing or have become illegible, contact the RSO to request replacements. Markings and labels on the transportation case must be durable, legible, in English, and printed on or affixed to the surface (e.g., a label, tag or sign) of the case. Required markings and labels on the transportation case for the Campbell Pacific Nuclear (Models 503DR and 503 Elite) gauges are: The words USA DOT 7A Type A and Radioactive Material. The words UN3332, Radioactive Material, Type A Package, Special Form, 7, RQ. This is the proper shipping name. Two DOT RADIOACTIVE YELLOW II labels (see below) affixed on opposite sides of the package. The CONTENTS is marked as Am-241; the ACTIVITY is marked as 1.85 GBq and the TRANSPORTATION

INDEX is marked as 0.2. The transportation index is the dose rate (mrem/hr) at one meter from the gauge. Required markings on the transportation cases for the Troxler (Models 4301 and 4302) gauges are: The words UN 2911, Radioactive material, excepted package, instruments, RQ. This is the proper shipping name. If a gauge requires return to the manufacturer for repair or service, contact the RSO for assistance in preparing the gauge for shipment.

Appendix A Gauge Accountability Use Log University of Nebraska Lincoln Authorized User Facility Manufacturer Serial Number Authorization Information Authorization Number Calendar Year Model Number Nuclide Date of Use Removed by (User Name) Job Site Use Location Date Returned To Storage Returned by (User Name) Note: The gauge accountability use log remains at the storage facility.

Appendix B BILL OF LADING for CPN Gauge Models No. 503DR and 503 Elite Shipper: UN3332, Radioactive Material, Type A Package, Special Form, 7, RQ, containing: Am-241: 1.85 GBq ( 50 mci) RADIOACTIVE YELLOW II Label, TI = 0.2 EMERGENCY CONTACT INFORMATION Name Work Cellular Home Joel Webb, RSO 402-472-2157 402-304-5333 402-465-9153 UNL Police 402-472-2222 NA NA This is to certify that the above-named materials are properly classified, described, packaged, marked, labeled and are in proper condition for transportation according to the applicable regulations of the Department of Transportation. Shipper: Date: (Signature)

Appendix C BILL OF LADING for Troxler Gauge Models No. 4301 and 4302 Shipper: UN 2911, Radioactive material, excepted package, instruments, RQ, containing: Am-241: 0.37 GBq (10 mci) EMERGENCY CONTACT INFORMATION Name Work Cellular Home Joel Webb, RSO 402-472-2157 402-304-5333 402-465-9153 UNL Police 402-472-2222 NA NA This is to certify that the above-named materials are properly classified, described, packaged, marked, labeled, and are in proper condition for transportation according to the applicable regulations of the Department of Transportation. Shipper: Date: (Signature)