PEND OREILLE RIVER, WASHINGTON

Similar documents
Hydropower Project Summary SULTAN RIVER, WA HENRY M JACKSON HYDROELECTRIC PROJECT (P-2157) This summary was produced by the

WEST ROSEBUD CREEK, MONTANA

KANAWHA RIVER, WEST VIRGINIA

ST. LAWRENCE RIVER, NEW YORK

Hydropower Project License Summary KERN RIVER, CA KERN CANYON HYDROELECTRIC PROJECT (P-178) This summary was produced by the

Hydropower Project License Summary PIT RIVER, CA PIT 1 HYDROELECTRIC PROJECT (P-2687) Pit River below Pit 1 Powerhouse

Hydropower Project Summary YADKIN, NC W. KERR SCOTT HYDROELECTRIC PROJECT (P-12642) This summary was produced by the. Hydropower Reform Coalition.

Hydropower Project License Summary YADKIN AND PEE DEE RIVERS, NORTH CAROLINA YADKIN-PEE DEE HYDROELECTRIC PROJECT (P-2206)

SOUTH FORK AMERICAN RIVER (CHILI BAR), CALIFORNIA

MONONGAHELA RIVER, WV

Hydropower Project License Summary CHIPPEWA RIVER, WI JIM FALLS HYDROELECTRIC PROJECT (P ) This summary was produced by the

ONTONAGON RIVER BOND FALLS HYDROELECTRIC PROJECT (P-1864)

CLARK FORK HYDROELECTRIC PROJECT LIHI APPLICATION FOR CERTIFICATION INTRODUCTION

SUMMARY OF 2010 WATER QUALITY MONITORING RESULTS WITHIN THE PRIEST RAPIDS HYDROELECTRIC PROJECT

AU SABLE RIVER. a. Foote (P-2436) A dam containing two existing earth fill embankment sections, a concrete

Low Impact Hydropower Institute AMENDED Application for Low Impact Hydropower Certification: Island Park Hydroelectric Project

Yale Hydroelectric Project FERC Project No APPLICATION FOR NEW LICENSE FOR MAJOR PROJECT Volume I

DEAD RIVER DEAD RIVER HYDROELECTRIC PROJECT (P-10855)

New Hydro without a new Dam NWHA FEBRUARY 16, 2016

Further information of project proposals is available on the World Wide Web at:

APPENDIX E TO SULLIVAN CREEK SETTLEMENT AGREEMENT MILL POND DECOMMISSIONING PLAN

Grafton Hydro, LLC. 55 Union Street, 4 th Floor Boston, MA, USA Tel: Fax: October 9, 2015

Newport/Sullivan Lake Ranger Districts

INTRODUCTION AND BACKGROUND

TOLEDO BEND PROJECT FERC NO DRAFT LICENSE APPLICATION EXHIBIT E - ENVIRONMENTAL EXHIBIT 2.0 PROPOSED ACTION AND ALTERNATIVES

Takatz Lake Project - Alaska

Columbia River Operations Summary

KILARC RESERVOIR PLANNING UNIT Cow-Battle Creek Watershed

Columbia River Treaty

FALL RIVER MILLS PLANNING UNIT Pit-McCloud River Watershed

Public Notice: Application for Permit

134 FERC 61,195 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

Low Impact Hydropower Institute 34 Providence Street Portland, ME Tel. (207) Fax (206)

EXHIBIT B PROJECT OPERATIONS

A Transboundary Approach to Mitigating Total Dissolved Gas in the Columbia River Basin. Mark W. Killgore, P.E. The Louis Berger Group, Inc.

Battle Creek Salmon and Steelhead Restoration Project January 2017

April 29, 2016 VIA ELECTRONIC FILING. Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

UPPER AMERICAN RIVER, CALIFORNIA

UNITED STATES OF AMERICA 132 FERC 62,179 FEDERAL ENERGY REGULATORY COMMISSION

FERC Relicensing of Hawks Nest Project (FERC NO. 2512) Glen Ferris Project (FERC NO )

Meacham Creek Restoration Project

FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D. C November 27, 2013

JUVENILE SALMON MIGRATION SECTION 5. blank page

Final Tailrace Water Temperature Monitoring and Enhancement Plan for

BAKER RIVER PROJECT DRAFT WATER QUALITY MONITORING PLAN

Vegetation Cover Type Mapping Study Plan for Energy Northwest's Packwood Lake Hydroelectric Project FERC No Lewis County, Washington

123 FERC 62,258 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. PacifiCorp Project No ORDER ISSUING NEW LICENSE

2012 TOTAL DISSOLVED GAS ABATEMENT PLAN WELLS HYDROELECTRIC PROJECT

Overview of Columbia Basin Water Management

CHAPTER 1: INTRODUCTION. Background: Shoreline Management in Washington State

Public Notice: Application for Permit

Public Notice: Application for Permit

February 6, 2018 MEMORANDUM. Council Members. SUBJECT: Update on Albeni Falls Settlement Agreement BACKGROUND:

If any questions arise concerning this application, please contact us.

TOTAL DISSOLVED GAS ABATEMENT PLAN

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

Mr. Rob Matthews Manager, Water Use Licensing Manitoba Conservation and Water Stewardship Box Saulteaux Crescent Winnipeg MANITOBA R3J 3W3

BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON PACIFICORP. Exhibit Accompanying Direct Testimony of Mark R. Tallman. FERC Order Issuing New License

Rocky Mountain Power Exhibit RMP (MRT-1) Docket No Witness: Mark R. Tallman BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH

CITY OF PATERSON, NJ AND GREAT FALLS HYDROELECTRIC COMPANY JOINT AGENCY / STAKEHOLDER MEETING AUGUST 3, 2016

TOLEDO BEND PROJECT FERC NO FINAL LICENSE APPLICATION EXECUTIVE SUMMARY

UNITED STATES OF AMERICA111 FERC 62,065 FEDERAL ENERGY REGULATORY COMMISSION. PPL Maine LLC Project No

If you have any questions on the OCMP, please do not hesitate to contact me at (425) or Keith Binkley at (425)

Avista Dam Relicensing Factsheet Commenting on the Draft License Application

Total Dissolved Gas and Temperature Monitoring at Chief Joseph Dam and Libby Dam, Montana 2003: Data Review and Quality Assurance

Dear Ms. Bose, Thank you for the opportunity to comment on the application by Juneau Hydropower Inc. for a

Prepared by: PacifiCorp 825 NE Multnomah Street Portland, OR 97232

LIST OF TECHNICAL APPENDICES

Warm Springs Hydro LLC 5203 South 11 th East Idaho Falls, ID

Appalachian Power Company Claytor Hydroelectric Project FERC No Debris Management Plan

Review of Application for LIHI Certification of the Newton Falls Hydroelectric Project St. Lawrence County, New York

A guide to Chelan PUD s program for managing the lands and shorelines within the Rocky Reach Hydroelectric Project Boundary

Elko Project Water Use Plan. Revised for Acceptance by the Comptroller of Water Rights

Anadromous Fish Agreements and Habitat Conservation Plans

Columbia Basin Operations and Flood Risk Management

MANZANITA LAKE PLANNING UNIT Willow Creek Watershed

Federal Energy Regulatory Commission Washington, DC November 26, 2012

LOWER DRUM PLANNING UNIT Yuba-Bear River Watershed

Weber Hydroelectric Project FERC Project No Preliminary Study Plan Water Quality

FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D. C June 29, 2009

Staff summary of Issues & Recommendations Protected Areas

Notice of Intent to Accept Proposals, Select Lessee(s), and Contract for Pumped-Storage

Passage Over Canadian Projects

Physical Works Terms of Reference

US Columbia Operations Overview. Columbia Basin Advisory Committee

FINAL LICENSE APPLICATION Exhibit C Construction History

Issues in Klamath River Dam Relicensing

Fall River Mills Planning Unit. Fish, Plant, and Wildlife Habitat. LCP Volume II Supporting Analysis for Recommendations

APPLICANT: Seattle Public Utilities (SPU) Attention: Mr. Richard Fernandez P.O. Box Seattle, Washington Telephone: (206)

DRAFT FISHERIES MONITORING PLAN. BLUE LAKE HYDROELECTRIC PROJECT EXPANSION FERC No SITKA, ALASKA. Prepared By: City and Borough of Sitka

DOMINION VIRGINIA POWER / NORTH CAROLINA POWER WITHIN DAY PEAKING PLAN LICENSE ARTICLE 414 Roanoke Rapids and Gaston FERC Project Number 2009

Public Notice. Navigation Section Notice Date: May 23, 2018 PO Box 3755 Expiration Date: June 21, 2018

JOINT EXPLANATORY STATEMENT for the SETTLEMENT AGREEMENT DATED NOVEMBER 30, 2004

EXHIBIT C CONSTRUCTION SCHEDULE

3.0 Proposed Action and Alternatives Proposed Action License Term Project Facilities to be Licensed...

Turbidity Changes During Culvert to Bridge Upgrades at Carmen Creek, Idaho

SCOPING DOCUMENT 1 WEBER HYDROELECTRIC PROJECT UTAH FERC PROJECT NO. 1744

PARR. PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No SC JANUARY 2013

Bitterman, Deborah Bitterman, Deborah; FW: Beebe ranch dock permit. Tuesday, September 21, :30:51 PM Draft BB Ranch Letter to Forums.

CONTENTS LIST OF TABLES LIST OF FIGURES

Transcription:

Hydropower Project Summary PEND OREILLE RIVER, WASHINGTON BOUNDARY HYDROELECTRIC PROJECT (P-2144) Photo: Rich Bowers, HRC This summary was produced by the Hydropower Reform Coalition and River Management Society

PEND OREILLE RIVER, WASHINGTON BOUNDARY HYDROELECTRIC PROJECT (P-2144) DESCRIPTION: The Boundary hydroelectric project is located in a narrow canyon in the Selkirk Mountains in the northeast corner of Washington, about 10 miles north of the city of Metaline Falls and one mile south of the U.S.-Canada border. The Pend Oreille River is about 120 miles long from its origin at Lake Pend Oreille in Albeni Falls, Idaho to its confluence with the Columbia River in British Columbia, Canada. The Pend Oreille River system is highly regulated, with flows controlled by seven hydroelectric and storage projects upstream from Boundary dam, and two in Canada downstream from the project. The license for this project was issued in conjunction with the license surrender for the Sullivan Creek Project (P-2225) based on a comprehensive settlement. The Sullivan Creek project is located on Sullivan Creek, a tributary of the Pend Oreille River and is being decommissioned and the dam removed. The comprehensive agreement was signed by: City of Seattle (Seattle City and Light), Public Utility District No. 1 of Pend Oreille County (owner of the Sullivan creek project), US Forest Service (USFS), US Fish and Wildlife Service (USFWS), National Park Service (NPS), Bureau of Land Management (BLM), Bureau of Indian Affairs (BIA), Washington Department of Fish & Wildlife (Washington DFW), Washington Department of Ecology (Ecology), Kalispel Tribe, Selkirk Conservation Alliance, The Lands Council, American Whitewater, Town of Cusack, Washington, Rick Larsen, and Al Six. This summary only pertains to the license issued for the Boundary dam hydroelectric project. A. SUMMARY 1. License application filed: September 29, 2009 2. License issued: March 20, 2013 3. License expiration: Feb 28, 2055 4. Settlement Agreement Filed: March 29, 2010 5. Waterway: Pend Oreille River 6. Capacity: 1003.53 MW 7. Licensee: City of Seattle (Seattle City Light Department) 8. Licensee contact: 700 5th Avenue Suite 3200 P.O. Box 34023 Seattle, WA 98124 9. Counties: Pend Oreille County April 2014 Page 2 of 7

10. Project area: 609.24 acres of federal land managed by US Forest Service (USFS) within the Colville National Forest, and 329.35 acres of federal land managed by US Bureau of Land Management (BLM) 11. Project website: http://www.seattle.gov/light/tours/boundary/ 12. Project Facilities: a. Boundary dam A 340-foot-high, 740-foot-long concrete arch dam, A 1,794-acre reservoir at a normal full pool elevation of 1,994 feet, Two 50-foot-wide, 45-foot-high spillways fitted with radial gates, An approximately 800-foot-long, 300-foot-wide forebay, an underground powerhouse containing six Francis turbine/generator units with a total authorized generating capacity of 1,003.253 MW, six 230-kilovolt (kv) transmission lines extending approximately 60 feet up the vertical face of the left abutment of the dam, and continuing horizontally for approximately 2,850 feet to an interconnect with Bonneville Power Administration s (BPA) substation, and appurtenant facilities B. IMPORTANT PROVISIONS AND REQUIREMENTS IN LICENSE The Washington Department of Ecology (Ecology) and US Forest Service (USFS) require Seattle City and Light to prepare a number of plans in consultation with various stakeholders and working groups. The table below identifies the plans required, the responsible working group and due date for the plan. Description (Name of Plan) Consultation Entity Due Date Required By Revised Terrestrial Resource Every 5 years from license USFS Condition 3 Management Plan issuance (First plan due on Adaptive Management Plan to monitor effectiveness of terrestrial resource measures Long-Term Erosion Control Monitoring Program Riparian Habitat Management Plans for Everett Creek and Boundary Wildlife Preserve (BWP) Upland Habitat Management Plan for BWP, BWP Addition, Tailrace East, and Everett Creek Road Maintenance Plan Final Multi- Resource Interpretation and Recreation Resources Working Recreation Resources Working Feb 28, 2018) Feb 28, 2014 USFS Condition 3 Feb 28, 2014 USFS Condition 3 Feb 28, 2017 USFS Condition 3 Feb 28, 2017 USFS Condition 3 Feb 28, 2014 USFS Condition 3 (5) Feb 29, 2016 USFS Condition 3 (5) April 2014 Page 3 of 7

Education Program Mill Pond Dam Site Monitoring and Maintenance Plan Tributary Delta Predation Study Plan Forebay Hydraulic Study Plan Design Plans for Native Fish Conservation [Propagation] Facility Section 5.46 of Tributary Management Plan (TMP) Section 5.47 of TMP Section 5.48 of TMP Within one year of the Commission ending its jurisdiction over the Sullivan Creek Project No. 2225. Feb 29, 2016, and Feb 28, 2027 USFS Condition 3 (9F) USFS Condition 3 (9A) Feb 29, 2028 USFS Condition 3 (9C) Feb 28, 2017 USFS Condition 3 (9G) Feb 28, 2014 Ecology Condition 3.5 Note: The (FAWG) consists of Seattle City Light (SCL), and to the extent of their interests in participating, the USFS, U.S. Fish and Wildlife Service (FWS), U.S. Bureau of Indian Affairs (BIA), the Kalispel Tribe of Indians (Kalispel Tribe), Ecology, Washington Department of Fish and Wildlife (Washington DFW), and the Selkirk Conservation Alliance (SCA). The Terrestrial Working consists SCL, and to the extent of their interests in participating, the Forest Service, FWS, Washington DFW, Ecology, and SCA. The Recreation Working consists of SCL, and to the extent of their interests in participating, the Forest Service, and U.S. National Park Service. The license requires SCL to submit the following resource management plans: 1. Bull Trout Protection Plan [Reference: License Article 405; License Appendix D- RPM Measures and Terms and Conditions included in FWS Biological Opinion] By September 16, 2013, SCL is required to file a plan detailing how it will implement the incidental take terms and conditions of the FWS Biological Opinion to minimize take of the threatened bull trout. The FWS required the following reasonable and prudent measures (RPM) to minimize impacts of incidental take on bull trout: Minimize the likelihood of bull trout outbreeding depression and loss of local adaptation from passing Salmon River bull trout over Boundary Dam. Minimize and monitor incidental take caused by handling related to fish capture and removal operations including electrofishing, excluding the trap and haul facility. April 2014 Page 4 of 7

Minimize effects to bull trout from chemical fish eradication activities. Minimize effect to bull trout from increased sedimentation input from in-water project activities. Monitor and report on the effectiveness and impacts of implementing all reasonable and prudent measures. Specific actions are required to implement the above mentioned terms and conditions and are described in the Appendix referenced above. These are not included in the summary for brevity. The plan should be prepared in consultation with FWS and Washington DFW. 2. Recreation Resource Management Plan [Reference: License Article 407] SCL filed a recreation plan in March 2010 which identified various recreation improvements in the area. The license approved the recreation plan and required SCL to: Complete recreational facility improvements by February 28, 2018. Build the new Peewee. Falls Viewpoint and Trail, the new Riverside Mine Canyon Viewpoint and Trail, and the new Metaline Falls Portage Trail and Boater Access Site by Feb 28, 2020. Complete the recreation facility improvements at the Vista House Recreation Area, at the Tailrace Recreation Area/Machine Hall Visitors Gallery, and Eastside Trail by Feb 28, 2023. 3. Water Quality [Reference: Appendix A: Water Quality Certification] The WA Department of Ecology, under it Water Quality Certification, has required that the Boundary project meet standards for various parameters as shown in the table below: Parameter Temperature Dissolved Oxygen (DO) Turbidity Total Dissolved Gas Standard Pend Oreille River Sullivan Creek, Slate Creek and its tributaries Temperature shall not exceed a 1-DMax of 12 C Highest 7- DADMax 20.0ºC due to human activities. When natural conditions exceed a 1-DMax of 20.0ºC, no temperature increase will be allowed which will raise the receiving water temperature by greater than 0.3ºC; nor shall such temperature increases, at any time, exceed t=34/(t+9). Lowest 1-day minimum of 8.0 mg/l Lowest 1-day minimum of 9.5 mg/l Should not exceed either a 5 NTU increase Same over background when the background is 50 NTU or less; or a 10 percent increase in turbidity when the background is more than 50 NTU. Total dissolved gas shall not exceed 110 Same percent of saturation at any point of sample April 2014 Page 5 of 7

collection. ph ph shall be within the range of 6.5 to 8.5, with a human caused variation within the above range of less than 0.5 units. ph shall be within the range of 6.5 to 8.5, with a human caused variation within the above range of less than 0.2 units. Bacteria Indicator Fecal coliform organism levels must not exceed a geometric mean value of 100 colonies /100 ml, with not more than 10 percent of all samples (or any single sample when less than ten sample points exist) obtained for calculating the geometric mean value exceeding 200 colonies /100 ml. Fecal coliform organism levels must not exceed a geometric mean value of 50 colonies /100 ml, with not more than 10 percent of all samples (or any single sample when less than ten sample points exist) obtained for calculating the geometric mean value exceeding 100 colonies /100 ml. 1-Dmax or 1 day maximum temperature is the highest water temperature reached on any given day. 7-DADMax or 7-day average of the daily maximum temperatures is the arithmetic average of seven consecutive 1-DADMax for any individual day is calculated by averaging that day s daily maximum temperature with the daily maximum temperature 7 days after that date. mg/l means milligrams per liter. NTU or nephelometric turbidity units is a unit to measure turbidity. The Water Quality Certification prohibits SCL from discharging oil, fuel or chemicals into the river or adjacent land and requires SCL to contain wash water with oils, grease or other hazardous materials resulting from wash down of equipment or working areas for proper disposal. In the event of a discharge of oil, fuel or chemicals in waters of the State, or onto land with a potential for entry into waters of the State, SCL shall immediately begin and complete containment and clean-up efforts of the spilled material. Cleanup work shall take precedence over normal work and shall include proper disposal of any spilled material and used clean-up materials. Such spill must be reported to Ecology within an hour. 4. Fish Passage [Reference: Appendix C- Department of Interior Fishway Prescription] Based on the settlement agreement, the US Department of Interior (Interior) requires SCL to install, operate, maintain and monitor a single upstream trap and haul fishway facility (upstream fishway or fishway) in the Boundary Project tailrace. The fishway would provide safe, timely and effective passage for bull trout, cutthroat trout, and mountain whitefish. By Feb 28 2015, SCL is required to file with the Commission a Fishway Development Plan (FDP) to be prepared collaboratively with the Fish and Aquatics Work (See above for membership.) The table below shows the implementation schedule for the upstream passage program. April 2014 Page 6 of 7

Protection, Mitigation, and Enhancement (PM&E) Measure Activity Schedule Tentative Date Implementation Plan Within two years of license issuance By Feb 2015 Fishway Design Research In the third through the tenth years following license Feb 2016-Feb 2023 issuance Fishway Design In the tenth through the 12th years following license Feb 2023-Feb 2025 issuance Fishway Design Submittal to the Within 12 years of license issuance By Feb 2025 Commission Fishway Construction Within two years of receiving the Commission s approval of fishway design Dependent on Commission approval Fishway Operation Within two years of receiving the Commission s approval of fishway design Dependent on Commission approval Status Report Annually following license issuance -- C. MAP There are two convenient ways to become familiar with this project on the Hydropower Reform Coalition website, www.hydroreform.org. Go directly to the project page http://www.hydroreform.org/projects/boundary-p- 2144 To understand the geographical context of the project, visit the On Your River section of the site. This link (http://www.hydroreform.org/on-yourriver/northwest) will take you to the section for rivers in the Northwest. Zoom in toward the north-eastern corner of Washington State. Of the four balloons you see, Boundary dam project is the project north and east of the Abercrombie Mountain on the Pend Oreille River, right before it enters Canada. April 2014 Page 7 of 7