Practice Advisory 14. Long span steel roof trusses: welding and section checks needed for some

Similar documents
Practice Advisory 14: Long span steel roof trusses - welding and section checks

STRUCTURAL STEEL FRAMING Section

Earthquake-prone, Dangerous and Insanitary Buildings Policy 2011

SECTION STRUCTURAL STEEL

STRUCTURAL STEEL FRAMING

SECTION PRE-ENGINEERED COLD-FORMED METAL ROOF AND FLOOR TRUSSES

MATERIAL SPECIFICATION FOR SECTIONAL STEEL HIGH MAST LIGHTING POLES

HANLON AND PARTNERS LTD Consulting Structural & Fire Engineers. Specification for. Mental Health Acute Inpatient Unit Wakari Hospital, Dunedin

Commission No Section

Specification for the Fabrication of Tower Structures

Insulating Cellular Concrete Steel Joists Painting. A. America Society for Testing and Materials (ASTM):

Awning Certification RISE

POLICY EARTHQUAKE PRONE DANGEROUS & INSANITARY BUILDINGS

1. Introduction. 2. Background. 3. Guidelines. CICA-Endorsed ENGINEER S COMPETENCIES

INSTALLATION. General. Important Note. Design. Transport

Regarding the refusal to issue a code compliance certificate for a house with a glass balustrade at 102 Oceanbeach Road, Tauranga

Figure 1: Typical Short Span Multi Girder Bridge Details

SECTION VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT

SECTION COLD-FORMED METAL TRUSSES

A White Paper on the NZ Building Code B2 (Durability) Issues, Solutions and where to from here

DIVISION: METALS SECTION: STRUCTURAL STEEL FRAMING REPORT HOLDER: CAST CONNEX CORPORATION

Release: 1. CPCCBC4002A Manage occupational health and safety in the building and construction workplace

SECTION PREFABRICATED PIPE BRIDGE(s)

SECTION METAL DECKING. A. Extent of metal decking is indicated on Plans, including basic layout for the following type of deck required:

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

SECTION QUALITY CONTROL - CONSTRUCTION MANAGER EDITION

Australian/New Zealand Standard

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

AMENDMENTS TO OPSS 1802 (JAN 95) MATERIAL SPECIFICATION FOR SMOOTH WALLED STEEL PIPE SUPPLY, STORAGE, AND DELIVERY OF WELDED STEEL PIPE

SECTION (formerly 05425) PRE-ENGINEERED, PRE-FABRICATED COLD-FORMED STEEL ROOF & FLOOR TRUSSES

DIVISION 5 METALS SECTION STRUCTURAL STEEL

STATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014

Standard Pole Range 5. In-Ground Mounted 6. Ground Line Protection 6. Base Plate Mounted 6. Quality & Design Standards 7. Quality Standard 7

Welding ASME Quality Manual Sample - No Field Installation Selected pages (not a complete plan)

SECTION 15 STRUCTURAL STEEL

GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410

Specification for Fabrication of Steelwork for Pole Structures

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PREFABRICATED STEEL PEDESTRIAN BRIDGE, TYPE 2

Christchurch City Council. PRK_3575_BLDG_001 Port Levy Fire Shed Detailed Engineering Evaulation Report

Chapter 1: Application and Administration

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PREFABRICATED STEEL PEDESTRIAN BRIDGE, TYPE 2

SECTION WELDING

Determination 2011/056

Student Services & Classroom Addition SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

b~êíüèì~âé=éêçåé= ÄìáäÇáåÖ=éçäáÅó=

SECTION (16071) - VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

C. Miscellaneous Metal Fabricators are specified elsewhere in Division 5.

PICKENS COUNTY BUILDING CODES SPECIAL INSPECTION PROCEDURE IBC CHAPTER EDITION

SECTION DRILLED CONCRETE PIERS AND SHAFTS

NATIONAL ENERGY BOARD ONSHORE PIPELINE REGULATIONS

PSL/26 ISSUE 13 PCN CERTIFICATION AVAILABLE. Certification Services Division Newton Building, St George s Avenue Northampton, NN2 6JB

1. Base plates, setting plates and anchor rods for columns. 8. Lintels if connected to structural steel columns.

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR QUALITY CONTROL PLAN FOR WELDING FOUNDATION PILING SPLICES

Analysis of Non Composite and Composite Space Frame for Varying Support Condition

SECTION MANUAL FOUR FOLD DOORS MODEL 38 DECORATIVE PANEL DESIGN

TERMS OF REFERENCE FOR SERVICE CONTRACTING

SPECIAL PROVISION FOR STRUCTURAL STEEL AND ALUMINUM CONSTRUCTION. C&T:SJC 1 of 10 C&T:APPR:DAJ:DBP: FHWA:APPR:

Inspection of Steel Girder Bridges

INS QA Programme Requirements

AS/NZS :2014. Structural steel welding AS/NZS :2014. Part 4: Welding of high strength quenched and tempered steels

Cast Steel Propellers W27. (May 2000) (Rev.1 May 2004)

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PREFABRICATED STEEL PEDESTRIAN BRIDGE, TYPE 1

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Structural performance of Christchurch CBD buildings in the 22 February 2011 earthquake. Summary

AS/NZS :2014. Structural steel welding AS/NZS :2014. Part 1: Welding of steel structures. Australian/New Zealand Standard

ThermaX B - a thermal break for use on steel framing

Specification for Pipe Fittings

SECTION VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT

SPECIAL INSPECTION AND OBSERVATION PROGRAM CITY OF CONCORD BUILDING DIVISION. Project Address:

Role of NDE in Regulatory Oversight of Nuclear Power Plants

Mayor and Councillors. Community Services Manager

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SPECIAL INSPECTION AND OBSERVATION PROGRAM City of Walnut Creek Building Division. Project Address:

SPECIFICATIONS FOR INSTALLATION OF PRECAST PRESTRESSED CONCRETE DECK PANELS

The design and construction requirements for structural steel buildings in New

ACE Butyl Tape System - A flexible, waterproof tape jointing system for use with renders & plasters.

Guidelines for the Construction of Pressure Vessel Type Tanks Intended for the Transportation of Anhydrous Ammonia at Ambient Temperatures

GUIDELINES FOR ROOF MOUNTED PHOTOVOLTAIC INSTALLATIONS

REVISIONS. App Sud. App PC. App Thom 2011/12/31 AA 2011/12/31 NK 2012/08/09 N/A AA 2015/07/20

SECTION BASIC ELECTRICAL MATERIALS AND METHODS

Earthquake-Prone Buildings Policy

SECTION METAL FABRICATIONS FOR STEAM UTILITY DISTRIBUTION

NORTHWESTERN UNIVERSITY PROJECT NAME JOB #

AS/NZS :2014. Structural steel welding AS/NZS :2014. Part 5: Welding of steel structures subject to high levels of fatigue loading

ASI National Structural Steelwork Compliance Scheme. A Guide for Clients, Builders and Prime Contractors

A. Section Metal Decking. (05300 in MF95) B. Section Cold Formed Metal Framing. (05400 in MF95)

Natural Sweater Village Ltd

1. Cast-in-place concrete is specified in Section

SECTION METAL WELDING

W-09 ANCHOR CHAIN CABLES AND ACCESSORIES FOR SHIPS

INTERNAL AUDIT AND ASSURANCE MANDATE

Structural Inspection Report

Specification Lightning Protection Systems

MATERIAL SPECIFICATION FOR SECTIONAL STEEL HIGH MAST LIGHTING POLES

SECTION STEEL JOIST FRAMING

SUNY GENESEO RED JACKET DINING HALL RENOVATION SECTION STRUCTURAL STEEL FRAMING

Construction and Dynamic Testing of Aluminium Nodes

Piletech Screw Pile Specification

Quality Control and Quality Assurance for Installation of Steel Deck

Ontario ENGINEERING STANDARD SPECIFICATION 1/7 REV. SPECIALTY ENGINEERING MATERIALS ENGINEERING QA CLARABELLE MILL NI-HARD TYPE 1 LINERS

Transcription:

Practice Advisory 14 Long span steel roof trusses: welding and section checks needed for some This Practice Advisory is issued in response to concerns about the collapse on 18 September 2010 of the Stadium Southland roof in Invercargill during a snow storm and provides guidance for owners, territorial authorities and practising structural engineers. Background A snow storm on 17 to 19 September 2010 caused damage to, or the collapse of, a number of buildings in and around Invercargill, including the roof of Stadium Southland. The report commissioned by the Department on the Stadium Southland roof collapse 1 found, however, that the snow loading would not have been sufficient to cause the collapse of Stadium Southland roof if its trusses had been fabricated to comply with the standards of the day. The Department considers it important that the circumstances of this failure are fully understood by building owners, territorial authorities and practising structural engineers and the implications for similar buildings around New Zealand examined and acted upon. Defects in the construction of the steel tube truss roof, particularly those portions that involved late design changes and welding on site, appear to have significantly reduced the ability of the roof to sustain the intended design loads and the snow load experienced at the time of the collapse. Purpose and scope of advisory This Practice Advisory is to: alert building owners to the issues that the report has identified with this long span truss steel construction provide advice to building owners to enable them to instruct Chartered Professional Engineers to review their buildings alert practising structural engineers assessing existing long span roof trusses in buildings throughout New Zealand provide advice to territorial authorities. 1 StructureSmith Ltd, Hyland Consultants Ltd, Structural Engineering Report on the Collapse of Stadium Southland Roof. May 2012. Long span steel roof trusses: welding and section checks needed for some (May 2012) 20 April 2012 1

It applies to all existing buildings throughout New Zealand: that have long span roof trusses (over 20 metres) fabricated from welded closed steel hollow sections such as circular and rectangular tubes, and to which members of the public have access. The presence of weld defects and undersize structural members may adversely affect the performance of buildings and it is important that these are identified and repaired. It is particularly important that building owners have confidence in the integrity of their buildings in areas where snow build up may overload the structure. Actions to be taken The Department advises the following actions from the various parties: Building owners with concerns: Owners should contact a Chartered Professional Engineer with suitable qualifications and experience to review the construction of the roof trusses in conjunction with a suitably qualified welding inspector. Structural engineers: Recommend to clients that construction records of existing roof structures are reviewed to ascertain that inspection reports are available confirming that welding complies with requirements of the standard of the day, eg, AS/NZS 1554.1 or NZS 4701 for structures built before 1994. If inspection reports do not comply then recommend identification of collapse critical connections and a programme of inspection following the guidelines set out in the flowchart in Figure 2. Territorial authorities: When advising owners of the need to renew their annual Building Warrant of Fitness, territorial authorities are advised to bring this Practice Advisory to the attention of owners. Building consent authorities: When building consent applications are made for any work on a building with long span steel roof trusses, building consent authorities are advised to bring this Practice Advisory to the attention of owners. Building owners of large span public buildings in snow-prone regions are advised to develop snow load monitoring, mitigation and evacuation procedures where there is a risk of snowfall exceeding design specification. Owners may also consider installing snow load alarms, possibly in conjunction with the security monitoring system. Long span steel roof trusses: welding and section checks needed for some (May 2012) 20 April 2012 2

Roof truss inspection Inspection steps A flowchart identifying appropriate inspection steps to take is shown in Figure 2 and described as follows. Where non-compliance is found, appropriate remedial work will need to be agreed with the Chartered Professional Engineer (structural). The inspection regime shown in the flowchart is hierarchical in that satisfaction of one level of testing should be completed before proceeding to the next level of more detailed checks. If instances of non-compliance are found at one level, then further testing should be undertaken at that level, at the direction of the engineer, until satisfactory compliance is achieved. Adequacy of welding quality assurance records The structural engineer should check whether welding records for the roof trusses complying with requirements of the standard of the day, eg, NZS 3404.1 and AS/NZ 1554.1, have been kept, and whether they cover the collapse critical joints. If appropriate welding quality assurance records exist, then no further action is required. Selection of a sample of collapse critical roof trusses for examination The structural engineer should use appropriate judgement to select 10% and no less than three roof trusses for further inspection. Identification of collapse critical joints From each of the selected sample of trusses, the structural engineer should identify for the inspectors three collapse critical joints, using the construction drawings if available. The critical regions of a typical truss have been identified in Figure 1 as an aid to selecting critical joints. This guidance does not relieve the structural engineers of their responsibility to exercise judgement in selecting collapse critical joints, particularly for complex truss configurations. One top chord splice One end bay diagonal member connection One bottom chord splice Middle half of truss Figure 12 Critical truss weld connection locations (Field welded splices are the most critical connections) Long span steel roof trusses: welding and section checks needed for some (May 2012) 20 April 2012 3

Weld visual examination Undertake 100% visual examination of the selected collapse critical welds in accordance with the requirements of AS/NZS 1554.1: 2011 for Structural Purpose (SP) welds. If welds, bolts, packing plates, movement joints have been omitted or there are gross defects, then a full inspection of all collapse critical trusses in accordance with the requirements of NZS 3404.1: 2009 Section 8 will need to be undertaken. Weld ultrasonic or radiographic examination Undertake ultrasonic or radiographic examination of collapse critical welds in accordance with the requirements of AS/NZS 1554.1: 2004 for Structural Purpose (SP) welds. If weld quality has not been achieved, then a full inspection of all collapse critical trusses in accordance with the requirements of NZS 3404.1: 2009 Section 8 will need to be undertaken. When reviewing new construction: Do Engage a Chartered Professional Engineer Ensure a qualified welding inspector is used. Identify collapse critical welds and members for examination. If using closed hollow sections as structural members, make sure to check the wall thickness supplied matches the specification. Don t Assume welds fabricated on site are as likely to comply as shop welds. Section geometry checks The structural engineer should select three collapse critical sections for each of the sampled trusses to determine that member sizes are correct. To determine that wall thicknesses of closed steel hollow sections are correct, undertake ultrasonic wall thickness checks of each selected section. Main points If adequate records of inspection by qualified welding inspectors of roof trusses during their construction or subsequent modification are not available, then section sizes and welds, particularly in closed hollow section tubes, may not be sufficient to meet the required design demands. Closed hollow sections may not have the specified wall thickness. Complete penetration welds in closed hollow sections may not have achieved full penetration and strength. This is particularly likely if backing strips have not been used in preparing the welds in accordance with the welding standard AS/NZS 1554.1. Long span steel roof trusses: welding and section checks needed for some (May 2012) 20 April 2012 4

Site welding of trusses, particularly where accessibility is difficult due to height or confined spaces, may not have been completed or achieved the specified quality. Compression splices without full contact on bearing plates or abutting sections may significantly reduce truss capacity. Packer plates at bolted connections between trusses and supports may reduce connection capacity if they are not adequately fitted. Designated slotted connections in the roof structure that have been prevented from moving may cause additional loads on other parts of the structure. Connections of steel roof trusses into concrete or masonry pilasters using cast in inserts may not have adequate ductility to cope with roof overload. Further advice and information The NZ Heavy Engineering Research Association (HERA) and Steel Construction NZ (SCNZ) are supporting this Department of Building and Housing Practice Advisory with targeted seminars and advice with the aim to inform on the requirements and provide a deeper understanding of the identification of critical members and critical joints and the associated inspection and fabrication procedures. For further information see www.hera.org.nz and www.scnz.org. References 1. Department of Building and Housing, Technical investigation into the collapse of the Stadium Southland roof, May 2012. http://www.dbh.govt.nz/ technical-reports 2. StructureSmith Ltd, Hyland Consultants Ltd, Structural Engineering Report on the Collapse of Stadium Southland Roof. May 2012. http://www.dbh.govt.nz/ external-technical-reports 3. NZS 3404.1: 2009 Steel structures Standard Materials, fabrication, and construction 4. AS/NZS 1554.1: 2011 Structural steel welding Part 1: Welding of steel structures This document s status te that this Practice Advisory is issued as Guidance Information in accordance with Section 175 of the Building Act 2004 and, if used, does not relieve any person of the obligation to consider any matter to which the information relates according to the circumstances of the particular case. Long span steel roof trusses: welding and section checks needed for some (May 2012) 20 April 2012 5

i n g Figure 2: Roof truss inspection flowchart Do adequate welding QA records exist? Roof truss compliance; no action required Select 10% but not less than 3 roof trusses Weld inspection Section geometry inspection Select 3 collapse critical joints per selected truss (tes 1 and 2) Select 3 collapse critical sections per truss (te 2) 100% visual examination of selected collapse critical joints (te 3) Section dimensions correct? Any welds, bolts, pack plates, movement joints omitted and/or gross defects? UT examination of 3 critical welds (tes 3 and 4) Inspection of collapse critical trusses to NZS 3404.1: 2009 Section 8 UT wall thickness checks correct? Weld quality achieved? Remedial action and/or special assessment Welding and connections compliance Section geometry compliance Roof truss compliance tes 1. Collapse critical trusses and collapse critical joints are to be identified by a suitably qualified and experienced Chartered Professional Structural Engineer. 2. The guideline on the selection of typical critical locations is given in Figure 1. 3. Personnel responsible for the examination, interpretation and reporting of non-destructive examination shall have adequate qualifications according to AS/NZS 1554.1. 4. UT examination to be performed on butt welds identified as critical by visual examination to determine whether a complete penetration has been achieved according to AS/NZS 1554.1 UT examination shall be performed according to an approved procedure that takes into account joint design and material thickness. UT can be replaced by radiographic examination. Long span steel roof trusses: welding and section checks needed for some (May 2012) 20 April 2012 6