Project Managers Group. I-SEM Change Control. February 2016 Version 0.1

Similar documents
I-SEM Programme Project Office Programme Change Control Procedure

Interim Governance Arrangements for All Island Retail Market Harmonisation Project

Change Control Process for the Co-Ordinated Retail Electricity Markets

The purpose of this paper is to present the outcome of recent PR19 assurance activities for note by the Water Forum.

I-SEM Project Managers Group (PMG) 15 November 2017 Key Notes, Actions & Decisions

James Cook University. Internal Audit Protocol

JOB DESCRIPTION ORGANISATIONAL STRUCTURE MAIN PURPOSE OF ROLE KEY RESPONSIBILITIES

GREATER MANCHESTER HEALTH AND SOCIAL CARE STRATEGIC PARTNERSHIP BOARD

Management of Strategic Capacity on the Network

Self Service Interface (SSI) Design Specification sections and 1.9.4; and Self Service Interface Code of Connection 1.14

SABRe Design & Development Process

CHANGE MANAGEMENT PLAN OKLAHOMA DEPARTMENT OF HUMAN SERVICES ENTERPRISE SYSTEM (MOSAIC PROJECT)

Sector management of regulatory document changes STAR project deliverable 8

Manitoba Health, Seniors and Active Living Transformation Program Charter. February 16, 2018 Version 1.0

ECB-UNRESTRICTED T2S OPERATIONAL GOVERNANCE PROCESS FRAMEWORK

HEALTHY BEES PLAN IMPLEMENTATION BRIEF

Project Steering Committee. Executive Leadership Team Assets leadership team Superintendents team Business Analyst/PMO

UNIVERSITY OF CAMBRIDGE INFORMATION SERVICES COMMITTEE PROJECT AND PROGRAMME GOVERNANCE: DOCUMENTATION GUIDE: STAGE GATES

Annex 4 CDM EXECUTIVE BOARD DECISION AND DOCUMENTATION FRAMEWORK. (Version 04.0)

Business Process. BP_SO_12.1 Unit Testing

GRIEVANCE PROCEDURE FOR THE IMPLEMENTATION OF WILMAR S NO DEFORESTATION, NO PEAT, NO EXPLOITATION POLICY

Volume III ARCHITECTURE MAINTENANCE PLAN

Wales Animal Health and Welfare Framework. Achieving High Standards Together

CAPITA PLC CORPORATE RESPONSIBILITY POLICY

Submission 1 Document Submitted by. Inter-Agency Emergency Management Office. . Reference Number. Submission Date 03 March 2015

Gambling-Related Harm Minimisation in Criminal Justice Invitation to Tender

All NEMOs proposal for the back-up methodology in accordance with Article 36(3) of the Commission Regulation (EU) 2015/1222 of 24 July 2015

Work Plan and IV&V Methodology

UCD IT Services. <Project ID> ITRM. Project Initiation Document. Version 1.0 8th Dec Version History

Structural Engineering & Civils Scope of Services

Smart Metering Implementation Programme. Consultation on New Smart Energy Code Content

BT Response A review of consumer complaints procedures - Ofcom consultation

Supports and coaches more than 150 IT Staff in change, release and problem management activities.

ANNEX 3. MASP Rev v1.1. Governance Scheme

Complaints, Feedback, Corrective and Preventive Action

20 August Introduction

ANNEX 3. MASP Rev v1.4. Governance Scheme

COLLECTIVE DISPUTES POLICY

GRIP for Programmes Release 1 (DRAFT) April Network Rail GRIP for Programmes Page 1 of 104

Building Standards Customer Journey

Request for Proposal (RFP)

Qualified Experts for Radioactive Waste Management A Consultation by the UK environment agencies

Joint Office of Gas Transporters

SABRe Design & Development Process

Procurement Strategy

NHSScotland Procurement Review

Request for Quotation (RFQ) for E-book conversion of Booklet on Achievements of Department of Commerce

GE/GN8640. Risk Evaluation and Assessment. Guidance on Planning an Application of the Common Safety Method on. Rail Industry Guidance Note

TSOs proposal for the methodology for Coordinated Redispatching and Countertrading in accordance with Article 35(1) of Commission Regulation (EU)

CONTRACT CONDITIONS, TECHNICAL, STANDARD FOR

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES

Customer Transformation Programme: Phases 2-4. Interim Chief Operating Officer. Summary

DECOMMISSIONING AND DISINVESTMENT STRATEGY CCG: CS01

Corporate Procurement. Sustainable Timber Procurement Policy

Table of Contents. All relevant process documentation and updates are available on the Ministry of Health website:

Disinvestment and Decommissioning Policy

External Supplier Control Obligations

International Airport Expansion Project. Terms of Reference for Legal Advisor

AGM RESOLUTION UPDATE JULY 2018

provide the key responsibilities of UK SBS in delivering quality and effective Strategic Procurement services to the Client

Exhibit B - A/E Scope of Services (General Contracting Project) State of Ohio Professional Services Agreements for Public Facility Construction

SEMOpx Day-ahead Market Products Stage 3 Progress Report. May 2017

INVITATION TO TENDER TO SUPPORT ORGANISATIONAL CHANGE AND TRANSFER OF UNDERTAKINGS OF THE CHESHIRE AND WARRINGTON GROWTH HUB

PMP Exam Prep Coaching Program

Information and Guidance relating to the Review of Unit Standards Registered on the NQF of Namibia

SAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURES

MARKET PROCESS DESIGN. MPD Data Aggregation

Request for Quotation (RFQ) for. Conducting audit of Online Campaign for Indian Plantations for IBEF. Request for Quotation [RFQ]

MSC - Marine Stewardship Council

ARTICLE 1 - ARCHITECT/ENGINEER S BASIC SERVICES

I-SEM Testing Tariff High Level Options Consultation

DRAFT FOR COMMENT. Comments should be sent to by * September 2005 PROPOSED AMENDMENT REPORT

Annex 33 IMPLEMENTATION PLAN FOR THE CLEAN DEVELOPMENT MECHANISM PROJECT STANDARD, VALIDATION AND VERIFICATION STANDARD AND PROJECT CYCLE PROCEDURE

BRIEF - PROJECT PLAN

European Transparency Regulation Implementation (GC0083)

PROJECT NAME SECTION GENERAL COMMISSIONING REQUIREMENTS

Casework Technical Support (Social Welfare - Project Management)

Human Resources Management Career Level 1

The International Baby Food Action Network (IBFAN) Breaking the Rules, Stretching the Rules 2017 Response and Action Plan

MARKET PROCESS DESIGN. Retail Market Release Prioritisation Process

APPENDIX C Configuration Change Management Verification and Validation Procedures

Business Centre Client Services Manager

Managed Wireless Service. Service Level Agreement

á1058ñ ANALYTICAL INSTRUMENT QUALIFICATION

Telecoms and Pay TV Complaints Q2 (April to June) 2015

END-POINT ASSESSMENT PLAN

Terms of Reference for Mind Committees

Change Control Management process for non-it related products/services 2.1. Specific definitions and abbreviations

Intra-Day Trading Project. Market Participant Technical Overview. Conference call number: , pin: 79592

Tendering Process Information Document for Chester Beatty Library

Staff Grievance Procedure

Support Services Policy for Access Education including Success Plans

ANNEX THREE. Regime for Monitoring of Separation of Batelco and NBN Compliance

Community Consultation Policy. Date this document was approved 8 May 2018 Legislative

I-SEM Interconnectors Project

Memorandum of Understanding

Digital Industries Apprenticeship: Assessment Plan. IS Business Analyst. March 2017

Alternative Connection Application and Offer Process Proposal

Guidance on project management

Update on Data Release Process

Transcription:

Project Managers Group I-SEM Change Control February 2016 Version 0.1

I-SEM Change Control purpose and scope The I-SEM Agreed Approach Document requires that a Change Control process must be approved by the I-SEM Steering Group. This process should be in line with recognised industry standards. To comply with this overall requirement for I-SEM Programme delivery, a standard process is needed to manage all proposed changes to the baselined programme time, cost or quality, which impact on two or more parties within the overall programme. In this context: Baselined time = unrecoverable slippage to any milestone on the Level 2 programme plan (and by inference, also Level 1 milestones) Baselined cost = to be confirmed on agreement of financial envelop Baselined quality = design documentation and specifications to be baselined Dec 2015 onwards, on which two or more parties depend A party is any one of: CER and UR, acting jointly TSO in its delivery role Interconnectors in their delivery roles Any other stakeholder involved in the I-SEM Programme e.g. TSO in any other role, generators, suppliers

I-SEM Change Control key principles the process must be appropriately inclusive and transparent to all parties the process must balance robustness with efficiency. This requires: clarity over what is or is not subject to change control a clearly documented process, communicated to all parties commitment to agreed timescales for CR turnaround strong administrative support for the process Change Requests will be classified by potential impact as shown in the table below. Note the financial bounds will be confirmed once the overall Programme cost envelop is agreed. Minimum Impact Moderate Impact Significant Impact Time Change limited to a non Critical Path Level 2 milestone, or recoverable slippage only Change to Level 2 milestone but Level 1 unimpacted Change to Level 1 milestone Cost No impact TBC TBC Quality No change to delivered product e.g. insertion of clarificatory para in design documentation Delivered product unchanged but approach is different (e.g. workaround), or change to non-critical functionality Change to critical functionality

I-SEM Change Control process overview The proposed Change Control process has four key stages, details of which are set out in Annex A: Submit and Log Change Request Complete Impact Assessment Decide Change Request Complete and Close Submit and Log Change Request: the TSO Programme Management Office will log all requests to change any element of the Programme s time, cost or quality baseline Complete Impact Assessment: the Joint Project Managers Group will review all CRs, and arrange an impact assessment where this is required from one or more I-SEM parties Decide Change Request: the Joint Project Board will consider the CR and any associated impact assessments. It will decide minimum and moderate impact CRs, and make a recommendation to I-SEM Steering Group for significant impact CRs Complete and Close: for approved CRs, the TSO PMO will co-ordinate the required updates to any baseline documentation (plans, cost estimates, specifications). For rejected CRs, the TSO PMO will notify the party raising the CR of the JPB s decision. Finally, the TSO PMO will close the CR.

I-SEM Change Control Role of other stakeholders The proposed Change Control process will apply to the RAs, TSO (in its delivery role), Interconnectors, and all other stakeholders in I-SEM (including the TSO in any other role) The RAs, TSO (in delivery role), and Interconnectors will be able to raise a CR All other stakeholders will be able to review the Change Register, and thus have full visibility of the status of any CR in the process (excluding any CRs deemed by the Joint Project Board to be commercially confidential) http://www.semo.com/isem/pages/home.aspx All other stakeholders will be fully involved in any relevant Impact Assessments through the relevant Participant Liaison Group Other stakeholders will not be able directly to raise a CR. Instead: They will be able to raise an issue through the Query Management Process (being run by the TSO s Participant Engagement Workstream) If the resolution of an issue identifies the need for a CR, this will be raised on behalf of the participant(s) by the RA, TSO or Interconnector as appropriate If the Query Management Process concludes that a CR is not required, but the participant disagrees with this decision, they may dispute this through an I-SEM dispute management procedure

Proposed approach for incremental documents Some documents, particularly the Interface Specifications, will be developed on an incremental basis, working with market participants throughout (e.g. via the Technical Liaison Group) Given the frequency of update to these documents, formal control of every change may not be practical. However, it is still important to apply good document management disciplines in their production, in order that market participants can be sure they are accessing the latest version of a document at any point in time The following approach will be used for this type of document: A baseline version of the document will be published (e.g. v0.1) Further minor changes / updates to this document will be published as Change Advice Notes (CANs), together with a redlined version of the baseline document. A participant seeking the latest version of the document will therefore access the redlined version, together with the relevant CANs for that document. For absence of doubt, CANs will be clearly published for participant consideration, but not subject to the full change control process At intervals, all relevant CANs will be rolled up into a new version of the document (e.g. v0.2), which will be processed through change control and issued as a new baseline. These intervals may be determined by a) the number of CANs relevant to the existing baseline becoming too large (and the resultant redlining of the baseline document, confusing) and / or b) the addition of substantial blocks of new text to a document

Annex A: Change Control Process - Detailed steps The following flow diagrams set out the steps for each of the four stages of the proposed Change Control Process. The parties involved in the process (shown as swimlanes on each diagram) include: RAs CER and UR, acting jointly TSO in its delivery role Interconnectors in their delivery roles* JPMG Joint Project Management Group, comprising RA representation (Jim McAllister and Helen Mounsey), and TSO representation (Simon Grimes and Mark Needham) CCC Change Control Co-ordinator, assumed to be a function of the I-SEM PMO Other SH any other stakeholder in I-SEM, including the TSO in any other role PLG one or more of any of the four Participant Liaison Groups JPB Joint Project Board ISG I-SEM Steering Group Note in the following diagrams the Interconnectors delivery roles are considered similar to that of the TSO, and their swimlanes thus combined

ISG JPB PLG CCC JPMG TSO/ Icon RAs I-SEM Change Control Submit and Log CR Raise CR Raise CR Review CR To IA Log CR Not complete Seek clarification from submitter

ISG JPB PLG CCC Minimum Impact CR sonly no IA may be required (tbc) JPMG TSO/ Icon As appropriate RAs I-SEM Change Control Impact Assessment Complete IA Complete IA Identify IA requirements Sense check OK To Decision Distribute for IA Assemble completed IAs Not OK Seek clarification Complete IA Pass directly to Decision Stage

ISG JPB PLG CCC JPMG TSO/ Icon RAs I-SEM Change Control Decision Review additional information Information received Compile CR and any IAs Advise raiser and close Seek clarification Log approval To Completion Rejected Review and decide / recommend Further information required Minimum / Moderate CR: Approved Significant CR Review and decide Significant CR: Approved

ISG JPB PLG CCC JPMG TSO/ Icon RAs I-SEM Change Control Completion Update documentation Update documentation Confirm completion Approved CR Request doc updates Issue updated documentation Close CR