Energy Trigger (A Existing Building Upgrade Mechanism Model)

Similar documents
IECC 2015 with Hawaii Amendments COMMERCIAL DESIGN CHECKLIST

IECC 2006 with Hawaii Amendments

IECC Commercial Significant Changes Summary Tier I

Dayton Chapter February 9, Bob Thomson, P.E., LEED-AP, CDT

COMcheck Software Version Envelope Compliance Certificate

2012 Ontario Building Code Requirements for New Construction. Bradford West Gwillimbury Building Division March 5, 2012

OBC SB-10 AND ASHRAE COMPLIANCE SUMMARY

ANSI/ASHRAE/IESNA Standard /2001/2004 Energy Standard for Buildings Except Low-Rise Residential Buildings

2009 IECC Chapter 1 Additions, alterations, renovations or repairs.

IECC 2006 with Hawaii Amendments

Code Change Review Summary

PART 9 ENERGY EFFICIENCY AND VENTILATION REQUIREMENTS (For Single and Two Family Dwellings)

FOR ADDITIONS and REMODELS Before filling out this application, read Green Building & Green Points Guideline Booklet for more in-depth information.

Residential Data Collection Checklist 2009 International Energy Conservation Code Climate Zone 2

Florida HERO Program Residential Eligible Product List All Products

CONSTRUCTION DOCUMENTS NECESSARY FOR PLAN REVIEW

Development and Introduction to the 2012 North Carolina Energy Conservation Code

Energy Code Compliance It s the Law

Retail Effects of ANSI/ASHRAE/IES Standard

Uniform Construction Code

Date Rater Verified. Rater Verified. Slab / Pre-Drywall / Thermal Inspection

A Closer Look Inspection Service 2015 IECC Residential DFW area handout

FLORIDA BUILDING CODE Energy Code (Residential) 6 TH Edition (2017) Chapter 1 [RE]: Scope and Administration

Next Connecticut Energy Code

IECC Residential Significant Changes Summary. Tier I

ENERGY STAR Qualified Homes National Program Requirements, Version 3.0

Appendix B. Certification of Intent to Comply

ONTARIO BUILDING CODE AND SUPPLEMENTARY STANDARD SB-10 PROJECT INFORMATION. Mechanical Designer Information*

Training Certification Categories

Charter Township of Washington

Village of Gurnee Construction Documents Submittal Requirements

City of Omaha Plans and Permits Commercial Alterations and Conversions Building Permit Submittal Checklist

2015 Michigan Residential Code Energy Worksheet for Single-family Additions, Alterations, Renovations and Repairs

Gerald R. Ford Museum

COMMERCIAL ENERGY EFFICIENCY

2016 ASHRAE 90.1 Summary of Important Changes

2015 Michigan Residential Code Energy Worksheet for New Single-family Residential Building

Changes to the Minnesota Commercial Energy Code. Presented by: Andy Thielen, PE

2015 MICHIGAN UNIFORM ENERGY CODE Effective: February 8, 2016

Implementing Low-Cost Energy Savings Projects & Conducting Energy Audits

2018 International Energy Conservation Code Updates

Applying Energy Code to Existing Buildings

2015 Michigan Residential Code Energy Worksheet for New Single-family Residential Building

Feature Zone IECC 2009 IECC

2014 British Columbia Building Code Changes

Energy Star Qualified - New Homes

By James Tente, MCP, CBO,CFM

Town of Farragut RESIDENTIAL CONSTRUCTION ENERGY EFFICIENCY. LAST UPDATE: July 03, 2014

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS

2018 International Energy Conservation Code (IECC) Updates

Rebates for Improvements Home Efficiency Program Fort Collins Utilities

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 9/30/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

2009 IECC with St Louis Amendments. Fenestration U-factor Skylight U-factor Glazed fenestration SHGC NR 0.

APPENDIX 3C DOMINION HOTEL SPECIFICATIONS

E d u c a t i o n a l S e m i n a r s f o r B u i l d i n g & R e s i d e n t i a l C o d e

CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist

National Energy Code for Buildings 2011

DOE Zero Energy Ready Home National Program Requirements (Rev. 06) April 20, 2017

2015 IECC Air Sealing Multifamily For Code Compliance Funding for Energy Code Training

The New York City Energy Conservation Code Fall, 2010

Inspection requests submitted by 2:30pm will be scheduled for the following business day unless otherwise requested.

INFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS

Building Permits A Guide for Homeowners

Energy Efficiency: Designing Wood-Frame Buildings for Occupant Comfort

HERO Program Residential Eligible Product List California Residential Eligible Products... 2

Sonoma County Energy Independence Program APPENDIX A ELIGIBLE IMPROVEMENTS

Instructions for the Residential Building Data Collection Checklist 2009 International Energy Conservation Code with 2011 Georgia Amendments

General Contractor: Company Name: Location of Proposed Structure: Tax Map #: Lot #:

Appendix E-1f: Small Building Methodology for Pre-SB2030 Projects

Energy Efficiency Requirements 9.36

ATS Le Grandiose, Sector 150 Noida. Energy Conservation Building Code (ECBC) Compliance Report

California HERO Program Residential Eligible Product List All Products

IECC - RESIDENTIAL - ENERGY TAC

Secondary Suite This form is used for both existing and new construction of a secondary suite in an existing structure

Building Permit Application

SectIon Energy Effldency

Green Building Guideline of Jordan

2012 INTERNATIONAL ENERGY CONSERVATION CODE ADOPTION TOOLKIT OCTOBER 2012

UNIFORM CODE ADMINISTRATION AND ENFORCEMENT REPORT (REPORTING YEAR: 2018)

REScheck Software Version Compliance Certificate

SPARTANBURG COUNTY BUILDING CODES DEPARTMENT

COMMISSIONING, OPERATION AND MAINTENANCE

Compliance Certificate

1. PREINSPECTION RESIDENTIAL ENERGY EFFICIENCY 7

Manitoba Energy Code for Buildings. Part 3 Building Envelope

OR LEGAL DESCRIPTION PLAN: BLOCK: LOT: APPLICANT / CONTACT:_ INSPECTION RESULTS TO BE MAILED TO THIS ? YES NO

Connecticut Housing Finance Authority. Construction Guidelines: Energy Conservation 2018

Permit Application Commercial / Industrial / Multi-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE

Boulder City NV Prepared by (Print Name) Signature Date

1. Each of the following is a compliance path option for energy conservation code compliance for Residential Buildings except.

2018 International Energy Conservation Code Updates

Town/City: State: Zip: Town/City: State: Zip: Phone: Cell: Phone: Cell:

Standards for Jackson EMC s Right Choice Program Revised: June 2011

The National Energy Code - Hope and Peril

STATEMENT OF DESIGN (for Part 3 Buildings) Ont. Reg. 332/12

AVOIDING 2015 MINNESOTA ENERGY CODE VIOLATIONS

Green Building Roundtable: Current Construction Techniques and Deep Energy Retro-Fits January 8, 2010

Residential Energy Credits

A Summary of the Basic Duties of Maintenance, Repair and Replacement for CARRIAGE PARK CONDOMINIUM ASSOCIATION

Green Building Guideline of Jordan

Transcription:

Trigger (A-11.2.1.2 Existing Building Upgrade Mechanism Model) Applicability All Building Permit applications for projects related to existing buildings are required to follow the energy upgrade trigger process with the following exceptions; i) Buildings categorized as; i. 1 and 2 Family Dwellings, or ii. Temporary Building/Use (< 1 year) ii) iii) Buildings designed and constructed to; i. ASHRAE 90.1-2007, or ii. ASHRAE 90.1-2010, or iii. NECB 2011 Projects categorized as; i. Interior Demolition: Scope of work is limited to interior alterations involving removal of non-load bearing walls, fixed millwork and related electrical/plumbing so that the space reverts back to a shell state that is not occupied. Future tenant improvement work and building permit will be required for occupancy of this space at which time Part 11 energy upgrades will be triggered. ii. iii. iv. Subdividing Existing Commercial Space: Scope of work of an existing office or retail space is being subdivided into small units. A new space is created as an empty (shell) space that is not occupied. Future tenant improvement work and building permit will be required for occupancy of this space at which time Part 11 energy upgrades will be triggered. Repair (Fire, Flood, Leak): Scope of work is different from "Repair" under Part 11's Flow Chart No.1 which is based on normal operation's wear and tear. This Repair work can be due to fire, flood, water leak, etc. where additional work triggered by Part 11 may be onerous and not covered by insurance. Re and Re Work (Remove and Replace): Scope of work is limited to the removal and replacement of existing appliance(s) or plumbing fixtures, typically within condominiums. Work comprises of replacing a tub, basin, kitchen sink, etc. but does not involve alterations to interior walls. However, renovations or overhauling of kitchen or washroom is not considered Re and Re Work. v. Minor Alterations: Scope of work is deemed as very minor, such as installing hand/mop sink to meet Health Department requirements. Acceptance of exemption under this category is at the discretion of the CBO, or the CBO's representative. vi. Site / External Alterations: Scope of work is outside the building envelope and independent of the building s operations. Examples include site work, canopy or awning installation, drainage, and surface parking lot work including parking lot/parkade kiosk upgrades.

Voluntary Upgrade ( Criteria) The Voluntary Upgrade option is applicable when the entire scope of work consists of the upgrading of energy related equipment and/or components as listed below. Any additional work not directly related to the upgrading of energy related equipment and/or components, negates the Voluntary Upgrade option. The intent of the Voluntary Upgrade exemption is to allow buildings to voluntarily upgrade energy related equipment or components without triggering additional upgrade requirements in any of the trigger categories. Certain conditions apply. i) All energy related equipment being replaced must be replaced with either; a) a more efficient model recognised in its class as high efficiency, or b) the most efficient model. ii) Equipment: All energy related components being replaced must be replaced with components that meet or exceed present Vancouver Building By-Law requirements. The addition or replacement of any of the following energy related equipment is eligible for the Voluntary Upgrade exemption; Boilers, Furnaces, Hot Water Tanks, Motors (including variable speed) Lighting Systems, Reduction Sensors (occupancy sensors, day-lighting sensors, etc.) Renewable Systems Photovoltaic system Solar Thermal system Biofuel-based system Geothermal Heating system Geothermal Electric system Wave & Tidal Power system High Performance Systems Ground Source Heat Pump system Air Source Heat Pump system Waste Heat Recovery system Components: The addition or replacement of any of the following energy related components are eligible for the Voluntary Upgrade exemption; Any component of a building s envelope

PROJECT TYPES AND THEIR RELATED CATEGORIES OF WORK REHABILITATION PROJECT TYPE (Flow Chart No. 1) REPAIR Repair pertains to a limited scope of interior or exterior renovation work to replace existing building components with functionally equivalent components. Repair work may not include work that increases the usable floor area of a building, creates an interconnected floor space, supports an addition or change of use, or the consolidation of more than one existing suite into a single tenant space. If the renovation includes other categories of work or project types such as a change of major occupancy classification or an addition, then the most restrictive upgrade levels from all project types would be applied. For Repairs, an E1 level of energy upgrade shall be applied. SMALL SUITE The upgrade trigger Small Suite pertains to limited renovation work within a small suite as defined in Division A, Article 1.4.1.2. Small Suite work may include reconfiguration of the interior space of the suite, but may not include work on more than level (storey or mezzanine), interconnected floor spaces, exterior renovations, or the consolidation of more than one existing suite into a single new tenant space. If the renovation includes other categories of work or project types such as a change of major occupancy classification or an addition, then the most restrictive upgrade levels from all project types would be applied. For Small suite renovations, an E2 level of energy upgrade shall be applied. MINOR RENOVATION Minor renovations mean work within a single tenant space which may occupy multiple levels in a building. Minor renovations may include reconfiguration of the interior space of the suite as well as exterior renovations or the consolidation of more than one existing suite into a single new tenant space; however, a change of major occupancy classification is not considered to be a minor renovation type project. Where the renovation includes a new interconnected floor space or a new mezzanine, this work would not be considered to be a minor renovation. New mezzanines are considered to be additions. If the renovation includes other categories of work or project types such as a change of major occupancy classification or an addition (mezzanine), then the most restrictive upgrade levels from all project types would be applied. MAJOR RENOVATION Major renovations means work which may include (singly or in combination): Interior re-configuration of multiple tenant spaces, interconnected floor spaces, exterior alterations, or alterations that create more than one new tenant space. However, where such renovation includes a change of major occupancy classification or a new mezzanine, this work would not be considered as a major renovation. New mezzanines are considered to be additions. If the renovation includes other categories of work or project types such as a change of major occupancy classification or an addition (mezzanine) then the most restrictive upgrade levels from all project types would be applied. RECONSTRUCTION - Reconstruction means any project where: extensive renovations are being carried on throughout the entire building and the building is completely gutted; where all drywall and plaster has been removed from the interior walls; all drywall, plaster, insulation and exterior cladding has been removed from the exterior walls ; and all floor and roof membranes and coverings have been removed. Reconstruction also includes substantial reconfiguration of the interior floor space. Reconstruction means exposing the primary structure of the building on all interior and exterior walls, floors and roof with only the primary structural elements remaining in place (the building skeleton). Where work which might otherwise be considered as reconstruction, is undertaken solely to facilitate the repair of a building due to envelope damage, insect infestation, mould abatement or asbestos abatement, then the work would not be considered a reconstruction: it would be considered a repair, minor renovation or a major renovation as defined in this By-law.

FLOW CHART NO. 1 Rehabilitation Project (Flow Chart #1) Voluntary Upgrade Repair/ Small Suite Minor Renovation Major Renovation Reconstruction NA NA Non- NA NA NA F1 S1 Non- N1 A1 E1/E2 F1 S2 Non- N1 A2 E2 F2 S2 Non- N3 A3 E4 F4 S4 Non- N4 A4 E6

CHANGE OF MAJOR OCCUPANCY CLASSIFICATION PROJECTS (Flow Chart No. 2) Change of Major Occupancy Classification Change of major occupancy classification means a change of use within a building, a suite, or its constituent floor areas where the proposed use is outside of the defined uses of the existing major occupancy classification permitted for the building, the suite, or its constituent floor areas. Small Suite Change of Major Occupancy Classification Small suite change of major occupancy classification means a change of use within a small suite, or its constituent floor areas where the occupant load for the entire suite does not exceed 60 persons and the small suite is limited to a Group A, Division 2, Group D, Group E, Group F, Division 2 (wholesale showroom), or Group F, Division 3 major occupancy. FLOW CHART NO. 2 Change of Major Occupancy Project (Flow Chart #2) Cumulative 5 Year Limit Exceeded? Small Suite? Did Hazard Index Increase? Yes No Yes No No Yes F4 S4 Non- N4 A4 E3 F1 S1 Non- N1 A1 E1 F2 OL increase<50% = S3 OL increase>50% = S4 Non- N3 OL increase<50% = A3 OL increase>50% = A4 E3 F4 OL increase<50% = S3 OL increase>50% = S4 Non- N4 OL increase<50% = A3 OL increase>50% = A4 E4

ADDITION PROJECTS (Flow Chart No. 3) Horizontal Horizontal additions include both minor and major horizontal additions. A minor horizontal addition is any expansion of a floor area beyond the extents of the existing floor area in which it is located by not more than 25 per cent of the existing building area, or by not more than 500 m 2 in aggregate floor area. A major horizontal is any expansion of a floor area beyond the extents of the existing floor area in which it is located by more than 25 per cent of the existing building area, or by more than 500 m 2 in aggregate floor area. Any construction creates new floor area that in-fills existing roof or deck areas, or is superimposed over existing building structure or floor area is not considered a horizontal addition. Vertical Vertical additions include both minor and major vertical additions. A minor vertical addition is the addition of new floor area (storey or mezzanine) that in-fills existing roof or deck areas, or is superimposed over existing building structure or floor area, with an aggregate floor area increase of not more than 25 per cent of the building area, or by not more than 500 m 2 in aggregate building area. A major vertical addition is an addition that increases the aggregate floor areas or mezzanine area increase of not more than 25 per cent of the existing building area or increases the total aggregate floor area by more than 500 m 2. FLOW CHART NO. 3 Project (Flow Chart #3) Horizontal Vertical Minor Horizontal Major Horizontal Minor Vertical Major Vertical F2 S1 Non- N2 A1 E2 F3 S2 Non- N4 A2 E3 F2 S2 Non- N3 A2 E2 F4 S4 Non- N4 A4 E5

Efficiency Table E1 E2 E3 BOMA BESt (Path 1) BOMA BESt (Path 2) MENU - Choose and complete all of the following; OR MENU - Choose and complete all of the following; OR MENU - Choose and complete all of the following; 1 @ L1 Requirements 1 @ L2 Requirements 1 @ L3 Requirements E4 E5 E6 BOMA BESt (Path 2) BOMA BESt (Path 2) OR MENU - Choose and complete all of the following; OR MENU - Choose and complete all of the following; L7 1 @ L4 Requirements 1 @ L6 Requirements

Trigger Acceptable Solutions BOMA BESt The intent of the inclusion of the BOMA BESt rating system is to recognise the efforts made towards improved building performance. Certain conditions apply: i) BOMA BESt certification is to be administered by BOMA. ii) As per all other E paths, the BOMA BESt path needs to show advancement over time using the following criteria for; BOMA BESt Path 1 - BOMA BESt (Level 1, 2, 3, 4) o Requires proof of; valid Certification, and ongoing commissioning per BOMA s BESt Practice Q.3 (Preventative Maintenance Program) BOMA BESt Path 2 - BOMA BESt (Level 1-AL2, 2, 3, 4) o Requires proof of; first-time Certification (to at least Level 1 with ASHRAE Level 2 audit) within the previous 18 months, or valid Certification, and an increase in BOMA BESt s Performance Benchmark Scale by at least one level within the previous 18 months, or advancing Certification (from one level to another) within previous 24 months. Proof may be accepted in the form of; - official Certification documentation produced by BOMA, - a single Commissioning/ Report developed and provided by a qualified consultant, contractor, or other subject-matter expert

TABLE A-11.2.1.2.D Alternative Acceptable Solutions for Efficiency L Level Sections Alternative Acceptable Solution Options Envelope 1) Reduce air leakage of all Vestibules (per 5.4.3.4 of ASHRAE 90.1 2) Upgrade all Opaque Doors performance (per 5.5.3.6 of ASHRAE 90.1-1) Upgrade Dead Band settings (per 6.4.3.1.2 of L1 HVAC 2) Upgrade Set-point Overlap Restrictions (per 6.4.3.2 of ASHRAE 90.1-3) Upgrade Off-Hour Controls (per 6.4.3.3 of 4) Upgrade Ventilation System Controls (per 6.4.3.4 of ASHRAE 90.1-5) Upgrade Heat Pump Auxiliary Heat Controls (per 6.4.3.5 of ASHRAE 90.1-6) Upgrade Freeze Protection and Snow/Ice Melting Systems (per 6.4.3.8 of 7) Upgrade Ventilation Controls For High-Occupancy Areas (per 6.4.3.9 of 8) Upgrade Single Zone VAV Controls (per 6.4.3.10 of 9) Upgrade Heat and Cool Limitation (per 6.5.2.1 of 10) Inspect and remediate HVAC Insulation (per 6.4.4.1 of ASHRAE 90.1-11) Inspect and remediate Duct and Plenum Leakage (per 6.4.4.2 of SWH 1) Upgrade all SWH Piping Insulation (per 7.4.3 of L2 Lighting Envelope HVAC SWH 1) Upgrade internal Exit Signs to not exceed 5W per face (per 9.4.2 of 2) Functional Testing (per 9.4.4 of 1) Reduce air leakage of all Loading Dock Doors (per 5.4.3.3 of ASHRAE 90.1-2) Upgrade all Floor Insulation (per 5.5.3.4 of 3) Reduce total Skylight Fenestration/Glazing Area to 5% of gross roof area (per 5.5.4.2.2. of 1) Clean and Balance all Air Systems (per 6.7.2.3.2 of 2) Balance all Hydronic Systems (per 6.7.2.3.3 of 1) Upgrade SWH system Temperature Controls (per 7.4.4.1 of ASHRAE 90.1-2) Upgrade SWH system Temperature Maintenance Controls (per 7.4.4.2 of

3) Upgrade SWH system Outlet Temperature Controls (per 7.4.4.3 of 4) Upgrade SWH system Circulating Pump Controls (per 7.4.4.4 of ASHRAE 90.1-5) Upgrade Pool systems (per 7.4.5 of 6) Upgrade pipe risers to incorporate Heat Traps (per 7.4.6 of ASHRAE 90.1-1) Upgrade to incorporate Automatic Lighting Shutoff (per 9.4.1.1 of 2) Upgrade to incorporate Space Control systems (per 9.4.1.2 of ASHRAE 90.1-3) Upgrade to control Parking Garage Lighting (per 9.4.1.3 of ASHRAE 90.1 - Lighting 4) Upgrade all Automatic Daylighting Controls for Primary Sidelighted Areas (per 9.4.1.4 of 5) Upgrade all Automatic Daylighting Controls for Toplighting (per 9.4.1.5 of 6) Upgrade to incorporate al Controls for specialized lighting (per 9.4.1.6 of 7) Exterior Lighting Control (per 9.4.1.7 of 8) Reduce total Skylight Fenestration/Glazing Area to 5% of gross roof area (per 5.5.4.2.2. of 1) Provide a Building Envelope Assessment Report, to be signed and sealed by a design professional, report to include: effective R-value, blower test, list of upgrades to achieve a compliance rating using the latest COMcheck software version. 2) Reduce air leakage of all Fenestration & Doors (per 5.4.3.2 of ASHRAE 90.1 - Envelope 3) Upgrade all Below-Grade Wall Insulation (per 5.5.3.3 of ASHRAE 90.1 - L3 4) Inspect and remediate all ceiling/attic space equipment and services including ductwork, plumbing, insulation, penetrations, dampers, valves, coils, pans and drains. HVAC 5) Inspect and remediate all floor/crawl space equipment and services including ductwork, plumbing, insulation, penetrations, dampers, valves, coils, pans and drains. 1) Provide an HVAC System Assessment Report, to be signed and sealed by a design professional. Report to include: systems reviews, upgrade and recommissioning options, with estimates for energy savings and cost paybacks. 2) Upgrade all ducts, plenums, and insulation (per 6.4.4 of ASHRAE 90.1 - ; inspect and remediate HVAC Insulation (per 6.4.4.1 of ASHRAE 90.1 - ; and inspect and remediate Duct and Plenum Leakage (per 6.4.4.2 of

3) Incorporate Exhaust Air Recovery systems (per 6.5.6.1 of ASHRAE 90.1-4) Incorporate a Service Water Heating Recovery system (per 6.5.6.2 of 5) Upgrade all Kitchen Exhaust and Replacement Air systems (per 6.5.7.1 of 6) Upgrade all Laboratory Exhaust and Replacement Air systems (per 6.5.7.2 of 7) Balance all systems (per 6.7.2.3 of ; clean and balance all air systems (per 6.7.2.3.2 of ; balance all hydronic systems (per 6.7.2.3.3 of 1) Provide an SWH System Assessment Report, to be signed and sealed by a design professional Report to include: systems reviews, upgrade and re-commissioning options, with estimates for energy savings and cost paybacks. SWH Lighting 2) Upgrade SWH system Controls (per 7.4.4 of Upgrade SWH system temperature controls (per 7.4.4.1 of ASHRAE 90.1 - Upgrade SWH system Temperature Maintenance Controls (per 7.4.4.2 of Upgrade SWH system Outlet Temperature Controls (per 7.4.4.3 of Upgrade SWH system Circulating Pump Controls (per 7.4.4.4 of 1) Provide a comprehensive Lighting System Assessment Report to be signed and sealed by a design professional Report to include: systems reviews, upgrade options, with estimates for energy savings and cost paybacks. 2) Upgrade total Exterior Lighting Power of the building (per 9.4.3 of 3) Meet the interior lighting power allowance by the Building Area Method of the suite (per 9.5 of 4) Meet the interior lighting power allowance by the Space-by-Space Method of the suite (per 9.6 of

1) Reduce air leakage of entire Building Envelope (per 5.4.3 of ASHRAE 90.1 - ; reduce air leakage of all Fenestration & Doors (per 5.4.3.2 of Reduce air leakage of all Loading Dock Doors (per 5.4.3.3 of ASHRAE 90.1 - Reduce air leakage of all Vestibules (per 5.4.3.4 of ASHRAE 90.1-2) For single retail/tenant spaces < 500 sq.m.) Perform an Air Leakage / Blower test and remediate 3) Upgrade all Roof Insulation (per 5.5.3.1 of Envelope 4) Upgrade all Above-Grade Wall Insulation (per 5.5.3.2 of ASHRAE 90.1 - L4 HVAC 5) For single retail/tenant spaces < 500 sq.m.) Replace storefront window(s) to meet the By-law. 6) Reduce total vertical Fenestration/Glazing Area to 40% of gross wall area (per 5.5.4.2.1 of 7) Upgrade all Fenestration/Glazing Performance (per 5.5.4.3 and 5.5.4.4 of 8) Inspect and remediate roof systems including membrane, parapets, scuppers, drains, gutters, downspouts and drains. 1) Upgrade all Zone Thermostatic Controls (per 6.4.3 & 6.5.2.1 of ASHRAE 90.1 - Upgrade Dead Band settings (per 6.4.3.1.2 of Upgrade Set-point Overlap Restrictions (per 6.4.3.2 of ASHRAE 90.1 - Upgrade Off-Hour Controls (per 6.4.3.3 of Upgrade Ventilation System Controls (per 6.4.3.4 of ASHRAE 90.1 - Upgrade Heat Pump Auxiliary Heat Controls (per 6.4.3.5 of ASHRAE 90.1 - Upgrade Freeze Protection and Snow/Ice Melting Systems (per 6.4.3.8 of Upgrade Ventilation Controls For High-Occupancy Areas (per 6.4.3.9 of Upgrade Single Zone VAV Controls (per 6.4.3.10 of ASHRAE 90.1 - Upgrade Heat and Cool Limitation (per 6.5.2.1 of ASHRAE 90.1-2) Upgrade HVAC to incorporate Economizers (per 6.5.1 of ASHRAE 90.1-3) Upgrade Heat Rejection Equipment (per 6.5.5 of 4) Upgrade to Air and Service Water Heating Heat Recovery systems (per 6.5.6 of Incorporate Exhaust Air Recovery systems (per 6.5.6.1 of ASHRAE 90.1 - Incorporate a Service Water Heating Recovery system (per 6.5.6.2 of 5) Upgrade entire Radiant Heating system (per 6.5.8 of ASHRAE 90.1 -

L5 L6 SWH Lighting Envelope HVAC SWH Lighting Envelope 6) (Re-)Commission all systems (per 6.7.2.4 of 1) Upgrade all Service Water Heating Equipment Efficiency (per 7.4.2 of 1) Lighting Control (per 9.4.1 of Upgrade to incorporate Automatic Lighting Shutoff (per 9.4.1.1 of Upgrade to incorporate Space Control systems (per 9.4.1.2 of Upgrade to control Parking Garage Lighting (per 9.4.1.3 of ASHRAE 90.1 - Upgrade all Automatic Daylighting Controls for Primary Sidelighted Areas (per 9.4.1.4 of Upgrade all Automatic Daylighting Controls for Toplighting (per 9.4.1.5 of Upgrade to incorporate al Controls for specialized lighting (per 9.4.1.6 of Exterior Lighting Control (per 9.4.1.7 of 1) Upgrade insulation levels of entire Building Envelope (Opaque Areas) (per 5.5.3 of Upgrade all Roof Insulation (per 5.5.3.1 of Upgrade all Above-Grade Wall Insulation (per 5.5.3.2 of ASHRAE 90.1 - - Upgrade all Below-Grade Wall Insulation (per 5.5.3.3 of ASHRAE 90.1 - Upgrade all Floor Insulation (per 5.5.3.4 of Upgrade all Opaque Doors performance (per 5.5.3.6 of ASHRAE 90.1-2) Upgrade all Fenestration/Glazing (per 5.5.4 of (For single retail/tenant spaces 500 m 2 ) Replace storefront window(s) to meet Table 5.5-5 of ASHRAE 90.1-2010. Reduce total vertical Fenestration/Glazing Area to 40% of gross wall area (per 5.5.4.2.1 of Reduce total Skylight Fenestration/Glazing Area to 5% of gross roof area (per 5.5.4.2.2 of Increase total Skylight Fenestration/Glazing Area (per 5.5.4.2.3 of Upgrade all Fenestration/Glazing Performance (per 5.5.4.3 and 5.5.4.4 of 1) Upgrade all HVAC Controls, Insulation and Leakage (per 6.4 of ASHRAE 90.1-1) Upgrade Service Water Heating system to meet the Mandatory Provisions (per 7.4 of ; Upgrade all Service Water Heating Equipment Efficiency (per 7.4.2 of 1) Upgrade Lighting system to meet the Mandatory Provisions (per 9.4 of 1) Upgrade all aspects of Building Envelope (per Section 5 of ASHRAE 90.1 - HVAC 1) Upgrade all aspects of HVAC (per Section 6 of SWH 1) Upgrade all aspects of SWH (per Section 7 of Lighting 1) Upgrade all aspects of Lighting (per Section 9 of L7 1) Upgrade existing building (per Part 10)