Mark Twain Lake Water Control Manual Update

Similar documents
OSAGE RIVER BASIN OPERATIONS WATER MANAGEMENT

VII - WATER CONTROL PLAN

LAKE SHELBYVILLE MASTER PLAN KASKASKIA RIVER WATERSHED SHELBYVILLE ILLLINOIS

Chapter VII. Falls Lake Project -- Water Control Plan

Lake Texoma Water Management Frequently Asked Questions (FAQs)

Missouri River Basin Water Management

EXHIBIT B PLANT OPERATION AND RESOURCES UTILIZATION

DES MOINES RIVER RESERVOIRS WATER CONTROL PLAN UPDATES IOWA ASCE WATER RESOURCES DESIGN CONFERENCE

Welcome STEP 1: STEP 2: STEP 3:

Reservoir Drought Operations

WATER CONTROL PLAN FOR JOHN H. KERR DAM AND RESERVOIR REVISED JUNE 2016

2017 Lake Hartwell Association

Status Report. Work to Date on the Development of the VARQ Flood Control Operation at Libby Dam and Hungry Horse Dam. January 1999.

Appendix I. Dworshak Operations

JUVENILE SALMON MIGRATION SECTION 5. blank page

Missouri River Basin Water Management

16 September Water Management Wilmington District. US Army Corps of Engineers BUILDING STRONG

EXHIBIT B PROJECT OPERATIONS

Summary of Flow and Water Quality Conditions Willamette Basin Science Review February 4-6, 2014

7.9 Lake Whitney Reallocation

LITTLE ROCK DISTRICT CORPS OF ENGINEERS WATER SUPPLY

Water Supply Reallocation Workshop

Office, District Engineer, Seattle District, Corps of Engineers, 4735 East Marginal Way, Seattle 4, Washington

OVERVIEW OF RESERVOIR OPERATIONS AND FLOOD RISK MANAGEMENT

MISSOURI RIVER BASIN WATER MANAGEMENT SPRING 2018 PUBLIC MEETINGS

PARR. PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No SC JANUARY 2013

ROGUE BASIN PROJECT CONSERVATION RELEASE SEASON OPERATING PLAN WATER YEAR 2018

Warm Springs Hydro LLC 5203 South 11 th East Idaho Falls, ID

Spring Forecast Based Operations, Folsom Dam, California

Albuquerque District

Forecast Informed Reservoir Operations for Groundwater Recharge Prado Dam

Missouri River Basin Water Management

KANSAS CITY DISTRICT. Clinton Lake s Role in the Wakarusa Watershed. Samantha Jones, Park Manager Clinton & Hillsdale Lakes 5 November 2014

Managing Idaho Power Company s Hydro Projects During Drought Conditions The Benefits of Communication and Collaboration

Current Water Management Practices for Kerr Reservoir

2. CURRENT AND ALTERNATIVE WATER CONTROL PLANS

MARK TWAIN LAKE WATER QUALITY REPORT. for

CORPS OF ENGINEERS. Water Resource Activities in the ACF Basin May 18, 2007

Missouri River Main Stem Reservoirs Annual Operating Plan. Missouri River Basin. Garrison North. Dakota. Oahe Big Bend. South.

CARLYLE LAKE ASSOCIATION

Albeni Falls Operations Meeting 2015

Analysis of Proposed Water Sale Agreement Between Sabine River Authority, State of Louisiana and Toledo Bend Partners, LP

WEST POINT PERTINENT DATA. GENERAL Location (damsite) Troup County GA, Chambers County AL, miles above mouth of Chattahoochee River

Old Document: Appendices 18 pages (1.84 MB) 8/9/13 5:22:06 PM -07'00'

Webinar for the Natural Floodplain Function Alliance 18 November 2013

Missouri River Basin Water Management Spring 2013 Public Meetings

Columbia River Treaty

An Investigation into the 2012 drought on Apalachicola River. Steve Leitman, Bill Pine and Greg Kiker

olumbia River Treaty The Columbia by Steve Oliver, Vice President, Generation Asset Management, Bonneville Power Administration 16 Oct

Columbia River Drainage

Water Resource Management in the Ukiah Valley

Elko Project Water Use Plan. Revised for Acceptance by the Comptroller of Water Rights

RECORD OF DECISION MISSOURI RIVER MASTER WATER CONTROL MANUAL REVIEW AND UPDATE

Sovereign Lands and Great Salt Lake

I. INTRODUCTION PURPOSE BASIN DESCRIPTION WATER RESOURCES DEVELOPMENT TYPES OF RESERVOIR PROJECTS ANNUAL REGULATION CYCLE

Project Information. Pursuant to Section 404 of the Clean Water Act (33 U.S. Code 1344), notice is hereby given that

John H. Kerr Dam and Reservoir Virginia and North Carolina (Section 216)

Water Management Under Severe Storm Conditions in Central and South Florida

PROGRAMMATIC ENVIRONMENTAL IMPACT STATEMENT

Glades Reservoir Draft Environmental Impact Statement

PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No SC SEPTEMBER 19, 2012

TABLE OF CONTENTS. List of Tables List of Plates. Previously Issued Design Memoranda

Camp Far West Hydroelectric Project Relicensing

DROUGHT CONTINGENCY PLAN SUMMARY

Maintaining Water Supply Resilience in Extreme Times

Glades Reservoir Environmental Impact Statement (EIS)

Smithville Lake 2000 Water Quality Report

Exploring the Possibilities At Prado Dam

U.S. Army Corps of Engineers Reservoir Operations Maria Placht, Institute for Water Resources, USACE 49

ND Detention Project Development Update

Canadian Entity s Preliminary View of Columbia River Treaty Post-2024 Called Upon Procedures. BC Hydro and Power Authority

U.S. Army Corps of Engineers and RiverWare. Fort Worth District Building Strong!

WATER CONTROL MANUAL

TOLEDO BEND PROJECT FERC NO DRAFT LICENSE APPLICATION EXHIBIT E - ENVIRONMENTAL EXHIBIT 2.0 PROPOSED ACTION AND ALTERNATIVES

Columbia Basin Operations and Flood Risk Management

Available Yield from Reallocation in Federal Reservoirs Excluding Lake Aquilla. The USACE study evaluated four alternatives for each reservoir:

Overview of Columbia Basin Water Management

Water Supply Board Briefing. Water Operations Department March 22, 2016

Ocklawaha River Restoration as Mitigation

HYDRAULIC CONNECTIVITY (HC) ENGINEERING & HYDRAULICS PERSPECTIVES

Appendix I R. L. Harris Dam and Lake. R. L. Harris Dam and Lake

Green River Basin Plan Executive Summary

5SECTION IX - FACILITY LOAD AND OTHER DESIGN CRITERIA

JUNE 2014 LAW REVIEW FEDERAL FLOOD CONTROL IMMUNITY SLIPPERY WHEN WET

Columbia River Operations Summary

Background and History of Water Management of Okanagan Lake and River

2 USCID/EWRI Conference

Harry S Truman Reservoir 1999 Water Quality Report

APPENDIX III Hydrologic and Hydraulic Evaluations

COON CREEK WATERSHED DISTRICT PERMIT REVIEW Mississippi Dr Coon Rapids, MN SQ FT Residence on 0.64 Acre Lot

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment.

CESAM-PD-EI 1. INTRODUCTION:

Cokato Lake (86-263) Wright County. Hydrologic Investigation

Oregon Administrative Rules Oregon Department of Fish and Wildlife

Klamath Hydroelectric Project Interim Measure 11 Study Activities for 2018

Chehalis Basin Strategy Programmatic SEPA Draft EIS

Manhattan Levee Section 216 Feasibility Study Public Workshop 17Apr13 Manhattan Kansas

ALABAMA-COOSA-TALLAPOOSA RIVER BASIN WATER CONTROL MANUAL

Thermal and Bioenergetics Modeling For Balancing Energy and Environment

PUBLIC NOTICE. Town of Beech Mountain Mr. Tim Holloman 503 Beech Mtn. Parkway Banner Elk, North Carolina 28604

Transcription:

Mark Twain Lake Water Control Manual Update Joan Stemler St. Louis District Water Control US Army Corps of Engineers

WATER CONTOL PLAN Overall Objectives Project Purposes Flood Control Hydroelectric Power Generation Water Supply Fish and Wildlife Recreation Incidental Benefits to Mississippi River

General Objectives/Overall Plan General Objectives. Mark Twain Lake is a flood control reservoir with multiple purposes. The purposes include hydroelectric power generation, water supply, fish and wildlife and recreation. There are also incidental benefits to Mississippi River navigation. The pool at elevation 606.0 feet NGVD retains one hundred percent of available flood control storage and one hundred percent of the joint-use storage for the other project purposes, namely hydroelectric power generation, water supply, fish and wildlife and recreation.

General Objectives/Overall Plan 1. Growing Season. Growing season typically is considered from April 1 st to October 31 st, but may vary depending on seasonal conditions. Growing season shall be complete when a significant amount of crops have been harvested as determined by consultation with local farming interests. Downstream conditions should be evaluated to determine the maximum release that would be non-damaging. Releases are limited to 10,000 cfs, based on downstream conditions. The maximum release will be restricted to 6,000 cfs if the stage of the Mississippi River at Louisiana and/or St. Louis is at or forecast to be at or above flood stage below elevation 615.0 feet NGVD. Releases will be reduced to 2,000 cfs 24- hrs prior to crest on the Mississippi River and may be increased 24-hrs after crest.

General Objectives/Overall Plan For pool elevations exceeding 615.0 feet NGVD, maximum releases become 12,000 cfs, based on downstream conditions. 2. Dormant Season. Dormant season shall be considered to exist from November 1 st to March 31 st, but may vary based on seasonal conditions. During this period, the release rate may reach the maximum of 12,000 cfs independent of pool elevations.

Flood Control Objective. The objective of flood control is flood damage reduction downstream of the project. Flood damage reduction benefits extend along both the Salt River and the Mississippi River downstream of the project. During the growing season (April 1 st to October 31 st ), the release will normally be 10,000 cfs or less (based on downstream conditions) until elevation 615.0 feet NGVD is exceeded. The growing season typically is considered from April 1 st to October 31 st, but may vary depending on seasonal conditions. Growing season shall be complete when a significant amount of crops have been harvested as determined by consultation with local farming interests. Releases may be restricted because of flooding on the Lower Salt River or on the Mississippi River at Louisiana and/or St. Louis, Missouri.

Flood Control Lower Zone of Flood Control Pool (Elevation 606.0 615.0 ft NGVD). Seasonal channel capacities, prevailing flow and forecast stages downstream of the Reregulation Dam are considered when operating in this zone. (a) The maximum release rate from the Reregulation Pool is 12,000 cfs during the dormant season (November 1 st to April 1 st ). (b) During crop season, the release rate from the Reregulation Pool will normally vary less than 10,000 cfs, based on downstream conditions. The nature of hydroelectric power generation is such that the release rate from Cannon Dam will normally vary between 0 cfs and 12,000 cfs. The maximum release will be restricted to 6,000 cfs if the stage of the Mississippi River at Louisiana and/or St. Louis is at or forecast to be at or above flood stage. Releases will be reduced to 2,000 cfs 24-hrs prior to crest on the Mississippi River and may be increased 24-hrs after crest.

Flood Control Upper Zone of Flood Control Pool (Elevation 615.0-638.0 ft NGVD). Seasonal channel capacities, prevailing flow and forecast stages downstream of the Reregulation Dam are considered when operating in this zone. (a) The maximum release rate from the Reregulation Pool is 12,000 cfs during the dormant season (November 1 st to April 1 st ). (b) During crop season, the release rate from the Reregulation Pool may be increased to 12,000 cfs, based on downstream conditions. The nature of hydroelectric power generation is such that the release rate from Cannon Dam will normally vary between 0 cfs and 12,000 cfs.

Flood Control Surcharge Pool (Above Elevation 638.0 feet NGVD). The minimum release from Mark Twain Lake is 12,000 cfs. If the inflow rate is greater than 12,000 cfs, PLATE 5-5 should be used in order to determine the appropriate release rate from Mark Twain Lake. PLATE 5-5 contains the surcharge pool regulation curves for the surcharge pool release rate. (a) If Mark Twain Lake pool elevation is forecast (water on ground) to reach surcharge pool, the discharge may be determined from the surcharge pool regulation curves (PLATE 5-5).

Hydroelectric Power Objective. The objective is to obtain the maximum amount of power generation revenue the project is capable of producing in conjunction with other project purposes. General Regulation Procedure. When within the joint-use pool, hydroelectric power production will be scheduled so as to meet the needs of SWPA. Normal lake drawdown within the joint-use pool as the result of power production will be limited to 2.0 feet per calendar week (i.e., Sunday through Saturday) and 4.0 feet per month (i.e., any consecutive four calendar week period) during May through October. During the remainder of the year, normal lake drawdown will be limited to 2.0 feet per week with no monthly maximum. Care will be taken to meet the power needs of SWPA everyday, but final control always rests with the Regulating Office. The need may exist to curtail hydroelectric power production on an immediate basis for downstream conditions. Cannon Dam Power Plant was designed to produce 58,000 KW of electrical power (installed capacity) as a peaking plant.

Water Supply Objective. The State of Missouri and the Federal Government have negotiated the water supply contracts which are shown in EXHIBIT C. Regulation Procedure. The State of Missouri shall provide a letter of request to the Finance Office for water to be taken from the State water supply account. All water taken directly from either Mark Twain Lake or the Reregulation Pool will be metered and a monthly accounting will be forwarded to the Finance Office. The Finance Office will maintain records of joint-use storage water released from the project for water supply, in addition to the metered readings.

Water Quality a. Objective. The objective is to ensure that the quality of water released from the Reregulation Pool meets the State of Missouri standards under 10 CSR 20-7.031 (4)(J) Dissolved Oxygen. This regulation states that waters of the state of Missouri must maintain a level of 5 mg/l dissolved oxygen. b. Regulation Procedure. In coordination between the Water Quality Office and the Water Control Office, tainter gate releases from Mark Twain Lake may be required in order to improve downstream water quality conditions. These decisions will be based upon dissolved oxygen data collection real-time within the Reregulation Pool, located at the Reregulation Pool stream gage. If the dissolved oxygen levels drop below the 5 mg/l criteria based on 10 CSR 20-7.031, subsection (4) part J Dissolved Oxygen, the preferred method of releases into the Reregulation Pool would be discharging water through the tainter gates.

Fish Spawn Current WCM wording: The objective is to enhance fish and wildlife habitat to as great an extent as possible without conflicting with the achievement of other project purposes. The pool elevation of Mark Twain Lake will be regulated whenever possible so as to minimize the amount of fluctuation during the period of time when fish are spawning. Proposed Alternatives Fish Spawn up to pool elevation: 608.0 thru 615.0

Fish Spawn Comment 1 Comment 2 In regard to the Mark Twain Lake Water Control Manual Update, we noticed a proposed change in pool elevation for Fish Spawn between 23 April and 1 May - 15 June. Our understanding of this proposed alternative would require a constant or slightly rising pool elevation up to 613.0 feet above mean sea level. It is our understanding of the Profile of Water Storage at Clarence Cannon Dam and Mark Twain Lake, that the Top of the joint-use pool is 606. Joint-use storage being: Power Water supply Recreation Fish and wildlife Inactive storage. Storage between 606 Top of the joint-use pool and 638 Top of flood control pool is for flood control storage. Therefore, the consensus is that the maintenance/raising of the pool elevation above 606 Top of joint-use pool for any use other than flood storage would greatly endanger, if not, significantly increase the risk of inadequate flood storage during the crop season. As we discussed last week, please consider increasing the maximum elevation during the fish spawn period to 615 for about a 21 day period during the last two weeks of May, 1 st week of June. Also, could you consider and include some language about managing for an extended (100 days?) period of higher elevation (at least 615) during mid April through late July one of every four years.

Fish Spawn Comment 3 Comment 4 When the dam was conceived its primary purpose was flood control, but the cost could be better justified for multi use as electric generation and recreation. It is difficult to balance these competing needs; however, one must be cognizant that the primary purpose is flood control. The fish spawn in the lake is incidental to flood control and must not be allowed to interfere with that purpose. Both purposes can be served only if maintaining a constant pool or rising elevation provides an elevation is 606 feet. Spring time flood pool should have no allocation to fish spawn. This letter is in regards to the Missouri Department of Conservation (MDOC) request to raise the level of Mark Twain Lake. We feel going from 606 to 613, during the growing season, would negatively effect flood control in the Salt River basin. As they (MDOC) currently have control of the pool from 567.2 to 606 for wildlife, fish spawn, ect., we feel anything over 606 would be better suited for flood control. Thank you for your attention to this matter.

Fish Spawn Fish Spawn Elevations within the Flood Control Pool at other St. Louis District Projects Lake Shelbyville 602.0 (5.6%) Equivalent to 608.6 at Mark Twain Lake Carlyle Lake 447.0 (7.5%) Equivalent to 609.4 at Mark Twain Lake

Fish Spawn Flood Control Utilization at Mark Twain Lake 608.0 4.3% 609.0 6.6% 610.0 8.9% 611.0 11.3% 612.0 13.7% 613.0 16.1% 614.0 18.7% 615.0 21.3%

Fish Spawn Flood Control Utilization at Mark Twain Lake For Elevations 608 thru 615 1 ft of storage = 0.2 of runoff For example: 2 of rainfall with 50% runoff = 1 of runoff = 5 ft of flood control storage Flood Storage available below 615.0 Elevation 608.0 609.0 610.0 611.0 612.0 613.0 614.0 615.0 Inches of Runoff 1.4 1.2 1.0 0.8 0.6 0.4 0.2 0.0

Fish Spawn Years of spawn out of 101 yr Preferred Plan w/o 608.0 609.0 610.0 611.0 612.0 613.0 613.0 to 615.0 54 Days 0% 51% 56% 58% 64% 66% 69% 70%

Fish and Wildlife Objective. The objective is to enhance fish and wildlife habitat to as great an extent as possible without conflicting with the achievement of other project purposes. The Water Control Office coordinates with the Missouri Department of Conservation and the Mark Twain Lake Project Office to provide optimum fish spawning conditions each Spring and enhance waterfowl habitat. Regulation. The pool elevation of Mark Twain Lake will be regulated from April 23 rd to June 15 th whenever possible so as to minimize the amount of fluctuation during spawn. This effort is in coordination with SWPA, COE and Missouri Department of Conservation. The Chief of Water Control Operations, taking into account all project purposes, hydrologic conditions and weather forecasts may attempt to moderate pool fluctuations during critical fish spawn when the pool elevation is 610.0 feet NGVD or below coordinated with Missouri Department of Conservation and Mark Twain Lake personnel.

Recreation Objective. The objective is to provide the best possible water conditions to support recreational activities such as boating, swimming, fishing, hunting, camping, etc., consistent with the procedures outlined in 7-03. Recreational areas are located on the shoreline of Mark Twain Lake's l8,600-acre jointuse pool. These areas are operated by the COE, the Missouri State Park Board and concessionaires. Regulation Procedure. Fluctuations within the joint-use pool, 606.0 feet NGVD, are limited to 2.0 feet per week and 4.0 feet per month in order to enhance recreation during May 1 st through October 31 st. Little regulation can be done within the Reregulation Pool to enhance recreation. Within the Reregulation Pool, large pool fluctuations and high flow velocities can be expected during power generation at Cannon Dam.

Incidental Benefits to the Mississippi River Objective and Regulation Procedure. The navigation project purpose assigned to Clarence Cannon Dam and Mark Twain Lake is achieved incidentally on the Mississippi River during low-flow periods by the release of water for non-consumptive water supply, for water quality enhancement, for improvement of downstream fisheries, and for hydroelectric power generation.

??? Questions???