Building Construction Identification Placard. Huber Heights Codified Ordinance Enacted 2011

Similar documents
THE PEOPLE OF THE CITY OF LOS ANGELES DO ORDAIN AS FOLLOWS:

Introduction. This Part One will address; Type 1 Fire Resistive and Type 2 Noncombustible buildings.

Knowledge Objectives (3 of 3)

Title: Building Construction for the Fire Service. Time: 3 hours. Teaching Materials: White board Building Construction for the Fire Service (PDF)

Hardware Store Basement Fire: Queens, NY Fire Behavior Case Study

twenty eight construction inspection & review APPLIED ACHITECTURAL STRUCTURES: DR. ANNE NICHOLS SPRING 2018 lecture STRUCTURAL ANALYSIS AND SYSTEMS

Fire Inspection and Code Enforcement, 7 th Edition. Chapter 6 Building Construction: Components Inspector II

twenty eight construction inspection & review Supervision Practices - IBC Supervision Practices - IBC Office Hours

Technical Topics. Wood I-Joist Floors, Firefighters and Fire

ESCONDIDO FIRE DEPT TRAINING MANUAL Section Truck Module Page 1 of 7 High Rise Anatomy Revised

Construction Concerns: Trusses Revisited Article and photos by Gregory Havel. January 22, 2018

First Revision No NFPA [ Section No ]

IRC Fire Protection of Floors Code Language 2012 IRC R IRC R302.13

City of Covington BUILDING PERMIT APPLICATION. Project Address: Tax ID: Parcel Size (Acres): Zoning District: Project Name: Description of Project:

Solar Photovoltaic System Submittal Requirements

Module 8: Ontario Building Code Fire and Spatial Separations

Fire Ground Survival Program Grant Guidance

2018 IBC Chapter 6 Types of Construction

Land Use and Development Regulations

Chapter 4-16 SPECIAL DESIGN STANDARDS FOR TYPE V CONSTRUCTION

Structural Design Issues for Housing and Small Buildings in British Columbia: Information for Local Authorities, Homeowners and Developers

A field perspective-what the inspector looks for during a Racking inspection.

Residential Building Inspector Curriculum and Recommended Publications

Part 9 deals with all single family dwellings as well as multi family up to 600 m2.

BUILDING CODE COMMISSION

PRIVATE DWELLINGS CHAPTER 1 December 7, 2013 INTRODUCTION / DESCRIPTION

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

Pg. xiv, xv Definitions. Pg. 2 A brief history pg. 12 Codes definition. Pg. 13 The principal purpose of code. Pg. 16 IBC. PG. 27 PG.

CODE 101 How To Read The California Building Code

2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES)

The Structural Redesign of Boyds Bear Country and its Related Systems. Boyds Bear Country, Pigeon Forge, Tennessee

Ad Hoc Committee Tall Wood Buildings IDENTIFICATION OF ISSUES (Updated June 22, 2016)

Common Firestop Issues in Wood Framed Commercial Construction

FAUQUIER COUNTY SINGLE FAMILY DWELLINGS FIRE OPERATIONS MANUAL. Presented by the Fauquier County Fire Operations Group SFM 08/17/08

assembly an open space between the roof and ceiling of a building attic balloon frame a joist constructed of steel with bars in the verticle web space

ICC AD HOC COMMITTEE ON TALL WOOD BUILDINGS RESPONDS TO CONCERNS RAISED DURING THE PUBLIC COMMENT PERIOD

ORDINANCE NO BE IT ORDAINED BY THE GOVERNING BODY OF THE CITY OF MANHATTAN, KANSAS: Section Adoption of the International Building Code.

Chapter 4 Test. Directions: Write the correct letter on the blank before each question.

Fire Performance Concerns of Lightweight Engineered Lumber (LEL) Systems

Santa Monica Fire Department SOLAR PHOTOVOLTAIC INSTALLATION GUIDELINE 2008 TABLE OF CONTENTS

RYAN BIGGS CLARK DAVIS

Beverly Hills Fire Department SOLAR PHOTOVOLTAIC INSTALLATION GUIDELINE 2008 TABLE OF CONTENTS

Fire Retardants and Truss Design. Overview

2009 IBC Section 1024 Approved Luminous Egress Path Markings

2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES)

PENNSAFE BUILDING INSPECTION SERVICES LLC Deck and Roof Cross Section Submittal

Tohono O odham Nation. Adoption of Building Codes

4. Number of drawings required: ( ) Locations of nearest streets

The Building Codes A.R.E. Building Design and Construction Exam Prep

Residential fall protection. Presented by Minnesota OSHA

PENNSAFE BUILDING INSPECTION SERVICES LLC PERMIT APPLICATION

Wood Frame. from the Pacific Northwest. British Columbia Building Enclosure Council

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

Structural Assessment Live Fire Training Building. FSCJ South Campus Jacksonville, Florida. Florida State College at Jacksonville

BUILDING CODE COMMISSION

ICC AD HOC COMMITTEE ON TALL WOOD BUILDINGS RESPONDS TO CONCERNS RAISED ON CODE PROPOSALS ADDRSSING TALL WOOD BUILDINGS (AUGUST 1, 2018)

CHAPTER 7 STRUCTURAL SYSTEMS

Introduction to Construction, June 2013, page 1 of 6

Wood I-Joists and Firefighter Safety American Wood Council Engineered and Traditional Wood Products

Essentials of Fire Fighting

Safe Practices for Traffic Incident Responders

BUILDING CODES & DESIGN CRITERIA

Administrative Changes

Bayou Hotel Property Update. December 6, 2016 Board of Commissioners

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

LEAD DESIGN PROFESSIONAL:

6-Storey Residential Buildings Combustible Construction. A Regulator s Perspective City of Richmond, BC Canada

HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW

*FOR RESIDENTIAL PROJECTS, CALL JACK CARNS AT *FOR COMMERCIAL PROJECTS, CALL BRIAN WRUBLE AT

PITT MEADOWS FIRE & RESCUE SERVICE. Shipping Containers. Minimum Standards for the use of shipping containers as storage buildings

How to Prepare Your LSE Report

A minimum of 25% of any money spent upgrading areas of primary function shall be devoted to ADA upgrades. Existing non-compliant areas include:

UNIFORM CONSTRUCTION CODE (UCC) BUILDING PERMIT APPLICATION RESIDENTIAL NEW CONSTRUCTION AND/OR IMPROVEMENTS

FIRE RATING AND FIRE PERFORMANCE

PRIVATE DWELLINGS CHAPTER 6 April 9, 2013 LIGHTWEIGHT CONSTRUCTION

SPEED FRAMING: FRAMER AND COMPONENT MANUFACTURER TEAM UP WITH TECHNOLOGY. A case study by MiTek

Floor-Mark How Smart are your floors?

ENTRY FORM. DVASE 2017 Excellence in Structural Engineering Awards Program

WOOD I-JOIST AWARENESS GUIDE

Lot#_ Subdivision/Land Development: Phase: Section:_. NON-RESIDENTIAL (Commercial)

2016 Safety Stand Down: Getting Started

Facts on the Fire Performance of Wood Trusses

City of Walnut Creek Development Review Services 1666 N. Main Street, Walnut Creek, CA (925) phone (925) fax

Plains Township Building Permit Application

City of Roanoke. Commercial Permit Submittal Guidelines

Engineering Design & Testing Corp. Post Office Box 8027 Columbia, South Carolina Telephone: (803)

BUILDING CODE VARIANCE

STATEMENT OF DESIGN (for Part 3 Buildings) Ont. Reg. 332/12

Minnesota Healthcare Engineers Association, Fall Conference. Bob Dehler, P.E. Engineering Program Manager September 14, 2017

PRESCRIPTIVE COMPLIANCE METHOD

PART I - DUNN CHAP. #13 & 14:

BUILDING/FIRE/ZONING PERMIT GUIDE

UNIFORM CONSTRUCTION CODE (UCC) BUILDING PERMIT APPLICATION RESIDENTIAL NEW CONSTRUCTION AND/OR IMPROVEMENTS

Name of Project: Address: Zip Code Owner/Authorized Agent: Phone # ( ) - Owned By: Select one Code Enforcement Jurisdiction: Select one

Name of Project: Address: Zip Code Owner/Authorized Agent: Phone # ( ) - Owned By: Select one Code Enforcement Jurisdiction: Select one

Why is a Hazardous Materials Spill/Industrial Accident a Threat to the City of Nacogdoches?...8-2

UCC Permit Application Procedures

CONTACT INFORMATION. PV System will require a separate Electrical Permit.

Safeguarding Vacant Buildings and Structures. Application to Vacate a Facility

International Building Code Essentials for Wood Construction

Transcription:

Building Construction Identification Placard Huber Heights Codified Ordinance 1523.01 Enacted 2011

City of Huber Heights Placard

What is there to discuss? History and Purpose (why did we do this?) The Sign Explained (At 3 AM, what in the world does this thing mean?) Future Growth and Development (What can we do to improve upon this?)

History and Purpose Where it Began Design and Challenges What drove the requirements How was it developed and why did Huber Heights get involved

Where it Began The actual first Building Placard appears to have been in Wheeling, Illinois on April 18, 1994 after a near miss fire. Article In the past 10 years, over 9 cities and states have independently passed their own legislation. Trussid.com Florida appears to be diligent in education and enforcement. Facebook, Law Most of the legislation arose from near miss or fatal fire incidents. Firefighternation.com

Design and Challenges Proposed in Huber Heights in 2004 by Lt. Mike Muhl after a near miss involving our own personnel Revised and put before Ordinance Review Commission and City Council by Fire Prevention Bureau in 2011 Multiple Years pass between code cycles reducing the opportunities to present new legislation Articulation to law makers and Economic Development Staff for non aesthetically pleasing signage Administrative Staff turnover with loss of institutional knowledge Reductions in staffing, limiting special project development over day to day priorities

What Drove the Requirements Significant Changes in Construction and Building Design Firefighter Fatalities and Injuries Quick Look information for ICs that was weather resistant, durable, permanent and reliable Changes in International Fire Codes within the last decade with increased focus on firstresponder safety (Signage, Egress, Communication, Etc.)

Education, Studies and Development Study and Surveys Bangor, Maine 1999 EFO Project Results of Study 1,500 Surveys Distributed at various National professional conferences with 1,333 returned Of the 1,333 responses, 16 departments use Truss Identification Signage Of the 16, only 4 departments differentiate between Floor and Roof as well as wood and steel trusses Of the original 1,333, there were 348 that identified incidents involving structural failure and truss construction in their community

NIOSH Reports 2003 NIOSH Tennessee Father s Day June 15, 2003 Family Dollar in Memphis, Tennessee Municipalities should consider requiring specific building construction information on an exterior placard. Discussion: Information regarding building construction is invaluable to fire fighters if a fire should occur. The information could provide fire fighters with details about roof type (lightweight truss, bowstring, etc.), roof materials (metal, wood, etc.), roof loads (HVAC units, displays, etc.), sprinkler system(s), standpipe location, utilities (gas or electric), occupancy, occupancy hours, chemicals on site, pressurized cylinders, contact numbers, and the interior floor layout. This information could save the IC time when planning the fire attack. Additionally, the information would provide fire fighters with important information that they might not otherwise have. However, the presence of building construction placards should not preclude doing pre incident planning and inspections. At a minimum, buildings could be marked with a triangle or the letter T on the outside of the building to warn fire fighters of the presence of truss construction. To ensure that fire fighters are aware of structures that might have a truss roof, the State of New Jersey has passed a law requiring all building owners to place an exterior placard on structures which incorporate a truss roof. Figure1 shows the signage used in New Jersey.

More NIOSH Reports Related to Truss and Building Markings Illinois December 22, 2010 Report Texas February 14, 2000 Report 45 NIOSH Investigations involving structural collapse and firefighter fatalities/injuries between 1996 and 2011. Reports Preventing Injuries and Deaths of Fire Fighters Due to Truss System Failures (May 2005)

How ours was developed 2004 Proposal from Huber Heights Lt. Mike Muhl Revisited in 2009 by new Huber Heights Fire Marshal with strong interest in Pre Incident Planning Influence from NFPA 1620 as well as NIOSH recommendations and LODD and near miss reports Community experiencing large volume of newer lightweight construction with heavy fire and occupant loads (mercantile districts) Participation in local and national trainings, firefighter development and code committees

The Sign Explained In a sentence, the sign is; Durable, weatherproof, readily identifiable but not distracting, reliable, descriptive, code compliant, user friendly, flexible and intended as a guideline, not to be replaced by experience, training and education. You must accept this sign is NOT a pre plan You must accept this sign cannot work alone You must accept this sign will not be accepted by everyone and is only a tool in the tool box

The Sign Explained, more Basically, take most of the major building components you would like to know about the building you are about to enter and squeeze them into series of color coded Fire Service letters and symbols on a 10 by 10 placard. Whenever you have a new building go up or renovate an existing structure, place a sign on structure in the same location as the last one and move on. (hopefully never needing it)

The Sign Explained Meat and Potatoes Take Five Major Building Components (One for each section of the Maltese Cross) First Identify Roof, Floor or Both (Letters in Center) Roof Construction Material (and design) Top Floor Construction Material (and design) Bottom Building Construction Classification (With Assistance) Special Hazards (Roof HVAC, HAZMAT, High Storage) Finally the outline color indicates presence of Sprinklers (Green for Protected and Red for Unprotected)

First Identify Roof, Floor or Both (Letters in Center) The center of the Maltese cross should allow you to appropriately identify where the presence of Lightweight Construction exists within the placarded structure. (Roof, Floor or Both) For structures more than one (1) story in height, the presence of the letter F (indicating Floor) may suggest a basement, crawlspace or just simply the floor joist supporting the second (2 nd ) story.

Roof Construction Material (and design) Top The Top of the Maltese cross was utilized to indicate the construction design of the Lightweight Truss in the Roof Construction, whether it was constructed of metal or wood and if wood, was it laminate or legacy construction. You should expect to see a small image of the construction type as well as a few words below the image indicating the materials used in its creation.

Floor Construction Material (and design) Bottom The Bottom of the Maltese cross is very similar in it s intent as the Top. The Bottom of the cross was utilized to indicate the construction design of the Lightweight Truss in the Floor Construction, whether it was constructed of metal or wood and if wood, was is laminate or legacy construction. You should expect to see a small image of the construction type as well as a few words below the image indicating the materials used in its creation.

Building Construction Classification (With Assistance) The Left side of the cross indicates the building construction classification. As we have all undoubtably learned the five (5) categories somewhere during our career, the challenge is to remember when it counts most. With all of the acronyms and abbreviations in the Fire Service these days, that can be taxing. Not to mention there are actually ten (10) categories, sub letters A and B for each roman numeral. Basically Type I to III is non or limited combustible, IV is Heavy Timber or combustible and V is wood frame or combustible. Upon request, we did decide to add the words non combustible, limited combustible and combustible to assist.

Special Hazards (Roof HVAC, HAZMAT, High Storage) The Right side of the cross indicates the presence of a special hazard. This is something that may not be present at your typical commercial occupancy/structure. In the case of many of our fast food establishments, there may be multiple HVAC, Mechanical and Electrical units on the roof weighing in tons. There are other occupancies that may contain High Rack or Palletized Storage that would require additional water supply and resources. Hazardous Materials tends to be its own animal requiring a special skill set and lack of fear to glow in the dark!

The outlining color indicates presence of Sprinklers (Green for Protected and Red for Unprotected) If the structure is equipped with an approved Fire Sprinkler System, the outline of the entire cross will be Green in color. If the structure is NOT equipped with an approved Fire Sprinkler System, the outline of the entire cross will be Red in color. The general concept was green for go and red for stop!

Future Growth and Development Pre Incident Plans Larger Knox Boxes In Depth Building Final Inspections (Maps, Instructions, Signage, Radio Repeaters, Etc. ) CAD (Data Entry from First Responders) Company Walkthrough (District Orientation) Annual Inspections (All Buildings)

Never Forgotten There are many others, not on this page, also in our thoughts and prayers

Thank you and be safe! Presented by: Jason Eckert, FPI, CFEI, EMT P Fire Marshal Huber Heights Fire Division 7008 Brandt Pike Huber Heights, OH 45424 jeckert@hhoh.org (937) 233 1564 (937) 237 4520