Software Applications for Runoff Hydrological Assessment

Similar documents
5/11/2007. WinTR-55 for Plan Reviews Small Watershed Hydrology Overview

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY

5/11/2007. WinTR-55 for Plan Reviewers Small Watershed Hydrology Intermediate WinTR-55 Training Modeling Multiple Sub-area Watersheds

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT DANIEL ASH POND B MISSISSIPPI POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY

Detention Pond Design Considering Varying Design Storms. Receiving Water Effects of Water Pollutant Discharges

COMPUTER APPLICATIONS HYDRAULIC ENGINEERING

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY

The Texas A&M University and U.S. Bureau of Reclamation Hydrologic Modeling Inventory (HMI) Questionnaire

APPENDIX IV. APPROVED METHODS FOR QUANTIFYING HYDROLOGIC CONDITIONS OF CONCERN (NORTH ORANGE COUNTY)

Peak discharge computation

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY

Learning objectives. Upon successful completion of this lecture, the participants will be able to describe:

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY

BMP Design Aids. w w w. t r a n s p o r t a t i o n. o h i o. g o v. Equations / Programs

RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART PLANT DANIEL NORTH ASH MANAGEMENT UNIT MISSISSIPPI POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY

Index. Page numbers followed by f indicate figures.

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257

Section 2: Hydrology. Introduction. What is the Return Period? Intensity-Duration-Frequency Data. Generating a runoff hydrograph 85 Minutes

A&M WATERSHED MODEL USERS MANUAL WATER RESOURCES ENGINEERING

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257

Runoff Calculations. Time of Concentration (T c or t c ) from one location to another within a watershed. Travel

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY

Design of Stormwater Wetlands

INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR

Water Resources Management Plan

Stormwater Management Impacts Resulting from the Volumetric Abstraction of Runoff from Frequent Storms per PADEP CG-1. Geoffrey A. Cerrelli 1, P.E.

RETENTION BASIN EXAMPLE

Rational Method Hydrological Calculations with Excel COURSE CONTENT

5/11/2007. WinTR-55 for Plan Reviewers Small Watershed Hydrology Hydrology Terms and Definitions

The impact of campus development on the flash flood potential: A case study at watershed USM Main Campus, Pulau Pinang, Malaysia

Drainage Analysis. Appendix E

NRCS Hydrology methodology review Minnesota NRCS recommendation MnDOT recommendation Using Atlas 14 with HydroCAD

3.3 Acceptable Downstream Conditions

FAST WATER / SLOW WATER AN EVALUATION OF ESTIMATING TIME FOR STORMWATER RUNOFF

HY-12 User Manual. Aquaveo. Contents

Overview of NRCS (SCS) TR-20 By Dr. R.M. Ragan

Green Station CCR Surface Impoundment

Stormwater Review Part 2. Rainfall and Runoff. Tom Seybert, PE and Andy Bennett, PE. Pennsylvania Surveyors Conference 2019

CLARK COUNTY REGIONAL FLOOD CONTROL DISTRICT HYDROLOGIC CRITERIA AND DRAINAGE DESIGN MANUAL

Development of a GIS Tool for Rainfall-Runoff Estimation

Drainage Simulation of Detention Pond with Tidal Effect at the Outfall during a Storm Period

APPENDIX E APPENDIX E ESTIMATING RUNOFF FOR SMALL WATERSHEDS

Hydrologic Study Report for Single Lot Detention Basin Analysis

SECTION III: WATERSHED TECHNICAL ANALYSIS

HYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR

APPENDIX E ESTIMATING RUNOFF FROM SMALL WATERSHEDS

Chapter H. Introduction to Surface Water Hydrology and Drainage for Engineering Purposes

LAKE COUNTY HYDROLOGY DESIGN STANDARDS

CVEN 339 Summer 2009 Final Exam. 120 minutes allowed. 36 Students. No curve applied to grades. Median 70.6 Mean 68.7 Std. Dev High 88 Low 24.

WinTR-55 Small Watershed Hydrology

CHAPTER 3 STORMWATER HYDROLOGY. Table of Contents SECTION 3.1 METHODS FOR ESTIMATING STORMWATER RUNOFF

DETENTION BASIN DESIGN USING RATIONAL HYDROGRAPHS

Inflow Design Flood Control System Plan

MODULE 1 RUNOFF HYDROGRAPHS WORKSHEET 1. Precipitation

Hydromodification Management Measures

Hydromodification Management Measures

APPENDIX K OPERATIONS AND FINAL COVER SURFACE WATER MANAGEMENT SYSTEM DESIGN

THE RATIONAL METHOD FREQUENTLY USED, OFTEN MISUSED

Technical Memorandum

Environmental Design Group

Calibration of Hydrologic Design Inputs for a Small Urban Watershed

SECTION IV WATERSHED TECHNICAL ANALYSIS

Learn how to design inlet grates, detention basins, channels, and riprap using the FHWA Hydraulic Toolbox and WMS

Run-on and Run-off Control System Plan

SOUTHEAST TEXAS CONTINUING EDUCATION

Inflow Design Flood Control System Plan

Summary of Detention Pond Calculation Canyon Estates American Canyon, California

Introduction. Keywords: Oil Palm, hydrology, HEC-HMS, HEC-RAS. a * b*

Stream Reaches and Hydrologic Units

Distribution Restriction Statement Approved for public release; distribution is unlimited.

APPENDIX F RATIONAL METHOD

Introduction to Storm Sewer Design

Modernization of High Hazard Dams in Austin, Texas. TFMA Spring Conference May 23, 2007

MVP 17.3 WATER BAR END TREATMENT SIZING AND DETAILS 1/22/18

Modeling the Hydrologic Impacts of Control Structures Utilizing LiDAR, ICPR, and GIS Technologies

2

Module 3: Rainfall and Hydrology for Construction Site Erosion Control

Hydrology and Water Management. Dr. Mujahid Khan, UET Peshawar

ENGN.4010 ENGINEERING CAPSTONE DESIGN Watershed Analysis. CiA

FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5) 1.0 Overview

Proceedings of the 2016 Winter Simulation Conference T. M. K. Roeder, P. I. Frazier, R. Szechtman, E. Zhou, T. Huschka, and S. E. Chick, eds.

12d Solutions Pty Ltd CIVIL AND SURVEYING SOFTWARE

CHELTENHAM TOWNSHIP Chapter 290: WATERSHED STORMWATER MANAGEMENT Article IV: Stormwater Management

A Stormwater Management Plan and Sediment Control Plan are required for all proposed developments within the City of Richmond.

SITE DESIGN ENGINEERING, LLC. 11 Cushman Street, Middleboro, MA P: F:

CIE4491 Lecture. Quantifying stormwater flow Rational method

iswm TM Technical Manual Hydrology:

Example 1: Pond Design in a residential development (Water Quantity calculations for a Wet Pond and Wet Extended Detention Pond)

Autumn semester of Prof. Kim, Joong Hoon

TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SPECIFICATIONS AND SCOPE 105.1

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff

CE Hydraulics. Andrew Kennedy 168 Fitzpatrick

CRITICAL ASSESSMENT OF MANAGEMENT PRACTICES AND POLICIES FOR STORMWATER AND SEDIMENT PONDS IN SOUTH CAROLINA

Hydrologic Engineering Center. Training Course on. Hydrologic Modeling with HEC-HMS. Davis, CA. Course Description

Introduction to HEC HMS. Daene C. McKinney

4.1 General Methodology and Data Base Development

Inflow Design Flood Control System Plan

Storm Sewer Design - Introduction

Transcription:

Bulletin UASVM Horticulture, 67(2)/2010 Print ISSN 1843-5254; Electronic ISSN 1843-5394 Software Applications for Runoff Hydrological Assessment Severin CAZANESCU 1), Sorin CIMPEANU 1), Oana GUI 2), Dana BURGHILA 1) 1) Faculty of Land Reclamation and Environmental Engineering,USAMV Bucharest, 59 Marasti Boulevard, Sector 1, Bucharest, Romania; cazanescu@gmail.com 2) Art and Design University, Piaţa Unirii 31, 400098 Cluj Napoca, Romania Abstract. Natural Resource Conservation Service (NRCS) hydrology techniques are based upon unit hydrograph theory and the runoff curve number method of calculating direct runoff from the rainfall occurring over specified areas (National Engineering Handbook, Part 630, Hydrology, NEH- 630.10 and 630.16). The Soil Conservation Service (SCS) and the Agricultural Research Service (ARS) in United States of America developed the supporting theory and verification studies for these since the 1940 s and 1950 s. In the beginning, all necessary computations were done by hand or by calculators and an analysis of a sizeable watershed typically took weeks or months. Since 80, they succeeded to develop computer programs to reduce the calculation time and allow analysis of complex sub-watershed systems. The software application has been developed all these years, adding new features and capabilities or modifications trying to be updated with the latest new computer technologies. The present paper presents three software applications developed for watershed hydrology, especially to calculate and analyze storm runoff volume, peak rate of discharge, and storage volumes for storm water management structures. The purpose of the analysis is to determine the application capabilities and limitations in order to use them in the specific Romanian conditions, with minimum modifications and adaptations. Keywords: hydrology, water management, runoff, watershed comparative analysis INTRODUCTION In the frame of Severin Cazanescu s PhD thesis Studies and research regarding the use of information technology in the design process of the facilities for water excess control and prevention in rural area, guided by professor PhD Florin Maracineanu, the analysis of several models and software applications was had in view. These models and software applications could be used in the land reclamation projects (drainage, dewatering and irrigations) in Romania. The main goal of the analysis was to find complex and advanced software applications that can be used in specific environment in Romania, with minimal modification or adjustment. The paper presents three such software applications, developed and used, on a large scale, in United States and Canada aiming to highlight their scope, capabilities and limitations and comparative analysis of the functions offered by these applications. Many actual data from the project: Water excess mitigation in Ghelinta Brates area, Covasna County has been used during the testing phase, in order to obtain accurate results. MATERIALS AND METHODS A briefly presentation of the analyzed software application has been performed, in order to be able to determine their capabilities and limitations for use in the specific Romanian conditions. 396

American Technical Release TR- 20 and Win TR-20 software application. The first version of the Technical release TR-20 was developed by Soil Conservation Service (SCS) in 1965, based on its researches and on Agricultural Research Service (ARS) researches, using the unit hydrograph theory and Runoff Curve Number method of calculating direct runoff from the rainfall occurring over specified areas. The mentioned theory and method are presented in the National Engineering Handbook, Part 630, Hydrology, NEH- 630.10 and 630.16). The technical Release TR-20 was subsequently revised in 80, when the first computing application was developed in Fortran 77. Nowadays, starting from the TR-20 model, an updated software application, running on Windows operating environment, named Win TR-20 has been released. The last version has dated since 2004, being currently improved. Based on a continuous development for over 45 years, the Technical TR-20 led to the development of a modern software application Win TR-20, which allows the assessment and modeling of the rainfall-runoff and watershed routing calculations. WinTR20 represents the watershed as a system of sub-areas and reaches. The model assists in the hydrologic evaluation of flood events for use in the analysis of water resource projects. It can be used to analyze current watershed conditions as well as assess the impact of proposed changes (alternates) made within the watershed. The maximum size of the watershed is of 78000 hectares. Multiple storms (or rainfall frequencies) can be analyzed within one model run. The direct runoff is routed through channels and/or impoundments to the watershed outlet. Fig. 1. Win TR-20 rainfall-runoff model (McCuen, 1998) The unit hydrograph is the transfer function used by TR-20 to transform the rainfall excess into direct runoff. The rainfall hyetograph is convolved with the unit hydrograph to produce the direct runoff hydrograph. This process is explained in Figure 1. 397

In order to develop a simulated runoff hydrograph for each sub watershed, a minimum amount of information is required. The area, time of concentration, and curve number must be specified for each sub watershed. In order to route upstream hydrographs to downstream locations, a representative cross section is needed from which a stage-discharge-end area relationship can be produced. Win TR-20 software application consists of more specialized modules, included into a single interface, easy to use (Win TR-20 User Guide, 2004). The most important modules are: - Structures calculates outflow from water impounding structures; - Base flow allows to process the flow rates resulted from rainfall hydrographs and to add the base flow to the storm hydrographs; - Flow divert allows the division of a reach hydrograph into two separate outflow paths; - Runoff curve number (CN) - Calculates the CN for a designated sub-area based on detailed land use and hydrologic soil group (HSG) combination information which can be entered for the sub-area; - Time of concentration (Tc)- Computes the time of concentration for a specific subarea using the flow path information that have to be provided (flow lengths, slopes, Manning n, and cover type for sheet and shallow concentrated flow and flow length, slope, Manning n, flow end area and wetted perimeter or flow velocity for channel flow). Based on the watershed characteristics provided and on the rainfall data, the application outputs are: - Runoff amount; - Discharge peak flow; - Assessment of runoff hydrograph; Technical release TR-55 and WinTR-55 software application. Technical Release TR 55 is an American norm which includes simplified and fast computation procedures of the storm runoff volume, peak rate of discharge, hydrographs and storage volumes required for detention ponds. These procedures are applicable for small watersheds having maximum 6500 hectares. The first version of TR-55 was issued in 1975, by the Soil Conservation Service SCS in United States of America and has been permanently updated, based on the researches, tests and experience acquired in time. The first revision was made in 1986, by adding three new types of rainfall distribution (SCS Type I, IA and III), versus the original model (SCS Type II) and a new velocity method of computing time of concentration was set, by splitting the time of concentration flow path into three distinct flow segments for sheet flow, shallow concentrated flow and channel flow. WinTR-55 is the application version developed using a Windows interface and output post-processor. Data input philosophy was changed and the program was revised to use a hydrograph computational routine instead of generalized tables and graphs. As a result, the hydrograph generation capability of the software was greatly enhanced as the user can now flood route hydrographs through stream reaches and reservoirs. The application is based on a model, developed for a single-event rainfall-runoff in small watershed (Win TR-55 User Guide, 2009). The model generates hydrographs from both urban and agricultural areas and at selected points along the stream system. Hydrographs are routed downstream through channels and/or reservoirs. Multiple sub-areas can be modeled within the watershed. A watershed consists of sub-areas (land areas) and reaches (major flow 398

paths in the watershed). For each sub-area, a hydrograph is generated based on land and climate characteristics. The runoff modeling can be done in two ways: - as channel reaches model, through which hydrographs are routed based on physical stream characteristics, - as storage reaches, through which hydrographs are routed based on reservoir storage and outlet characteristics. The runoff hydrographs collected and discharged are combined as needed to represent the accumulation of flow and of water movement from the upland areas down through the watershed reach network to the watershed outlet. The generated model for a watershed can consists of maximum 10 sub-areas and 10 reaches. Fig. 2. Watershed computation scheme performed with Win TR 55 Win TR-55 application provides the following reports (Win TR-55 User Guide, 2009): - peak hydrograph presentation and a listing of peak discharge and time by sub-area or reach identifier, for each storm evaluated; - sub-area data table; - reach summary table; - sub-area time of concentration details - sub-area land use and Curve Number details - reach channel rating details - structure output table and structure rating details. Win TR 55 uses the Win TR 20 computational routine for generating, routing, and adding hydrographs. If the watershed exceeds 10 reaches or the channel or structural hydraulics require a complex rating relationship (for example, a principal spillway and an auxiliary spillway), another program should be used, such as Win TR 20 or HydroCAD. HydroCAD HydroCAD Storm Water Modeling System is a software application used to model the runoff generated by rainfalls. The first version was issued in 1986. The application combines Technical Release TR-20 and TR-55 and the generated model based on Santa Barbara hydrograph (SBUH), Soil Conservation Service (SCS) hydrograph and Natural Resources Conservation Service (NRCS) hydrograph, adding graphical functions and capabilities to use data basis and supplementary computational for hydraulic parameters (Fig. 3. and Fig. 4.). 399

Fig. 3. Drainage system diagram Fig. 4. Generated hydrograph by HydoCAD The program performs a large series of computations, usually used for drainage systems design, computations including the followings (Stormwater Modeling System, Version 9.1, Owner's Manual, 2010): - runoff hydrographs type SCS, NRCS and SBUH; - use of the rational method to calculate the maximum rainfall flow with IDF(intensity-duration-frequency) curves; - hydrograph routing through detention ponds/structures and pipes; - calculation of detention ponds, including embedded storage, coupled with variable tail water; - hydraulic computation of drainage pipes and channels; - advanced pond storage calculations, including embedded storage; - automated layout and modeling of underground storage chambers. - land use analysis and pollutant loading calculation - management and report of multiple rainfall types. The last version of HydroCAD (HydroCAD 9.1) can be used together with Carlson Hydrology 2010, allowing to map soil groups, ground covers and sub-catchment boundaries, giving automatically all the sub-catchment necessary information to the HydroCAD model. The data are extracted from AutoCAD drawing, including AutoCAD Map or Civil 3D. If a 400

terrain model (TIN) is available, the time-of-concentration values can be automatically calculated using the Curve Number method and seamlessly transmitted to the HydroCAD model. RESULTS AND DISCUSSION Summarized comparison of the three software applications results Tab. 1 Watershed minimum area Watershed maximum area Runoff methodology used Rainfall type Unit hydrograph Curve number entry Curve number limitations Time of concentration calculation HydroCAD Win-TR-20 Win-TR-55 No restrictions 1 acre No absolute minimum is included in the software. The user should carefully examine the results from sub-areas less than 1 acre. No restrictions 78000 hectares 6500 hectares SCS unit hydrograph procedure (unlimited points), Santa Barbara Urban Hydrograph, Rational Method Extensive rainfall library plus user-defined storms SCS or Delmarva U.H., plus user defined curves Automatic curve number lookup and weighting, with adjustment for unconnected impervious areas Unit hydrograph method NRCS Type I, Type I(48), Type IA, Type II, Type II(48), Type III, and Type NM (60-75) or user defined SCS hydrograph is automated uploaded by the application, for other unit hydrographs, data need to be manually inserted Automatic search or direct entry of curve number No restrictions 30-100 30-100 All TR-55 methods plus common channel shapes, upland method, and CN method 2 calculation methods: NRCS method based on delay equation and NRCS velocity method SCS unit hydrograph method based on Curve Number -CN NRCS Type I, IA, II, III, NM60, NM65, NM70, NM75, or user defined Dimensionless unit hydrograph Velocity factor/ peak grade 484, or user defined having maximum 50 points Automatic curve number lookup and weighting, with adjustment for unconnected impervious areas. Calculates Tc for sheet, shallow concentrated and channel flow Tc limitation No restrictions Tc > 0 0.1 hours < Tc < 10 hours Tc precision 1/10 minutes or 1/600 hours 1/100 hours Rounded to the nearest step Subarea limitations Runoff accuracy None None 1-10 Standard Standard Within +25% of TR-20 Reach routing Muskingum-Cunge or Storageindication method with optional routing delay (translation) Muskingum-Cunge Method Muskingum-Cunge Method 401

Reach hydraulics Detention pond routing Detention pond hydraulics Detention pond sizing estimation Detention time Pond storage calculations Underground storage Flow diversions (split flows) Pollutant loading Routing diagram Calculation procedure Unit system Graphics capabilities Reports Automatic calculation for common shapes or custom cross-sections Storage-indication method, dynamic storage-indication method, or simultaneous routing Automatic calculations for orifice, weir, culvert, etc, used alone or combined for outlet structures Using actual inflow hydrograph By plug-flow and center-ofmass methods Automatic calculation from pond dimensions or surface areas, plus direct entry Automatic chamber layout and modeling, including embedded storage calculations Automatic diversion of outflow from specified pond outlet(s) Automatic land-use reporting and pollutant loading Interactive, on-screen, with labels and background image Automatically calculated as required English, Metric, or custom, plus split input/output units Full graphics to screen, printer, or file Automatic reports with headings, graphics, etc. None. Requires entry of routing coefficients. Storage-indication Must be entered directly, no calculations provided Doesn t include this function Not calculated Direct entry only Requires external calculations Allows the diversion of the runoff hydrograph in two different reaches None None Batch mode calculation of entire watershed Metric and English Schematic watershed runoff view Hydrograph edit and printing Reports with information regarding: peak discharge flow, drainage area; runoff amount; peak runoff occurrence time for each subarea. If the system has more than 10 reaches, channels or structures, needs a complex of estimation relations Storage-indication Detention pond defined by area, height, outlet structure dimensions and type and structure estimation formulas. Assumes to define a pipe or to configure a weir. If none of the variants is accepted, another dimensioning method will be used, but not with the software application Not calculated There are 3 variants depending on pond input data for pond and outlet type Requires external calculations Not available None None Manual initiation of each calculation Metric and English Hydrograph edit and printing Reports with input data; rainfall data; peak hydrograph and occurrence time, outlet structure data; drainage data; RNC time of concentration; tables with land use and soil curve number. Storage data Automatic by job name Manual insert Manual insert 402

An analyze of the technical similarities and differences between HydroCAD, Win TR- 20 and Win TR-55 software applications have been performed and the obtained results are presented in Table 1. HydroCAD combines the most used functions of TR-20 and TR-55, having many other built-in hydraulics, graphics and automatic database and on-screen routing diagram. CONCLUSIONS Typical calculation and modeling existent in the three software applications can be used in Romania too, adapting the input data to the area specific features. Design activities which can be achieved with these computer programs include: design and sizing of drainage system components in order to control water excess; develop control strategies for minimizing the effects of water excess. REFERENCES 1. ***United States Department of Agriculture, Natural Resources Conservation Service, Win TR-20 User Guide, Issued July 2004. 2. ***United States Department of Agriculture, Natural Resources Conservation Service, Small Watershed Hydrology, Win TR-55 User Guide, Issued January 2009. 3. ***HydroCAD Software Solutions LLC, HydroCAD Stormwater Modeling System, Version 9.1, Owner's Manual, 2010. 403