Form -1. [Vide Notification dated 1 st December 2009] FOR PROPOSED. COSTAL ROAD AT DRONAGIRI, NAVI MUMBAI Precast RCC Bridges On Holding Ponds-

Similar documents
APPENDIX I. (See paragraph-6) FORM 1

APPENDIX I. (See paragraph-6) FORM 1

APPENDIX I (See paragraph 6) FORM 1

APPENDIX I. (See paragraph 6) FORM 1

Annex F Scoping Checklist

FORM 1 & 1 A. Palladium Grand II RESIDENTIAL & COMMERCIAL DEVELOPMENT. Palladium Grand II, S. No. 17/1A/2, Dhanori, Pune, Maharashtra

FORM I SUBMISSION TO STATE ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, ANDHRA PRADESH. BY. Asst.Director of Mines and Geology, Rajamahendravaram

Molvan- Chhamuchhal Group Gram Panchayat. Taluka- Mangrol, District- Surat. Ph. No

FORM-I. 13. Name of Applicant District Collector Nasik 14. Registered Address Address : Collector Office, Nasik

APPENDIX I (See paragraph 6) FORM 1

FORM 1. APPLICATION FOR OBTAINING ENVIRONMENTAL CLEARANCE VIDE PARA 6 OF S.O.1533 OF MOEF NOTIFICATION DATED 14 th SEPTEMBER 2006

M/s. Karthika Mines & Minerals Pvt.Ltd.-Colour Granite Quarry Ha. FORM - I

FORM 1 BASIC INFORMATION S.NO.

APPENDIX I (See paragraph 6) FORM 1 (Application for Environment Clearance)

Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd &

FORM-I for seeking clearance for project attracting CRZ notification

UPDATED FORM I. SUBMISSION To Ministry of Environment & Forests & Climate Change, New Delhi. Prepared by. M/s. VIJAYNAGAR SUGAR PVT. LTD.

FORM I TERMS OF REFERENCE. For. QUARRY OF ROAD METAL (6.265 Ha) Sri K Kasi Raju. PROP: K.Kasi Raju

APPENDIX I (See paragraph - 6) FORM 1

FORM 1. 8 Does it attract the specific condition? It yes, No Please specify 9 Location At Village Akurli, Akurli Road, Kandivali(E), Mumbai

APPENDIX - I (See paragraph 6) FORM 1

APPENDIX- I FORM- 1. (I) Basic Information:

Proposed Construction Multi Specialty Hospital Naruvi Hospitals 2. S. No. in the schedule 8(a)

Appendix I. Form 1 BASIC INFORMATION PAWA MASONARY STONE MINING PROJECT VILLAGE PAWA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN

(Residential cum Commercial Project) APPENDIX I (See paragraph 6) FORM 1. Plot area: 37,039 m 2 Built up area: 1,11, m 2

APPENDIX I (See paragraph 6) Form 1 (I) Basic Information

Sri.T.N.Balasubramanya

Submitted To State Expert Appraisal Committee (SEAC), State Environmental Impact Assessment Authority, Andhra Pradesh.

UPDATED FORM I, (Submitted to State Expert Appraisal Committee, Telangana)

FORM 1 (As per new Notification of MoEF dated vide S.O 3067 (E))

No 1 Name of the Project/s M/s. Velchal Laterite Mine 2 S. No in the Schedule 1(a)

APPENDIX I (See paragraph 6) FORM 1

FORM 1. Gownivaripalli Village, Tehsil. Gorantla Mandal, District. Anantapur District, State

Sand, Stone & Bajri Mining Project Applicant: Shri Ashish Kumar, M/s Ashish Stone Crusher. Form-1 FORM-1 SRUSHTI SEWA, NAGPUR 1

FORM I. [Vide M.o.E.F & C.C Notification dated 14 th September, 2006] For Proposed Residential & Commercial Project ALCOVE. M/s.

Project: Bhidauni Khadar Ordinary Sand Mining Project on Yamuna River FORM 1 Applicant: M/s Satyug Foods Pvt. Ltd. FORM- I

FORM 1. 1 Name of the Project Pinakin Mangubhai Patel 2 S. number in schedule 8 (a)

FORM 1. No condition? If yes, please specify. 8. Does it attract the specific. No condition? If yes, please specify. 9. Location Geo Coordinates

APPENDIX I (See paragraph 6) FORM 1. Plot area: 10,439 m 2 Built up area: 50, m 2

FORM 1 FOR PROPOSED CONSCTRUCTION BUILDING PROJECT ( SQ. M) ANAMOL LIFE STYLE

Form I. for. Proposed Construction of High Rise Residential Cum Commercial Building Eco Gardens

Details required for submitting Fresh EC Application. (Category B2 Projects: Mining of Minor Minerals)

APPENDIX I (See paragraph 6) FORM 1. Plot area: 13,114 m 2 Built up area: 81, m 2

FORM 1. Basic Information Sr. No. 1 Name of the project River Sand Mining Project of Shree Sabarmati Majur Kamdar Sahakari Mandali LTD.

FORM 1. /area/length/tonnage. No condition? If yes, please specify. 8. Does it attract the specific

UPDATED FORM-1 EXTENSION OF VALIDITY OF ENVIRONMENTAL CLEARANCE. Sri Fakir Rohidas

FORM-1. PROJECT: Sati & Garhi Sand Ghat,Ulai River (Area-22 Ha), Dist:-Jamui. APPLICANT: M/s Westlink Trading Pvt. Ltd. FORM- I.

FORM 1 (As per new Notification of MoEF dated vide S.O 3067 (E))

A 'N 'E B 'N 'E C 'N 'E D 'N 'E

.APPENDIX I (See paragraph 6) FORM 1. Sl. No. Item Details 1. Name of the project/s

Revised FORM - I & PRE-FEASIBILITY REPORT

APPENDIX I. (See paragraph-6) FORM 1

Proposed Ordinary Sand Mining Project at Gata No.- 8Ka/195, Village- Ratauli, Tehsil- Laharpur, District- Sitapur, U.P. FORM 1

(I) Basic Information:

FORM 1 (Application for Environment Clearance)

M/s. SURYA ENTERPRISES H.No: , Sri Paradise Apartments, New Andhra Bank Colony, Anantapuramu District

Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd &

APPENDIX I (See paragraph - 6) FORM 1

APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE

APPENDIX I (See paragraph 6) FORM 1

M/S Overseas Min Tech Consultants, Jaipur 1

FORM 1 Riverbed Sand Mining Project

Application for Prior Environmental Clearance (EC)

FOR THE PROPOSED EXPANSION IN BACKWARD INTEGRATION PROJECT FOR

APPENDIX I (See paragraph - 6) FORM 1

APPENDIX I. (See paragraph 6) FORM 1

FORM-I. Environmental Clearance (EC)

APPENDIX I. (See paragraph 6) FORM 1

Ms.Thriveni Earthmovers Private Limited HO.22/110,Greenways Roads,Fairlands,Salem,Tamilnadu

APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE

REPORT OF SAND STONE MINING PROJECT (KHATADARI Q.L. No. 178 FOR

FORM-1. Sr. No 1 Name of the Project Harbour Heights 2 S. No. in the Schedule 8(b) Townships and Area Development projects.

APPENDIX I (See paragraph - 6) FORM 1

FORM 1 Riverbed Sand/Morrum / Mining Project

Appendix I. Form 1 BASIC INFORMATION MASONARY STONE MINING PROJECT VILLAGE KOLIYA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN

ITHC/PRJ/18-19/EIA/138 1 IND TECH HOUSE CONSULT

APPENDIX I. (See Paragraph 6) FORM 1

FORM 1. Basic Information. Sl. No.

Haridarshan Residency ( Row Type House & School Building )

Proposed Multiplex & Commercial Complex FORM I

9 Plot/Survey/Khasra No S.No: 153/1, 153/2, 171/1, 171/2A, 172/1B1, 172/1B2, 172/C1, 172/1C2, 172/2A, 172/2B, 172/2C & 180/1.

THE SINGARENI COLLIERIES COMPANY LIMITED (A Government Company)

Renewal of Environmental Clearance for Commercial Complex City Square 2 S. No. in the Schedule 8 (a), Building & Construction project

UPDATED FORM I 433 TPD CALCINED PETROLEUM COKE PLANT WITH 9 MW COGENERATION OF POWER PROPOSED AT

Application Form for Obtaining Environmental Clearance from State Level Environment Impact Assessment Authority (SEIAA), Tamil Nadu

FORM I (OPENCAST LATERITE MINE ha)

Salient Features of Proposed Project Namely Surya Emerald proposed to be developed by M/s. Surya Buildcon

MOHIT PETROCHEMICALS (P) LTD, (NAGINA ROAD, BIJNOR)

JAI MAA SHARDA STONE CRUSHING

APPLICATION (FORM-I) FOR EXTENSION OF VALIDITY OF ENVIRONMENTAL CLEARANCE FOR UMRER OC UMRER AREA, WCL. EC Capacity 3.50 MTPA EC ML Area 944.

FORM 1 SRI LAKSHMI GAYATRI HOSPITAL (P) LTD.

556/2C2,3B2,4A,5B,6B,7,8,9,10,11A,12A, 12B2,

FORM Name of the project/s Amendment in Existing Environmental Clearance to

Ambey Mahila Swa Sahayata Samuh President. Smt. Tuleshwari Vill- Gangikot Post: Gangikot Teh.- Surajpur Dist: Surajpur (C.G.

FORM 1. Amendment in Environment Clearance Of Redevelopment Project Redevelopment Project

APPENDIX I FORM 1. Basic Information:

Annexure-IV. Form-I for seeking clearance for project attracting CRZ notification. At Thengamputhur Village, Tamil Nadu by

RATNAAKAR SHELTER LLP

Salai Godhani Stone Quarry of Mr. Arvind Janraoji Gajbhiye in Village Salai Godhani, Th Nagpur (Gra) & Dist Nagpur Form I APPENDIX-I FORM-1

30 TPH Fertilizer Blending unit for Customized NPK Production at Zuarinagar, Sancoale, Marmugao, SouthGoa, Goa

Transcription:

Project Name : Design and Construction of Precast Arch Bridges(3s.) on Holding Pond. 3A, 3 & 4 for Form -1 [Vide tification dated 1 st December 2009] FOR PROPOSED COSTAL ROAD AT DRONAGIRI, NAVI MUMBAI Precast RCC Bridges On Holding Ponds- (At Dronagiri, Tal-Uran, Dist-Raigad, Navi Mumbai. Maharashtra) Of M/s. CIDCO Ltd. Prepared by EXECUTIVE ENGINEER(SPECIAL PROJECT) CIDCO, 2 nd Floor, Deck Level, F-202A, Belapur Rilway Station Commercial Comlplex, CBD-Belapur, Navi Mumbai-400614. M/s. CIDCO Ltd. / 1 /

Project Name : Design and Construction of Precast Arch Bridges(3s.) on Holding Pond. 3A, 3 & 4 for (I). BASIC INFORMATION Item Details 1 Name of the project/s Design and Construction of Precast Arch Bridges(3s.) on Holding Pond. 3A, 3 & 4 for the connectivity of Coastal Road at Dronagiri, Navi Mumbai. 2 S.. in the schedule ---- 3 Proposed capacity/area/length/tonnage to handled/command area/lease area/number wells to be drilled Construction of Arch Bridges on Holding Pond.3A, 3 & 4 having total area of @ 5000.00 Sq.Mts. 4 New/Expansion/Modernization Expansion-Revalidation of the project for Connectivity of coastal road at Dronagiri, Navi Mumbai. 5 Existing Capacity/Area etc. Nil 6 Category of Project i.e. 'A' or 'B' B 7 Does it attract the general condition? If yes, please specify. 8 Does it attract the specific condition If yes, please specify. 9 Location Navi Mumbai Plot/Survey/Khasra. Village Tehsil/ Taluka District State 10 Nearest railway station/airport along with distance in kms 11 Nearest Town, city, District Headquarters along with distance in kms. 12 Village Panchayat, Zillah Parishad, Municipal Corporation, Local body (complete postal addresses with telephone nos. to be given) Annexure-I Location Plan Dronagiri Uran Raigad, Navi Mumbai Maharashtra Panvel Raiway Station-20km Mumbai Airport-40 km Panvel-20km, Alibag-65km Village-Dronagiri, Tahsil-Uran, Dist - Raigad, Navi Mumbai, Maharashtra. M/s. CIDCO Ltd. / 2 /

Project Name : Design and Construction of Precast Arch Bridges(3s.) on Holding Pond. 3A, 3 & 4 for (I). BASIC INFORMATION Item Details 13 Name of the applicant Shri. M. P. Pujari, Executive Engineer (Special Project). 14 Registered Address CIDCO LTD, 2nd floor, Nirmal, Nariman Point, Mumbai: 400021. 15 Address for correspondence : Executive Engineer(SP),CIDCO, t&c Department, 2 nd Floor, Deck Level, F-202A, Belapur Rilway Station Commercial Comlplex, CBD-Belapur, Navi Mumbai- 400614. Name. Shri.M.P.Pujari Designation (Owner/Partner/CEO) Executive Engineer (Special Project) Address Executive Engineer(SP), CIDCO, t&c Department, 2 nd Floor, Deck Level, F-202A, Belapur Rilway Station Commercial Comlplex, CBD-Belapur, Navi Mumbai. Pin Code 400614 E-mail mppujari@rediffemail.com Telephone. 022-27570517 Fax 022-27570517 16 Details of Alternative Sites examined, if any. Location of these sites should be shown on a topo sheet. The site is a part of Existing Coastal Road at Dronagiri, Navi Mumbai for which the Environmental Clearance is given by MoEF vide Order. 5-61/2007-IA-III dated-3 rd Feb, 2009 (Annexure-II). w the project requires revalidation of E.C. from MoEF for the construction of Precast Arch Bridges for connectivity of the coastal road for that MCZMA has given recommended to the project (Annexure III) 17 Interlinked Projects Precast Arch Bridges. 18 Whether separate application of interlinked MoEF has granted the M/s. CIDCO Ltd. / 3 /

Project Name : Design and Construction of Precast Arch Bridges(3s.) on Holding Pond. 3A, 3 & 4 for (I). BASIC INFORMATION Item project has been submitted? Details environment and CRZ Clearance for the works of construction of coastal road vide Order. 5-61/2007-IA-III dated-3 rd Feb, 2009. 19 If yes, date of submission t Applicable 20 If no, reason t Applicable 21 Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. (a) The forest (conservation) Act, 1980? (b) The wildlife (protection) Act. 1972? (c) C.R.Z tification, 1991? 22 Whether there is any government order I policy relevant/ relating to the site? t Applicable t Applicable 23 Forest land involved (hectares) t Applicable 24 Whether there is any litigation pending against the project and/or land in which the project is propose to be set up? (a) (b) (c) Name of the Court Case. Orders/directions of the Court, if any and its relevance with the proposed project., there is no litigation pending against the project or land in which the project is proposed to be set up. M/s. CIDCO Ltd. / 4 /

Project Name : Design and Construction of Precast Arch Bridges(3s.) on Holding Pond. 3A, 3 & 4 for (II) ACTIVITY 1. Construction, operation or decommissioning of the Project involving actions,. which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) 1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing land, vegetation and buildings? Yes approximate quantities /rates, The bridges are to be constructing on Holding Ponds.3A, 3 & 4 at Dronagiri, Navi Mumbai. The land is in the possession of CIDCO Ltd. The approximately 10,000.00 to 12,000.00 Sq.mt area are full of mangroves in Holding Ponds are to be removed. 1.3 Creation of new land uses? The existing land is of Holding Ponds to felicitate the drainage system during High Tide & Low Tide Levels. 1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Attached as Annexure - IV. 1.5 Construction works? Yes Attached as Annexure - V. 1.6 Demolition works? 1.7 Temporary sites used for construction works or housing of construction workers? 1.8 Above ground buildings, structures or Earthworks including linear structures, cut and fill or excavations. 1.9 Underground works including mining or tunneling? --- -- 1.10 Reclamation works? 1.11 Dredging? 1.12 Offshore structures? 1.13 Production and manufacturing processes? 1.14 Facilities for storage of goods or materials. M/s. CIDCO Ltd. / 5 /

Project Name : Design and Construction of Precast Arch Bridges(3s.) on Holding Pond. 3A, 3 & 4 for. 1 15 Facilities for treatment or disposal of solid waste or liquid effluents? 1 16 Facilities for long term housing of operational workers? 1.17 New road, rail or sea traffic during construction or operation? 1 18 New road, rail, air, waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or pipelines? 1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? -- -- --- --- --- approximate quantities /rates, 1.22 Stream crossings? --- 1.23 Abstraction or transfers of water from ground or surface waters? 1.24 Changes in water bodies or the land surface affecting drainage or runoff? 1.25 Transport of personnel or materials for construction, operation or decommissioning? 1.26 Long-term dismantling or decommissioning or restoration --- --- --- M/s. CIDCO Ltd. / 6 /

Project Name : Design and Construction of Precast Arch Bridges(3s.) on Holding Pond. 3A, 3 & 4 for. works? approximate quantities /rates, 1.27 Ongoing activity during decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either temporarily or permanently? --- 1.29 Introduction of alien species? 1.30 Loss of native species or genetic diversity? 1.31 Any other actions? M/s. CIDCO Ltd. / 7 /

Project Name : Design and Construction of Precast Arch Bridges(3s.) on Holding Pond. 3A, 3 & 4 for 2. Use of Natural resources for construction or operation of the Project (such as. land, water, materials or energy, especially any resources which are nonrenewable or in short supply): Information / chccklist 2.1 Land especially undeveloped or agricultural land (ha) 2.2 Water (expected source & competing users) unit: m 3 /day 2.3 Minerals (MT) 2.4 Construction material - stone, aggregates, sand / soil (expected source - MT) approximate quantities /rates, Land is developed as Holding Pond. Yes Development phase: (Construction Purpose) Source: Tanker Yes 2.5 Forests and limber (source - MT) 2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT), energy (MW) 2.7 Any other natural resources (use appropriate standard units) Concrete Material using RMC of Quantity @ 18000.00 Cum. 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.. 3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna and water supplies) 3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by M/s. CIDCO Ltd. / 8 /

Project Name : Design and Construction of Precast Arch Bridges(3s.) on Holding Pond. 3A, 3 & 4 for. changing living conditions? 3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. 3.5 Any other causes 4. Production of solid wastes during construction or operation or. decommissioning. Information/Checklist 4.1 Spoil, overburden or mine wastes t Applicable 4.2 Municipal waste (domestic and or commercial wastes) 4.3 Hazardous wastes (as per Hazardous Waste Management Rules) --- 4.4 Other industrial process wastes --- 4.5 Surplus product --- 4.6 Sewage sludge or other sludge from effluent treatment --- 4.7 Construction or demolition wastes --- 4.8 Redundant machinery or equipment --- 4.9 Contaminated soils or other materials --- 4.10 Agricultural wastes --- 4.11 Other solid wastes --- 5. Release of pollutants or any hazardous, toxic or noxious substances to air M/s. CIDCO Ltd. / 9 /

Project Name : Design and Construction of Precast Arch Bridges(3s.) on Holding Pond. 3A, 3 & 4 for (Kg/hr).. 5.1 Emissions from combustion of fossil fuels from stationary or mobile sources 5.2 Emissions from production processes 5.3 Emissions from materials handling including storage or transport 5.4 Emissions from construction activities including plan! and equipment 5.5 Dust or odours from handling of materials including construction materials, sewage and waste. " 5.6 Emissions from incineration of waste 5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) " 5.8 Emissions from any other sources M/s. CIDCO Ltd. / 10 /

Project Name : Design and Construction of Precast Arch Bridges(3s.) on Holding Pond. 3A, 3 & 4 for 6. Generation of ise and Vibration, and Emissions of Light and Heat:. 6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes 6.2 From industrial or similar processes 6.3 From construction or demolition As stated in 6.1 6.4 From blasting or piling - with source ise expected during course of execution of work i.e operation of excavators & vehicular movement will be brought least by confining area from the surrounding. 6.5 From construction or operational traffic As stated in 6.1 above 6.6 From lighting or cooling systems t Applicable 6.7 From any other sources t Applicable 7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea.. 7.1 From handling, storage, use or spillage of hazardous materials. 7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) 7.3 By deposition of pollutants emitted to air into the land or into water. 7.4 From any other sources. 7.5 Is there a risk of long term build up of pollutants in the environment from these sources? approximate quantities / rates, M/s. CIDCO Ltd. / 11 /

Project Name : Design and Construction of Precast Arch Bridges(3s.) on Holding Pond. 3A, 3 & 4 for 8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment.. Information/Checklist 8.1 From explosions, spillages, fires etc. from storage, handling, use or production of hazardous substances. 8.2 From any other causes 8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? 9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality.. 9.1 Lead to development of supporting facilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: --- Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.) Housing development Extractive industries Supply industries Other M/s. CIDCO Ltd. / 12 /

Project Name : Design and Construction of Precast Arch Bridges(3s.) on Holding Pond. 3A, 3 & 4 for. 9.2 Lead to after-use of the site, which could have impact on the environment. 9.3 Set a precedent for later developments 9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects --- --- --- (III) Environmental Sensitivity. Areas Name / Identity Aerial distance (within 15 km.) Proposed project location boundary 1 Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value. 2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests 3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or underground waters --- --- --- --- 5 State, National boundaries --- 6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas --- M/s. CIDCO Ltd. / 13 /

Project Name : Design and Construction of Precast Arch Bridges(3s.) on Holding Pond. 3A, 3 & 4 for. Areas Name / Identity Aerial distance (within 15 km.) Proposed project location boundary 7 Defense installations --- 8 Densely populated or built-up area --- 9 Areas occupied by sensitive manmade land uses (hospitals, schools, places of worship, community facilities) 10 Areas containing important, high quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution or environmental damage, (those where existing legal environmental standards are exceeded) 12 Areas susceptible to natural hazard which could cause the project to present environmental problems. (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) --- --- --- --- M/s. CIDCO Ltd. / 14 /

Project Name : Design and Construction of Precast Arch Bridges(3s.) on Holding Pond. 3A, 3 & 4 for "I hereby giver undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. It is further to mension that the Environment Clearance is given by MoEF for the construction of Coastal Road at Dronagiri, vide order.5-61/2007-ia-iii, dtd.3 rd Feb,2009. w the present proposal needs revalidation for the construction Precast RCC Bridges on Holding Ponds.3A, 3 & 4 which is part of coastal road for the connectivity. Date: 30.12.2014 Place: Navi Mumbai Signature of the applicant Executive Engineer (SP) 2 nd Floor, Tower :10, Belapur Station Complex, CBD Belapur, Navi Mumbai pin - 400 614. M/s. CIDCO Ltd. / 15 /