Cadia Expansion The Impact of Installing High Pressure Grinding Rolls Prior to a Semi-Autogenous Grinding Mill

Similar documents
SAG Page 2. Page 1

Comminution Circuit Design vs. Feed Size or Mine-to-Mill 2.0

Development and Implementation of the new 2240 kw (3000 HP) VERTIMILL Grinding Mill for Newcrest

SAG Page 1. Page 2

The implications of ore hardness variability on comminution circuit energy efficiency (and some other thoughts)

Up-grades and Optimization of Crushing and Grinding Plants HPGRs for hard rock applications

Mining Magazine Congress, Oct. 8-9, 2009, Niagara-on-the-Lake, Canada

Resource Efficient Mining Processes of Tomorrow

IMPROVEMENTS IN SAG MILL THROUGHPUT FROM FINER FEED SIZE AT THE NEWMONT AHAFO OPERATION

High pressure grinding rolls applications for the platinum industry

Evaluation of Grade Engineering using Enterprise Optimization. Michael Scott, Nick Redwood

VertiMill Performance Updates in Secondary and Regrind Duties at Cannington Mine, BHP-B

Comminution systems today and tomorrow. VDMA Minerals Symposium Lima, May 3 rd, Rilmar Ojeda. 1 ThyssenKrupp Resource Technologies

SAG Mill Control at Northparkes Mines (Not So Hard After All)

MOUNT CARLTON COMMINUTION CIRCUIT DESIGN, START-UP AND OPTIMISATION

SAG Page 2. Page 1

I-43 I-44 DESIGN OF THE 40 FOOT DIAMETER SAG MILL INSTALLED AT THE CADIA GOLD COPPER MINE

HPGR- THE AUSTRALIAN EXPERIENCE. R. Dunne, D Maxton, S Morrell, and G. Lane

Sustainable Mining through Continuous Operational Cost Control and Decrease of It Over the Mine Life Saso Kitanoski Director Sales and Service CEE

TAKING CONTROL OF THE MILL FEED: CASE STUDY - PARTIAL SECONDARY CRUSHING MT RAWDON. Brian Putland, Bernie Siddall and Andrew Gunstone

The SCSE Parameter- Enhancing the Usefulness of the JK Drop Weight A and b Parameters

Improvements in bi-metal production at the Brunswick plant, Costerfield.

Crushing. Comminution

An Overview of the HPGR and Fine Grinding Technologies to Characterize Ore Grindability

For personal use only

HRC : Taking HPGR efficiency to the next level by reducing edge effect

An overview of HPGR testwork program at Mintek

Integration and Optimisation of Blasting, Crushing and Grinding at the Newmont Ahafo Operation

Sukari revise Gold production in Egypt

DEVELOPMENT AND APPLICATION OF AN ENERGY BENCHMARKING MODEL FOR MINERAL COMMINUTION. *S. Nadolski, B. Klein, D. Gong, Z. Davaanyam 1 and A.

PROVING POTENTIAL COST AND POWER SAVINGS WITH HPGR TECHNOLOGY

A CLOSER LOOK AT INCREASING HPGR EFFICIENCY VIA REDUCTIONS IN EDGE EFFECT

COMMINUTION CIRCUIT OPTIMISATION

Development of an Innovative Copper Flowsheet at Phu Kham. M F Young and I Crnkovic

Predicting SAG/AG Mill and HPGR Specific Energy Requirements Using the SMC Rock Characterisation Test

SAGDesign TM Using Open Technology for Mill Design and Performance Assessments

HPGR revolution in Platinum?

MINE TO MILL OPTMISATION AT PADDINGTON GOLD OPERATIONS

SHEDDING LIGHT ON SECONDARY CRUSHING

Minerals Enduron HPGR High Pressure Grinding Roll

High Pressure Grinding Rolls HRC. The evolution of HPGR technology

NEW BENDIGO GOLD MINE OPTS TO MAXIMISE COARSE GOLD RECOVERY

FIRST YEAR OF OPERATION OF HPGR AT TROPICANA GOLD MINE CASE STUDY. (*Corresponding author:

PYTHON UNDERGROUND PROCESSING PLANT CRITICAL DESIGN

New project in Russia with semiautogenous mill selected according to the results of SAGDesign testing

T S X : R M X N Y S E. M K T : R B Y. Rubicon Begins Stockpiling Mill Feed for Projected Production Commencing Mid-2015

IMPROVING ENERGY EFFICIENCY IN BARRICK GRINDING CIRCUITS. 1 Barrick Gold Corp.

A NOVEL AG-CRUSHER-HPGR CIRCUIT FOR HARD, WEATHERED ORES CONTAINING CLAYS

IMPROVING ENERGY EFFICIENCY IN BARRICK GRINDING CIRCUITS

ACHIEVEMENT OF HIGH ENERGY EFFICIENCY IN GRINDING MILLS AT SANTA RITA. *S. latchireddi 1 and, E. Faria 2

THIS PAPER WAS PRESENTED AT THE FIFTH INTERNATIONAL CONFERENCE ON AUTOGENOUS AND SEMIAUTOGENOUS GRINDING TECHNOLOGY (SAG 2011).

Stirred Milling machine development and application extension. Jon Allen Metso Global product manager, Stirred Mills

The Increased Recovery Project at the Phu Kham Copper-Gold Operation, Laos PDR. Authors: A Hoyle, D Bennett, and P Walker

RAPID RAMP-UP OF THE TROPICANA HPGR CIRCUIT

Mining. Simulation of the Mineração Serra Grande Industrial Grinding Circuit. Mineração. Abstract. 1. Introduction. Thiago Oliveira Nunan

THE DEVELOPMENT OF A SMALL-SCALE TEST TO DETERMINE WORK INDEX FOR HIGH PRESSURE GRINDING ROLLS

Developing Process Control Standards for Optimal Plant Performance at PanAust Limited

We are building NEW AITIK. New Aitik. 36 million tonnes

T S X : R M X N Y S E. M K T : R B Y

GETTING MORE FROM DRILL CORE PRELIMINARY SAG DESIGN

SUBMITTED BY. The Morrell Method Sub-Committee of the Industrial Comminution Efficiency Working Group VERSION DATE. 21 Aug 2015 APPROVED BY

DE-AGGLOMERATION IN HIGH PRESSURE GRINDING ROLL BASED CRUSHING CIRCUITS

HPGR in the Iron Ore Industry

Production of pelletizing concentrates from Zandrivierspoort magnetite/haematite ore by magnetic separation

Performance optimization of an industrial ball mill for chromite processing

ECO-EFFICIENT MINING SPECIAL FOCUS ON COMMINUTION

ENGINEERING SERVICES

Copyright in this document is wholly reserved to Ausenco Services Pty Ltd.

A Pilot-Scale Examination of a Novel High Pressure Grinding Roll / Stirred Mill Comminution Circuit for Hard-Rock Mining Applications

POLYCOM high-pressure grinding roll.

ABSTRACT INTRODUCTION

MILLING CONTROL & OPTIMISATION

Increasing Grinding Circuit Robustness with Advanced Process Control

The TMAC Resources Inc. Hope Bay Project An Innovative Approach. Gerhard Bezuidenhout

Operational Excellence on the plant floor and in the control room: A disciplined approach to understanding the opportunities to maximise the

OCEANAGOLD PROVIDES AN UPDATE TO HAILE COMMISSIONING AND REVISED COMPANY GUIDANCE

Development of an AG/SAG mill batch test methodology

Progressive grinding technology with Loesche VRM for the mining industry

Increasing Productivity Without Capital Expenditure

Grinding Mills. NCP supplies new Grinding Mills and all ancillary equipment to clients across the globe

MINERALS HAZEMAG. Mobile and Semi-Mobile Plants. Member of

Mining. Performance analysis of the HRC HPGR in pilot plant. Mineração. Abstract. 1. Introduction. Renato Oliveira

MODEL PREDICTIVE CONTROL APPLICATION AT LUMWANA COPPER CONCENTRATOR

11th MILL OPERATORS CONFERENCE HOBART 2012

Practise of large scale hematite ore beneficiation

Comminution Energy and How to Reduce it. Tim Napier-Munn JKMRC (UQ) and CEEC

Selection of Comminution Circuits for Improved Efficiency

INVESTIGATION OF SORTING TECHNOLOGY TO REMOVE HARD PEBBLES AND RECOVER COPPER BEARING ROCKS FROM AN AUTOGENOUS MILLING CIRCUIT

THE IMPROVEMENT OF THE EFFICIENCY OF AN ALUMINOSILICATE CRUSHING CIRCUIT

Minto Mine. Mill Operations Plan

Process Technology & Innovation. Process optimization for mining and aggregate industries

Communition Abstract. Fine grind attritional mills; can they or should they go coarser. D Capstick and B Currie

Crushing Screening and conveying In- House Workshop

Optimisation Study Yanfolila Gold Project Mali

Introducing HPGR Crushers into a Russian Magnetite Operation

Figure 1: Schematic block-diagram of the project test work

OPTIMISATION AND CONTINUOUS IMPROVEMENT OF ANTAMINA COMMINUTION CIRCUIT

Metallurgium TM. Lessons Learned from the Copper Industry Applied to Gold Extraction. John O. Marsden

SAG MILLING IN AUSTRALIA FOCUS ON THE FUTURE

SAGwise total process control The key to efficient SAG mill operation

Transcription:

Cadia Expansion The Impact of Installing High Pressure Grinding Rolls Prior to a Semi-Autogenous Grinding Mill Andy Apfel Maintenance Foreman Tom Waters Plant Metallurgist

Outline About Cadia Valley Operations Cadia East Upgrade Construction and commissioning Operational lessons

CVO Operational Overview Deposits Cadia Hill Open Cut Care and Maintenance Cadia East Underground Ridgeway Underground Concentrator 1 Concentrator 2 Concentrators Gold Doré Copper Concentrate

Old Concentrator 1 Circuit x2 Throughput and stability of circuit primarily dictated by SAG mill and availability of recycle crushing circuit. Typical circuit throughput 17-18 Mt/y.

Drivers for Circuit Expansion Parameter Units May 2008 Plant Trial May 2008 Plant Trial Cadia East Model Ore Source Cadia Open Pit Cadia East Underground (Blasted) Cadia East Underground (Caved) DWI kwh/m 3 8.1 9.9 10.0 RWI kwh/t 20 26.5 31.1 BWI kwh/t 17.5 21.4 21.5 Throughput Mt/y 18.8 12.1 12.4 Cadia East ore harder and fines deficient compared to Cadia Hill. Significant reduction in throughput expected if treating in existing concentrator.

Final Flow Sheet Design x2 Modeled throughput of 2450 t/h:1770 t/h through the HPGR and 680 t/h of screen undersize or primary crushed ore. Target primary grind of 150µm.

Role of the Owners Team An Owners Team was established for the Cadia East Project. Their role was: To ensure that the project design met operational needs. Develop and manage an operational readiness plan

Purpose of the Owners Team The Owners Team was established for the following reasons: Gain site acceptance. To ensure people had adequate time for reviews. So the Operation was prepared to take on the project. The Cadia East Project had to be delivered as a high quality project.

HPGR Circuit Design The Project consulted with many parties in regards to the operation of a HPGR, these included: HPGR suppliers Polysius, KHD and Köppern. HPGR user forum: Freeport, Boddington and Cerro Verde. The following initiatives were included in the design: Feed gate design changes. Magnets, metal detectors and bypass chutes. Process control system that allowed 2500 t/h to be fed to a 30t HPGR feed bin.

HPGR Circuit Design

Commissioning Schedule Benefits of the staged implementation was to: Level labor resource Minimise process disruption Match the Cadia East underground mine ramp up Stage 1 Ball Mill Q3 FY11 Stage 2 Crushing and Screening Q2 FY12 Stage 3 Flotation and Regrind Q4 FY12 Stage 4 HPGR Q4 FY12 Concentrate pumping and Filter plant upgrade Q4 FY12

Stage 2 Commissioning Initial performance of circuit was poor - frequent trips and instability. Stage 2 ramp up team formed which consisted of a multidisciplinary group that focused on key issues in addition to their normal roles. Team had insufficient resources to focus on longer term problems and complete training and handover documentation.

Review of Stage 2 Commissioning Post Stage 2 reviews found the commissioning strategy had underestimated the complexities and intensive workload of commissioning a plant upgrade of this size. Newcrest formed an Operational Commissioning Team who were separate from day-to-day operations. Professional operators, process control, technical writers, fitters, electricians and process engineers.

Commissioning and Ramp-Up Team Process Engineer x 2 Process Control Maintenance Planner Technical Writer Superintendent Business Improvement Operational Commissioning Lead Mechanical Commissioning Lead Electrical Commissioning Lead Administration Operational Technician x 2 Mechanical Technician x 2 Electrical Technician x 4 Operational Labour

Stage 3 and 4 Commissioning HPGR was commissioned successfully. Team created operator training packages, operating strategies and maintenance packages prior to handover. Stage 4 handed over mid August 2012 to the operational team. Daily throughput consistently above 2400 t/h by December 2012.

Project and Commissioning Advice Operations need to be involved in Projects at a pre-feasibility stage. Operational readiness is a holistic process and not confined to one discipline. Commissioning activities are labor intensive and should not be underestimated.

HPGR Operation Gradual increase in HPGR F 80 over first 10 months of operation to approach design feed conditions. Operates at fixed speed to a pressure setpoint of 130 Bar. Circuit throughput now dependent on HPGR availability.

Circuit Operation Steady state conditions in secondary circuit with bin levels controlled by feed forward loops. Screen and crusher efficiency improvements targeted to reduce recirculating load in secondary circuit. SAG mill speed, water and feedrate process control systems simplified. SAG mill F 80 can range from 16mm to 100mm. Ball charge and liner design encompass these extremes.

Circuit Performance Relative to Design Cadia East survey conducted in November 2013 with AMIRA P9P. Parameter Survey Design ROM Ore F 80 (µm) 100,320 170,000 Cyc OF P 80 (µm) 141 150 Circuit specific energy (kwh/t) 21.2 22.0 A*b 35.1 27.5 BWI 19.5 21.5 Lower energy requirement and lower Cyc OF p80 than design. ROM F 80, A*b and BWI: Survey ore was finer and softer than design. HPGR reduction ratio approximately 2, % -1mm increased by 2. Negligible change in BWI through HPGR at various pressures.

Design and Implementation Negatives Partial charge up of 16MW ball mill prior to increased site power availability. Horizontal transfer points create segregated feed to main distribution bin and secondary crusher feed bin. Operating speed dead band in vibrating screen feeder motors.

Design and Implementation Positives HPGR feed stockpile decouples front end and SAG. Three feed options to SAG: HPGR product, screen undersize and coarse feed which provide flexibility and redundancy. SAG: Full wraparound electric motor, fully curved pulp lifters, large shell lifter spacing.

Acknowledgements Authors: Dieter Engelhardt: Manager Ore Processing, Cadia Valley Operations Greg Lane: Chief Technical Officer Ausenco Malcolm Powell: Professional Research Fellow, The University of Queensland, SMI/JKMRC Newcrest Mining Limited for providing the opportunity to publish and present the paper. All the professionals, tradesmen, operators and contractors who helped commission the plant upgrades at CVO. HPGR suppliers: Polysius, KHD and Köppern Polysius User s Forum: Freeport, Boddington and Cerro Verde