UNIT III Earthwork Estimation & Reinforcement Estimation

Similar documents
UNIT I Introduction & Specifications

MAHARASHTRA STATE BOARD OF TECHNICAL EDUCATION (Autonomous) (ISO/IEC certified)

SUMMER 16 EXAMINATIONS Subject Code: Model Answer- Estimating and costing Page No. 01 /19

DEPARTMENT OF CIVIL ENGINEERING

Design and Estimation of Reinforced Building: A Case Study

MAHARASHTRA STATE BOARD OF TECHNICAL EDUCATION (Autonomous) (ISO/IEC certified)

SIDDHARTH GROUP OF INSTITUTIONS :: PUTTUR Siddharth Nagar, Narayanavanam Road QUESTION BANK (DESCRIPTIVE) UNIT-5 FOOTINGS & STAIRS

NATIONAL INSTITUTE OF ANIMAL BIOTECHNOLOGY (NIAB), HYDERABAD

Scanned by CamScanner

Confined masonry. An illustrated guide for masons. This manual explains this technique. Confined masonry. RC frames. Columns first, walls after

SIDDHARTH GROUP OF INSTITUTIONS :: PUTTUR Siddharth Nagar, Narayanavanam Road QUESTION BANK (DESCRIPTIVE)

UNIT-I DESIGN CONCEPTS, DESIGN OF BEAMS Part - A (Short Answer Questions)

footings are provided with a concrete grade of M20. The maximum axial load 1600 KN as arrived from design is taken for the design of the footing.

Calculation of requirement of Labour. for construction of IAY/CMRHM

AN ISO 9001 & COMPANY TENDER DOCUMENT. TENDER No: EPI/WRO/CON/757/0119 FOR

PRICED BILL OF QUANTITIES

SCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST- RAIGARH, MUMBAI.

Drainage, Road Drainage and Collection Pit A - EXCAVATION:

Lecture 1 INTRODUCTION

Tender Schedule for the Work "Construction of Staff qtrs. at Tainda S/S (1no.)

CONCRETE BLOCK MASONRY

PARTICULAR SPECIFICATIONS MASONRY WORK BRICK WORK

UNIT I SIMPLE STRESSES AND STRAINS, STRAIN ENERGY

Estimate FOR THE SEPTIC TANK

VTU EDUSAT PROGRAMME Lecture Notes on Design of Stair cases

Lecture Retaining Wall Week 12

CHAPTER 3 BEHAVIOUR OF FERROCEMENT HOLLOW SLABS

KANPUR SMART CITY LIMITED

WORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00

Est. Cost : Rs.35,000/- Sl. No.

Good Construction Practices Part I

Tender ref no: SBIIMS/BHU/AO2/ / 57 Date: PRICE BID FOR CIVIL WORKS AT SBI UDALA BRANCH (A) RAIN WATER HARVESTING. Cum 15.

Building Construction

CIVIL WORKS Mahesh G. Nair

Schedule for construction of ROB Approaches no. 48, 54,55 of PKG-III (MGR) including temporary road diversion along ROB approach No 55.

CIVIL ENGINEERING YEAR QUESTION BANK

NATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI ESTATE MAINTENANCE DEPARTMENT

SCHEDULE OF RATES. WORK : External Waterproofing for Basement at Dena Bank, Kandivali Branch SR NO PARTICULARS UNIT QUANTITY RATE AMOUNT

Approximate estimate of renovation and extension work of faculty room in JIST, Jorhat-10 Estimate is prepared as per PWD SOR

DESIGN CATALOGUE FOR RECONSTRUCTION OF EARTHQUAKE RESISTANT HOUSES

6. Design of Portal Frames (For class held on 20 th, 26 th and 27 th March 07)

B.Tech III Year II Semester (R09) Supplementary Examinations December/January 2014/2015 World

Masonry and Cold-Formed Steel Requirements

Mason s Training Programme on Onsite Treatment Systems

1 Site Preparation & marking L.S 1, brickwork in basement in cm 1: cft 19,975.00

APPLICABILITY TABLE. Council BSC CHRC GRC IRC LSC MRC RRC Applicable Yes Yes Yes Yes Yes Yes Yes

DATA SHEET 3 Concrete Masonry Lintels MARCH 2013

ITEM No. D E S C R I P T I O N UNIT QTY. 5-E343.2 In class III material m³ 1,260 - Max. Depth: m For disposal

Est. Cost : Rs.40,000/-

3. Bond, Anchorage and Shear This chapter will discuss the following topics:

Unit Rate. Subtotal in SDG. Site Clearing Preliminary Works. 1.0 Job. Excavation & Earth Works. Stone Masonry Works in foundation 100 M.

SIDDHARTH GROUP OF INSTITUTIONS :: PUTTUR Siddharth Nagar, Narayanavanam Road QUESTION BANK (DESCRIPTIVE)

CE 6407 ESTIMATION AND QUANTITY SURVEYING UNIT I PART A

Compiled by: Civil Works Department, SSA Punjab.

CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES PRECAST BOX CULVERTS CONSTRUCTION SPECIFICATION

Confined masonry. Definition

Subject with Code: Strength of Materials(16CE104) Course& Branch: B. Tech - CE Year &Sem : II-B. Tech &I-Sem Regulation: R16

# 150

Description Unit Quantity Rate Kshs. Amount Kshs.

BILL OF QUANTITIES. S.No Discription Unit Rate Quantity 1 Boring, Providing and installing cast in situ single under reamed piles of

Proposed Revisions to Part 2, Sections 2.13 to Draft DEVELOPMENT AND SPLICES OF REINFORCEMENT SECTION 2.13 DEVELOPMENT REQUIREMENTS

ITEM 461 STRUCTURAL PLATE STRUCTURES. Galvanized steel plates shall conform to AASHTO M167 and aluminum plates shall conform to AASHTO M219.

PND Training Hall Conex Building, Kabul ABSTRACT OF COST

Amendment -1. Date: NIT No. RECPDCL/CSR/CWC/ /3368 dt:

DESIGN OF RC ELEMENTS UNIT 1 PART-A

General Technical Specification

Section G1. Design of Cast-In-Place Box Conduits

Sri Rama Krishna Institute of Technology Basic civil engineering Unit-2(BUILDING COMPONENTS AND STRUCTURES) 2 mark questions

United Nations Development Programme-South Sudan

2016 DESIGN AND DRAWING OF REINFORCED CONCRETE STRUCTURES

Name of work: Renovation of toilets in main building near molecular biology lab. Sl Rate Amount Description Quantity Unit No Rs Ps Rs Ps Schedule A

CE2401-DESIGN OF REINFORCED CONCRETE AND BRICK MASONRY QUESTION BANK

Tank plan. Scale 1:100. Over Flow. Clean Out. inlet. Rail hand. walk way. Steel ladder. Opening 70 *150 cm. 20cm wall A 01. Water tank in Barika 1.

GOVERNMENT OF ODISHA PANCHAYTI RAJ DEPARTMENT. Construction of Culvert on Sunamudi Nalla (2 Span RCC slab)

Sub Total for Demolishing

UNIT-1 RETAINING WALLS

Course Title: ESTIMATION AND COSTING. Credits (L:T:P) : 4:0:0 Total Contact Hours: 52 Course Code: 15CE53T

ASD OF CONCRETE MASONRY LINTELS BASED ON THE 2012 IBC/2011 MSJC. TEK 17-1D Structural (2011) Related TEK: 14-7C, 14-13B, 17-1C, 17-2A

ALLOWABLE STRESS DESIGN OF CONCRETE MASONRY LINTELS. TEK 17-1C Structural (2009) Related TEK: Uniform load. Triangular load. Concentrated loads

KSK COLLEGE OF ENGINEERING AND TECHNOLOGY DEPARTMENT OF CIVIL ENGINEERING CE 2505-DESIGN OF RC ELEMENTS QUESTION BANK

COLUMNS 1- Definition: The Egyptian code defines columns as : 2- Types of concrete columns

> 0. 1 f, they are treated as beam-columns.

Fence Stone. Self locating Wall System

w w w. m d u e. i t - i n f m d u e. i t

TENDER FOR EXPANSION OF ASH POND AT NALCO's ALUMINA REFINERY AT DAMANJODI

ENGINEERING PROJECTS (INDIA) LTD. (A Govt. of India Enterprise) ADDENDUM NO. 1

SECTION 303 CULVERTS

Construction of Shopping Complex at MNIT campus.

1 Exam Prep Placing Reinforcing Bars Tabs and Highlights

VALLIAMMAI ENGINEERING COLLEGE

Proposed Modification to the Florida Building Code

Questions with Solution

Paragraph Description Page No General Materials Concrete Masonry Work Altitude Valve Vault Cover 25-4

SIDDHARTH GROUP OF INSTITUTIONS :: PUTTUR Siddharth Nagar, Narayanavanam Road QUESTION BANK (DESCRIPTIVE)

Technical Assistance by JICA TRANSITIONAL PROJECT IMPLEMENTATION SUPPORT FOR EMERGENCY RECONSTRUCTION PROJECTS IN NEPAL

This drawing. is preliminary. and not for. construction or. implementation. purposes. project number 170 END VIEW DESIGN STRENGTHS: PLAN

Name of work:- GAMES VILLAGE - CONSTRUCTION OF INTERNAL (WBM) ROAD, PROTECTION WORK AROUND TREES AND PAINTING COMPOUND WALL TENDER SCHEDULE

FOR BUILDING WORKS PART-I WORK INFORMATION - (TO BE FILLED-UP BY PROJECT) Work is

APPLICATION OF LIFE CYCLE ASSESSMENT FOR RESIDENTIAL BUILDING CONSTRUCTION

PRESTRESSED CONCRETE STRUCTURES. Amlan K. Sengupta, PhD PE Department of Civil Engineering Indian Institute of Technology Madras

Transcription:

SIDDHARTH GROUP OF INSTITUTIONS :: PUTTUR Siddharth Nagar, Narayanavanam Road 517583 QUESTION BANK (DESCRIPTIVE) Subject with Code : ECV(13A01605) Year & Sem: IV-B.Tech & I-Sem Course & Branch: B.Tech - CE Regulation: R13 UNIT III Earthwork Estimation & Reinforcement Estimation 1. Following Fig. Shows the Section along the shorter span of a room of size 4X5.5m (Internal dimension). The thickness of the slab is 13 cm. The thickness of wall is 40 cm. 2. (A) What are the different methods for computation of earth work in road embankments? (B) Explain about Lead and lift. 3. Estimate the quantity and cost of earth work for a road between two stations A to B with the following data. Width of road is 10m at formation surface and side slope 2:1. Rate of earth work in banking and cutting may be taken as Rs. 10.00 per cubic meter including a lead up to 150m with a condition that portion of earth work available from cutting is to be utilized for banking with in the same lead of 150m. The date on field book for the portion of road are as follows; 4. Workout the quantity of reinforcement by preparing bar requirement schedule of a beam as per the drawing given below.

5. Prepare bar bending schedule and calculate the quantity of reinforcement in a R.C.C (1:2:4) lintel as per data given below: Total Length of the lintel including bearing=1.50 m Thickness of wall=400 mm; Thickness of lintel=150 mm; Main reinforcement 5 bars of 12 mm ϕ (out of which 2 bars are bent up near support) Top reinforcement 2 bars of 10 mm ϕ; 6 mm ϕ, 2 legged stirrups are provided @175mm c/c uniformly. 6. Calculate the quantity of steel required by preparing bar bending schedule, for a R.C.C (1:11/2:3) lintel cum sunshade as per the drawing given below. Take clear span of Lintel as 1.2m and bearing over the support is 0.3 m on either side. 7. A room 600 cm long and 500 cm wide has a flat roof. There is one T-beam in the center (cross Section below the slab 30cm X 50cm) and the slab is 15 cm thick. Estimate the quantity of iron Bars required for reinforcement (For the T-beam only) from the data given below. Main bars: 8 No.s - 25mm dia in 2 rows of 4 each (all 4 in the bottom being straight and others Bent) Stirrups: 10 mm dia and 15 cm C/C throughout. Anchor bars: 2 No. s - 16 mm dia 8. Prepare a detailed estimate for earthwork for a portion of road from the following data. Formation width of road is 10 meter, side slope 2:1 in banking and 1/2: 1 in cutting.

9. Estimate the quantity of earthwork for an embankment, 120cm long, 8m wide @ crest and whose side slopes are 2 to 1. The central height from 0 to at every 30m intervals are 0.60m, 1.2m,1.6m,2.0m and 1.3m. 10. Write briefly about the following: (A) Development length of Reinforcement. (B) Lap length of Reinforcement. (C) Bent up bars. (D) Cover to the Reinforcement. (e) Density of steel Prepared by: R RAJESH KUMAR.

SIDDHARTH GROUP OF INSTITUTIONS :: PUTTUR Siddharth Nagar, Narayanavanam Road 517583 QUESTION BANK (OBJECTIVE) Subject with Code : OR(13A03701) Year & Sem: IV-B.Tech & I-Sem Course & Branch: B.Tech - ME Regulation: R13 III. Earthwork Estimation & Reinforcement Estimation IV. Contracts and Tenders V. Rate Analysis & Valuation 1. The expected out turn of 2.5 cm cement concrete floor per Manson per day [ ] A) 2.5 sqm B) 5.0 sqm C) 7.5 sqm D) 10 sqm 2. The correct prismoidal formula for volume is [ ] A) D [first area + last area + Even area + 2 odd areas] B) D/3 [first area + last area + 4 Even area + 2 odd areas] C) D/3 [first area + last area + 2 Even area + 4 odd areas] D) D/6 [first area + last area + 2 Even area + 4 odd areas] 3. Pick up the correct statement from the following: [ ] A) The bent up bars at a support resist the negative bending moment B) The bent up bars at a support resist the sharing force C) The bending of bars near supports is generally at 45 D) All the above. 4. For 12 mm thick cement plastering 1 : 6 on 100 sq. new brick work, the quantity of cement required, is [ ] A) 0.200 m3 B) 0.247 m3 C) 0.274 m3 D) 0.295 m3 5. In the mid-section formula [ ] A) The mean depth is the average of depths of two consecutive sections B) The area of mid-sections is calculated by using mean depth C) The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two sections D) All the above. 6. The area of a sloping surface of a protective embankment of mean height d, side slopes S: 1 and length L is [ ] A) d x d x s B) d 2 x (ds) 2 C) L.D sq. Root (1 + s 2 ) D) All the above.

7. If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by [ ] A) Mid-section formula B) Trapezoidal formula C) Prismoidal formula D) All the above. 8. The expected out turn of 12 mm plastering with cement mortar is [ ] A) 2.5 sq m B) 4.0 sq m C) 6.0 sq m D) 8.0 sq m 9. The total length of a cranked bar through a distance (D) at 45 in case of a beam of effective length L, is [ ] A) L + 0.42 d B) L + 2 x 0.42 d C) L - 0.42 d D) L - 2 x 0.4 d 10. While estimating a rcc structure, the omitted cover of concrete is assumed [ ] A) At the end of reinforcing bar, not less than 25 mm or twice the diameter of the bar B) In thin slabs, 12 mm minimum or diameter of the bar whichever is more C) for reinforcing longitudinal bar in a beam 25 mm minimum or diameter of the largest bar which is more D) All the above 11. The cross-sections for a highway is taken at [ ] A) right angle to the center line B) 30 meters apart C) Intermediate points having abrupt change in gradient D) All the above. 12. For 100 sq. m CC (1: 2: 4) 4 cm thick floor, the quantity of cement required, is [ ] A) 0.90 m3 B) 0.94 m3 C) 0.98 m 3 D) All the above. 13. A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is [ ] A) 500 m3 B) 1000 m3 C) 1500 m 3 D) All the above. 14. The expected out turn for EW in excavation in ordinary soil per mazdoor per day is [ ] A) 1m3 B) 2 m3 C) 3 m3 D) All the above. 15. Pick up the incorrect statement from the following: [ ] A) Lead is the average horizontal straight distance between the borrow pit and the place of spreading soil B) The lead is calculated for each block of the excavated area C) The unit of lead is 50 m for a distance up to 500 m D) The unit of lead is 1 km where the lead exceeds 2 km.

16. The expected out turn of half brick partition wall per mason per day is [ ] A) 1m3 B) 2 m3 C) 3 m3 D) All the above. 17. If B is the width of formation, d is the height of the embankment, side slope S: 1, for a highway with no transverse slope, the area of cross-section is [ ] A) B + d + Sd B) Bd + Sd 2 C) B x d - Sd 1/2 D) All the above. 18. The slope of the outlet of 'P trap' below the horizontal is kept [ ] A) 8 0 B) 10 0 C) 12 0 D) 14 0 19. The unit of measurement is per quintal for the following: [ ] A) Collapsible gates with rails B) Rolling shutters C) Expanded metal wire netting D) M.S. reinforcement of R.C.C. works 20. The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is [ ] A) 1.00 m 3 B) 1.25 m 3 C) 1.50 m 3 D) 1.75 m 3 21. Pick up the correct statement from the following: [ ] A) If the bed level is above N.S.L. the canal is called fully in baking and the berms are designed as 3 d where d is full supply depth of water (F.S.D.) B) Area of canal in cutting = BD + Sd2 where B = bed width, d = depth of cutting and S is the side slope C) Area of the bank of canal = B1d1 + Sd2 where B1, d1 and S are the width of bank, height of the bank above N.S.L. and side slope respectively D) All the above 22. The rate of an item of work depends on [ ] A) Specifications of works B) Specifications of materials C) Proportion of mortar D) All the above 23. The rate of payment is made for 100 cu m (per % cu m) in case of [ ] A) Earth work in excavation B) Rock cutting C) Excavation in trenches for foundation D) All the above 24. Berms are provided in canals if these are [ ] A) Fully in excavation B) partly in excavation and partly in embankment C) Fully in embankment D) All the above 25. The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by prismoidal formula, is [ ] A) 3250 m 3 B) 3225 m 3 C) 3275 m 3 D) 3300 m 3

26. The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended [ ] A) 100mm B) 150mm C) 200mm D) 300mm 27. Pick up the correct statement from the following: [ ] A) Bricks are paid per thousand B) Cement is paid per 50 kg bag C) Lime is paid per quintal D) All the above 28. The weight of an item is measured correct to nearest [ ] A) 0.25 kg B) 0.50 kg C) 1.00 kg D) 5 kg 29. Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds [ ] A) 2.0% B) 2.5% C) 4.0% D) 5.0% 30. Formula for U-hook [ ] (A) 9ɸ (B) 6ɸ (C) 12ɸ (D) 24ɸ 31. Formula for L-hook [ ] (A) 9ɸ (B) 6ɸ (C) 12ɸ (D) 24ɸ 32. Formula for Stirrup-hook [ ] (A) 9ɸ (B) 6ɸ (C) 12ɸ (D) 24ɸ 33. Length of bent up bar (45 0 ) [ ] (A) 0.3d (B) 0.4d (C) 0.45d (D) 0.6d 34. Length of bent up bar (30 0 ) [ ] (A) 0.3d (B) 0.4d (C) 0.45d (D) 0.6d 35. In RCC works the end and side covers should be [ ] (A) 2.5 to 5 cm (B) 3 to 4 cm (C) 4 to 5 cm (D) 1.2 to 2 cm 36. In slabs bottom and top cover should be [ ] (A) 2.5 to 5 cm (B) 3 to 4 cm (C) 4 to 5 cm (D) 1.2 to 2 cm 37. In beams bottom and top cover should be [ ] (A) 2.5 to 5 cm (B) 3 to 4 cm (C) 4 to 5 cm (D) 1.2 to 2 cm 38. Unit weight of 20 mm ɸ bar is [ ] (A) 2.46 Kg/m (B) 3.85 Kg/m (C) 1.58 Kg/m (D) 0.62 Kg/m 39. Unit weight of 25 mm ɸ bar is [ ] (A) 2.46 Kg/m (B) 3.85 Kg/m (C) 1.58 Kg/m (D) 0.62 Kg/m 40. Unit weight of 16 mm ɸ bar is [ ] (A) 2.46 Kg/m (B) 3.85 Kg/m (C) 1.58 Kg/m (D) 0.62 Kg/m 41. Unit weight of 16 mm ɸ bar is [ ] (A) 2.46 Kg/m (B) 3.85 Kg/m (C) 1.58 Kg/m (D) 0.62 Kg/m 42. Gross income = [ ] (A) Net income + out goings (C) Net income -out goings (B) Gross income + out goings (D) none 43. Yearly purchase = [ ] (A) 50/rate of interest (C) 75/ rate of interest (B) 100/rate of interest (D) none

44. Annual installment (sinking fund) [ ] (A) I=(s x i)/(1+i) n -1 (C) I=(s x i)/(1+i) n +1 (B) I=(s x i)/(1+i) n x1 (D) none 45. Who is the administrative head of the department [ ] (A) Assistant engineer (C) chief engineer (B) Superintendent engineer (D) none 46. Who is the circle head [ ] (A) Assistant engineer (C) chief engineer (B) Superintendent engineer (D) none 47. Dry volume of 12mm plastering (for 100 mm 2 ) [ ] (A) 1 m 3 (B) 2 m 3 (C) 3 m 3 (D) none 48. Dry volume of 20mm plastering (for 100 mm 2 ) [ ] (A) 1 m 3 (B) 2 m 3 (C) 3 m 3 (D) none 49. Number of bricks for 10 m 3 [ ] (A) 5000 (B) 500 (C) 50 (D) 5 50. The brick work is not measured in cu m in case of [ ] A) One or more than one brick wall B) Brick work in arches C) Reinforced brick work D) Half brick wall Prepared by: R RAJESH KUMAR