Structural Inspection

Similar documents
STRUCTURAL EVALUATION OF WASHINGTON ELEMENTARY SCHOOL WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT (WCCUSD)

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

STRUCTURAL EVALUATION OF DOVER ELEMENTARY SCHOOL WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT (WCCUSD)

ROOME & GUARRACINO, LLC Consulting Structural Engineers 48 Grove Street Somerville, MA Tel: Fax:

Building Division Informational Handout

Structural Design Engineers 120 Montgomery Street, Suite 1410 San Francisco, California / Fax 415/

STRUCTURAL EVALUATION OF TARA HILLS ELEMENTARY SCHOOL WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT (WCCUSD)

ACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings

Jackson Crossing Located in Alexandria, VA. Technical Report 1 Michael Bologna

SECTION WOOD FRAMING. A. Includes But Not Limited To 1. Furnish and install wood framing and blocking as described in Contract Documents.

WALL CONSTRUCTION CHAPTER 6

Structural System. Design Criteria Fire Resistance Concrete designed for 2 HR rating (worst case) Geotechnical Report Allowable Bearing Capacity

Attachment A. USG Minimum Design and Construction Requirements for Wood Framed Structures

SECTION WOOD FRAMING. A. Includes But Not Limited To: 1. Furnish and install wood framing and blocking as described in Contract Documents.

FIGURE R502.2 FLOOR CONSTRUCTION

On Cold-Formed Steel Construction. Light Gauge Steel Engineers Association Washington, D.C Toll Free (866)

90% Design Submittal Structural Calculations Parking Garage CDRL

Structural Technical Report 1 Structural Concepts / Structural Existing Conditions Report

Carroll County Bureau of Permits and Inspection Residential Code Compliance Guidelines Detached Garage

Part 1: Vocabulary Select the best answer and write the corresponding letter in the space provided.

1. The subfloor must be structurally sound and able to withstand live and dead loads with a deflection limitation of L/360.

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)

Project. San Jose City College Physical Education Building. Prepared For. Prepared By PLACE IMAGE HERE. Ken Bauer, AIA Principal

Structural Technical Report I October 5, 2006 Structural Concepts / Structural Existing Conditions Report

WALL CONSTRUCTION CHAPTER 6

Tier 1 Assessment Linderman Gymnasium Polson, MT

Connaught. Facility Audit report for: Connaught Regina, SK. Report Created: Page 1 of 20

Subject: Amphitheater School District Reroofing Projects Amphi High School, Building 900 Roof Evaluation SCI Project Number:

THE CITY OF WALTHAM MASSACHUSETTS PURCHASING DEPARTMENT PHASE III RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING CONDOMINIUMS AND CONDOMINIUMS

STRUCTURAL EVALUATION OF JOHN F. KENNEDY HIGH SCHOOL WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT (WCCUSD)

VOLUNTARY - EARTHQUAKE HAZARD REDUCTION IN EXISTING HILLSIDE BUILDINGS (Division 94 Added by Ord. No. 171,258, Eff. 8/30/96.)

PLYWOOD FLOATING FLOOR

DIVISION: WOOD, PLASTICS AND COMPOSITES SECTION: STRUCTURAL PANELS REPORT HOLDER: ENERCEPT, INC.

THE FLORIDA BUILDING CODE

SPECIAL INSPECTION AGREEMENT FORM

ENTRY FORM. DVASE 2014 Excellence in Structural Engineering Awards Program

Stone and Masonry Veneer

MAIN FLOOR PLAN. #G x 14 x 8 Shed - Chicken Coop By SDS-CAD Specialized Design Systems 10'-0" 3'-0" 1'-0" 14'-0" 14'-0" 1'-0" 6'-0" 3'-0"

PRESENTATION PLAN A MODEL COMPARISON FLOOR CONSTRUCTION

STRUCTURAL CONDITION ASSESSMENT

GARAGE MAIN FLOOR PLAN

Brent Ellmann Structural Option 200 Minuteman Park, Andover, MA Structural Consultant: Dr. Hanagan

The Passive Fire Protection Handbook

GARAGE MAIN FLOOR PLAN

David A. Walenga Technical Assignment #1

SPECIAL INSPECTION AGREEMENT

GARAGE MAIN FLOOR PLAN

RESIDENTIAL DETACHED ACCESSORY STRUCTURES

Structural Redesign Gravity System

STATEMENT OF SPECIAL INSPECTION FORM

Custom 22' x 40' - 16' Tall Garage Plan #g227 By SDS-CAD Specialized Design Systems

SECTION R614 STRUCTURAL INSULATED PANEL WALL CONSTRUCTION

#G445 Plans, 48'x28' x 10' detached garage with bonus room By SDS-CAD Specialized Design Systems

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: ROOFING AND SIDING PANELS REPORT HOLDER: FOUR SEASONS BUILDING PRODUCTS, LLC

Nortrax Section David Manchester Road, Ottawa NON-STRUCTURAL METAL FRAMING 16 May 2014 Page 1

Southwest Housing, Arizona State University

Diaphragms 2. Design Process. Design Process. Diaphragms are the roofs and floors of the upper stories

Custom 30 x 48-14' Tall Garage Plan #g226 By SDS-CAD Specialized Design Systems

Thesis Proposal Structural Redesign / Cost, Schedule and Coordination Analysis / Architectural Impact

1000 CONNECTICUT AVENUE

Framing Methods Structural Components

SECTION PLATE CONNECTED WOOD TRUSSES

Administrative Changes

Statement of Special Inspections Michigan Building Code 2012 (MBC 2012)

HOLDOWN & STRAP SCHEDULE

Modular Wood Framing Goes Vertical

NCMA TEK RESIDENTIAL DETAILS FOR HIGH WIND AREAS. TEK 5-11 Details (2003)

Supplemental Plan Correction Sheet for LA Residential Code Prescriptive Design (2011 LARC)

Danielle Shetler - Structural option Courtyard by Marriott Lancaster, PA

SECTION STEEL DECKING

Table 3. Detailed Comparison of Structural Provisions of IRC 2000 and 1997 NEHRP (Continued)

FDA OC/ORA Office Building

COURTYARD INFILL STRUCTURE DESIGN

Structural Technical Report #2 By Robert Whitaker

Temecula Medical Center Temecula, CA

4.6 Procedures for Connections

one structural behavior, systems, and design ARCHITECTURAL STRUCTURES: FORM, BEHAVIOR, AND DESIGN DR. ANNE NICHOLS SUMMER 2015 lecture

CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE Residential Accessory Structures

Supplemental Plan Correction Sheet for LA Residential Code Prescriptive Design (2014 LARC)

DIVISION 5 METALS SECTION COLD-FORMED METAL FRAMING

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Minimum required percentage of length of braced wall band on each storey 4

SEATTLE CENTRAL COLLEGE BROADWAY PERFORMANCE HALL SEATTLE, WASHINGTON STRUCTURAL EVALUATION FOR PREPARED BY PCS STRUCTURAL SOLUTIONS

SUBJECT: NEW 2000 INTERNATIONAL RESIDENTIAL CODE (IRC) DATE:

Building Excellence IV Capital Levy Projects Under Construction

one structural behavior, systems and design Course Description Course Description Syllabus & Student Understandings statics mechanics of materials

DIVISION: WOOD, PLASTICS AND COMPOSITES SECTION: STRUCTURAL PANELS REPORT HOLDER: EVALUATION SUBJECT: STRUCTURAL PANELS

ESCONDIDO FIRE DEPT TRAINING MANUAL Section Truck Module Page 1 of 10 Building Construction Roof Types Revised

SECTION NON-STRUCTURAL METAL FRAMING

UCC Permit Application Procedures

Structural Conditions Assessment of Current Lapeer District Schools Administration Building 250 Second Street, Lapeer, Michigan

KORA_Req._for_Eng._Studies_on_Stouffer_Apts. KU Reference No

WALL CONSTRUCTION CHAPTER 6

Garage/Accessory Structures

Earth and Engineering Sciences Building University Park, Pennsylvania

TECHNICAL REPORT 1. Structural Concepts / Structural Existing Conditions. Penn State Hershey Medical Center Children s Hospital. Hershey, Pennsylvania

The Structural Redesign of Boyds Bear Country and its Related Systems. Boyds Bear Country, Pigeon Forge, Tennessee

SFR SUBMITTAL REQUIREMENTS

Mandatory Wood Frame Soft-story Retrofit Program STRUCTURAL DESIGN GUIDELINES

International Code Council

Transcription:

General: Background: An inspection and structural analysis have been performed for the purpose of evaluating the buildings structural systems and components. A full set of structural drawings was utilized for our inspection and analysis. The inspection was done on May 12, 2005. All observable structural systems were inspected for conformance with the original design drawings and for any signs of distress or other conditions which could compromise the building s structural integrity. Many structural elements were covered with finishes or insulation and thus not accessible for inspection. Physical layout: The L shaped building is configured with two sloped roof classroom wings and a high roof gymnasium at their intersection. The wings have a gable profile with a 1 in 12 slope and a ridge running down the center. The south wing terminates into the south side of the east west wing with roof valleys at their intersection. The gym roof is shed configuration with a 1 in 12 slope to the south. Foundations: Description: Foundations are conventional concrete footings founded on undisturbed native soils or compact fill. Building columns are founded on concrete spread footings that are typically 3 0 square by 12 deep. Highly loaded columns have larger footings. Spread footings at perimeter walls are buried with top of footing at 3 0 below exterior grade. 8 concrete foundation walls are utilized around building perimeter. 1 2 wide by 8 deep concrete strip footings are located below foundation wall at classroom wing end walls, stair alcove foundation walls, interior concrete walls, and perimeter walls of gym. Other foundation walls have no strip footing but instead span between column spread footings which are typically spaced at 14 0 on center. Condition: The foundation is buried and could not be inspected but appeared to be performing adequately. Foundation failure would result in settlements that would be evident in the superstructure and no such distress was observed. The foundation system should have a remaining useful life of 25 50 years. The building floor is a 5 thick concrete slab on grade reinforced with welded wire fabric. The slabs condition was good with no sign of unusual cracking, settlement, or other deficiencies. Remaining Life Expectancy: The slab should have a remaining useful life of 25 years. Roof Framing: Description: The classroom wings are framed with tongue and groove timber decking spanning between glue laminated wood beams. 4x6 nominal decking is orientated parallel to the roof ridge and typically spans 14 0 between beams. Decking is supported by 7 x22 ¾ deep glue laminated beams. Each beam is supported by two June 2005 Glacier Valley Elementary School Condition Survey Report Page 34 of 178

pipe steel columns, one at exterior wall and the other at corridor wall. A reduced depth section of beam cantilevers over the corridor wall to ridge at centerline of building. The reduced beam depth allows maximum clearance for mechanical ductwork running below beam and above the corridor ceiling. The gym high roof is framed with tongue and groove timber decking spanning between glue laminated wood beams. 3x6 nominal size decking is orientated east west and typically spans 9 5 ½ between beams. Decking is supported by 11 x 39 deep glue laminated beams. Each beam is supported by two pipe steel columns, one at each end. Inspections indicated the condition of gym roof framing was good. The only framed floor area is a small mechanical mezzanine at south side of gym. This area is essentially an extension of the classroom wing roof framing. Condition: Inspections indicated the condition of classroom wing roof framing was fair. The majority of roof beams were exposed and showed no signs of excessive checking, splitting or distress. The majority of roof decking was obscured. In classrooms, acoustical ceiling tile was adhered directly to bottom of decking and foil faced insulation attached to bottom of decking prevented inspection above the suspended corridor ceilings. The only decking available for inspection were sections that had been replaced during the latest re roof. Past roof leaks had allowed moisture to penetrate and rot some areas of decking. Pieces of the rotted decking had fallen to the suspended corridor ceiling and were observed during our inspection. It was apparent that some areas of decking had experienced severe rot. The replacement decking was exposed from underside and appeared to be in very good condition. The extent of decking that needed to be replaced and the severity of rot observed in the fragments found on top of corridor ceilings leaves some uncertainty about the condition and long term performance of original decking. We understand a complete inspection was done at the time of last re roof and that all questionable decking was replace at this time. We assume all compromised sections of decking were repaired or replaced during the last re roof. The gymnasium roof beams were exposed to view and easy to inspect. They showed no signs of excessive checking, splitting or distress. Most of the decking was obscured by ceiling tile but a section over mechanical mezzanine was exposed and in good condition. Remaining Life Expectancy: The classroom wing roof framing system should have a remaining useful life of 15 25 years. The gym roof framing system should have a remaining useful life of 20 25 years. June 2005 Glacier Valley Elementary School Condition Survey Report Page 35 of 178

Structural Analysis Results and Deficiencies A structural analysis has been completed based on information contained in the original construction drawings and confirmed during our on site inspections. The analysis was based on the 2003 International Building Code. The following deficiencies were found. June 2005 Glacier Valley Elementary School Condition Survey Report Page 36 of 178

0321 1 Typical roof decking and glue laminated beam The original building was designed for a roof snow load of 40 psf. The current code roof snow load is a minimum of 50 psf. A check of the decking and framing indicates that the members typically have the reserve capacity to resist the additional 10 psf. The exception is in the inside corner of the building in the roof framing over the toilets and janitor rooms. Both the existing decking and glue laminated beams are overstressed by 30%. The deck spans in this area should be reduced by adding new glue laminated beams centered between each of the existing beams. This will result in an increase in the capacity of the decking and reduce the loads on the existing beams. The existing valley beam should be replaced with a new glue laminated beam to increase the capacity of the framing. New 3 diameter pipe columns and 2 0 square footings at interior wall locations will be needed. $15,000. See architectural deficiency items for additional costs. June 2005 Glacier Valley Elementary School Condition Survey Report Page 37 of 178

0321 2 Snow drifting adjacent to Gym roof Areas subject to snow drifting around the higher gymnasium roof do not have the additional reserve capacity to carry the dead loads prescribed by today s codes. The deck spans in these areas should be reduced by adding new glue laminated beams centered between each of the existing beams. This will result in an increase in the capacity of the decking and reduce the loads on the existing beams. New 3 diameter pipe columns and 2 0 square footings at interior wall locations will be needed. $38,000. See architectural deficiency items for additional costs. June 2005 Glacier Valley Elementary School Condition Survey Report Page 38 of 178

0321 3 Lack of lateral load resisting system No lateral load resisting system is present in longitudinal direction of wings. Exterior walls are plywood sheathed and could act as shearwalls, but continuous strip windows prevent a continuous load path and eliminate the possibility of using the exterior walls as shearwalls. Corridor walls are gypsum sheathed and could provide some nominal lateral load resistance, however the gypsum sheathing stops just above the ceiling and therefore can not be used as a shearwall. Preliminary wind and seismic calculations indicate that ½ plywood should be added to one side of each of the corridor walls. The sheathing could either be continuous the length of the corridor or installed only on the 24 walls between classroom entry alcoves at approximately each fourth classroom with a minimum of two walls on each side of the corridors each wing. For the discontinuous wall remedy, tie struts need to be created to transfer the lateral loads into the shear walls. The tie struts can be created by installing Simpson CMST16 continuous straps on top of the decking. Simpson PHD2 hold down anchors should be provided at each end of each wall segment to resist the over turning loads. The hold June 2005 Glacier Valley Elementary School Condition Survey Report Page 39 of 178

downs will require the addition of 2 feet square footings at each location. 5/8 drill in adhesive anchors spaced at 32 on center along each of the shear walls is required. $35,000. See architectural deficiency items for additional costs. (photo not available) 0321 4 Insufficient transverse shear walls Shear walls transverse to the direction of the wings are provided on one side of each on the entry corridors. However, the lateral loads exceed the capacity of these shear walls. Additional plywood sheathing should be added to the existing shear walls. This occurs in nine places. The wall on the opposite side of the entry corridors should also be sheathed with ½ plywood each side. This condition occurs in three locations. These walls all tie directly into the existing glue laminated roof beams. Simpson PHD5 hold downs should be provided at each end of these walls. The hold downs are typically located at the existing interior column footings. $17,000. June 2005 Glacier Valley Elementary School Condition Survey Report Page 40 of 178

0321 5 Insufficient sheathing in roof diaphragm to resist lateral loads Description: The initial construction consists of T&G decking without plywood roof diaphragms. In addition, during the re roof project no sheathing was added at that time. The drawings do not indicate how decking is attached. A check of the capacity of the decking diaphragm nailing based on the typical AITC deck nailing methods was done. The typical nailing pattern does not have adequate capacity based on the current shear wall locations. A new layer of ½ sheathing should be applied over all of the existing 3 and 4 T&G decking. It may be feasible to install plywood on the underside of decking if adequate access will be created by other renewal improvements. For example if ceilings, lights and mechanical ductwork will be replaced, it may provide adequate access such that plywood could be attached to underside of roof deck. Another option would be to wait until the next re roof is necessary and install the plywood at this time. $235,000. See architectural deficiency items for additional costs. June 2005 Glacier Valley Elementary School Condition Survey Report Page 41 of 178