SENTINEL BARRIER - GENERAL INSTALLATION GUIDELINES

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service.

If a new residence s electrical service is not located within 200 feet of existing

CONCRETE SLABS Job Ready Checklist

Main Drain (s): 1 AVSC dual suction pool main drain, and 1 Eclipse 20" low provide spa drain

CONCRETE FOOTINGS AND WALLS Job Ready Checklist

Basic Service. This Section provides information regarding a. Introduction

Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc.

YOUR SPLASH PAD RESOURCE

BRILLIANT WONDERS LED WATERFALL INSTALLATION INSTRUCTIONS CMP SERIES. Brilliant Wonders LED WATERFALLS

THE CONSTRUCTION SUPERVISOR

Residential Building Inspections

Nassau County Building Department

ETL listed for installations within 5 ft. (1.5M) of outer edge of water

1420 Miner Street Des Plaines, IL P: desplaines.org COMMERCIAL STRUCTURES (INCLUDING ALTERATIONS AND ADDITIONS)

INSTALLATION INSTRUCTIONS CMP SERIES

BUILDING PERMIT APPLICATION CITY OF SIDNEY BUILDING INSPECTION DEPARTMENT

ACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings

PHASE 1 Foundation & Drainage New Construction Phased Inspection Report John & Mary Doe 5237 Clinton Street, Denver, CO 80238

SERVICE POOL CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION

RESIDENTIAL BUILDING PERMIT GUIDE FOR MULTI-FAMILY DWELLINGS

March 2018 Progress. Work Completed, Week Ending 3/23/18:

Water for the World. 7 y

Gas meter clearances and service installation requirements

INSPECTION TIMING CHECKLIST FOR RESIDENTIAL FRAME BUILDING PRIOR TO INSPECTION REQUEST

SWIMMING POOL PERMIT AND INSPECTION REQUIREMENTS

City of Rohnert Park Building Department Inspection Descriptions

CITY OF DANA POINT. COMMUNITY DEVELOPMENT, BUILDING AND SAFETY Golden Lantern, Suite 209 Dana Point, CA

Town of Kingsville. Building Department

LIST OF CLASSIFICATIONS OF CONTRACTORS

COMMERCIAL POOL CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION

METATEK POWER HOUSE CONSTRUCTION BUILDER S GUIDE CHECKLIST

Item Description Qty Rate Total

Section 2: Underground

Pre-Delivery Instructions

Fiberstars Lighted Laminar Flow Fountains

SpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 )

Description of Work: Cost: $

Section 7: Specifications

US Pool Lift Model #114 (Independence) Installation Guide

Single Family Residential Building Permit Questions & Answers

BELMURO WALL SYSTEM INSTALLATION GUIDE

Free standing Patio covers

CITY OF SELMA, TEXAS Inspection Guidelines: Residential

1 AND 2 FAMILY DWELLING REQUIREMENTS

APPENDIX 5: CONSTRUCTION CHECKLISTS

Inspection requests submitted by 2:30pm will be scheduled for the following business day unless otherwise requested.

Application Date: / /20 Permit Number. Legal Description of Property: Mailing Address: Building Address: Section: Lot(s)

APPLICATION FOR A BUILDING PERMIT (Retaining Wall/Garden Wall Construction Details)

City of Westerville Guide to Commercial Inspections

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

Proud of its Heritage, Preparing for its Future

RUNNERS (Required to convert to real property)

Lonsdale Building Inspections Department 415 Central Street W. PO Box 357 Lonsdale, MN (507) fax (507)

Contractor/Owner initials are verification that items #1 and #2 and items (a) thru (g) above are included in the submitted plan/drawing.

Successful Home Contracting

City of Bullhead City Development Services/Public Works. Permit Submittal Requirements FENCES

EXPRESS PERMIT INFORMATION

PART 5 WATER SYSTEMS

CONSTRUCTION COST BREAKDOWN THIS IS FORM CCB

Building a Wood Deck, Gazebo, or Pergola

Unit Rate. Subtotal in SDG. Site Clearing Preliminary Works. 1.0 Job. Excavation & Earth Works. Stone Masonry Works in foundation 100 M.

OWNER-BUILDER? A HOMEOWNER S GUIDE TO BUILDING PERMITS AND INSPECTIONS FOR PROJECTS IN ARROYO GRANDE, CALIFORNIA

SPRINKLER SYSTEM Job Ready Checklist

BIDDER REQUEST FOR INFORMATION #001 CONSOLIDATED

CONCRETE TILE PAVERS

Town of Kingsville. Building Department

WORK DESCRIPTION AND REQUIREMENTS FOR SEMI IN-GROUND SWIMMING POOL

ADDENDUM NO Refer to Specifications Section Alternates. Clarifications to alternate descriptions are as follows:

Pre-Delivery Instructions

Anchorplex retaining wall construction guide

Important: Before You Start

Please check with your local inspection authority for any additional requirements before installation.

$ Plan Review Fee when Permit Application is submitted SHED BUILDING PERMIT APPLICATION. Application Date / /

Single Family, Orange, CT

District of Ucluelet Building Permit Guide

ROUTT COUNTY REGIONAL BUILDING DEPARTMENT 136 * P.O.

TYPICAL INSTALLATION INSTRUCTIONS

PARTIAL CABINET FITNESS SYSTEMS. Installation Guide

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

EXHIBIT B TO AGREEMENT BETWEEN PENSACOLA HABITAT FOR HUMANITY AND SUBCONTRACTOR. Scope of Work. Plumbing. Division 055 Plumbing Rough

DEFENDER. Installation Manual

MAKING APPLICATION RESIDENTIAL POOL/SPA/HOT-TUB

BERKELEY COUNTY ENGINEERING AND

Anchorplex retaining wall construction guide. Building. Anchorplex. Retaining Wall Systems

Screen & 3-Season Porches

Village of Algonquin

Town of Falmouth FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage COSTS FOR SUBSTANTIAL IMPROVEMENTS / REPAIR OF SUBSTANTIAL DAMAGE:

03 CONCRETE TAKEOFF SUMMARY REPORT Takeoff and Items Cost Summary. Ryan Manocchio

Marbella Isles Homeowners Association, Inc.

The University of Texas Health Science at Houston Swimming Pool Renovation Project Phase 1: New Filter System

Installation Guidelines

This guide only applies for sewer assets up to and including 225mm diameter.

Building. Anchorplex. Retaining Wall Systems

New Creation Builders 5309 Barkwill Ave Cleveland Oh

CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36TH STREET MERCER ISLAND, WA PHONE:

BUILDING DEPARTMENT GUIDE TO RESIDENTIAL BUILDING PERMITS

NOTE: 1) PRIOR TO BEGINNING WORK TRANSFER RIM ELEV. FROM MH K1 TO A TEMPORARY BENCH MARK FOR USE AS CONTROL DURING CONSTRUCTION. 2) CONTRACTOR TO INST

Entellus 75 NORTH STREET MERRILL SHERIFF CONSTRUCTION. 181 North 200 West, Suite #4. Bountiful, UT Phone

Residential Building Plans

Transcription:

www.arizonawholesalepoolcontractors.com The Swimming Pool Construction Checklist is designed to give you some guidelines and hints of items to look for while you re building your own pool. It s outline follows the scheduled order of the phases of pool construction. It s only a guide use it as such. If you have questions or if you would like to add something to this checklist that you think would help others in building their own pool please let us know. Table of Contents 1. Layout Construction Pre check 2. Excavation 3. Plumbing 4. Steel/Rebar 5. Electrical 6. Shotcrete 7. Masonry/Water Features 8. Decking 9. Access, Barriers & Tile 10. Construction Cleanup 11. Interior Finish 12. Pool Start up

Layout: Date Scheduled: Date Completed: Verify your property line setback, window and structure distance are maintained Paint out pool equipment location must be 5 minimum from water s edge. Verify and establish pool bond beam elevation confirm deck type with layout. Confirm electrical, gas and water requirements with layout sub. Electrical panel location, adequate power for equipment/future requirements Gas meter location propane tank location access to dig 21 deep trench Propane tank location must be accessible to street view. Water select a hose bib for use with the automated water leveler. All hose bibs require a vacuum breaker be added to the hose bib. Finally, do an overall review of the pool design. Will the deck work with the remaining space as planned? Is the pool where you intended it to be? Re layouts cost money, so be sure you like what you see. Does the yard grade rise or fall near the pool? May require retaining component. Record Bond Beam Elevation height set at: (+/ finished to patio height or finished house floor elevation.)

Layout (cont.) Finally, do an overall review of the pool design. Will the deck work with the remaining space as planned? Is the pool where you intended it to be? Does the yard grade rise or fall near the pool? Measure waterfall pad (if applicable) confirm square footage (ie. 8 x5 =40sqft.) Order Blue Stake compare blue stake notes to pool layout and design features. Note: The layout will be 6 larger on each side or 12 overall measured for the excavator. the pool must be over dug and then replaced with shotcrete then it will finish per design. Did you order your pool equipment yet? Use your pool equipment spec sheet. Go to: ArizonaWholesalePoolEquipment.com Get your equipment delivered for Free (Arizona residents only) have it on site prior to the plumbing phase.

Excavation: Date Scheduled: Date Completed: Confirm excavator completed pre site and has bid proper equipment for the access. Verify the width of the access Make a note of what is required for the replacement of the access Masonry Wall # of: sections pilasers stucco paint color Remove and replace an existing gate add a self closing gate spring Note: All gates must open out and away from the backyard not into the yard. Confirm pool bond beam elevation and verify deck type with excavator. Verify yard grade changes. Does the change in grades require a retaining wall? Raised bond beam or additional fill to remain? Pad out deck area with pool fill 3' beyond finished deck. Ask the excavator if they will dig a trunk line for the pool equipment. Ask the excavator what their policy is on removing excess fill. Note: Hard digs are always a possibility ask the excavator s experience in your area.

Plumbing: Date Scheduled Date Completed: Plumber should provide all pool equipment slabs plastic or concrete. Pool equipment should be set on a firm level grade. Pool equipment set within (+/ ) 6 to pool water level. Check to make sure all plumbing lines are set below pool bond beam. Verify plumbing schematic the number of returns, skimmer location, pool vac line, auto water leveler and all other plumbing lines are in place. Verify that all exposed PVC pipes get painted at the pool equipment location. Did your plumber install your salt water call? Record the plumbing system (pipes, equipment) pressure at plumbing completion: psi Notes: * Did you select your deck material yet? I hope so if not get busy. * Did you order your pool fence? Need a sub? Go to AZWPC.com and request a quote. * Did you submit for a gas line permit/inspection (if necessary)

Steel/Rebar: Date Scheduled: Date Completed: Verify steel company has special engineering detail (if applicable) Verify steel standard engineering with the rebar/steel sub prior to scheduling the steel install date. Check that all steel is blocked off the dirt by 3 concrete spacers. Visually review all tie wraps at cross section are cut, bent down and away from the pool interior finish. Check steel is below the top of the form boards set by the excavators. Confirm additional features such as: In pool table or bar stool(s) have steel caissons provided Spas & spill ways, water features are accounted for. Note: Confirm with shotcrete sub contractor that they will provide Sonotubes for table or bar stools at the time of shotcrete (if applicable)

Electrical: Scheduled Date: Completion Date: All electrical conduit (wrapped or grey PVC) and light brass is below finished grade per UBC and city requirements. Verify all deck, anchor and fence bonding is complete. * Diving Pools need a bond wire for the metal jig in the deck * Wrought iron fences or metal object within 5 of water need a bond wire * Equal potential bond (deck bond) wire installed applicable in some cities Proper pool panel is in place for current and future needs. 3 clearance in front of pool panel is maintained. Note: Once the electrical is completed it time to call for your first inspection. Call for your Pre shotcrete and in some cities a rough electric inspection Your city: Inspection Request Line: Online web address: Your Permit Number: Pre shotcrete /rough electrical inspection code (see city chart): Confirmation Number:

Shotcrete: Scheduled Date: Completion Date: Verify pre shotcrete inspection from your city/county is green and approved. Record plumbing is still at or under pressure: psi. Water is available on site for shotcrete company to use during installation. Clean out area is specified or a clean tub available? Verify steel blocking in place no cave ins, mud or other debris on or covering rebar. Paver or Flagstone deck: Have the crew notched the beam for the aerator. In pool tables or seats Sonotube on site or shotcrete company provided (verify) Water cure schedule. See shotcrete company instruction sheet 4 times/day 4 days. * Note: Take pictures and/or video of the shotcrete process. Send them to www.arizonawholesalepool Contractors.com and show off your pool with rest the rest of the build your pool builders here in Arizona.

Masonry & Water Features Date Scheduled: Date Completed: Complete all masonry structures in and around pool and deck area. Waterfall complete Masonry structures on the beam are set to extend over the beam or flush with the beam. See tile and stone facing detail on pool print. Deck rocks, masonry transitions/columns complete. BBQ, seat walls and all masonry features are in place to at least 18 above deck height or completed. Electrical, gas lines and all future sleeving is completed, inspected (if necessary) and buried. Access walls completed verify with deck crew for access requirements prior. * Note: Have you selected your tile and made your internal finish selection? Hurry, it s coming up soon

Decking: Date Scheduled: Date Completed: Record plumbing is still under pressure psi. All drain lines, sleeving and sprinkler repairs under the deck area are complete. All masonry and rock are set and in place. Color selection has been made and confirmed by deck sub contractor. Handrail anchors, diving board jigs, fence/metal bonding wires are in place and on site. All basketball, volleyball and umbrella sleeves are on site and marked on the pool plan. In pool table formed and poured with deck. Paver or stone deck requires separate sub. All skimmer and automated water leveler rings and lids are on site for deck crew. Concrete Paver and Natural Stone Decks: Deck crew to provide round paver lids or plastic lids? Aerator is cut and 90 over (remember the notch in the beam at shotcrete) to the finish below the coping edge of the deck. Paver crew must set and secure all anchors and jigs in concrete prior to paver set. See manufacturer specification for securing anchors and jigs.

Access & Barriers: Date Scheduled: Date Completed: Internal barriers such as wrought iron, mesh safety fence is scheduled for installation. Access gates and existing fences are complete and in place per city requirements. Self closing gate springs are in place and working. Gates open out & away from backyard. Interior doors and windows are ready for final inspection. See city/county requirements. * Note: Need a Swimming Pool Fence & Barrier Sub Contractor? Go to: ArizonaWholesalePoolContractors.com/Safety and request a bid from our qualified list of Valley fence and barrier contractors. Tile: Date Scheduled: Date Completed: Tile and grout color selection is complete and verified with sub contractor. Mosaics, step/bench banding, tile inserts (white plaster finishes) cut and placed on site.

Construction Cleanup: Date Scheduled: Date Completed: All trenches are back filled and excess fill is removed from the site. Pool interior is scrapped, extended plumbing lines (returns, drains) cut and leveled. All excess water and debris removed from the pool interior Yard is rough graded and all construction waste and excess concrete is removed from the site. Call for Your Pre plaster inspection Your city: Inspection Request Line: Online web address: Your Permit Number: Pre shotcrete /rough electrical inspection code (see city chart): Confirmation Number: * Note: Someone must be home to allow the city/county inspector into the house.

Interior Finish: Date Scheduled: Date Completed: Pool interior is clean and ready for finish no standing water or construction debris. Tile inserts are on site and available for finish crew. Slurry pit location provided and arranged for by interior finish company. Water available on site. If your home is on a well system for water, request a Water truck provider service. * Note: Pebble finish requires a second day to complete acid wash. Plaster finish is installed and water filling the pool the same day.

Pool Startup: Date Scheduled: Date Completed: Pull skimmer plug from bottom of skimmer requires long handle t bar with 2 square socket. All chemicals and start up materials on site. Salt water pools require large amount of salt (200 400 lbs.) use quick dissolve salt. Pool equipment orientation available from pool startup company. Start up date: Start up water chemistry Water calcium number: Total hardness number: Recommended PH level: Record: All pool equipment manufacture model and serial numbers.