Constructed Wetlands

Similar documents
Water Supply in North Texas: Where Does (and Where Will) it Come From?

Indirect Reuse with Multiple Benefits The El Monte Valley Mining, Reclamation, and Groundwater Recharge Project

DRAFT. TO: Stephanie Griffin, P.E. PROJECT: Region C Water Supply Plan Freese and Nichols, Inc.

Forecast Informed Reservoir Operations for Groundwater Recharge Prado Dam

Climate Change and the Future of Groundwater in California: Conjunctive-Use and Aquifer Recharge

State Politics, Water Supply, and Systems Engineering

California s Sustainable GW Management Act and the Orange County Groundwater Basin

Cypress Chamber of Commerce. John Kennedy Executive Director of Engineering & Water Resources Orange County Water District July 11, 2017

DRAFT MEMORANDUM. Water Management Strategies for Tarrant Regional Water District

Groundwater Replenishment with Purified Water Injection Provides Drought Protection & Environmental Benefits

July 18, GEOSCIENCE Support Services, Inc. P.O. Box 220, Claremont, CA Tel: (909) Fax: (909)

Recycled Water Intertie Study. Final Report

Treatment Wetlands: Facilitating the Beneficial Use of Reuse

The Impact of Indirect Reuse on Water Supply Planning

Exploring the Possibilities At Prado Dam

Issues in the Provision of Sanitation Services and Wastewater Reuse Iranian/US Workshop on Water Management

Section 8 Stevinson Water District Study Area

ADOPT A RESOLUTION OF THE CITY COUNCIL IN SUPPORT OF THE CALIFORNIA WATERFIX AND CALIFORNIA ECO RESTORE

Replenishing Groundwater for Sustainability

Reuse Texas Style: Status of Potable Reuse Initiatives in the Lone Star State. Ellen McDonald, Ph.D., P.E. Alan Plummer Associates, Inc.

STORMWATER HARVESTING FOR ALTERNATIVE WATER SUPPLY IN VOLUSIA COUNTY, FLORIDA

Developing Local Resources for Groundwater Replenishment

Business Development Association of Orange County. Nov. 16, Chris Olsen, PE Director of Engineering Orange County Water District

Section 5 Management Goals and Impediments

Water Banking Projects Update for Municipal Water District of Orange County

Appendix J. Existing Efforts for Identifying Multi-Benefit Projects

Tarrant Regional Water District Receives ISI Envision Silver Award

Salinity Management Strategies During Drought

WMWD Western Municipal Water District Customer Handbook to Using Water Efficiently in the Landscape

Jordan River Basin. Planning for the Future. Salt Lake County Watershed Symposium (August 11, 2011) Todd Stonely Utah Division of Water Resources

Recycled Water Managed Aquifer Recharge in California

Coachella Valley Regional Water Management Group (CVRWMG)

Transforming Wastewater to Drinking Water: How Two Agencies Collaborated to Build the World s Largest Indirect Potable Reuse Project

Next Steps in Potable Reuse for Padre Dam. WateReuse San Diego Chapter Meeting October 9, 2013

Water Reuse: Orlando s Experiences & Perspectives. Rick Howard, PE Public Works Director

Texas Water Plan and Region C Water Plan. UTA Water Systems Design Class March 26, 2009

Stormwater Treatment Wetlands

Reutilización de Aguas Residuales en la Agricultura

2009 ANNUAL REPORT OF SANTA ANA RIVER WATER QUALITY

In support of an alternative water supply

California Drought, Water, Parks, Climate, Coastal Protection, and Outdoor Access for All Act of 2018 (Proposition 68) Item 5.7

WATER RESOURCES SUMMARY July 2015

Reclaimed Water Aquifer Storage Recovery: Optimization of Our Freshwater Resources

Brackish Desalination Water Supply Planning for Resiliency and Growth

WATER RESOURCES SUMMARY June 2016 INFLOWS & OUTFLOWS Total for Year to Date - (acre-feet)

June 4, Mr. Arden Wallum General Manager Mission Springs Water District Second Street Desert Hot Springs, CA Dear Mr.

WATER RESOURCES SUMMARY October 2016 INFLOWS & OUTFLOWS Total for Year to Date - (acre-feet)

WATER RESOURCES SUMMARY September 2016 INFLOWS & OUTFLOWS Total for Year to Date - (acre-feet)

WATER RESOURCES SUMMARY November 2016 INFLOWS & OUTFLOWS Total for Year to Date - (acre-feet)

5. Basin Evaluation Salt and Nitrate Balance

Comparative Study on Total Suspended Solids and Nutrients of the Las Vegas Wash Between the Demonstration Weir and its Terminus at the Las Vegas Bay

Meridian s Class A Recycled Water Program

Santa Ana River Wasteload Allocation Model Update

Created in 1924 as a political subdivision of the State of Texas. Primary missions: water supply, flood control and recreation

Pima County Receives A+ for ROMP Upgrades

Aquifer Storage and Recovery: Implementation of a Drought Management Plan

Indirect Potable Reuse for Groundwater Recharge Succession Strategy for Recycled Water

SANTA ANA WATERSHED BASIN STUDY

Wood Canyon Emergent Wetland Project. City of Aliso Viejo 12 Journey, Suite 100 Aliso Viejo, CA 92656

WATER RESOURCES SUMMARY September 2018

Water Supply Report May 4, 2018

Report on Groundwater Recharge in the Orange County Groundwater Basin

APPENDIX I WATER SUPPLY AVAILABLE TO REGION C DRAFT

San Mateo Plain Groundwater Basin Assessment Stakeholder Workshop #8 17 APRIL 2018

Overview of Conjunctive Management in California Let s Have a Frank Discussion

Los Angeles 3 rd Regional

A10. Cost and Benefits Summary

WATER RESOURCES SUMMARY October 2017 INFLOWS & OUTFLOWS Total for Year to Date - (acre-feet)

Carpinteria Valley Water District. Q&A Carpinteria Groundwater Basin (CGB) August 20, 2014

Irvine Ranch Water District s Groundwater Banking Program

Option 11. Divert Water from Miocene and Hendricks Canal to Supply the Ridge

A joint effort of the Orange County Water District and Orange County Sanitation District

Mark R. Norton P.E., LEED AP, ENV SP Water Resources & Planning Manager Santa Ana Watershed Project Authority

Expanding Potable Reuse Opportunities with a New Approach

5. RESOURCE MANAGEMENT STRATEGIES

Sierra Mountains. LA Aqueduct. Supplies Conservation

Orange County Water District. SCAP May 4, 2015

DRAFT Master Water Reclamation Plan. City Council Meeting March 28, 2017

Projected Impacts of Climate Change on Water Resources in the Upper Rio Grande Basin

Building Resiliency to Drought through WaterSMART. Presentation for IFC FLOW 2018 Workshop April 25, 2018

Subsurface Desalination Intake & Potable Reuse Feasibility Studies. TAP Workshop #3 City of Santa Barbara, California October 26, 2016

Santa Ana River Watershed. SAWPA Celeste Cantú April 17, 2012

Public Hearing on. Region C Water Plan. May 25, 2010

WATER RESOURCES SUMMARY April 2015 INFLOWS & OUTFLOWS Total for Year to Date - (acre-feet)

WATER RESOURCES SUMMARY December 2014

WATER RESOURCES SUMMARY September 2014

WATER RESOURCES SUMMARY May 2015

Overview of ENVISION: A Sustainability Rating System for Infrastructure Projects

California Water Commission. June 28, 2018

Hickory Creek 319 grant project City of Denton

Sustainable Water Future for the City of Los Angeles

FEMA s Mitigation Support for Resiliency: Innovative Drought and Flood Mitigation Projects

Putting Title 22 Water to Beneficial Use in the Central Valley

APPENDIX I WATER SUPPLY AVAILABLE TO REGION C

Sustainability of a potable water supply for a

Five Year (2017 to 2022) Deviation to the Prado Dam Water Control Plan and Sediment Management Demonstration Project

Water Tomorrow: Foundational Actions Funding Program Metropolitan Water District of Southern California February 23, 2017

APPENDIX I WATER SUPPLY AVAILABLE TO REGION C

Farmington Dam Repurpose Project

Reservoir Operation Constraints and Opportunities, from the perspective of the Bureau of Reclamation

Transcription:

Constructed Wetlands A Tool to Improve Water Supply Sustainability for the SBV Water Conservation District WESTCAS Annual Conference June 16-18, 2010 R. Robert Neufeld San Bernardino Valley Water Conservation District Timothy J. Noack, P.E. Alan Plummer Associates, Inc.

SBV Water Conservation District Background SBVWCD water supply operations History Spreading Basins Seven Oaks Reservoir Borrow Pit

SBV Water Conservation District Background (cont d) Spreading basin issues Decreased percolation rates Sediment Organic mats Higher O&M costs Endangered species complicates adding more basins Borrow Pit Seven Oaks Reservoir

SBV Water Conservation District Borrow pit issues Background (cont d) Decreased percolation rates Soil compaction Deposition of fines Fault barrier A possible solution Constructed wetland

Constructed Wetlands and Water Supply OCWD TRWD CCWA

Huie & Panhandle Wetlands Clayton County Water Authority, GA Metro Atlanta area; indirect potable reuse Previously utilized forested LAS Hydraulic limitations on LAS Converting to wetlands increased capacity Huie site Converted portion of LAS to wetlands Panhandle site Converted all of LAS to wetlands

Benefits Huie & Panhandle Wetlands Clayton County Water Authority, GA Continued reliable water supply during droughts Lower energy costs Protected green space Public support

G. W. Shannon Water Recycling Wetland Richland-Chambers Reservoir Tarrant Regional Water District, TX TRWD service area western half DFW metroplex Indirect potable reuse Multi-phase project Goal water quality improvement

Trinity River (before wetland treatment)

Outflow of TRWD Field Scale Wetland (after wetland treatment)

G. W. Shannon Water Recycling Wetland Richland-Chambers Reservoir Tarrant Regional Water District, TX Benefits Effectively reduces TSS & nutrients Operational Flexibility Drought-Proofs reservoir Public use through TPWD

Prado Wetlands Orange County Water District, CA 465 ac wetlands behind Prado Dam Primary goal - remove nitrogen Removes approx 20 tons nitrate per month Summer reduces NO3-N from approx 10 to < 1 mg/l

Other Benefits Prado Wetlands Orange County Water District, CA Compliments riparian habitat supporting T&E species Cost effective nitrogen removal Effective in attenuating some PPCPs (NWRI, 2010)

Tailoring a Constructed Wetland to the SBVWCD Site Utilize borrow pit to maximum extent Convert pit to wetlands Improve function of the footprint Utilize existing basins in pit

Conceptual Layout NORTH Stage III Stage II Stage I Spreading Basins Pump Station Recharge Pools Wetland Cells

Operational Modes for SBVWCD Wetland Potential source water Releases from Seven Oaks Reservoir Diverted natural surface flows (SAR) Imported water (SWP) Recycled water from nearby WRFs (with appropriate blending) Aggregate production wash water

Operational Modes for SBVWCD Wetland BORROW PIT Reservoir Releases or Diverted River Storm Flows Wetland Treatment System Recharge Pool Spreading Basins OR Imported Water (SWP) Aquifer OR Aggregate Wash Water

SECONDARY DILUENT SOURCE PRIMARY DILUENT SOURCES Operational Modes for SBVWCD Wetland BORROW PIT Recycled Water* Wetland Treatment System Recharge Pool Spreading Basins Reservoir Releases Aquifer Aggregate Production Wash Water Imported Water NOTE: The recycled water contribution should be in compliance with California regulations

Benefits of a SBVWCD Wetland Improves quality of water from reservoir Percolation improves Lower maintenance needs Opportunity to use other local water sources Reduce need to purchase imported water More consistent ( drought-proof ) inflows Creates wetland habitat Green space amenity Eco-tourism Possible mitigation bank

Moving It Forward Currently completed conceptual-level design Further studies Evaluate regulatory issues Permits, water rights, etc. Water source/water quality studies Inflow frequency, identify WQ constituents Prelim geotech investigation (dev. costs) Pilot scale wetland Identify funding Coordination with nearby private developments Park land credits

Questions? R. Robert Neufeld 909.793.2503 rrneufeld@sbvwcd.dst.ca.us Timothy J. Noack, P.E. 214.631.6100 tnoack@apaienv.com

G. W. Shannon Water Recycling Wetland Richland-Chambers Reservoir Tarrant Regional Water District, TX Parameter Total Suspended Solids Mass Removal Rate (lbs/acre/day) Field- Scale Pilot- Scale Percent Mass Removed (%) Field- Scale Pilot- Scale 103 55 96 95 Total Nitrogen 1.33 1.19 66 82 Total Phosphorus 0.20 0.17 43 66